Document 2VbdRKwVBR8zq5Ow390X671p
Monsanto f '
DfCTATE IN SEQUENCE:
1. HEADING INFORMATION
}. NAMES OF ADDRESSEES
3. NAMES OF CARBONEES
4. IMMEDIATE ACTION NEEDED
5. REPORT ON CAU
'
v;<.... 0IV.SKJR
CUSTOMER NAME
_ ,J
OAK V CAU
______Standard T chemical
Cirr AND STATE
A I Date rcccnco
_______ Chicago Heights. 111.^60411
4-4-72 ~*daIe nrpto
4-6-72
CUSTOMER MAILING LIST CHANGES-SERVICE CENTER USE ONIY
NAME AND MlE
w MR MAC CAIECORV COOES
J
1
REPORT CAPTIONS:
1. OBJECTIVE 2. PERSONS CONTACTED 3. RESULTS
4. ACTION REQUIRED
10 '/T'/
MOWN
SERVICE CENrtl
D. B. Roush CC or, J. Roder
P. W. Gann B. L. Shimley P. L. Slayton R. V. Keyland
SAICSMAN
Dancer
sbisctlvei To convert 400 gallon PR-1 system to Thermlnol 66. contactst Lane Johnson - IngineeTTIQ Results Standard T Chemical has a 400 gal Thermlnol PR-1 system at 2600 S.
Federal In Chicago. This syatem operates at 550*r and heats a resin kettle used to manufacture paper sealant chemicals. Mr. Johnson does not bale lave any of the sealant contacts a food product directly or indirectly and is not presently concerned with the FDR laws.
The Federal Street resin plant is to be dismantled in a year and the Thermlnol FR-1 equipment will be relocated to the Chicago Heights plant. The reassemble sealant operation will be started up on Thermlnol 66. The engineering firm "PILOT UNITS PRODUCTS" will design the new T-66 system. Design work is cureently in progress.
' Mr. Johnson does not-want to convert his existing FR-1 system to T-66 because the investment in safety equipment to handle T-66 will be lost when the plant is torn down. In order to quamantee a supply of FR-1 for the next year, the engineering firm "Pilot Units Products" has purchased unused FR-1 from various people on the east coast. Presumably, this may be one of the companaies which was buying FR fluid from Monsanto customers in March, 1972.
Mr. Johnson will try to keep abreast of developments in the PCB situation. If standard T feels continuation of sealant production at the old plant with Thermlnol FR has become too risky at some future time, they may move juat the sealant system equipment to the new location on a crash basis and switch to T-66 prior to closing the Federal Street plant.
Actions Requiredi 1. Send complete set of design information for new T-66
system toi
I. Z. Rubin Pilot Units Products
P. 0. Box 114
South Orange, N. J. 07079
(Telephone 201-763-0399)
Mil |KV. IVUI
1 - CENTRAL OFFICE COPY
MCNS 077597
Monsantn^r '
cAi "ipd#f- Organic bivii
DICTATE IN SEQUENCE:
\. HEADING INFORMATION
2. NAMES OF ADDRESSEES
3. NAMES OF CARBONEES
4. IMMEDIATE ACTION NEEDED
5. REPORT ON CALI
"
CUSTOMER NAME
Standard T Chamical ClfY AND STATE
PATE Of CALL *1 ' 1 OAK RECEIVED DATE TVSfO 1
_____ _ Chicago Heights, Hi._ - Pegs Two!
CUSTOMER MAILING LIST CHANGES - SERVICE CENTER USE ONLY
1
NAME ANO TITLE
Tsr M MR MAC CATEGORY CODES I
REPORT CAPTIONS:
1. OBJECTIVE 2. PERSONS CONTACTED 3. RESULTS 4. ACTION REQUIRED
ISOION
SERVICE CENTER
SALESMAN
TO .
-CC................ ..
...
. 2, Adviae. Mr. <7ohnaon of significant, development* in PCB situation Which might favor an aarly conversion to Therminol 66.
. .
tear. Backgroundi The 400 gallon FR-1 system runs at 5S0*F and haats a - jaokstsd rasin kettle manufacturing a paper sealant. The system is composed -
of a gas fired Bclipse boiler, pump, expansion tank and jacketed kettle.
The boiler is located below grade in an unsprinklered room with a steam
boiler, isolation and containment of a Therminol spill without a fire is a
problem in the boiler room. . .
..
.
The distribution piping passes under a plant street (pipe tunnel) and then ~ to the jacketed kettle. The underground piping was welded several years ago to eliminate kjjpm^s in the inaccessible pipe tunnel.
The jecketed stainless steel kettle has been badly d$iaged in the upper jacket area due to chloride stress cracking. Last year the top 6" of the jacket was. cut out and replaoed. There is seme question about remaining jacket life if FR use is continued one more year.
Following the jacket repairs last year, the foreman became quite sick and '
eventually had a kidney removed. Mr. Johnson wondered if there was any
possibility of PCB poisoning. Since the jacket repairs were made at ambient
temperature, I told him no, but offered the service of our Medical Dept, if '
he wished further information. Because the issue is considered closed,
Mr. Johnson is relunctant to reopen a potential problem for his company
-
as well as ours. He will contact Monsanto if they wish to discuss the
matter further.
'
When moving the existing equipment to Chicago Heights, Mr. Johnson would _ drain i the .'Therminol FR and return it to Monsanto. He would plan to flush the equipment after reinstallation. Disposition of the flush would be decided . at that time. Furnace anuffing, inerting of the expanaion tank, etc. would be added during the reinstallation.
D. I. DanzerI
Mil IKV. II/UI
I - CENTRAL OFFICE CORY
MONS 077598