Document 2RdYB29wERrY8B1ekMxv6YKJL
UNITED STATES ENVIRONMENTAL PROTECT ION AGENCY
REGION 5 77 WEST JACKSON BOULEVARD
CHICAGO, IL 60604-3590
SEP 3 0 2019
REPLY TO THE ATTENTION OF
CERTIFIED MAIL RETURN_RECEIPT REQUESTED
Nancy Van Burge] Assistant General Counsel Kinder Morgan, Inc. 370 Van Gordon Street Lakewood, Colorado 80228
Email: N::mcv VanBur;2J'.h'?k..indermor~an.com
Dear .Ms. Van Burge]:
EnL"losed is a fiJe--starnped Consent Agreement and Final Order (CAFO) which resolves l(j 11de1
1\forgan Liquids Tenninals. LLC and KM Phoenix Holdings, LLC docket
,,o. CAA-05-2019-0032 _ _ _ . As indic ed by the filing stamp on its first paf~ . w e filed the
CAFO wiTL th~ Regional Hearing Clerk on
() ~__j
P!1r:=uctm 10 P3ragraph 35 of tbe CA..FO, Kin er M organ Liquids r en ninals.. LLC anc.1 K j\/1 Phoenix Holdings, LLC must pay the civil penalty within 30 days of the filing elate. four electronic funds transfer must display the case name and case docket nurn her.
Please direct any questions regard ing this case to William Wagner, Associate R :~1;:nnal Co,rnseL 312-886-4684.
Sincerely,
Bnan Dickeris, Chief Ai,: Enforcement ;ind Compliance Assurance Section (l\1N/OH)
Enclosure
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS
In the Matter of:
)
)
)
KM Phoenix Holdings LLC, and
)
Kinder Morgan Liquids Terminals, LLC )
Cincinnati Terminal
)
Cincinnati, Ohio
)
)
Respondents.
)
Docket No. CAA-05-2019-0032 Proceeding to Assess a Civil Penalty
Consent Agreement and Final Order
Preliminary Statement
1.
This is an administrative action commenced and concluded under Section 113(d)
of the Clean Air Act (the Act or the CAA), 42 U.S.C. 7413(d), and Sections 22.1 (a)(2).
22. 13(b) and 22.18(6)(2) and (3) ofthe Consolidated Rules of Practice Governing the
Administrative Assessment of Civil Penalties and the Revocation/Tem1ination or Suspension of
Permits (Consolidated Rules), as codified at 40 C.F.R. Part 22.
2.
Complainant is the Acting Director of the Enforcement and Compliance
Assurance Division, U.S. Environmental Protection Agency (EPA), Region 5.
3.
Respondents are KM Phoenix Holdings LLC (KM Holdings) and Kinder Morgan
Liquids Terminals, LLC (Kinder Liquids), both of which are limited liability companies doing
business in Ohio.
4.
Where the parties agree to settle one or more causes of action before the filing of
a complaint, the administrative action may be commenced and concluded simultaneously by the
issuance of a consent agreement and final order (CAFO). 40 C.F.R. 22.13(6).
5. The parties agree that settling this action without the filing of a complaint or the adjudication of any issue of fact or law is in their interest and in the public interest.
6. Respondents consent to the assessment of the civil penalty specified in this CAFO and to the terms of this CAFO.
Jurisdiction and Waiver of Right to Hearing 7. Respondents admit the jurisdictional allegations in this CAFO and neither admit nor deny the factual allegations in this CAFO. 8. Respondents waive its right to request a hearing as provided at 40 C.F.R. 22.15(c), any right to contest the allegations in this CAFO and its right to appeal this CAFO. 9. Section 113(d) of the Act limits the authority of the Administrator of the EPA (Administrator) to matters where the first alleged date of violation occurred no more than 12 months prior to initiation of the administrative action, except where the Administrator and the Attorney General of the United States jointly detennine that a matter involving a longer period of violation is appropriate for an administrative penalty action. 10. The Administrator and the Attorney General of the United States, each through their respective delegates, have determined jointly that an administrative penalty action is appropriate for the period of violation alleged in this CA.FO.
Statutory and Regulatory Background 11. Section 110 of the Act provides that states must submit plans for the implementation, maintenance and enforcement of the national primary and secondary ambient air quality standards, where such plans must include, among other provisions, a permit program to enforce emission limitations and other control measures. CAA l 10(a)(2)(C). 12. 40 C.F.R. Part 52 sets forth regulatory provisions pertaining to the approval and
2
promulgation of implementation plans. Section 52.23 of the general provisions pertains to the violation and enforcement of provisions approved into a state implementation plan, and provides, in pertinent part, as follows:
Failure to comply with any ... permit limitation or condition contained within an operating permit issued under an EPA-approved program that is incorporated into the State implementation plan, shall render the person or governmental entity so failing to comply in violation of a requirement of an applicable implementation plan and subject to enforcement action under section 113 of the Clean Air Act. 13. On February 20, 2013, U.S. EPA, Region 5, approved into the Ohio State Implementation Plan (SIP) a Pennit to Install and Operate (PTIO) program to make Ohio's air permit program for minor sources more efficient and the permit provisions federally enforceable. 78 Fed. Reg. 11748. 14. The Ohio Environmental Protection Agency (Ohio EPA) issued a PTIO (P0l 16569) to the gasoline distribution bulk tenninal located at 930 Tennessee Ave., Cincinnati,
Ohio (Facility) under the EPA approved SIP PTIO program on May L 2014. The PTIO sets forth
emission limitations and work practices that apply to the Facility's tanks and tank components, and provides, in pertinent part, that "all openings, except stub drains, shall be equipped with a cover, seal, or lid which is to be in a closed position at all times except when in actual use for tank gauging or sampling." Part C.3(c)(l)(d) of PTIO P0l 16569.
15. The Administrator may assess a civil penalty ofup to $37,500 per day of violation up to a total of $320,000 for violations that occurred after December 6, 2013 through November 2, 2015, and $46,192 per day of violation with a maximum of$369,532 for violations that occurred after November 2, 2015, through the period of violation. under Section l 13(d) of the CAA, 42 U.S.C. 7413(d), and 40 C.F.R. Part 19.
3
Factual Allegations and Alleged Violations 16. On March 30, 2016, EPA issued a Notice of Violation (NOV) to BP Products North America Inc. (BP), which, until February 1, 2016, was the owner and operator of the Facility, for certain violations of the Facility's PTIO. On June 30, 2016, Region 5 issued an NOV to KM Holdings, the current ovmer of the Facility. which is a joint venture limited liability company b_etween Kinder Morgan, Inc. and BP., and Kinder Liquids, the current operator of the Facility, which is a wholly-owned subsidiary of Kinder Morgan Inc., for continuing violations of the Facility's PTIO. KM Holdings has assumed all liability for the violations alleged in this CAFO that accrued while BP was the owner and operator of the Facility. 17. During a June 3, 20J 5 inspection of the Facility, EPA and OEPA inspected Tank 016, which stores transmix and is equipped with an internal floating roof, a center vent, and two perimeter vents. The internal floating roof contains a gauge hatch, deck fittings and seams, and seals, which are openings to Tank 016. From the top of the Tank OJ 6, while the tank openings were not in actual use for gauging or sampling, EPA and OEPA inspectors measured gases emitted downwind of the center vent with a photoionization detector (PID) and recorded values as high as 8,032 ppb of volatile organic compounds (VOC). Subsequently, on May 16, 2016, EPA perfonned a second inspection of the Facility, including Tank 016. Using a FUR GF-320 camera, EPA inspectors observed continuous leaking hydrocarbon emissions from the center vent and two perimeter vents from Tank 0 16, while the tank openings were not in actual use for tank gauging or sampling. The above-described hydrocarbon emissions from Tank OJ 6 are evidence of violations of Part C.3(c)(l)(d) of the PTIO P0l 16569.
4
18. In a Section 113 conference with Kinder Liquids on September 12, 2016, Kinder
Liquids stated its intent to inspect and, if required, repair the tank. Kinder Liquids subsequently
completed its inspection of the tank on October 18, 2016, and its repair of the tank on March 6,
2017. The repairs included, among other things, the installation of new floating roof seals.
Kinder Liquids returned the tank to service on April 29, 2017.
Civil Penalty
19. Based on analysis of the factors specified in Section 113(e) of the CAA,
42 U.S.C. 7413(e), Respondents' prompt return to compliance, and the facts of this case,
Complainant has determined that an appropriate civil penalty to settle this action is $10,000.
20. Within 30 days after the effective date of this CAFO, Respondents must pay a
$10,000 civil penalty by sending a cashier's or certified check, payable to "Treasurer, United
States of America." to:
US. EPA Fines and Penalties Cincinnati Finance Center P.O. Box 979077 St. Louis, Missouri 63197-9000 The check must note Respondent's name and the docket number of this CAFO. For electronic
funds transfer, make payable to "Treasurer, United States of America," and send to:
Federal Reserve Bank of New York ABA No. 021030004 Account No. 68010727 33 Liberty Street New York, New York 10045
Field Tag 4200 of the Fcdwire message should read: "'D68010727 Environmental Protection Agency" In the comment or description field of the electronic funds transfer, state Respondents' names
and the docket number of this CAFO. For Automated Clearinghouse (ACH) payment, also
5
known as REX or remittance express, make payable to 'Treasurer, United States of America,'
and send to:
US Treasury REX/Cashlink ACH Receiver ABA: 051036706 Accollllt Number: 310006, Environmental Protection Agency CTX Format Transaction Code 22-checking
In the comment area of the electronic funds transfer, state Respondents' names and the docket
number of this CAFO.
To pay on-line, go to w11w.na1 .f!ov. Use the Search Public Forms option on the tool bar and
enter SFO 1.1 in the search field. Open the form and complete the required fields.
21. Respondents must send a notice of payment that states Respondents names and
the docket number of this CAFO to EPA at the following addresses when it pays the penalty:
Attn: Compliance Tracker (AE- I 8J) Air Enforcement and Compliance Assurance Branch Air and Radiation Division U.S. Environmental Protection Agency, Region 5 77 W. Jackson Boulevard Chicago, Illinois 60604
William Wagner (C-14J) Office of Regional Counsel U.S. Environmental Protection Agency, Region 5 77 W. Jackson Boulevard Chicago, Illinois 60604
Regional Hearing Clerk (E-19J) U.S. Environmental Protection Agency, Region 5 77 W. Jackson Boulevard Chicago, Illinois 60604
22. This civil penalty is not deductible for federal tax purposes.
23. If Respondents do not timely pay the civil penalty, EPA may request the Attorney
General of the United States to bring an action lO collect any unpaid portion of the penalty with
interest, nonpayment penalties and the United States enforcement expenses for the collection
6
action under Section l 13(d)(5) of the CAA, 42 U.S.C. 7413(d)(5). The validity, amount and appropriateness of the civil penalty are not reviewable in a collection action.
24. Respondents must pay the following on any amount overdue under this CAFO. Interest will accrue on any overdue amount from the date payment was due at a rate established by the Secretary of the Treasury pursuant to 26 U.S.C. 662l(a)(2). Respondents must pay the United States enforcement expenses, including but not limited to attorneys' fees and costs incurred by the United States for collection proceedings. In addition, Respondents must pay a quarterly nonpayment penalty each quarter during which the assessed penalty is overdue. This nonpayment penalty will be 10 percent of the aggregate amount of the outstanding penalties and nonpayment penalties accrued from the beginning of the quarter. 42 U.S.C. 7413(d)(5).
General Provisions 25. Consistent with the Standing Order Authorizing E-Mail Service of Orders and Other Documents Issued by the Regional Administrator or Regional Judicial Officer under the Consolidated Rules, dated March 27, 2015, the parties consent to service of this CAFO by e-mail at the following e-mail addresses: wagner.william@epa.gov (for Complainant), and Nancy VanBurgel@kindermorgan.com (for Respondent). The parties waive their right to service by the methods specified in 40 C.F.R. 22.6. 26. This CAFO resolves only Respondents' liability for federal civil penalties for the violations alleged in this CAFO. 27. The effect of the settlement described in paragraph 26 above, is conditioned upon the accuracy of Respondents' representations to EPA, as memorialized in paragraph 30 of this CAFO and Respondents' letters dated April 16, 20 I 8, and July 9, 2018.
7
28. The CAFO does not affect the rights of EPA or the United States to pursue
appropriate injunctive or other equitable relief or criminal sanctions for any violation of law.
29. This CAFO does not affect Respondents' responsibility to comply with the CAA
and other applicable federal, state and local laws. Compliance with this CAFO will not be a
defense to any actions subsequently commenced pursnant to federal laws administered by EPA.
30. Respondents KM Holdings and Kinder Liquids certify that the Facility is in full
compliance with the terms and conditions of its PTIO.
31. This CAFO constitutes an "enforcement response" as that term is used in EPA's
Clean Air Act Stationary Civil Penalty Policy to detennine Respondent's "full compliance
history" under Section 113(e) of the CAA, 42 U S.C. 7413(e).
32.
The terms of this CAFO bind Respondents, its successors and assigns. Each
person signing this consent agreement certifies that he or she has the authority to sign for the
party whom he or she represents and to bind that party to its terms.
33.
Each party agrees to bear its own costs and attorneys' fees in this action.
34.
This CAFO constitutes the entire agreement between the parties.
8
KM Phoenix Holdings LLC, Respondent
'1-17-19
Date
Richard Steinberg Vice President, Chief Compliance Officer KM Phoenix Holdings, LLC
Kinder Morgan Liquids Terminals LLC, Respondent
1'-17-11
Date
Richard Steinberg Vice President, Chief Compliance Officer KM Phoenix Holdings, LLC
United States Environmental Protection Agency, Complainant
St1,.tL6~
Date
()(Michael D. Harris
"ft Acting Director
Enforcement and Compliance Assurance Division
U.S. Environmental Protection Agency, Region 5
9
Consent Agreement and Final Order In the Matter of: BP Products North America, et al., Cincinnati Terminal Docket No. CAA-05-2019-0032
Final Order
This Consent Agreement and Final Order, as agreed to by the parties, shall become effective
immecliately upon filing with the Regional Hearing Clerk. This Final Order concludes this
proceeding pursuant to 40 C.F.R. 22.18 and 22.31. IT lS SO ORDERED.
Ann L. Coyle
~\
Regional Judicial Officer
U.S. Environmental Protection Agency
Region 5
10
Consent Agreement and Final Order
In the matter of: Kinder Mor~4~b%11fsT erminals, LLC and KM Phoenix Holdings, LLC
Docket Number: CAA-OS O
.
CERTIFICATE OF SERVICE
I certify that I served a true and correct copy of the foregoing
Order, docket number CM o(l~l1 bDV::,--which was filed on__,_,~--------+-
manner to the following addressees:
Copy by E-mail to Attorney for Respondent:
Nancy Van Burgel nancv vanbunzel(a)kindern1onzan.com
Copy by E-mail to Attorney for Complainant:
William Wagner wa~mer. \vi lli a m ( 0 e p a . g o v
Copy by E-mail to Regional Judicial Officer:
Ann Coyle covle.ann@.epa. goy
Dated:
Regional Hearing Clerk U.S. Environmental Protection Agency, Region 5
CERTIFJED MAIL RECEIPT NUMBER(S): _ _ _A---(#~-~4--:+---- - - - - - -
{