More PRACTICAL IDEAS.
Enameled Coal Screw* Save Oollar*
Our TUftce 450-Kt* and two 250-hp boil
er* bum coal- We had a troublesome
corrosion problem a law years back In conveying con) from storage hopper to boilers. Suitor in wet coal iortned sul* furle acid, attacking the screw convey
were sent to the Erie Enameling Co. They applied a hfgh-glost, acfd- and
Impact-resistant enamel. Screws have
been in service lor years. Besides,
less horsepower Is needed to operate
ors and housings. Screws lasted only three momhs.
First, we used jobber costing. Hot although life of spirals was extended,
coat was high and friction increased. Then we tried industrial porcelain en
amel. Both the spirals and housings
conveyors. AU new conveyors are row enameled before installation. And, when bare alee) begins to show, we taka con
veyor out and send It to Erie hr a new cool. Thus we get the equivalent of a
new conveyor for one-third the cost of a
new one. And with less outage lime.
Bob fftoccs
New York, N. Y.
Drilling Info Lines
Under P. .ressureV
Hcne arb plant-tested method* l ing Into lines or vessels under p Moat adapter parts are from sc
Top sketch shows adapter. Hi
this for putting a 2-in. connectlt
12-in. gas-oil line. Actual drilllt
Stops Water Hammer in Blowdown Line
10 minutes. Drill was 1 47/64 , trouble of chips getting under vs
cause 1-in, flushing connection is
boiler water after -frequent open-and,closing. Lines with leaking valves were
rid of chips.
Drill Vk in. smaller than ID ol Pressure drop across orifice open
much hotter than others. Load condition was such that wa
didn't have chance te regrind valves
last season. As we were short of valves, neither could we replace them nor could
negligible even in high-pressure v To make adapter in top sketch
Veld nettle to pipe that's to be ts
12) Fasten gate valve and drill t ment shown.
we install new sea) valves beyond them. Inspecting' blowdown system, we
found trouble. Blowdown line of each boiler wo* connected to a common head
Second sketch shews adapter k<
up, ready for drilling. To drill: Open gate valve, then drain Una.
Start drilling. 13} Alter drilling thr
We iiao troubles with boiler blow* down system. Each time that any one of
er and common header vent to top of blowdown tank. System thus made a
.
pipe, pul) drill clear of goto vab* shut off. (4) Remove drilling <
large U-tube working as dead pocket for
condensate. So repeated Bushing and
ment, and hook up piping. Bottom sketch shows method of cl
condensing cycle* ol leaking boiler wa Ing out plugged-up feed noules in
out boiler* was shut down before midnight, there was water hammer in blow lines early next morning. Water ham
ter pushed, then drew back water col
umn in deed pocket. Result was a series of water hammers, sketch.
reactor of our fluid catalytic reft unit.* (1) Close valves 3 and 4. Remove blind flange at 5 and U'
mer was not severe at first, but became louder and louder until it was pretty bad.
Boiler blow-valves are. old-fashioned, gear-lift, solid-disk, single-valve type and
We cut a hole in bottom of common header, welded a piece of pipe, installed
a 14-In. valve, and ltd the. pipe to ash trench. By opening this small valve to drain common header, water hammer*
drilling equipment. {3} Insert drill open valve 5. (4) Drill out pM* noule and flush out as necessary 1 velve connection 6, (5} Pull drill d out of valve 3 and thtit valve 6* l11
were no linger tight enough to sea) eventually stopped bothering us.
blind flange at 5, open valves 1 ood
If C Wtt
Taipei, Free China
S B Mono
Montreal, Qoeb*t
>34 [Continued on page !2fl)
nAm 'tM"0N tN0 HmNc8 SrctlON
ijtepless, Wide Range Speed Control
^riplrect Coupled Draft Fans
257 Liquid Rheostats rontrol the speed of boiler by wound rotor motors you get:
jpt/jmnjediata response to varying draft conditions.
fwSrtooth; continuous, ttophti speed control.
WiEquol-iaflsJfiVity over the entire operating range. BhL; ng&lf WORK*. Motor speed is varied by increasing and
resistance. This is accomplished by raising and lowering and the level of current-carrying electrolyte. A pilot S^t^fansmits'draft condition to a lifting mechanism which
Electrode position and electrolyte level. A full resistance
P^ded in only 10 inches of electrode travel. The basic
of liquid rheostat operation plus the utilization of spefc^?/-fogintcrtd electrodes gives a linear relationship between
' and electrode travel over the complete rheostat range.
*** not mechanically connected to the motor it located to suit the most convenient plant layout. For com* '***!!*. contact your Allis-Chalmers representative or write
14S7544.
ALLIS-CHALMERS
ill
Milwaukee 1, Wiseontiit
mywbfi-'-'
1953