ASBESTOS CONFERENCE TEXTILE FIBERS DEPARTMENT
NOVEMBER 17-18, 1983 RICHMOND, VIRGINIA
OUTSIDE CONTRACTORS
DU 053023
DUP 1010981
OUTSIDE CONTRACTORS stion 1. Has your site dealt witn an outside contractor m ar_.
aspect of asbestos handling (installation, removal, waste disposal, etc.)? Caoe Fear - Yes Waynesboro - Yes Cooper River - Yes
Chattancooa - ves Richmond - ves Seaford - Yes Martinsville - Yes Kmstor - Yes Did i-ickory - Yes -Camden'- Y-es
DU 053024
DUP 1010982
question 2. Describe briefly the job(s) handled by the contractor.
Cape Fear
Most asbestos related jobs are performed by Daniels Construction.
Removal of 4 _joi 1 - f i red boilers (involved gross asbestos removal) was performed by Central Salvage, Inc. Bala Cynwyd, Pa.
Wavnesboro Demolition of acetate facilities.
Insulation removal and repair - Brown and Root.
Removal of insulation from salvage pipe.
Coooer River
Renovation ofLa polyester exchanger and upflow prepolvmerizer.
C.hattanooaa Waste disposal.
R i c hmon d
Large scale jobs - boiler .reinsulation, exhaust flue duct,
etc.
--
--
Seaford
Many jobs over the last several years.
Martinsville
General insulation work. Insulation installation, fabricatin' ""and modification of piping, valves, ducts, and equipment.
Kinston
Waste disposal. Transoonts dumpster to plant landfill and empties.
Old Hickory Removal and waste disposal.
DUP 1010983
DU 053025
Question 2. (Continued) Camden Demolition of auxiliary power house. Spinning machine overhaul. Boiler overhaul. Stripping inTulation from dismantled process piping.
DU 053026
DUP 1010984
Question 3. List the contractors and indicate your assessment of the contractor's oerformance.
Gate Fear
:-
Daniels Construction - Good
Central Salvage - Borderline, required excessive follower.
Waynesboro Manchester - Poor
Brown and Root -Good now
WNI Industrial Service - Borderline
Coster River
__
Daniels Construction - Good
Chattanooga
-=
BFI
Waste DisposalIncorporated,
Richmond Ford Brothers Insulation Company - Satisfactory
Seaford County Insulation - Very good Tri State - Good Major Construction - Fair
Martinsville BWB - Satisfactory Star-Davis -'Good Metro - Satisfactory
Kinston Carter-Hill Sanitation - Good
DUP 1010985
DU 053027
aggaark iam &-, MHt? ii
-i ;;-rf"--'tm'-;Tf-jjg-I
Question 3. (Continued!
Old Hickory Levy, Nashville, Tn. - Good
C 2 T'.'l 6 n Daniels Construction - Very good 5oiler Tube Company of America - Good Camden Steel Meta1 Company - Satisfactory, required close followup.
DUP 1010986
DU 053028
maiiii mm
I;
; >: ilics .1 iaapiiK
stion 4. Hew is liaison handled between the site anc the contractor?
Cape Fear
Contractor coordinates from the area with contractor management.
wavnesbero
Engineering contract coordinator.
Cooper River
Engineering and/Environmental Control Groups
Chattanooga
__
Contract coordinator
Richmond 'rh. rough Construction
ce2ford
Contract administrator
Marti r.sv*11 e
_
Du ?ont has liaison assigned to coordinate contractor work or site.
Kins ton
Site contacts contractor via phone when needed.
Old Hickory Contract coordinator (Du Pont Area Contract Administrator).
Camden
WUfrrart TooVdinator nandles all communications with supervisor of contractor personnel.
DUP 1010987
DU 053029
Question 5. What role did the site play in dealings between the contractor and governmental agencies?
Cape Fear
Prepared notification correspondence and coordinated site visits by government as required.
^avnesboro
None.
Coooer River
Notification and disposal.
Chattanooga
v_
None. Richmond
None.
Seaford
Contact between Delaware'-Val ley Purchasing, Contract Administrator, and contractor relative to OSHA requirements.
Martinsv111e . CT
None. Plant insists that contractor meets all Federal arc State requirements.
Kinston
Site handled all contacts. Cld Hickory
-Followup on necessary contacts.
Camden
Handled correspondence relative to demolition, removal, renovation.
Arranged visits to site upon request of government represer.tar .es.
DUP 1010988
DU 053030
Question 6.
What information did the site give the contractor with respect to the health hazards of asbestos, governmental requirements for personnel protection, monitoring, waste disposal, etc.?
Dace Fear
Regulations, Du Pont Engineering Standard S47, had contractor sign document that asbestos handlers were in medical surveillance program.
wavnesboro
OSHA and EPA standards.
Cooper River
Following notification. Complete packet. Trained their suoervision on barricades, ventilation, disposal, labels, wetting, and respirators? Performed monitoring.
Cnattancoaa
Documented discussion with contractor and his responsibility to comply with Reg. 40 CFR 61.
"ichmond
~old about the asbestos standard and that's about it.
Sea^ord
Complete review of Seaford Administrative Work Procedure.
Martinsvi11e
Insists that cantractor follow all plant procedures and GSHA guidelines.
Kinston
Site covered contractor. Regional Purchasing covers the requirements.
Old Hickorv
Includes a statement in the scope of work, wnat the material it and that he must foliow-tne law.
Camden
Provided contractor with copy of OSHA and EPA standards for asbestos; contract coordinator reviewed requirements.
DUP 1010989
DU 053031
Question 7.
Did the site furnisn the contractor with any equipment, either loaned or permanently, to use with the astescos job? If so, list the equipment.
Cape Fear
Nothing furnished.
Waynesboro
Nothing furnished.
Cooper River
Half-mask respirators.
Cnattanooqa
__
Nothing furnished.
Richmond
__
Nothing furnished.
Seaford
Nothing furnished.
Martinsville
Nothing furnished.
K-i ns ton
Nothing furnished.
lid Hickory
Norma 11 y4((pBh furnished. On one job, we supplied bacs and tags for the asbestos waste.
Camden
Gave Camden Steel and Metal enough disposable respirators fen his employees involved with the job. Nothing furnished otrer contractors.
DUP 1010990
DU 053032
Question 8. tew was comanaganerrt rroidctf?
Cape Fear
With understanding between Plant, Construction, and CcC'-actor management prior to starting the jod; interface with contracto'management was through specific individuals.
Wavnesboro Contacts with contractor supervision only.
Cooper River
__
Plant support requested by Daniels. Worked with their suce-v s:n,
Chattanooga
Richmond
_
All dealings, comments, audit results were given to the ccrtrsctcrliaison.
Sea ford
Has not been a problem,. ......... .,
Martinsville Plant provides guidelines, but contractor manages his peocie.
Kins ton
Contractor was made aware of the hazards. Management left contractor.
*.
Cld Hickory Told them what to do, not how to do it.
Camdtfrr
Told contractor, or gave it in writing if contractor requestec. that if we were doing this job this is how we would do it. Emphasized, however, and made sure contractor understooa t*at how he did the job was his decision. All contacts handled between site contract coordinator and contractor supervst'-.
DUP 1010991
DU 053033
naWlMMi
Ouestion 9.
If the site audited the job while the contractor was performing it, list the"segments of tne job audited, how the auditing was done, and the frequency of auditing.
Caoe Fear
Work practices were audited 2-3X per day by Environmental Group, continuously by Plant and Construction management. Air samples were taken randomly outside, contractor barricade to insure Du Pont employees' safety.
Wavnesboro
Air monitored outside barricaded areas.
Cooper River
On Day Shift by Environmental Control and Process Control (they did monitoring).
Chattanooaa
Annual audit of pickuo, transportation, and disposal..
Richmond
Not formally.
Sea ford
Barricades, signs, removal methods, dust contamination, samel v:. bagging, disposal, etc. Frequency of audits was daily.
Martinsville
--
Barricades Wetting down Protection to operating personnel Waste disposal Personal protective equipment
Audits done daily.
Kinston
Audited dumping of insulation in a hole. Annually.
Old Hickory
~
Daily on all phases.
U P 1010992
DU 053034
mMIBB ife xifeatsfek^
. a: ii kitlial Sl ,i: t fitfa^MaiaiiftBataKMaaiaMIMiiliiiiiaiMiKB;!j&ii
Question 9. (Continued)
Camden
Work practices audited almost continuously by contract coordinator; several times/day by SHEA, Engineering and Manufacturing (if worK done in operating area). Auditing done by visual inspection. All aspects of the government requirements for handling asbestos were audited" Air samples for asbestos concentration taken outside barricade by Engineering.
DUP 1010993
DU 053035
I,--SifttriflFr---ifeHjiir
Question 10. List and explain briefly other items pertinent to outside contractor involvement witn asbestos.
Caoe Fear Hopefully from this survey, we can develop a list of the "best" asbestos handling contractors.
Waynesboro Biggest problem is cleanup of an area after contractor is dene.
Coooer River
Chattanooga
Richmond
Seaford 6 mil plastic bags are'Turn i'shed 'by Du Pont. Disposal (off-site) by "Eastern Disposal". Arrangements through SHEA. Dw.t'HtSkS are being worn by contractors for removal o* stwdfcmk.
Martinsvi11e Generally, Contractors have been used at Martinsville to do non-asbestos work. There have been no contractors used to do strictly demolition type work. Plant forces have generally stripped asbestos insulation outside on pipes, valves, ducts aad_equipment that contractors have removed or modified prior to disposal.
Kinston Contractors used to remove insulation should take adequate safe guards to prevent exposure of Dlant personnel.
DU 053036
DUP 1010994
Question 10. (Continued) Old Hickory You have covered the waterfront. Camden Cheapest isn't always least expensive. A contractor we hac for one job was totally unfamiliar with the hazards of asbestos and the myriad of government regulations and rec taoe involved with handling asbestos. His idea was to krocf. it down and haul it away. Plant personnel spent a great deal of time "Holding his hand" so that in the end, although he was low bidder, the job cost more than it would have if we hac gotten a qualified contractor originally. A contract shoulc not be approved unless all areas involved are sure tne contract: can do the work on his own.
DU 053037
DUP 1010995
SUMMARY
All sites have used outside contractors in asbestos work.
t Extent of contractor involvement ranges from transporting waste asbestos to landfill to demolition of a major facility.
Assessment of contractor performance from poor to very good.
Liaison with contractor varies widely.
Call on shone when needed.
Contract coordinator responsible for all dealings with contractor.
Six '6' sites handled reauired notification of governmental
agencies.
t
Information imparted by site to contractor re hazards of asbestos and regulations ranges from simply telling contractor to comply with regulations to m-deoth review of regulations and hazards.
Two (2) sites have furnished respirators for contractor personne';' one other has supplied bags and tags for waste.
A1! sites avoid comanagement by letting contractor do the jcs without specifying how ne does it; communications with contractor supervisor only.
Auditing ranges from practically none to continuous.
Need to develop a list of best qualified contractors.