Document 2jppM9JReyeB2yRXe3716Jx6a

Region 6 Compliance Assurance and Enforcement Division INSPECTION REPORT Inspection Date(s): Media: Regulatory Program(s) 02/14/2019 Water Brine - SDWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Contact: Perdure Petroleum, LLC NBU 51 36.793938, -96.737802 Shidler, Oklahoma 74652 12012 Wickchester Lane Houston, Texas 77079 Osage County Ben Becker 918-793-2881 FRS Number: Identification/Permit Number: Media Number: NAICS: SIC: N/A OKU000874 N/A 21111 1311 Personnel participating in inspection: Kent W. Sanborn 6EN-WR Environmental Engineer (918) 557 - 1615 EPA Lead Inspector Signature/Date Supervisor Signature/Date Kent W. Sanborn Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2019.03.20 11:32:06 -05'00' Kent W. Sanborn GUY TIDMORE Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=USEPA, ou=Staff, cn=GUY TIDMORE, dnQualifier=0000012807 Date: 2019.03.20 13:03:07 -05'00' Guy Tidmore Date 20 MAR 2019 Date 6ENFORM-019-R7 (2/15/2017) 1 Section I - INTRODUCTION Perdure Petroleum, LLC / NBU 51 Inspection Date: 02/14/2019 PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Perdure Petroleum, LLC oil and gas facility located at latitude 36.793938 and longitude -96.737802 near Shidler, Oklahoma on 02/14/2019 for an unannounced inspection. No representative of Perdure Petroleum, LLC was present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION The inspection consisted of a facility in the North Burbank Unit (NBU), NBU 51 site, where previous discharges of produced water had occurred. Section II - OBSERVATIONS I observed runoff from the previous spill site seeping to the nearby creek and a temporary dirt dam had been built next to creek as well. I observed that the treated soil was in place. With a calibrated YSI Pro 30 Conductivity Meter, I took a Total Dissolved Solids (TDS) reading of the fluids on the Hill side and observed a range between 12,000 mg/L to 23,000 mg/L TDS readings along the runoff flow towards the creek. The nearby creek reading was 1,050 mg/L TDS. Section III - AREAS OF CONCERN There are still concerns of elevated TDS levels during rainfall events from runoff from the previous spill site, as observed during this inspection. Section IV - FOLLOW UP Conduct a follow up inspection in approximately one month. Section V - LIST OF APPENDICES N/A 2