Subject: Monthly Report of Tests - Hay 1341.
Inclosure:
(a) Suninary of Reports Submitted. (B) List of Tests Incomplete. (C) Addenda to Alphabetical Index of
Tests Dated October 31, 1934. (D) List of Tests Reported During
Month Ending May 31, 1941.
1. Inelosures shoving status of experi mental and test work arc submitted.
A- T. Church
-
-I 4
i 1
A
1
i !
SUT0001
CRMC-M&S-003666
1^. NATAL ENGINEERING EXPERBXKT >^TIOW Annapolis, Maryland
SUMMARY OF REPORTS ASSIGNED AND SUBiaTTED THIS MONTH
Inspection Tests
Tests brought forward from April 1941 ............................ ................................... Tests assigned........................................... ..................................................................... .. Tosts reopened.............................. ...................................................................................... Tests cancelled ....................... ........................................................ ........................ .. Tests closed out .......................................... Tests remaining open .............................................................................
324 171
1 0 132 364
Reports submitted ........................................ Supplementary reports submitted ....................... ........................................................ Total reports submitted ....................................................................................
642 6
648
Other Tests
Tests brought forward from April 1941 Tests assigned ....................................... Tests reopened............ Tests cancelled .............................................. Tests cosqileted............ ..................................
508
61 2 2
37 532
Tests incomplete (listed in inclosuro 3) ........................................................... Tests complete but held open awaiting financial adjustment
(listed in inclosure B)................... ................................................................. .. Tosts assigned and completed during month and listed in
inclosure B for record purposes ............................................................................
495 24 13 632
vjteports submitted............ ..................................................................................... ............. Reports submitted on tests completed but held open awaiting
financial adjustment ............................................................ ................................. .. Reports suhnittod on tests assigned and completed during month .......... Supplementary reports submitted.............................................. ................. Total reports submitted ................................................... ................................. ..
52
11 11 45 119
Sugaary of Reports
Inspection reports submitted this month .................................................... ..
Other
"
" " " ..............................................................
Total
"
" " " ..............................................................
Total
"
" fiscal year prior to this month ..
Total
"
" fiscal year ......................
648 119 767 4451 5213
Requests for copies of reports of tests should be submitted to the Bureau of Ships prior to the completion of the tost.
i
j ; i i J ! i
i i
I i {
>
\
SUT0001
CRMC-M&S-003667
JJi fi
HAVAL ERGIHEERIHG EXPERIMENT ^VTION Annapolis, Maryland
Report of tests for nonth ending May SI, 1941
Serial number and prior ity.
Amount of Date A So.
deposit of letter
by ex-
authorii-
hibitor, ing test,
if any.
Same of article or material tested. Haas of firm sub mitting same.
Remarks' on -Status Initial
and per cent of of
completion.
Test
Probable date of Officer
report of test.
B-4860 B
5-22-41 JJ52 (16) (356)
Coapd.,rust prey.,Rust Bon Arrangements 324- Spec.l4C4a- sub.by underway. Standard Oil Co.of H.J.
JGO
B-4864 A
Engine,subm.2000-hpFairbanks,Morse A Co.Cont.HOd-1369- Changing blower gears and two cxh. manifolds.
20# oompl.
WJ
B-4869 B
-- Bo date JJ33(1) (356)
Packing,rod.asbes.braiddd Arrangements Sym.1103- Various rnfrs. underway.
JGO
B-4873
5-27-41
B QP/W:C(4)(1) (354)
Meld.hard-surfacing alectr.Awn.it ing for purpose of obtaining matl. info on which to base
spec.-Bergstrom Alloys Corp.
BR
B-4874 B
--
5-24-41 Feedwater- Boiler water NA23/B23-7 treat.- KAS,Uiani,Fla
Underway.
JGO
TESTS COMPUTED AND REPORTS SUBMITTED
4782 9S86 B-277 B-S60 B-1387 B-1813 B-1892 B-2387 3-2374 E-2715 3-3142 3 3152 B-3462 B-3551 B-3642 3-3666 3-3719 B-4138 fl-4142 3-4154 B-4263 3-4261-3^4279 B-4368 B-4392 3-4393 3-4423 B-4430 B-4466 3-4474 3-4478
B-4552 3-4562 3-4563 B-4593 B-4625 3-4529
CANCELLED
9562 B-2467
-37 IKCL0SU5E (B)
CRMC-M&S-003668
i ~ rrv
CRMC-M&S-003669
Ok EAVAL ENGINEERING EXPERESK^rATI WJ Annapolis, Hary-lond
Report of tests for month ending l-oy SI, 1941
D-472S A
5-7-41 Gages,pressurc-in phenolic Underway.
S87(l) (354)
ease- Clapp Instrument Co.
3-4724
4-21-41 Plugs,spark -
3 S82-3(lS)(DYs4)(S41-3) Revision of Spoc.l7Pl.
Continuing.
3-1725
.b
5-1-41 lubricant,hydraul.,fluid Underway. JJ14(DYs-4) Linda 1 EP- Celluloid Corp.
3-4726 A
8-20-26 Oil.lub., samples from DD267/S51(7-24-Ds) US5 KILANEA.
Conpl.fe Ron.
B-4729 A
11-25-24 LS/SPIS (11-14-Ds)
Oil.lub.ft Ilesel fuel,used Compl.A Rep. in type approval test eng. at National Supply Co.
B-4735 A
4-S0-41 Gages,pressure- Acme Gauge Underway. JJ41(27) (DYs-2) A Instrument Co.,exhib.
B-4741
A
5-9-41 JJ7-3 (956)
Oil,Diesel fuel- Hercules Compl.A Rep. Oil Co.
B-4742 A
4-21-41 Oil.lub.,Essolube-for
Compl.A &ep.
JJ14 (DYa-4)
Diesel eng.crankcase-BuSLips.
B-4748 'B.
4-14-41 JJ32 (DYe-4)
Insul.felt.woven asbes. Union Asb.A Rubr.Co. and Raybestos-Vanhattan, Inc.
Comp 1. Rep.
B-4760 A
6-26-23 JJ7-6/L5(6-13-S)
Gasoline,avia.,100 octane ft motor fuel V- from NAS, Pearl Harbor.
Compl.A Rep.
B-4761 B
8-21-40 840 (DYs)
Noise-Background surveys Report A sub. of ships' nachy.spaces to determine preferred signal frequencies.
B-4766 B
-- 5-12-41 Aer-E-431-RY,JJ7G1
Ql'(6826)
Gasoline.aircraft eng.fuels Arrangements
Qual.tests of- Haritime.
underway.
Oil Co.
B-4767 B
5-10-41 Oil,hot running torpedo S75/JJ14(293)(Pr8a) Sinclair Refining Co.
Arrangements underway.
B-4768 B
-- 4-29-41 JJli (21o)(Pr5b)
Oil,lub.,hydraul.gearSpec.0S1113- Standard Oil Co.of K.J.
Arrangements undervay.
B-4786 B
-- 5-2-41 JJ33(1I (DYs-4)
Pack..metal.substitute for flax pack.,RainsRains Packings.
Arrangement s underway.
. . --------- - ~ '
-34-
..... ----------- "
J3L" JBL J00 JGO JGO JBL JGO JGO JGO JGO
JBL
JGO JGO JGO JGO
CRMC-M&S-003670
SUT0001
SUTOOOl
CRMC-M&S-003671
"*****9?!r
..JL-.isSSIP*1
iu jn
i/ua- ~r iu^
p-V HAVAL EHGISEERING EXPERIMKT Annapolis, i-'aryltmd
A B-4211
A
Report of tests for conth ending Hay 31, 1941
--
1-14-41 Liner,cyl.,naia engine,
Tests 60/*
Disp. 132004 erteked-Exam.o f-CHEROfCEE
B-4214
3-11-41
A QPA<AC(4)(2) (DYs,Dw)
3eld-Proc.appr.test for Awaiting oatl. Cl.P-1 molyb.alloy steel sta.piping-Cramp SB COrp.
TfFJ SR
}
B-4215 A
-- 8-20-26 DD287/S51(7-24-Ds)
Boise- Exhaust sys.,2ES 481-496 type-Suit.teston PC class subchaserProJ.Order 385/41.
Construction compl. DFJ and muffler shipped.
B-4216 A
3-10-41 JJ32(DYs-4)
B-4243 $ 500.00
3-7-41
B JJ14 (DYs-4)
Insul..tape ,asbes.-Kay-II- Test underway. K- Eeasbey A liattison Co.
Oils,lub.,Symb.1042.1047, 2075-2250, 3050-3120 Valroline Oil Co.
Underway.
JGO JGO
B-42S5 B
2-26-41 JJ14 (DYs-4)
Oil,lub.,Diesel en'ineSya.3065-D-The Xexas Co.
32 hrs.in CFR.
UFJ
Underwood tests coapl
Ji'ork factor ,90JC.
B-4257 4 200.00
3-14-41
A Aer-R-431-RY, JJ7G1
QK (5630)
Gasoline,aircraft eng. fuels-Qual.tests ofSpec .Ai/W-F-756,701,776, 781- Sun Oil Co.
Snap 1.A Rep. Await.finan.adj.
B-4259 4 260.00
11-25-24 Reid.Plate- for proc.
A L5/BP46 (11-14-Ds) appr-Combustion Engr.Co.
Conpl.A Rep. Aura it. fin&n . ndj .
JGO
i ircs
B-4260 B
3-10-41 JJ52(15)(DYs-4)
Coapd.,rust prev.Types B&C- J>pec.l4C4- Keatsfoot Oil Corp.
Hat1.not reed.
JGC -
B-4261 4 130.00
3-5-41
B JJ52 (15) (DYs-4)
Cogpd.,rust prev.,thinfila,Gr.l,2,3- Sinclair Refining Co.
B-4265 B
3-13-41 S41-5(DYs-2)
Jt..pipe,flex.ball-for pipe cognec.to recipro. acty- Barco Ufg.Co.
Underway. Underway 90/
JGO |
l JBL
B-4269 B
3-7-41 JJ52(19) (IT/8.4)
Paint,alun.,heat-rcsist.
Type approval test Shcrwin-tfilliams Co.
Underway.
JGO <
B-4277 B
-- 11-25-24 L5/NP16 (11-14-Ds)
Oil,crankcase A aotor tune-up "ftviex" A Penetra ting "ilexox"- U.S.Engr.
Office,St.Louis,Ho.
Underway 1 July
JGO :
B-4282 v 50.00
3-18-41
A S75/JJ14(264) (PrSa)
Oi1,1ub.,fo r hot running Underway. torpedoes-Union Oil of Cal.
--28--
JGO
-
' .-
-
f
r SUT0001
F' " ' j / n, i
ff iM1
CRMC-M&S-003672 ^r -
.1 --
iirf.:
1
CRMC-M&S-003673
o
*
ss. NAVAL ENGINEERING EXPERIMENT J^TAIION Annapolis, Maryland
Report of tests for nonth ending May SI, 1941
B-3881 A
10-14-40 Plating,chromium- for QP/Plating (DYs-2) salvaging crankshafts.
Crankshaft being installed.
WFJ
B-5882 A
B-3888 B
1-14-41 S48-24(DYs2)
1-23-40 Cont.HOs-79539
Valves,stm. pres.reducing, 10)J. Exhib.making improved Cl.LA-Leslie Co. chg.for Cl.C serv.
Eng.,Die eel .marine,Ker-
Days in serv. 85
m&th 4-226- Cont.KOs-79539 Hours oper.- 166
Service test of.
Ltr.rep.B sub.
JBL WFJ
B-3894 --
1-16-41
A C-NOs-77975,C-NOs-79125
Generator set.Diesel eng. 640-kw, Life test ofConts.KOs-77975 & 79125.
Tests 50% 1066 hours oper. Bcps.A,B,C sub.
FJ
B-3902 B
1-17-41 Oil.lub..Diesel engine JJ14(DYs4) Socony-Vacuum Oil Co.
300 hrs.opor. in Atlas-Lanova.
WFJ
B-3913 B
1-7-41 JJ14(DYs4)
Lubrleant,slow speed,hyd. Report in prep. pres.,loaded A Compound, gear.ieaded-MctaLead Prod,
JGO
B-3914 B
1-16-41 Compd.,anti-seisc,N6rm
Underway.
JJ46-5(DYs4) #30- Specialty 6ales Corp.
JGO
B-3915 t 75.00
1-7-41
B JJ32 (DYs-4)
Insul.,cement,high temp. Hy-Tcmp brand- sub.by Keasboy A Mattison Co.
Underway.
JGO
B-3917 B
1-14-41 Compd.,jt.A thread,hi ~h Underway. S19-8 (DYs-4) temp.- Natl. Eng.Prod.Inc.
JGO
B-3918 B
12-18-40 JJ3S(l) (DYs-4)
B-3919
1-21-41
B Jj/Bearings(1)(DY82)
Pack.,plas.,non-grnphitic A semi-met.,for stern tubes- Durametallic Corp.
Matl.not reed.
JGO
Beoring.spheroidiscd steel Specimens fwd.to
KCS
Bearium Metals Corp.
exhib.for heat-treat.
B-3920
1-23-41
A DD355/S48(DYs-2) (MV)
Piping,corrugated steel Failure of- CSS AYLSIN.
Matl.not redd.
WCS
B-3921 B
12-20-40 Insul..molded asfees.,Type Underway. JJ32(DYs-4) C- Asbestos Ltd.,Inc.
JGO
B-3922 6 35.00
1-13-41 Taps -
B JJ41(9) (Sfi) (DYs-4) 7/ells Tool Co.
ModifiedMatl.to be sub.
JBL
B-3943 B
1-13-41 Muffler.exh., SavageS41-3 (DYs4) Suit.test on Kenaath
Model 4-226 Diesel eng.
Test compl. Report sub.
WFJ
B-3967 B
--
1-31-41 JJ14(DYs4)
Lubricant,Diesel eng. Cadcl NC- Tide Cater Associated Oil Co.
-24-
200 hrs.opor.in Atlas-Lanova.
WFJ
CRMC-M&S-003674
SUT0001
DOCUMENT REQUEST FORM
ACCESSION IMOI /fSox2//S'
BOX HUMBER
)C, ooo 6 8 /
CESCR2RT10*
| SEGMENT NUMBER
5"
INITIALS
(*Jf J-
date
sa//J
NUMBER OF RAGES
>t oyistf\~Uf /S^pa-ijt gry^
- 7%^ /?y/#
SUT0001
CRMC-M&S-003675
Annapolis, BhrylonS Re'-->t of tort* for month ending !2a?*-'51 1941
B-3255
9-27-40
A QP/BAC(2)(l)(Dw)(DYs)
Tie Id- 13? chronc no tale diaphragm passage unit to alloy steel inner A outer rings- Proc.appr.forHestinghouse EAU Co.
Roport sub.
B-3264 Reopened
2-14-41
6 L5/&P16 (11-14-Ds)
Held- Unionnelt process Qual.of- Lukenweld.Inc.
Report subm.
B-3283
A
10-7-40 Head.cyl..Uooney- for SS/S41-6(10-2-DYs) Hinton 201A Diesel eng.
1460 lirs.oper. conpl.
B-3293
A
--
6-12-40 JJ14 (SS)
Oil,lub.,Spec.RPM Dclo for DAilcsel engineSYd.Portsmouth.Va.
Report H sub. Continuing.
B-3318 B
10-15-40 JJ41(9)(DYs)
B-3322
10-15-40
A 838-1(1) (9-5-DYS-2)
Taps.rolled throadEenry L. Hanson. Inc.
Blower,portable air jetSchutte A Koerting Co.
Hatl.not reed. Rep.in manuscript
B-3333
A
--
10-15-40 Bear..Alcoa alun.alloy
Brg.failed after
S41-3 (DYs-2) crankpin in Hinton 201A 14;42 hours-
Diesel engine-
Asrait .replacement.
B-3347 B
10-19-40 Vaises.red..diaphragm S48-24(DYs-2) oper.type- O.C.Keckloy.
Matl.not reed.
3-3355 A
-- 8-20-26 DB287/S51(7-24-Da)
Pistons,exper.,Failed 1-2
type- Inspection of,from Hinton 8 l/2 x 10 1/2 Diesel eng.- DSS SNAPPER.
Test 30? compl.
B-3361 $ 50.00
10-24-40
B JJ52(15) (DYs-4)
Compd.,rust prev..Types
CAD- K.D.Spec.l4C4d6ulf Oil Corp.
Underway.
3-3362 B
-- 10-21-40 Aer-E-431-RY,JJ7G1
021(6263)
Gasoline,aria.fuel,eng. Spec.AN-9532- Standard Oil Co.of Indiana.
Test held up at request of exhib.
B-3366 --
10-23-40 Lelding of silicon-bronse Underway.
B QP/takC(2)(l)(Dw) (DYs) Investigation of.
Continuing.
B-S369 | 500.00 10-24-40 Crankshaft- for Martin A C-N0s-76673(10-15-DYs)(2) Motors Diesel eng.-Cont.
SOs-76673-Torsion tests.
Rep.made Continuing.
B-3373 # 50.00
7-23-40 Oil,lub.,Symbol 5190-
B JJ14(7-10-SS) Onion Oil Co.of Calif.
Compl.A Rep. await.finan.adj.
3-3383
B
10-24-40 JJ32(DYs4)
Insul.Pipe cov.A Blocks, Undorway.
85? magnesia, precision
molded- Plant Rub. A Asb.Y.ks. -18-
BR
BR X!FJ JGO J3L JBL HFJ JBL HFJ
JGO JGO SR KCS JGO JGO
sirroooi
CRMC-M&s 003676 1_
BAVAL EBGIHEERI1IG EXPERIKEKT^ATIOK Annapolis, Maryland
Report of tosts for month ending iday 31, 1941
B-3075 B
B-3086 B
8-20-26 DD287/S5117-24-Da)
8-21-40 S39-2(SS)
Tubes, boiler from USS GRIDLEY.
Hat1.not rood.
Insul..lagging,heat trans. Underway. factor-Galv.steel,fibrous glass A asbes.coverings.
wcf JOC
B-3093 A
3-3104 A
B-3126 B
-- 8-26-40 Valve,redue.air dome loaded Underway 70#
SS/S48-24 (DYs)
Type 36H4-Foster Eng.Co.
8-29-40 Gage,boiler water level- Mat1.not reed. SSl-3(6) (8-28-DYs) L.J.Bordo Co.,Inc.
-- 9-4-40 S48-23 (8-28-DYs)
Traps,stn.open bucket,Cl. Hdtl.not reed. B, Type approval testKieley A iftieller,Inc.
JBI JBL JBL
B-3128 B
B-3151 B
9-3-40 S48-23(8-26-DYs)
9-3-40 JJ33(l)(8-19-DYs)
Traps,steam,redo3ignedType approval test Armstrong Machine tforks.
Underway 10#
Pack.,asbes.high pres.rod Underway. General Asb.ik Rubr.Div. Roybestos-ISanhattan, Inc .
JBL JGC
B-3193 B
B-3210 A
-- 9-3-40 Pack.,flex.met.improve d JJ33-(l)(8-21-DYs) Style 100- Crane Co.
Await.new samples.
9-21-40 Aer-E-34-SL, B24-3
ATL, SIS
Gasoline,avia.,Samp.from Hat1.not reed. Patrol Plane fueling,Gaso line deliv.buoy.WRIGHT.
JGC JGC
B-3211 | 100.00
9-23-40
B JJ52(15)(9-11-DYs)
compds.,rust prev.,Thin- Comp1.A Rep. fila.tectyl 502-B A 511-A Await.finan. adj. brands-Potomac Chen.Co.
JGC
B-3212 A
-- 9-18-40 Trap,steam- Designod by S48-23 (8-27-DYs) Chief Haoh.L.E.Gray.USN.
Report sub. Serv.test underway.
J?I
B-3225 A
8-27-40 Engine, DieselC-S51-5 (8-21-Dq) Exhaust disposal.
Lab.tcst EES compl.
Rep.25#; FC461-496 muffler test 100#.
WJ
B-324S I 200.00
9-28-40 Valve,blow-off-
B S51-3(l)(9-ll-DY-2) The Okadee Co.
Service test until Scp.1,1941.
JUI
B-3246 $ 75.00
9-18-40
B JJ32 (9-3-DYs)
Insul.cement,Type B,#300 brand- F.E.Schundler Co.
Underway.
JGC
B-3254 A
10-1-40 JJ46-10(DYs-2)
Metals- Nichrome, DriverEarris Co.- Hastelloy. Alloy Haynes-Stellite.
Rep.nade. Cont * ~. Add.natl.recd.
90S
-17-
CRMC-M&S-003677
SUT0001
NAVAL ENGINEERING EXPERIMENT RATION Annapolis, Maryland
Report of tests for month ending May 51, 1941
B-2956 B
8-20-26 DD287/S51(7-24-Ds)
B-2939
6-21-40
0 AT23/S51(6-1-Mh) (SS)
B-2940
6-19-40
B CL42/S51(4-10-Mh ) (SS )
B-2943
~
7-23-40
C JJ46-1(21) (6-18-SS)
Tube,boiler- Failure of USS WYOMING.
Underway 40JJ
Tubes,boiler,for USS KALMIA
Underway 40J(.
Tubes,economiser,for #8 boiler- SAVANNAH
Underway 35J?
Metals- 5-point Deephard Report in prep,
process for hardening
r
wear.surfaces of machy.-
Foote Bros.Gear A Uach.Corp.
wes TfCS WCS WCS
B-2945 A
B-2947 B
~ 7*-22~40 JJ46-1(25) (SS)
8-20-26 DD287/S51(7-24-Ds)
Metals,stee1.molybdenum vanadium- Beth.Steel Co.
Tubes,boiler- Failure of USS ZAHE.
Report C made. Add.matl.recd.
Underway 40#.
TfCS wes
B-2968 9 100.00
7-24-40
B S43-2(7-16-SS)
B-2964 A
~ 7-29-40 JJ46-l(l)(6-27-SS)
Boatings,rollorRollway Bearing Co.,Inc.
llotal,propeller alloyMn-Ni-Cu (Pure ifio)
90# compl.
Cavitation tests underway. Prelim, rep.made.- Cont'g.
JBL wqs
B-2971 B
--
7-30-40 Compd.,Joint A thread,
Underway.
S48-23(SS) high temp.-- I.H.Grancell.
JGO
B-2987 I 200.00
6-6-39
B QS1 (5-1-Os)
Meters,f.o.-Calib.for trials Maritime Con.Hulls 53-58 A 110- BN SBADD Co.
Continuing.
JBL
B-2988 9 126.00
7-25-40
A JJ35(2) (7-11-SS)
Pack.,asb.high pres.rodFerfection- U.S.Rubr.Co.
Report in prep. 15 June.
JGO
B-5018
--
8-1-40 0il,lub.,for Diesel eng. Compl. Rep,35#
TJFJ
B
JJ14 (7-24-Ds) Alox #157 additive for.
Add.tests deferred.
B-S020 --
7-10-40
B QP/fefcC(2)(3}(7-12-Sw)SS
Weld-Snail dia.EPAHT fipe for Naval service- Suit, test of Thermit process.
Underway.
BR
B-3043 C
-- 8-14-40 Clamps,hose. Acne Metal JJ-34F4 (S-5-SS) Products Co.
Underway as
JBL
opportunity permits.
B-3054 A
7-22-40 S43-2(SS)
Bearings,strut A stern
Underway.
tube,rubber segment type-
Design data for.
B-3072
--
8-20-40
A QP/SAC(2)(l)(8-l-Sw)DfYs
Tubes,alloy,butt weld,4-S? Matl.not reed. Cr-Mo-Ti tubes to 18> Cr8% Ni-Ti tubes- Qual.of proc.
-16-
JBL BR
CRMC-M&S-003 678
^S. KAVAL EKGIKEERING EXPER1TL12J.STAII0H
Annapolis, Maryland
'
Report of tests for month ending Kay 31, 1941
B-2806
A
B-2810 B
-- 6-25-40 S43-l(6-28-SS)
-- 6-21-40 S39-1 (6-15-SS)
Coupling,clutch,Type FBO 150- Yfonwoy Clutch Co.
Insul.,Felt.Rockwool, for boiler uptakesEagle Pichor Sales Corp.
Matl.not reed. Underway.
JBJ
JGO
B-2814 B
B-2819 B
6-24-40 855-2(6-17-SS)
4-27-40 S41-5 (SS)
Filters Diosol fuel oil
Oil,lub.,Texaco #303 in iesol engines.
Proj.rep. sub.
WJ
5 filters tested- Cont'g.
Tests discont'd. Report in prep.
npj
B-2820 B
--
4-27-40 S41-S (SS)
Oils,lub..Sinclair 610 actor oil in Diesel engs.
Tests in Atlas-
MBJ
Lanova complj Tests
in GM 6-71 scheduled.
B-2822 B
6-27-40 Pack, .stern tube, seal-met. Report in prep.
JJ33 (6-20-SS) Sym.1405-Crono Pk.Co.
IS June.
JGO
B-2855 --
6-17-40 Gages,pres.differential- Underway.
B V102-29360 (6-28-SS) - Crosby Stm.Gagc A Valve Co
JBL
B-2856
A
-- 6-27-40 Couplings,flex- Crocker- 40^ 1 July JJ43(4-22-SS) TTheeler 2lec.Ufg.Co.
JBL
B-2864 B
-- 7-6-40 Valve,relief,constant bk. Prelim.rep.sub.
S48-24 (6-15-SS)
pres.- Foster Engr.Co.
Rep.in manuscript.
JBL
B-2878 B
--
7-10-40 Boise isolator- Johns S40(5-22-SS) Manville Sales Corp.
}.0%. Indefinite
JBL
B-2903 $ 100.00
5-6-39
B QX1 (5-1-Ds)
Meters,f.o.- Calib.for trials Maritime Com.Hulls 102-5-Beth.Hulls 1481-84.
Continuing,
JBL
B-2912 B
--
4-27-40 S41-3 (SS)
Oil,lub..Std.Oil of H.U. Essolube H D in Diesel engine.
Ltr.Rcp.90^; Under BFJ wood A work factor complj Tests in prog, in Cummins,CM 6-71 A Cat. B-3400 engs.
B-2915 C
-- 7-15-40 Bear.,Phenolic type,for Matl.not rood. S43-2 (7-2-SS) motorboat strut A stern tubes A Pump shaft bear, serv.-Richardson Co.
JBL
B-2926 A
6-22-40 JJ46-10(6-1-9S)
Shafts,for blower serv.Colmonoy overlay process Wall-Colaonoy orp.
Suspended.Await. Bureau decision re base metal.
(JBL (BR
B-2937 $ 150.00
7-20-40
B MC63-66/S55-5(T)-462
Meters,f.o.-Calib.for trials Maritime Com.hulls 63-66- Ingalls SB Corp.
-15-
Continuing.
JBL
SUT0001
CRMC-M&S-003 679
DOCUMENT REQUEST FORM
ACCESSION rasa
ft(3>ox.
DESCRIPTION
BOX NUMBER
1 DdfiC Q$#l
I SEGMENT NUMBER
1 OL
feZ- -
INITIALS
U/dr T
DATE
NUMBER OF FACES
(
/? ?/.
CRMC-M&S-003680
t i
J
^S. RATAL E80IBEERIK0 EXPERIMEITnSTATION Annapolis, Maryland
Report of tests for month ending liny 31, 1911
B-2341 B
B-2379 B
2*19*40 JJSS/tS (1-23-SS)
3-1-40 JJ33/L5 (11-3-SS)
Pack..plant fiber sheetVellutex- Vellumoid Co.
Seals, oil Various mfra.
Underway. Extended inves.
B-2439 B
3-2-40 S43-2/L5 (2-2-SS)
Bearings,strut A sternSyathetic rubber strips, Lucian Q. Uoffitt.Inc.
Underway.
B-2452 B
1-16-40 Packing .steering gear, JJ33/L5 (1-J.l-SS) telemotor rams A valves-
Various nfrs.
Underway.
B-2473 I 160.00
3-15-40
B JJ45-(2) (SS)
Valves,lever-seald- Gaso line service- Hoastead Valve Kfg.Co*
Mat1.not reed.
B-2488 | 300.00
3-28-40
B S47/L5 (9-14-SS)
Pumo,rotary,fuel A lub. oil`,Cl.K3,N2,02 servicesQuimby Pump Co.,exhib.
Matl.not reed.
B-2490 | 100.00
3-27-40
B S4S-2/t5(2-20-SS)
Bearings,roller- Boiler Bearing Co.of America.
95^ complete.
B-2491 --
3-27-40
A P0240/41,Ll-2/fcP(3-28-F)
Compd..preservative,thin- Report A sub.
film(Folar)- for machy.
Continuing.
Develop.of spec.for.
B-2528 # 287.50
5-6-39
B QS1 (5-1-Os)
Meters,f.O.-Calib.for trials C-2 Diesel carbo vesselsliaritine Com.#22-25.Tampa jf33-S6-Tampa SB A Engr.Co.
Continuing.
B-2529 B
4-6-40 Indicators,sight flow,for Underway. S48-10 (4-1-SS) low pressure steam drains.
B-2S31 A
B-2541 A
4-9-40 S41-6(SS)
-- 3-28-40 ProJ.Order 238/40
Clutch,froc wheelingMercury Clutch Corp.
Feedwater, boiler Inves.of problems.
Report in prep. Underway.
B-2544 B
Valve.plug,type for Gaso- Matl.not redd. JJ45(2)(SS) serv.-Borrett Mach.Co.
B-2606 B
-- 4-24-40 S39/L5 (12-29--SS)
Insul.,Felt .woven glass U.3.Asbestos Division, Baybesto s-Manhattan, Inc.
Underway.
B-2628 A
--
Oral
Engine, Diesel,Vinton 12cyl.,201A Tests of eng. parts A lub.oils in- at lew London,Conn.
-13-
Engine being shipped to EES.
JGO JBI JBi JGO JBL JBL JBL JGO JBL
JBL JBI JGO JBL JGO WFJ
CRMC-M&S-003681
t
SUT0001
SUT0001
CRMC-M&S-003682
'NS. NAVAL ENGINEERING EXPERIMENT-STATION Ahnapolis, Maryland
Report of tests for month ending Ray 31, 1941
B-1336 B
~ 5-6-39 JJ46-l/L5(4-28-Ds)
Metals- Relaxation prop, of alloy sted bolt matl. now in commeroial use.
Report D in prep.
WO:
B-1339 90.00
4-25-39
B SZ9/LS (4-7-Ds)
Insul..block,high temp. Baldwin-Hill Co.
Awaiting new samoles.
JGC
B-1342 A
42239 S41-3/S82(4-20-Dq)
Cyl .head,Lanova,1-lobo-
Suit.rep.50#; Wear
test with A without super- rep.being revised;
charging A deter.most
Superchg.test
suit.type supercharger
discontinued.
for DO powerboat Diesels.
W*
B-1343 A
4-22-39 S41-3/S62 (4-20-Dq)
Cyl.head^ Lanova,1-lobeTest with A without super charging A deter.most suit.type supercharger for DA powerboat Diesels.
Rep 85# compl jTfear rep.being revised; Superchg.test discontinued.
T.TJ
B-1345
fi
5-5-39 S39/td (8-2-Ds)
Insul.,glass fiber felt Onion Asbes.A Rubber Co.
Report in prop.
JGC
B-1388 B
-- 6-17-39 JJ33/L5(5-11-D)
Pack.,plas.metal.,coil fora,metal.foil jacket, Sea-No armored Nek-Seal Stylo 501- Sca-Ko Pk.Co.
Underway. Partial rep.sub.
JGO
B-1471 B
6-13-39 S48-23/15(5-19-Os }
Traps,Steam,impulse type with integral strainerYarnall-V.'aring Co.
Letter rep.subm.
JBI
B-1477 B
-- 6-7-39 S48-23/L5(3-17-Da)
Valves,plug,for fo,feedwater A stoam servicesKuohler-Huhn Co.,Inc.
Extended service tost underway.
Jlil
B-1494 B
-- 5-23-39 S39/L5(5-1-Ds)
Insul.,block,molded asbes. Underway. UNIBESTOS- Union Asbestos Partial rop.sub. A Rubber Co.
JG<
B-1500 B
6-13-39 Tool,silver brazing.for JJ4l/L5(6-2-Ds) Cu A Cu-Ni alloy tubes.
Underway 80#
WCi
B-1S17 B
-- 6-27-39 Valves,boiler blow-off, 348-23 (5-5-Os} L.J.Bordo Co.,Inc.
Matl.not reed.
JBI
B-1524 A
B-1542 B
B-1568 A
6-28-39 S41-S (6-27-Dq)
-- 6-24-39 JJ46-6/L5 (3-15-Da) -- 7-10-39
JJ46/L5(6-15-Ds)
Liners,cyl..chromiumplated, Diesel engineVan der Borst process.
Liner #490-G 7506
NFJ
hrs;tesip.di8cont d.
Liner #658-G 834 hrs.
eompl.
Alloy.alum.cast- Natl. Bronze A Alum.P4ry.Co.
Final rep.in prep. jrcf
Alloy,silver brazing,Easy- Pro1in.rep.nado,
Flow ifZ- Handy a Harmon. -10-
Continuing.
WC!
>
CRMC-M&S-003683
. a-
SUT0001
CRMC-M&S-003684
JL^S. NAVAL ENGINEERING EXPERD'EKX-ATATION Annapolis, Maryland
Report of tests for month ending Ikiy 31, 1941
B-604 B
-- 8-6-38 Metals- Rate growth of HP16 (7-21-Ds) natls<wh6n subjected
to high temp.steam.
Underway 50. Add. samps.reod. Tests to steam underway.
wes
B-689
--
9-30-38 Valves/ reducing-
B S48-24(H)/L5(7-15-Ds) Hlpfcl Hfg.Co.
High pressure valves not reod.
B-704 B
-- 10-5-38 Weld- l/8" dia.Aeriswcld QP/nelding/L5(9-14-Ds) Phos-Br.electrodes and
retest of,in5/32" dia. siso- Lincoln Sloe.Co.
Test eoapleted. Report in prep.
JBL BR
B-708 A
B-748 B
9-28-38 SS/S41(9-21-Ds)
10-13-38 JJ46-1 (10-10-0s)
Engines,2-cyclc,double
Uatl.on hand,
noting Diesel- Invcs.to Underway,
determine means of restor
ing excessively worn
cylinder liners of.
Metals- Low alloy oorros- Spoeimens ready resist.steel- Invcs.tor to place in boiler, possible usefulness for Other tests comply boilers & oth.pres.vessels.
BR
(WCS (BR
B-792 Reopened
11-4-38
B QP/Welding/LS(10-l4-Ds)
Wei d-Qual. test of Champ. Rep.A made. Await. Bluo Devil 85 A Red Devil matl.for retest 75-Carb-molyb.eleetrodes. Class I matl.
B-872 A
-- 12-7-38 Water- Treat.of in dosed Report A sub. S41-5(ll-29-Ds) cooling sys.wlth chromates.Continuing.
B-886 B
-- 10-14-38 Pack.,cond.tubes,copper JJ33/L5(10-12-Ds) foil- Various mfrs.
Report in prep, June 15.
B-908 | 400.00 12-16-38 Pump,rotary gear,for Ml Exhib.making B S47/t5 (11-15-Ds) & HI serv.-Schutte-Xoerting changes.
B-934 | 125.00 12-27-38 Insul..Super Uhibestos- Underway. B S39/L5(12-21-Ds) Union Asbestos & Hubr.Co.
B-940 Reopened
2-20-41 Valves,relief.constant
Underway as
B S43-24(DYs-2) back pres.-Elipfel Hfg.Co. permitted.
B-969
12-28-38
B QP/Welding(12-7-De}
eld-Carb-molyb.steel stm. Reports E-L sub. pipe-Proc.appr.test-BoilorsBYds.Phila.,K.T..Horfolk, Pug.Sd.A Mare Island.
B-1016 B
4-23-38 S39/L5 (4-19-Ds)
Insul.,blanket,turbineFiberglas brand- OwensComing Fiberglas Corp.
Underway.
B-1046 A
Reopened
3-3-41
JJ46,-6/t5 (8-27-Ds)
Metals, Alum.alloy east 2nd lot- Frontier Bronze Corp.
-8-
Underway SOX
BR JGO JGO JBL JGO JBL BR
JGO <rcs
SUT0001
it i4 j j H; I.Z
111
. -.&me
fr
^s. NAVAL ENGINEERING EXPERIlENT'-SjrATION Annapolis, Maryland
Report of tests for month ending May 31, 1941
B-300 B
6-18-38 BeAring matl.-The Amer. S43-2/L5 (4-3-Ds) Brake Shoe A Foundry Co.
Continuing.
JBL
B-375 B
6-4-38 Reqn. EN8/2/79601.
Eraporators,Kleinsehaidt vapor compression type distilling plant.
Underway.
JBL
B-386 * 300.00
6-8-38 Couplings,flex.-Thomas
B S41-3/S82/L5 (5-16-Ds) Flexiblo Coupling Co.
Service tost underway.
JBL
B-398 A'
12-27-37 S39/L6 (12-18-Ds)
Insul.,cemcnt,water-proof Report in prep. coat. -INStJLKOTE 4 EAGLE INSGLSEAL- J.lfanville Corp 0 A Eaglo-Picher Co.
JGO
B-401
6-27-38 Wold- Columbium bear.4-6j5 Mat1.on hand.
B . QP/toelding/L5(6-9-Ds) Cr-lio steel (0.50^ Bo)
BR
B-402 B
-- 6-18-38 Pack..Gaskets,spirql wd. Awaiting new
JJ3S/L5(4-16-Ds) metal.asbes.-Azor Corp.
matl.
JGO
B-403
--
6-21-38 Radiators,steam heating- Underway as oppor.
B BD415/20/S48(6-10-Ds) sub.by NYd, Boston.
permits.
JBL
B-432
--
6-28-38 Valves, reducing-
B S48-24(R)/L6(6-17-Ds) O.C.Eeekley Co.,Inc.
Exhib.making changes.
JBL
B-457 A
6-17-38 Compds;,sealing,turbine S48-23/L5 (3-11-Ds) casing,sub.by vor.mfrs.
Rep.J sub.; BAL in prep.- Cont'g.
JGO
B-468 A
6-17-38 Compd..sealing,thread S48-23/L6 (3-1-Ds) joints,sub.by Tor.mfrs.
RBp.I sub.; JAK in prep.- Cont'g.
JGO
B-466 B
Reopened
2-4-39
S39/L5(l-30-Ds)
Insulation,Rockwool, im proved TUCOWUL- Tuco Co.
Underway.
JGO
B-490
--
7-19-38
B QP/AeldingAs (6-29-Ds)
Weld.electrodes,Phos-BrEdoo Process- Eccles A Davies Uaohy.Co.
Report in typing
BR
B-562 B
-- 8-16-38 S19/15 (8-2-Ds)
Coatings.NO-OX-ID-IZED
Underway 80JJ
reenforced fabric wrapper-
Corros-prdT.coir.for propoll,
shafts- Dearborn Chsa.Co.
WCS
B-585 $ 250.00
6-22-39
B Reopen.S43-2/L6(5-12-Ds)
B-591 A
MS
Oral Buong.
Ball bearingsBearings Co.of America.
Engine ,2-eyl.commercial Diesel-Devcl.for use as 150-hp powerboat engine.
Matl.for retest not reed.
Deferred for Test B-2793.
JBL WFJ
B-592 t 260.00
8-29-38
B S48-24(R)/L5(8-16-Ds)
Valves,red.,Cl."ca" and "d"- Atlas Valve Co.
.7.
Exhib.making changes.
J3L
_
i
\) f i % | i i l
1 c i 1f
4I
*i >
t fi
e i
i
I
* | j
i
SUT0001
CRMC-M&S-003686
NAVAL ENGINEERIES EXPERIMENTSATION Annapolis, Maryland
Report of tests for month ending May SI, 1941
9898 8
-- 12-31-37 S47/L5-2(12-10-Dx)
Seals,rotary pump and turbine shafts- Inves., development ft test of.
Underway. Extend, inves. Rep.3 manu script completed.
JBL
9977 B
B-6 B
B-7 B
B-42 B
2-10-38 Melding of manganeseS44(l-21-0s) bronze propellers.
85/C completed. Continuing.
9-22-37 Insul.cement,hard-finish Report in prep. JJ32/L6 (9-16-Os) Prep.by EES- Var.mfrs.
$ 175.00
1-4-58
JJ33/L5 (12-29-Ds)
1-21-58
JJ33/L5(12-29-Ds)
Pack.,Sea-Ro Nek-Seal, Style 5051 ft Sea-Ro Super heat Spiral Style 503Sea-Ro Packing Go.,Ino.
Rep.C sub. Final rep.in prep. June 15.
-- 2-28-38 Solder,silver,medium Jj/Solder(2-23-Os) temp. (Cadnium silver).
Underway S0>.
BR JOG J30
MCS
B-106 B
--
3-15-38 Pumps,f.o.-Effect of low Rep.A sub.- Under
JBL
JJ7-3/L5 (12-3-Os) viscosity on capacity.
way as oppor.permits.
B-146
--
4-2-58
B QP/fTelding/LS (3-31-Ds)
Meld- Effects of are length Rop.A sub.
on properties of Ni-Cu
. Await.add.matl.
alloy and pure nickel.
BR
B-161 B
4-7-30 Pack..valve stem, QP self- Underway. JJS3/L5(S-2-Ds) setting- Q-P Signal Co.
JQO
B-186
--
4-15-38
B OP/frelding/LS (4-12-Ds)
Meld.-Houldough Powderfor use as backing matl* Metal Bond llfg.Co.
Underway. Prelim, test completed. Report in prep.
BR
B-190 B
-- 4-13-38 JJ33/L5 (4-5-Os)
.Pack.,plastic met.,Type CAR EDS 33P25A- Line ar Packing ft Rubber Co.
Underway. Partial rep.sub.
J00
B-220 $ 200.00
4-22-58
B Reopen.S48-23/L6 (3-4-Os)
B-267 B
-- 4-29-38 S48-23A5(3-22-0s)
Traps.thermoStaticSterling Engineering Co.
Separator,steam- DriSteam Valve Sales Corp.
Completed.
JBL
Rep.in prep. 15 June.
Exhib.to submit new valve.
JBL
B-278 B
B-280 B
B-288 B
8-298 B
-- 5-7-38 Packing,plastic,nonJJSS/LS(5-2-Ds) graphitic- Various mfrs.
Final report in prep.
-- 4-20-38 S39/L6 (4-22-Os)
Insul.,85). magnesiaformed flanged coverePlant Rubber ft Asb.Mks.
Rpport in prep.
Reopened
2-27-41
JJ46(17) (DYs.Dw)
Meld- Hard-facing rods
Report in prep.
-jplO for gas weld.,etc.-
Suit.of- Coast Metals,Inc.
5-13-38 JJ46-l/LS(4-13-Ds)
Metals- Creep test of-
Ferrous-- Timken Co. -6-
Underway 75*. Tie Id. test underway. Met.Rep.in 7-2668
JGO JCO BE MCS
CRMC-M&S-003687
SUT0001
.Jsp. NAVAL ENGINEERING SXPERIirEKt^TATION
Annapolis, Karyland
1
Report of tests for month ending !!ay 31, 1941
9360
7-19-37
B Qlytoe lding/t5 (5-21-Ds )
Void- Inves.of silver brg. Report in prep. non-ferrous rods A ulectr. Amer.Silver Prod.Res.Pro).
9372 A
-- 7-25-37 Piping- Erosive effect 548/lS (4-29-Ds) superheatod steam on.
Prclinu rep.made. Final samp.cont'g.
9421 B
--
7-6-37 Tubes,boiler- Failuros-
Indefinite.
S51(6-25-Mh) lliso.samples from Bueng.
9443 B
5-4-37 Pack.,plas.met.Sym.1432JJ33/L5(7-28-Ds) A 1434- Anchor Pack.Co.
Underway. Indef. Partial rep.sub.
9550 B
-- 9-10-37 Grease,lubricationJJli/LSO-10-Va) investigation of.
Underway. Indefinite.
9564
9-24-37 Bearings, Kicorta-
A S62-2(V)/lS(9-3-Ds) We stinghouse EAK Co.
Add.tests being made.Prel.rop.made.
9604 A
--
Oral Gears, reductionBoiso tests on ships.
Continuing,
9685 B
-- 10-20-37 S39/L5 (10-6-Ds)
Insul.,pipe A flg.coversUnibestos- Onion Asbestos A Rubber Co.
Final rep.in prep. 1 June.
9703 B
11-8-37 S39/L5 (10-20-Ds)
Insul.,glass wool,for in takes,boilers A casingsOwens-Illinois Class Co.
Report B sub. Rep.C in prep.
9725 A
11-3-37 Propellers- Determine S44/L5 (10-19-Ds) suitable materials -for.
Fommal rep.sub. Continuing.
9734
--
11-17-37 Welding- Weldability of
B qP/teelding/15 (11-13-Ds) iron alloys.
70% completed. Await.add.mat1.
BR
ucs WC5 JCK JGC JBI JBI JGC
JGC
WCS BR
9790
12-6-37
B QP/taelding/L5(ll-30-Ds)
Weld-Inves.to deter.suit, of root A face bends to quel.welders to work with Ii-Cu,Cu-Bi,C-Mo steel A Mg-Br with Phos-Bronte.
Completed.. Report in prep.
9803 B
I 85.00
12-9-37 Themometer^dist.reading Compl.A Rep.
S87(A)/L5 (H-12-Os) dial- U.S. Gago Co.
Await.finan.adj.
9865 B
12-3-37 L1-Z/SP16 (8-2-Di)
Piping,Valves,fittings A Rep.C sub. Final joints for use with *reon Report in prep, refrigerant- Inves.of
9883 A
Reopened
5-15-41
JJ33/L5 (12-28-Ds)
Packing,raskets-Flexitallic reenforced type-Flexitallie Gasket Co.
Continuing,
-5-
BR
JBI JBI JC-C
CRMC-M&S-003688
SUT0001
DOCUMENT REQUEST FORI1
ACCESSION BOSES
CSSCftCTXOM
Cl, S. /l/a.(/2dC
BOX BUM&Eft
b<LUO&%)
SEGMENT KUHSE*
<&nj/ne.c*r\j
"7h*nt6/(y tepori <% ics+s -
INITIALS
(AJE^r
DATE
SO// 3^
KUMBEA OF PAGES
/
S'fzct-tjy-o
(<?Y(
SUT0001
CRMC-M&S-003689
h /O; iSLi i
'It IO' gr* fi
* '-7^', T
A
NAVAL ENGINEERING EXPIRIIIE Annapolis, liaryland
TATION
Report of tests for nonth ending -llay 31, 1941
7619
--
11-14-36 Blowors,f.d.-Sound ab
A CAR SS3;Eng.S53(10-28-Ds) sorption methods for*
Continuing.
JBL
7696 B
-- 12-19-35 881-1(12-12-Ds)
Photomierographie stand ards- Non-ferrous.
Stds.being oollec. when available*
WCS
7699 B
12-12-35 Unions, forged steel. S48-23/1*5 (11-20-Ds )
Report made. Continuing.
WCS
7764 B
Reopened
1-23-37
JJ46-2/to(l-8-Ds)
Bushings.Beryllium-Copper- Underway 30/i.Test Beryllium Products Corp. mach.being modif.
WC3
7773 B
12-3-35 Ll-2/liP16 (6-4-Ds)
Governors,pres.A Valves,
reducing- Invos.of aatl. for wearing parts of.
Report in prep.
JBL
7781 A
$ 958,20
1-24-35
S47/L5 (1-16-Ds)
Governors.pump,constant A excess pressure typesPoster Engineering Co.
Indefinite
JBL
7818 B
-- 2-12-36 Welding- Approval tost S-7166 (2-11-Ds) of aluminum electrodes.
Report A made. Continuing.
BR
7851 B
2*19*36 S48-23/L5(2-14-Os)
Connec.f lcx.bulkhead-
for steam pipingFostcr Wheeler Corp.
Awaiting Bureau's action.
JBL
8089 A
-- 5-8-36 S4-24(R)/L5(3-21-Ds)
Valve3.pres.reducingOperation of in scries.
indefinite
JBL
8103 A
5-14-36 S48-23 (5-14-Ds)
Joints,pipc-Naint&ining tightness with steam at 600#. 7S0*F. temp.
Rep.C made. Rccom. cont'g. along diff.lines.
WCS
8561 B
10-27-36 CA37/S58 (6-20-Da)
Pack.,compressed asbes. sheet- Inves.to develop aeth.of test- Var.cxhib.
Extended. New sample being submitted.
JGO
8732 B
11-12-33 Pack.,asb.cloth,plain A Report in prep. S39/L5 (10-26-Ds) wire rcinforced-Vdr.mfrs.
JGO
8833 B
2-10-37 JJ33/L5 (2-9-Ds)
Pack.,Sym.1104-Tests of Determine max.A minimum lubrication required.
Report in Drcp.
JGO
8865 B
8866 B
-- 2-20-37 QP/t5 (12-17-Ds)
-- 1-13-37 JJ33/L5 (12-22-Ds)
Tubes,condenser- Tests in Extend.inves. Con.
WCS
experimental condensers. reinstalled.Underway.
Pack..Gaskets,manhole555 Guardian brandGarlock Packing Co.
Underway.
JGO
8867 B
1-12-37 JJ33/L5 (12-22-Ds)
Pack..plastic met.A nonmetal. Sym. 1106, 1107 and
1434- Garlock Pack.Co. -3-
Underway. Indcf. Partial r.p.sub.
JGO
CRMC-M&S-003690
SUT0001
SUT0001
CRMC-M&S-003691
0.8. JU&AL ENGINEERING EXPERIMENT STATION Annapolis, Maryland
List of tecta reported during month ending May 31, 1941
Teat Mo.
9586 JGO
15 Paeking,braided asbea. impregnated with copper compound,for use on corrosion resisting steel shafts- Developed and sub.by United
States Steel Corp., mfg.by Johns Manville Co.- Considored unsuit.
B-560 MCS
29 USS HELENA- '*ont.N0s-55897- Diesel genesator sets- Exam.of engine cylinder liner- 'sirbanks,Morse & Co.- Seo report for reoossoend.
B-1158-C 7 Stability of sodium thiosulfate solutions for use in dissolved JGO oxygen testing cabinets- Mo recommendations.
B-1181-I 1 Lubricating oil-- Samples of used extreme pressure oil taken from JGO Vo.5 unit of USS ASTORIA- Ho recommendations.
B-1387-AB 12 Oil filters- used oil from U.S. Coast Guard cuttersJGO Sa tisfaotory for further use.
B-1471 JBL
1 Yarway impulse steam trap with integral strainerConaidered suitable for use.
B-1684-D JGO
O)B-1810 ^JBL
7 Boiler mater ttseatment, Naval Annunition Depot, Zona Xsland,V.Y.See report for recommendations.
16 Shafts, chrome plated,for blower service- Westinghouso EAM Co., exhib.- See report for recommendations.
B-1813 JBL
21 Refrigeration regulator- *ulton Sylphon Co.,exhib.Considered suitable for HaVl use.
B-2367 DCS
14 USS ME3SHXS- Boilers- bracks in knuckles of front steam drumheadHo reoosmendations.
B-2706-AP 16 Cont.75606- Boiler gaskets for Hawaii's Point Order #12JGO Carlock Packing Co.,contr.- Acceptance recommended.
B-2706-AQ 22 Mont.73606- Boiler gaskets for Portsmouth,Va.Order #4JGO Garlock Packing Uo..contr.- Acceptance recommended.
B-2706-AR 28 Gaskets,asbcstos.metallic doth,for HYd,Charleston,S.C.- Cont. JGO HOs-73606- Garlock Packing Co.,contr.- Acceptance recommended.
B-2706-AS 29 Cont.73606- Boiler gaskets for Boston Order #4- Gorlock backing JGO Co.,contr.- acceptance recommended.
B-2T37-J JGO
20 Lubricating oil draining interval- Extension ofMo recoocandations .
B-2793 WJ
26 Diesel engine lubricating oils and bearings - Report for April 1941.
B-2795-S-1 29 Determination of Diesel engine erankcase lubricating oil dilution NFJ and comparative viscosity - See report for recommendations.
-2-
SUT0001
m
CRMc-M&S-003692
'*
CRMC-M&S-003693
' U.SRATAL^ENGINEERING EXPERIMENT STATION Annapolis, Maryland
List Of tests .^ported during month ending May , 1941
/^"ost No.
B-2831-499 JBL
m.
26
Ball bearings- Cont.^251s-66832- McGill "Yg.Co.Aeoeptanoe recommended.
B-2831-500 26 Ball bearings- *'ont.261s-66917- MoGill Mfg.Co., JBL Aooeptanoe recommended.
B-2831-601 27 Ball bearings- Cont.F-501-19- Marlin "ockwell ^orp. ,mfr. JBL Aooeptanoe recommended.
B-2831-502 29 Ball bearings- General Electric Co.Order JOT- 740473-89 on Now JBL Departure- Aooeptanoe recommended.
B-2831-505 29 Ball bearings- General Electric wo.Order RW-741849-24 On JBL New Departure- aooeptanoe reoommended.
B-2831-606 29 Ball bearings- Brooklyn Nary xard Cont.R-990- Hew Departure,mfr. JBL Aooeptanoe recommended.
B-2831-508 29 Ball bearings- General Electric Co.Order R-740499-89 JBL Hew Departure- aooeptanoe recommended*
B-2831-509 29 JBL
C>-2834-E JBL
9
Ball bearings- General Electric Co.Order RN-741685-24on Hew Departure- Aooeptanoe recommended.
Hew York Shipbldg.worp.Order 421-2663- Valves,pressure redueingLeslie Co.,mfr.- Acceptance recommended.
B-2834-F JBL
20 Hew York Shipbldg.^orp.Order 421-2190 on Leslie Co.- Reduoing waives - Aooeptanoe recommended.
B-2834-F-2 22 Hew York Shipbldg.^orp.Order 421-2190 on Leslie Co.- Valve, JBL pressure reducing- Aeoeptance recossicnded.
B-2834-F-3 26 Hew York Shipbldg.^orp.Order 421-2190 on Leslie Co.-
JBL
Beducing Valves- Aooeptanoe recommended.
B-2835-I-3 13 JBL
Reqn.1-40 Sundry 12645, Cont.N151s-53246- ''elres,pressure reducing, for HYd,Fhila.- Foster Engineering Co.,mfr.Aeeeptanoe reoommended*
B-2836-M 9 ^ont.HOs-78434- alves,pressure reducing- for NSD,Sewell's Point, JBL Va.-Foster Engineering Co.,mfr.- Acceptance reoommended.
B-2835-N JBL
B-2887-I JGO
t^-2887-J JGO
9 Seqn.L-1328-l-41-wont.H244-s-25791- Valves,pressure reducingfor BSD, San Diego,Calif .-Foster Engineering Co.,mfr.- Acoop.reeom.
7 i'Ont.73858- Asbestos metallio cloth for remerton Order #14 and Phila.Order #10- General Asbestos A Rubber Div.of R-yt^estosManhattan,Imo.,eontr.- Acceptance recommended.
14 Cont.73858- Asbestos metallic cloth packing for HAS,Jacksonville, Fla.-General Asbestos A *ubber Div.,Raybestos-Manhattan,Inc., *frAooeptanoe roeonmended. -8-
T
SUT0001
CRMC-M&S-003694
U.S. H4VAL ENOIHEERIHG EXPERIMENT STATION ^ Annapolis, Maryland
List of tosts reported during month ending May 31, 1941
Test Mo,
B-2B88-H JGO
28 Contract 73859- Hydraulic packing- Quaker Rubber Corp.,mfr.Anoeptanoe reoommended.
B-2889-H JGO
19 Packing.plastio metallic- for Navy Yard,Washington,!).C,Contraet 73860- Crane Peeking Co.,oontr.- Acceptance recommended.
B-2691-P 1 Packing,metallio flexible,for MYd,Charleston,S,C.yl4- Cent. JGO 73862- Felt Produots Mfg*Co,,oontr.- acceptance rooonsnended.
B-2891-Q JGO
23 Cont.73862- flexible metallic packing- *elt Produets Mfg.Co,, mfr*- Acceptance reconsnended.
B-2892-M JGO
22 Packing,flax,for HYd.Puget Sound Order #2- Cont.MO-s-78663Clinton Mfg.Co.,contr.- Aoooptanoe recommended.
B-2895-E0 5 JGO
Packing,braided asbes.rod- wont.73866- Garlock Peeking Co., for Havy Yi,Y*kon,Flo.- Acceptance recommended.
B-2895-EP 6 JGO
Paeking,braided asbes.rod- Garlock Packing Co.,contr.- for MYd, Phila.- Aoeeptanee reooamended.
8-289S-EQ
O'00
2895-EH
JGO
7 8
Cont.73866- flydraulic packing for Horfolk,Ve.- Garlock Peeking Co., contr.- Acceptance reeosmiended.
Cont.73866- Hydraulic packing for >oston,Mass.Order #15Garlook Packing Co.,contr.- acceptance reoommended.
B-2895-BS 16 Packing,hydraulic,for MYd,Mare xslond- Cont.NOs-73866JGO Qarlook Packing co.,contr.- acceptance recommendod.
B-2895-BT 28 Packing,braided asbes.rod- Cont.73866- Garlock Packing Co.,oontr. JGO for Bremerton - Aoooptanoe recOnsaendod.
B-2895-HJ 29 ''ont.73866- Boiler gaskets for San Diego,Cal.- Order 392JGO Garlook Packing Co.,contr.- Acceptance recommended.
3-2896-G #00
29 wont.73867- Plant fiber sheet packing for Norfolk "rder #31Johns Manville Products Corp.,contr.- acceptance recommended.
B-2912 JGO
1 Lubricating oil- Ssples of new and used Essolube HD from U.S. Submarine aase,New London- Mo reooamendations.
B-2970-46-E 14 Thermometers- Cont.106478- Manning,Maxwell A Moore,Inc.,mfr. JGO Acceptance recommendod.
B-2970-74-C 13 JGO
Ob-2970-78-B 7 JGO
Thermometers- wont.108597- Manning,Uaxwell A Jfcore.Inc.,mfr. Acceptance recommended.
thermometer- ^ont.13013- Manning,Maxwell A Moore.Inc.,mfr.Aooeptance reconsnended.
-9-
i
SUT0001
m |
CRMC-M&S-003695
.4
h iUM
DOCUMENT REQUEST FOR*1
accesskm rasa
SOX NUMBER
SEGMENT NUMBER
Gat 3//3~ OC060
!
scscurrxoa
INITIALS UJt^T
date
^//X_
NUMBER Of PAGES
/
U, S. /VaviU nj/n <er'i ny Ey^e-rt
S-hx4i Ox\
"TK.owttd.* report <JYv 4tsK - ~7VU-j rtHl,
*m
SUT0001
T Test Ho.
B-4346 J6L
B-4368 JGO
B-4375-C JGO
B-4388-B JGO
B-4388-C JGO
B-4388-D JGO
B-4411-I JGO
sB-4411-J ) JGO
B-4411-K JGO
B-4411-L JGO
B-4411-M JGO
B-4411-H JGO
B-4412-D JGO
B-4413 J3L
B-4417 HFJ
B-4448 JGO
B-4451-B JBL
U.S. RATAL EHGIKEER1HG EXPERIMENT STaTIOK
Annapolis, Maryland
/>.
List of tat reported during month ending May SI, 1941
May
26 Gage.pressure,Type 8 welded tube construction- Manning.Maxwell & Moore,Inc.,exhib.- Ho recoanendations.
IS Bloth,asbestos- ^mbol S/516-KFR and S/515-FR - U.S.Rubber Co.Ho recommendations.
6 Lubricant,ball bearing,Grade B.modium- Reqn.l-6178-S- for KSD, SeKa.ll's Point- ^alvolino Oil Co.,contr.- Standard Oil Co.,mfr.~ Aoceptance recommended.
12 Oil filters- used lubrieating oil from, OSS KASSASOIT Analyais of- Seo report for recommendations.
12 Oil filters- used lubricating oil from, USS PC450Analysis of- Ho roooamendations.
23 Oil filters- used lubricating oil from, USS PC451Ho reooBmendations.
14 Plate steel- Chemical analysis of- Cont.708-1Bethlehem Steel Co.,mfr- Acceptance recommended.
19 Plate steel- Chemical analysis of- `'ont.708-1Bethlehem *teel Co.,mfr*- acceptance recommended.
20 Plate steel- Chemical analysis of- Cont.708-1Bethlehem Steel Co.,mfr.- acceptance recommended.
21 Plate steel- Chemical analysis of- Cont.708-1Bethlehem Steel Co.,mfr.~ Acceptance recommended.
23 Steel plates and sheets- Chemical analysis of- Cont.708-1 Bethlehem Steel Cc.,mfr.- Acceptance recommended.
29 Plate steel-Chemical analysis of- `'ont.708-1 Bethlehem Steel Co.,mfr.- acceptance recommended.
9 Plate steel- Qiemioal analysis of- Cont.433-? Bethlehem Steel Co.,mfr.- acceptance recommended.
IS 2" Jacket mter temperature regulator- Sarco C0.,Ine.,mfr.- Goats. HOs-70937 and 77243- American Locomotive Co.'s P.0. H666 and H1042Aoceptonee recommended.
22 Reliability test of General Motors Corp.Model 6-71 BC 60-kw Diesel generating set- See report for recommendations.
1 Lub.oil and Gj.esel fuel- Samples token from 0.?.Engine 8S2031 at Fairbanks,Morse A Co.- Mo recommendations.
7 Meters,mter- for USS INDIANA- Kenport Hews SBADD CO.Order H378-147 Buffalo Meter Co. ,mfr.- acceptance recommended.
-27-
/