Document 2Rp2qyXGKKMgrz12eE90xRDGp
FRAZER PAINT COMPANY 2475 Hubbard Avenue Detroit, Michigan
SCHEDULE I
TRADE NAME: CATEGORY:
COLORi QUALITY:
55 RedLead in Oil Red Lead inOil
Red First
Pigment: 75%
Red Lead ^razer Pigment Silica
Lbs.
1020 125 130
Vehicle: 25% Raw Linseed Oil Heavy Bodied Linseed
Oil Mineral Spirits Turpent ine Drier'<
*
350
16 19 19 18:
Yield in Gallons
Unit Cost
Total Cost
Weight
.095
96.90
per
.035
4.38
gallon .01 1.90
finished Storage & handling cost
product, through loss - 1%
Laboratory
record
21. lbs.
.13
45.50
102.58
1.03
.143
2.29
.015
.2
* ' " .10
1.90
.07 1.26
Storage Sc handling cost
through loss - j/o
51.24 1.54
Calculated Yield Manufacturing Loss - 2i% Actual Yield
1697
80.8
2. 78.8
Cost Analysis; Material cost rer gallon Direct labor cost rer gallon Factory overhead per gallon
Bulk cost per gallon Complete package cost per gallon, including filling charge Factory cost in nackage per gallon
PRICES
(a) To a company owned or controlled outlet (b) To an independent wholesaler (c) By company owned or controlled outlet to retail customer (d) To an independent retailer(Dealer) (e) To other (Industrial)
* (Contractor)
156.39
I.98 .10
.08 2.13
.19 2.32
None None 4.25 3.32 3.6l 9.40
rTpSoouceo at I he hmiunm.
N 5150
OPA 16252