Document 2jLjgVZJzBVG0a7KeVNbjnn7b
Monsanto
,.[ i LocnoK, w. b. Howard - General Offices
0*Tt August 29, 1967
CC-
tUBirCT
PROJECT LOSS PREVENTION REPORT 67-64
RF.FCBENCl
CEA-1430
TO : Mr. R. S. Yates (Project Manager)
R. E. Doerr R. E. Howard J. L. Mathews P. K. Ward - Anniston S&PP Project File S&PP Location File
COPIES TO THOSE PRESENT
J. R. Fullgraf H. D. Gabelman
R. J. Green
B. Howard MacPherson - Anniston t M. J. Pistek - WGK H. F. Ray - WGK R. P. Stevens R. S. Yates
PATE AND PLACE OF MEETING Missouri.
August 15, 1967, Creve Coeur,
CEA-1430
Increase Liquid Aroclors Capacity, Anniston
Plant, Anniston, Alabama.
This project is for a new tank farm, mixing area, flaking area^ and drumming area. Capital will be approximately $1.6M; completion target is January, 1969. Although no additional capacity is claimed under this project, the operation will be changed from three shift, seven day, to one shift, seven day.
A flaker will be added for solid aroclors and another flaker for biphenyl. Exhaust systems will be provided to remove fumes from the flakers.
PROCESS
1. Mix Tank
Solutions of aroclors are prepared in toluene
and xylene in a mix tank. The toluene and xylene used
for this purpose are pumped from drums directly into the
2,000 gallon mix tank. This tank is jacketed for steam
and for water. The tank will be nitrogen padded.
2. Biphenyl Surge Tank
The flash point of biphenyl is
235F. The biphenyl surge tank in the flaking area will
be heated, but only to approximately 80C. The biphenyl
will thus be below the flash point.
0285325
TOWOLDMONOQ44214
Mr. R. S. Yates
-2-
August 29, 1967
3. Scale-up of Flaker Size
The new flakers will be of
significantly larger size than the present flakers. The
aroclors are expected to perform on the new flakers as
well as, or better than, they do on the present flakers.
The biphenyl gives some problems in flaking with the
present flakers, and some of these problems may continue
with the new flakers. Although there is a scale-up factor
with the new flakers, no significant scale-up problems
are anticipated.
.
FIRE PROTECTION
A 120' x 60' x 1 story metal siding on
steel frame prefabricated type building will be erected north
of Bldg. 27 for flaking and drumming of aroclors.
It is recommended that this building be provided with an ordinary hazard wet pipe system of automatic sprinklers. The system should be supplied from a feed connected to the fire main in Fifth Street with a post indicator type shut-off valve located at least 25 ft. from the proposed building.
LOSS EXPOSURE
The maximum probable loss is anticipated
to occur from the scarring of an aroclor flaker roll. Re
surfacing of the roll would require about one month. On
this basis the BI loss would be approximately $100M. Equip
ment repair costs for the resurfacing would be approximately
$4,000.
LOSS PREVENTION GUIDE
Attached to R. S. Yates' copy of
this report is a copy of Form G-1425, Loss Prevention Review
Guide, which can be used as a safety check list for this
project.
'
LOSS PREVENTION REVIEW BY PLANT
The S&PP Branch of CED
does not plan a complete review of design prints for safety
provisions. S&PP requests plant personnel, including plant
safety personnel, to follow the development of design prints
and to check the progress of construction with particular
emphasis on personnel safety and loss prevention.
SAFETY MANAGER
R. J. Green will be Safety Manager for
this project. Please contact him for reviews during the
design phase of this project.
R. J. Green
B- H
W. B. Howard ps
0285326
TOWOLDMONOQ44215