Document 2bvJNx6zZjXzz7vqJyKMr6oa

0 John E. Fox November 9, 1978 Insulation Material from Department 15 J. A. Glass W. L. Riddick A Lynell Cale As per your request, I have obtained an analysis of the insulation materials you submitted from the Department 15 steam lines that will require removal during the reactor modification project. Samples of the material contained asbestos. This will require that our asbestos removal plant procedures be followed closely during this project. The major provisions in the procedures are that insulation material shall be wetted,and that all materials shall be bagged,and that no material shall be allowed to fall from the structure or be allowed on the walk ways. Detailed stripping procedures can be obtained from our insulator foreman, Sherman Jones. /mbr John E. Fox </ MAP 001448 LAM023324