Document 2jGbBYr5gRYrkk5kmjDmOMY2a
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4
ATLANTA FEDERAL CENTER 61 FORSYTH STREET
ATLANTA, GEORGIA 30303-8960
ELECTRONIC MAIL CONFIRMATION OF RECEIPT EMAIL REQUESTED
Ms. Mollie Maruca Vice President EHS & Facilities Pall Aeropower Corporation 10540 Ridge Rd. New Port Richey, Florida 34654-5129 mollie_maruca@pall.com
SUBJ: Resource Conservation and Recovery Act (RCRA) Compliance Evaluation Inspection (CEI) Pall Aeropower Corporation EPA ID No. FLD046855086
Dear Ms. Maruca:
On March 31, 2022, the U.S. Environmental Protection Agency, along with the Florida Department of Environmental Protection (FDEP), conducted a CEI at the Pall Aeropower Corporation located in New Port Richey, Florida, to determine the facility's compliance status with RCRA and applicable regulations.
Enclosed is the EPA RCRA inspection report which indicated that deficiencies of RCRA were discovered during the inspection. A copy of the report has been forwarded to the FDEP for follow-up and further review. If you have any questions regarding this matter, please contact Parvez Mallick, of my staff, by phone at (404) 562-8594 or by email at mallick.parvez@epa.gov.
Sincerely,
ARACELI ARACELI CHAVEZ Digitally signed by CHAVEZ 08:50:16 -04'00' Date: 2022.05.16
Araceli B. Chavez Chief RCRA Enforcement Section
Enclosure
cc: Ms. Shannon Lenhart; FDEP (Shannon.Lenhart@FloridaDEP.gov) Ms. Sarah Green; FDEP; (Sarah.Green@FloridaDEP.gov) Ms. Leslie Pedigo; FDEP (Leslie.Pedigo@Floridadep.gov) Mr. Dave McFarland; Pall Aeropower Corporation (dave_mcfarland@pall.com) Mr. Michael D'Acunto; Pall Aeropower Corporation (michael_dacunto@pall.com)
Internet Address (URL) http://www.epa.gov