Document 2Rbd3KdGX99vV8b1bV9bQ3BO7
VINYL II PLANT CONSOLIDATED AUDIT PROGRAM
I. OPENING (TUESDAY, SEPTEMBER 10, 1991 - 7:30 AM TO 10:30 AM) DOW CONFERENCE CENTER
ATTENDANCE:
Page 1
REDACTED
CONFIDENTIAL
Howard Wilkinson of the Audit Group began the opening session by expressing gratitude to the Vinyl II plant personnel for the time and effort put into completing all the pre-work involved in preparing for the consolidated audit. The three day audit agenda was also reviewed and everyone introduced themselves.
II. VINYL II PLANT OVERVIEW PRESENTATIONS
ORGANIZATION & PLOT PL7\N
PROCESS & UNIT OPERATIONS (Process Description, Flowsheets, Chemistry Including Side Reactions, Instrumentation and Critical Instruments)
*FURNACEAREA *DISTILLATION *OXY `ECOLOGY
REVIEW OF PLANT/DEPARTMENT POLICIES/PROCEDURES AND COMMUNICATIONS REVIEW OF TRAINING AND RETRAINING PROGRAMS
REVIEW OF SIGNIFICANT INCIDENTS/ MAJOR CONCERNS
R&si49540
Page 2
*LOSSES
REACTIVE CHEMICALS SAFETY MEDICAL
Chris Messelt, Plant Superintendent of Vinyl II reviewed the plant organization/structure and some of th^ process control. Almost 30% of the plant process is controlled by Mod5. The plant operates with 6-operators per shift, 3-SOS's and 3-OS's.
i reviewed the process and unit operations which included Process Description, Flowsheets, Chemistry-Side Reactions, Instrumentation and Critical Instruments. Presentations included some Start-up and Shut-down procedures/checklists.
reviewed the plant Policies, Procedures, and Communications. Safety
responsibility is clearly defined in the Vinyl II Plant Safety Policy (Each employee is -
r sponsible for his/her safety and that of co-workers).
also reviewed the Vinyl II
Safe Job Procedure Manual, Personal Protective Equipment Policy, Industrial Hygiene
Policy, and Training Policy. Procedures are assigned to each shift to be up-dated. This
is done by a Procedure Audit/Development Status Checksheet. Different methods of
communicating are used at Vinyl II (Control Room Operations Logbook, Operations
Instruction Logbook, Communications Manual, Daily Shift Tailgate Meetings, Safety
Meetings, Bulletin Boards and Letters). Weekly Maintenance and Project Reviews are
also held.
The Vinyl II Plant Safety, Project Review, and Key Parameter Programs looks to be extremely effective and driven by line employees. Daily Production and Tailgate meetings ar^ held. A plant representative attends the plant Contractor safety meetings. Goal Setting for all employees is on-going and we support this effort. We also support your efforts to standardized your Red Tag System which is already in progress.
REDACTED
CONFIDENTIAL
RECOMMENDATIONS:
The following recommendations are based on the Vinyl II Plant defined opportunities for improvement. Other opportunities will be addressed during the audit sessions.
1. Consider centralizing all plant operating procedures to one location. During the pre-audit inspections, procedures were found to be in several places.
Although in different books the operations procedures, red tag procedures, policies, etc. are in the control room and in the Safety /Training Coordinator's office. Lab and loading procedures are in the lab and loading office respectively with copies in the Safety Coordinator's office. /Jo FtuCTHEC /fcf7ch)
R&S149541
Page 3
2. We support your plans to up-date your Operations Manuals. Consider developing a timetable for this project and submit it with your action plans.
This is answered in detail later. Basically, resources and overtime limit the
ability to make much progress on this until Mod5 conversion is complete. The
Mod5 conversion will update much of this, and it was felt that redundancy
should be minimized.
PuyvthcmL iA<jt(ck)
TRAINING AND RETRAINING PROGRAMS: SUMMARY:
The Vinyl II Plant plans are to convert all training efforts to the the IPT (In-PlantTraining) concept The Loading Area and Gold Hat Safety Training are now using the "IPT" concept All other employee (exempt and non-exempt) training is completed via checklist. A new technical employee training checklist was recently developed. About 5% of the IPT modules are complete and an IPT Flowsheet has been developed. -Some opportunities for improvement were identified in this area that will be addressed during the audit sessions.
SIGNIFICANT INCIDENTS/MAJOR CONCERNS: SUMMARY:
reviewed the current plant Statistics, Significant Incidents from 1990 1991, Repetitive Incident Causes, and Areas of Concern. Quality Performance Improvement Index data is generated to track the plant performance in several areas. Significant Incidents are broken down into key areas to help identify problem areas. Some opportunities for improvement were identified in this area that will be addressed during the audit sessions.
REDACTED
CONFIDENTIAL
R&s149542
I YDI CATES PRIORITY ITEM
Page 4
III. VINYL II PU\NT TOUR (10:30 a.m. to 11:30 a.m.)
Before leaving for the plant tour the Vinyl II plant indoctrination video was reviewed by the audit teams_ Excellent job on your overview presentations. Thanks, LAD Consolidated Auditors
* INDICATES PRIORITY ITEM
CONFIDENTIAL
r &s i 49543
REACTIVE CHEMICALS AUDIT (TUESDAY, SEPTEMBER 10, 1991 -- 12:00 PM - 4:00 PM) AUDIT TEAM:
PRESENTER: ATTENDANCE:
Page 5
WRITER:
The Reactive Chemicals Committee is very appreciative of the effort Vinyl II personnel put into this reactive chemicals review. Obviously there was a tremendous amount of work which went into the preparation. The presentation was very well organized.
The Reactive Chemicals Committee agrees with all the opportunities for improvements listed in the packet. The following are opportunities which were emphasized during the review.
ACCOMPLISHMENTS SINCE LAST 2 YEAR REVIEW
There was lots of improvements since the last 2 yr review such as increasing coke recycle length by reduction in carbon tet, more MOD V control, better furnace temperature/cracking control, improved catalyst, change over to Kynar packing in C-211, 02 analyzer on C270, new THROX scrubber train, bleed-valves to identify leaking PSV's
j. * is
REDACTED
CONFIDENTIAL
` INDICATES PRIORITY ITFM
33
CO
to t4n*
Page 6
RECOMMENDATIONS:
* 1.
Consider developing a cross compatibility chart for all process chemicals in use at Vinyl II. Texas Division has excellent compatibility charts based on the CHEMPAT computer program that perhaps could be modified for your purposes. A contact which was mentioned that may be of some assistance is Dave Leggett in Texas..Reactive Chemicals Lab. This chart could also be used in your reactive chemicals training program.
This chart will be developed by IQ 92. Responsibility:
CCMPUTt-
2. It was mentioned that chlorine addition to C-255 is based on analytical results from grab sampling. It was also mentioned that rate changes make it difficult to exactly adjust the chlorine flow. Consideration should be given to implementing more reliable flow control.
, -3
The improved flow control scheme is planned with implementation by 1Q92. -
-
Responsibility:
,
jjo CHAU6&
* 3. * 4.
Oxygen Service: Review P&ID's to make sure that cpec breaks are located properly. Determine and indicate areas where oxygen can backflow and create a reactive chemicals hazard. This effort should also be extended to chlorine service.
Such a review will be conducted 'to identify potential hazards by 1Q92. 5rlCM.L[)
Responsibility:
/O0 DC
1A'l
Chlorine service: Develop procedures for performing maintenance on chlorine
lines.
O>n poa
Chlorine equipment maintenance procedures will be developed by 12/31/91.
Responsibility:
.
_
CfOjfJhL T2> VSUjdc.
CONFIDENTIAL
* 5. 6.
Chlorine service: A pipe spec for chlorine service does not currently exist at Vinyl II. Obtain a copy of the pipe spec which is used at CA 2 & CI2 and implement at Vinyl II.
A chlorine service pipe spec will be obtained and implemented at Vinyl II.
Responsibility:
_
12/31/91.
L<tmPcte_ i Hz--
Oxygen reactivity: Implementation of dual flow meter on all feeds to OXY-EDC should be considered.
R&S149545
INPII' rPP."'PTT> n'l:M
Page 7
This project was delayed due to Mod5 delay. Anticipate 1993 or later
approval.
jjo fu/irH&t
* 7.
Consider obtaining documentation on the worse case credible scenarios which were used for sizing the reliefs on the Oxy-EDC reactor. This information should reside in the Vinyl II reactive chemicals file and could be used in your reactive chemicals training program.
* 8.
Oxy-EDC reactor PSV sizing information will he obtained and included with reactive chemicals data by 12131/ 91. Responsibility:
OMPLtXZO ifac-
Procedures should be developed which specify the time frame for changing out rupture disks at Vinyl II. Also, ruptures disks should be an integral part of the pressure vessel program.
Rupture discs will be included in the PSVprogram and changed at a
minimum ofevery 2 years. Registration to be completed by 12/31191.
Responsibility: _
.
REDACTED
CONFIDENTIAL
* 9.
Consider developing procedures that address the adding of waste materials to T410. These procedures should address reactivity and flammability concerns. Written procedures should be established for minimizing the risk of inadvertently mixing together incompatible waste.
Waste storage guidelines and equipment labeling for T410 will be developed
by 12 31191. Responsibility:
,,
10. Consider performing positive identification tests on the Betz chemicals and also on sodium thiosulfate. Certificate of analysis is provided by the vendor but this is not considered fool-proof.
Positive identification procedures will be implemented by 12/31/91.
Responsibility: _
4*J&e it>
2__
A block policy will be written to address identification of vendor supplied
process materials by 1/1/92. Responsibility:
Odw\ (?c6^r~~
11. The Reactive chemicals Reactive chemicals binder should be updated with more current reactive chemicals tests data.
Pertinent reactive chemical data will be reviewed and/or updated and included in the plant binder by 2Q92. Responsibility:
CdM Pte TT O / l/q /
R&S149546
Pagcg
12. It was mentioned that
has a flow diagram for determining if an
instrument should be considered critical. Obtain this flow chart and discuss with
Buck Bailey. Review the plant instrument list and determine the criticality of
instruments in areas where key reactive chemicals concerns exist.
Shortage ofI & E labor caused the list to be reduced in the past. Mod V will
address Critical instruments using redundancy. Completion depends on;
funding for Mod5. Area personnel have reviewed current list. Vinyl II does
not agree with the critical instrument flowsheet that requires triple
instrumentation.
/Jo *fo77ctj
* 13.
Due to the problems of stress crack corrosion the piping specs for Vinyl II should
be reviewed to assure that stainless steel bolts are not being used in areas
where this could be a problem.
*.
Vinyl IIpiping specs will be reviewed and revised as necessary by 1Q92. This
will include development ofprocedures to confirm spec compliance when
materials arrive on site. Responsibility:
_
and CH
Maintenance Group.
CHtRJJd Rt> 5/^2--
14. Determine if the type of insulation used in the Dowtherm area is appropriate with respect to avoiding spontaneous ignition hazards.
Insulation type will be identified by 12 ! 31 / 91. Responsibility:
P& C ^ 3
dcwPLarE. iz-J! /
* 15.
In order to minimize the potential for acetylene/chlorine explosion problems in Vinyl II scrubber review operation of the Miracle column with respect to the possibility of chlorine being sent to Vinyl II . If this potential exists safeguards should be installed to avoid the hazard.
t
n H
oo
z H >
Miracle column specs will be reviewed with Solvents/EDCI to identify
possible hazards by 2Q92. Responsibility:
/Jo CMAddELs "
16. Adsorbents used for spill clean-up at Vinyl II should be tested in the reactive chemicals lab to assure compatibility with plant chemicals.
Pads are used along with clay pellets and occasionally saw dust. No problems have been experienced. No testing is planned at this time. /j^ fanrhctL i/Hcrtcrj
17. The Reactive Chemicals Committee agrees with the need for evaluating and documenting worse case scenarios for each area of the process.
Worse case scenarios will be evaluated and included in the reactive chemicals
training program by 2Q92. Responsibility:
/Jd e_
^
Cn
-fcJk
Page 9
18. The Committee also agrees with the need to continue to develop, document and implement corrective action plans to address ail relief system deficiencies.
* 19.
This is ongoing and will take several years to complete. _ ,,
nas
completed evaluation of the 10 worst with corrective actions to be
implemented during the 1992 plant shutdown. Fourteen more are now being
evaluated.
w 7 uPc^wt^
ht#. sHuittn^d
Another area that is in need of improvement is training. The suggestion to consolidate pertinent reactive chemicals information into a dedicated training program is excellent and right on target. This could be included on C-9 checklist for documentation and follow-up.
A reactive chemical trainingprogram will be developed and implemented by
2Q92. Responsibility:
/Jo C//W66-
ELECTRICAL RELIABILITY AUDIT: (Tuesday, September 10,1991-12:00 p.m. to 12:30 p.m.)
Audit Team:
Presenter:
Attendance:
REDACTED
CONFIDENTIAL
Writer:
ELECTRICAL RELIABILITY AUDIT SUMMARY:
ACCOMPLISHMENTS/IMPROVEMENTS SINCE LAST AUDIT (1989):
1. Excess equipment has been removed/relocated; the floor sections of computer room and building 6601 have been replaced; wiring is more orderly and the room is in good condition.
2. The 15 kv feeders have been replaced with new feeders.
3. The control room is clean, neat and except for the mezzanine deck, the random storage of miscellaneous items is more or less negligible. Panels and cabinetry are in an improved condition and wiring is more orderly.
R&S149518
INDICATE
Page 10
4. For the most part, motor enclosures, conduits and auxiliary devices have been painted and the equipment is in good condition.
5. Marked improvement is visually apparent in all major categories except transformers, which remains the same.
GENERAL COMMENTS:
1. For the most part, cabling and cable tray installations throughout the plant are in good condition; however, some installations, such as those located at the substations and at some of the transition points, are in need of attention. At these locations, cable trays tend to be overfilled and overloaded, Re.-NEC 318; cabling has not been installed in a neat and workmanlike manner, Re.-NEC 11Q12, and in cable tray runs, other than horizontal, cables are not tied to transverse members of the cable trays, Re.-NEC 318-8(b). For additional details, see field wiring, item 1, this audit.
2. The Safety Electrical One Line Diagram (SEOLD), drawing no. B07-001-V51-001, is not in compliance with Dow's Safety and Loss Prevention Standard S-316-3.E. The drawing depicts transformer TR-1C and it's associated circuity; however, the transformer nomenclature has not been included; the most recent revision date on the drawing is August, 1990.
3. Either the grounding conductors are hidden from view or seven of a total nine plant power transformer cases are not grounded. Motors are grounded; however, at least 80 percent are not grounded in accordance with Dow's preferred method for motor grounding, Re.-DES 7C-0101 (L) 5.4.2. Other audited electrical equipment (components and devices) appear to be adequately grounded and in compliance with established codes and standards.
4. Equipment labeling has either faded, fallen away, is incomplete or it has never been installed on numerous pieces/components of electrical equipment such as transformers, motors, local control stations, control panel and junction box enclosures, and the like. Proper equipment identification labeling is a mandatory requirement of the Louisiana Division, Safety and Loss Prevention Standard, S-316.
5. Both battery rooms/installations are in need of maintenance attention. In the old battery room - corrosion is present on the cell interconnecting bus linkages, the battery support racks, the exhaust fan, conduits and associated hardward; the ceiling is in poor condition; one of two lighting fixtures is out and housekeeping can be improved. In the Mods Battery Room - Some of the cells have low electrolyte levels. Cold air is being drawn into the room from the adjoining switchgear room and condensation and/or high humidity is present.
* INDICATES PRIORITY ITEM
CONFIDENTIAL
R&S149549
REDACTED
Page 11
6. Vinyl II, Block 66, grounding wells were visually audited to determine the condition of access and availability of each individual well. Results are identical to the results of the electrical audit performed in July, 1990 with one exception; two additional wells, not depicted on the reference drawing, dwg. no. B7-012V51-001, Rev.P, are included as part of this audit.
7. Plant electrical equipment has been in service for some time and excluding overfilled and overloaded cable trays at transition points and at the substations, a corrosive effect in the furnace and cooling tower areas and a deteriorated condition with respect to the battery installations, plant electrical equipment appears to be in good condition and well maintained.
RECOMMENDATIONS:
1. Investigate and determine reason for temperature differentials between radiator tubes/sections on transformers TR-1B and TR-3B. Corrective action ____ requirements to be in accordance with investigation results.
The reason for the temperature differentials will he investigated by 12 / 31/ 91
and corrective actions identified as required. Responsibility:
Cj-hAlJb-
/ofat. (SriMTOo^S)
2. Inspect integrity of transformer grounding. Transformers shall be grounded in accordance with Dow's engineering specification (D.E.S.) 7C-0101 (L) 5.6.
A transformer grounding inspection will be made by 1Q92. Responsibility: tv &6}<T2_
3. Rehabilitate the old battery room in building 6601, the batteries and all associated equipment/hardware. Rehabilitation should include sealing all conduits and wall openings between the batteries and adjacent rooms. _
Wall openings and conduit will be sealed by 12/15/91. Additional rehabilitation will be evaluated and implemented in 1Q92. Responsibility:
4. Provide some form of follow-up/supervision to insure all batteries are properly maintained, Re. Safety and Loss Prevention (S&LP) references E-2 and C-9.
There are currently 3 battery bank maintenance requirements on the plant C-9
checklist. These checks will be performed in the future by the Division battery
bank maintenance group with reporting to block I IE supervision. This will be
implemented in 4Q91. Responsibility:
_ _r
'-ff
CONFIDENTIAL
R&s149550
INDICATES PRIORITY ITEM
Page 12
5. Seal cable tray and conduit entrances into electrical rooms, analyzer and instrument houses.
Cable tray and conduit entrances will be sealed by the end of 1Q92.
Responsibility:------------ . .
_
OrmPatTB
6. Update the Safety Electrical One Line diagram (SEOLD), dwg. No. . B07-001-V51-001 and properly post in an appropriate accessible location in all electrical rooms, Re.-S&LP S-316-3.E.
The SEOLD will be updated by 12115191 by
_
OjwPulte. /z.fa /
7. Label all buildings, electrical equipment and devices in accordance with S&LP S316-3.
This labeling will be done by the end of3Q92. Responsibility:
REDACTED
CONFIDENTS I
NOTE: The following general recommendations require long-term continuous attention and action but will result in a much improved electrical installation enhancing the overall electrical reliability of the plant.
8. When equipment is being removed from service or relocated, physically remove field wiring and conduit that has been identified "for demolition". Also, refrain from futher overfilling and overloading of existing cable trays and conduits.
The p lant will evaluate the need for field demolition on a-job byjob basis and
perform the demolition in accordance with established priorities and available
funds. New instrument cable being run in new Mod5 cable tray.
Responsibility:
jjD f<A(iTHEpl flcrroi0
9. All new motor installations and motor change outs/replacements should be grounded in accordance with Dow's preferred method for motor grounding, Re.D.E.S. 7C-0101 (L) 5.4.,i.e., the grounding conductor should be connected directly to the motor frame. Field corrections should be made when feasible.
The plant will comply with D.E.S. 7C-0101 (L) 5.4 for new installations.
Responsibility: ,, . .
Uo FUtim&t tH-Trod
10. Discontinue the usage of beam type conduit clamps (korns) and the usage of unistrut and unistrut straps in weather exposed and corrosive atmospheres. Angle/channel iron and u-bolts are recommended.
This recommendation will be reviewed with block HE personnel by 12/31 / 91 and use of these items will be minimized where possible. Responsibility:
`r-yi.: m
CO
$
' INDICATES PRIORITY ITEM
Page 13
11. Continue existing PM program for motor starters, transformers, circuit breakers, etc. and in addition, attention should be directed towards formalizing an effective predictive and preventative maintenance (P/PM) program.
PIPMprogram emphasis should increase with formation of the Chlorinated
Hydrocarbons maintenance group.
^
CONFIDENTIAL
* INDICATES PRIORITY ITEM
3503*) <UCroDJii
LABORATORY AUDIT: (Wednesday, September 11, 1991-7:30 a.m. to 8:00 a.m.)
Audit Team:
Presenter:
Attendance:.
Page 14
Writer:
The Vinyl II Plant Lab manual looks to be in very good condition. All lab procedures . were reviewed and revised in January, 1991. Appropriate warning signs are posted throughout the lab. A lab instruction log was developed in March, 1991 and is beirig utilized.
RECOMMENDATIONS:
1. Audit/Review the use of all hazardous chemical storage cabinets in the Vinyl II Plant with all employees at Vinyl II (Instrument and Shop employees should be included in such training).
Guidelines to be written and distributed to the plant, HE, and Shop by 1192.
Responsibility:
pc&TE-
2. Consider replacing all rusted 55 gallon chemical drums stored outside the lab. Some drum labels were not in place also.
* 3.
Label good drums and dispose of the balance by 1 j 92. Responsibility:
I CHlUW 5<APL3T' uur (MA&Sbt ID
Z.
Consider incorporating Dow's labeling system for lab chemicals.
To coordinate with vendors by 1192. Also follow for Dow containers.
Responsibility:
Cawi PccfE-
* 4. Consider installing a high temperature alarm on the lab refrigerator.
Will install high temperature alarm on the refrigerator by 2Q92.
Responsibility:
pcM-i PultW
5. Consider storing hazardous chemicals below eye level.
INDICATES PRIORI* T-'M
o O Z-
B
w z H >r
C/5
r->-
-CCCDD* <0_3n
Page 15
Will move existing chemicals below eye level or have written exception report
by 1192. Responsibility:
CvA
* 6.
Remove all excess flammables from the lab and store in outside solvents cabinet. Remove excess hazardous chemicals such as nitric acid, nitromethane, nitroethane, vinylidene chloride, epoxy butene, etc. These chemicals should be removed from the Vinyl II Plant. Contact R&D or Environmental Services for assistance.
Will remove excess flammables to outside storage and dispose ofchemicals listed above and any others not required on a frequent basis . Completedll /91. Responsibility: _
-
7. New employees receive mostly hands on training and is reviewed by the-lab specialist and supervision. Very little to no documentation of such training was found. Consider developing an IPT module for this training. Documentatiorr should be kept in one location.
Will develop IPT's for lab training by 3Q92. Responsibility:
LOSS PREVENTION/FIRE/BURNER MANAGEMENT AUDIT (Wednesday, September 11,1991 -8:00 a.m. to 11:30 a.m.)
jUO CHA^6c
Audit Team:
Presenter: <
Attendance:
Writer:
The plant appears to be in good condition with no serious loss prevention concerns. The plant staff was very helpful in compiling the necessary pre-audit information and in evaluating the results to determine areas that need further attention.
There are some excellent programs in place in the plant to assure that process'changes and modifications receive the necessary attention before implementation. Recent capital project activity that I have been involved with has been well organized and planned. The implementation of burner management programs has progressed very well within the framework of available capital.
i\p.,
ITEM
Page 16
This list of recommendations will contain some but probably not all of the items that were identified as "Opportunities For Improvement" by the Vinyl II Plant. They should be added to the overall list of action items.
ELECTRICAL:
RECOMMENDATIONS:
The Electrical Emphasis group should be considered as supported by the Loss Pr vention group. Refer to Electrical Reliability Audit Recommendations.
FIRE PROTECTION:
RECOMMENDATIONS:
1. Schedule Maintenance and Loss Prevention to review the condition of the plant
fireproofing and areas of protection.
------
An audit will be scheduled by 12 !31191. Responsibility:
2. Initiate a program of annual inspection.
7Z>
* 3.
This will be included on the 1992 C-9 checklist Responsibility: CewfUt-Tt
Sprinkler protection needs to be added to D-109. Contact Engineering and Loss Prevention to design coverage and arrange the installation.
Design of this additional coverage will be initiated by 12/31/91.
Responsibility:
70 (fht--
* 4.
Review the existing Fire Protection drawing and update the coverage areas to include the new sprinkler systems that have been added. Set up a CHAMPS request to have Engineering update the Fire Protection drawings. This is an area where the insurance carrier has requested current information.
A CHAMPS request to engineering to update this drawing was initiated by
11/91. Responsibility:
w
Ciwpc&rz. '</7/
5. Schedule a meeting with the Fire Protection Department and Loss Prevention to
identify the 2-3 most likely fire situations to expect in Vinyl II and outline a plan of
action for the different areas.
^--
This meeting will be scheduled by 1Q92. Responsibility:
FIRED EQUIPMENT:
REDACTED
CONFIDENTIAL
R&S149555
INDICATES
rM
Page 17
We have reviewed and support the list of items that were identified by the plant staff in the area of fired equipment.
RECOMMENDATIONS:
1. Consider compiling the individual documentation files, including calculations, for each furnace system.
* 2.
Documentation package will be assembled by 1Q92. Responsibility: _ &{mJ2r 7a z.q^Z'
Schedule all Vinyl II Plant Employees for fire extinguisher training.
All Vinyl II Plant Employees will be scheduled in 1992. Responsibility? fjo
CMrfuert. 3. Consider adding a fire wall between MOD V battery chargers.
To be completed by 2Q92 by
f/o (MlfofbE-
CRITICAL INSTRUMENTS:
RECOMMENDATIONS:
* 1.
The instrumentation testing procedures should be reviewed to be sure your specific intentions are being implemented. Many of the procedures are simple functions tests and do not appear to check a range of operation that may be needed in some cases. These should be reported back to a responsible plant or technical supervisor.
These have been reviewed and HE to expand procedures by 2Q92.
Responsibility:
^
* 2. Develop a plant policy for bypassing trips, shutdowns, alarms, etc.
Completed on September 12, 1991 by
COMPLETE,
DRAINAGE:
RECOMMENDATIONS:
* 1.
Observe sprinkler operation to determine if this causes flooding conditions. Is it a problem that needs further correction? Would it create a further problem in the event of a fire in the area?
REDACTED
CONFIDENTIAL
R&s 149556
' \ D i CA TES r RIC RUT ITEM
Page 18
Sprinkler operation has been observed and some flooding is evident. However, the plant does not plan any additional actions regarding this minor flooding problem.
2. Continue to evaluate sealing/testing of dike walls.
The plant has a program to seal walls but no testing has been done. Testing
will be evaluated by 2Q92. Responsibility: _ ^
1-
PRESSURE VESSELS/PSV's:
RECOMMENDATIONS:
* 1. Develop a definite schedule to get unregistered vessels on the pressure vessel inspection program.
Unregistered vessels have been identified and the data sheets were completed
by 11/91. Responsibility:
_
Area Engineers.
Cev^ceTS-
* 2.
Continue with the PSV review program to update calculations and documentation. What is the level of activity that is currently planned?
One engineer is assigned to this activity. Ten of the PSVs with the worst potential have been evaluated and corrective measures identified. Corrective actions on 20-30 PSV's are expected to be implemented during the 1992 shutdown. Responsibility:
3. Add the steam boilers to the pressure vessel program as a way to prompt the annual required State Fire Marshall inspections by the insurance company.
The boilers will be added to the PVprogram by 12131191. Responsibility: CHWJfrC. to
CRITICAL EQUIPMENT:
RECOMMENDATIONS:
* 1.
Review Loss Prevention Principle 6.2.3B regarding protection for air cooled fan exchangers. Contact Maintenance Tech to see if there is reliable equipment available to comply with this recommendation.
LPP 6.2.3B will be reviewed and maintenance tech contacted by 1Q92.
Purchase and installation of such equipment will be subject to overall plant
priorty and availability offunds. Responsibility:
MAINTENANCE:
\Jo rHijfbcE
n o -z
52
pi
z H >tr
id
21
REDACTED
INDICATES PRIORITY ITTM
Page 19
RECOMMENDATIONS:
1. An area of future anticipated interest is detailed inspection and testing of certain pipeline systems. What pipelines would you identify (in block and out of block) as candidates for more detailed routine inspections?
Plant pipeline inspection programs will be reviewed and modified if
appropriate by 2Q92, Responsibility:
_
y/* CHmJ6E-
INSURANCE PACKAGE:
RECOMMENDATIONS:
* 1.
Schedule a follow up meeting with me to compile a good original copy of the insurance package to send to Midland.
Completed 11 /91. Responsibility:
65)yjft^T,
OCCUPATIONAL HEALTH AUDIT (Wednesday, September 11, 1991 12:00 - 4:00 p.m.)
Audit Team :<
Presenter: Attendance:
Writer: EDUCATION AND TRAINING: Employees receive Hazard Communication training in annual plant training review meetings. The written Hazard Communication manual and MSDS's are current. The plant orientation film is an excellent example of addressing health and physical chemical hazards.
O 3*
n
H H a
-on
2 2H! >r
INDICATES PRIORITY ITEM
I0(D/) 4Ct(cnJO^oi
Page 20
RECOMMENDATIONS:
* 1.
Documentation of Safety Meetings (include monthly, tailgate and pre-job) could be improved by providing a more detailed agenda describing the items covered, and name of presenter, along with your sign-up sheet.
A new form was utilized starting 1111191. Responsibility:
(jswtfiCTE.
* 2.
We support your plans to have a duplicate HAZCOM/MSDS Manual located in the control room to ensure that it is readily available to all employees. The MSDS section should be expanded to include maintenance and janitorial items.
A copy ofthis manual was put in the Control Room 11/91. We will include the MSDS for maintenance andjanitorial items by 1Q92. Responsibility:
3. Efforts to make the CPAI as complete and representative as possible for the job assignments will result in a helpful resource for indoctrination and annual training and for documentation purposes.
The CPAI will be updated 1Q92. Responsibility:
AJb CHftfJoE.
4. The orientation film is very well done, but when it is updated it should include
Asbestos and address the mouthbit respirator usage.
To be updated by 4Q92. Responsibility:
fjQ
5. There are various HA2COM training aids and Industrial Hygiene is available to help assist you with items for better presentations.
Will use. Responsibility:
* 6.
We noted several small brown bottles in the lab without labels. Also, several 55 gallon storage drums had weathered labels or no labels at all. Some of the drums were in poor condition.
We will identify and dispose ofproperly by 1/30/92. Responsibility: CCiM PuR-Td
RESPIRATOR PROTECTION PROGRAM:
There is a written respiratory protection program which addresses the elements of S&LP Standard S-206. Personnel receive annual training and SCBA users must demonstrate proficiency. There is a designated cleaning station.
% T
<_n
REDACTED
CONFIDENTIAL
!M)k\\T:T PRIORITY I !TM
Page 21
REDACTED
CONFIDENTIAL
RECOMMENDATIONS:
* 1.
The written respirator program is in need of updating and should include name of reviewer, date, reference to OSHA 29CFR 1910.134 and 1910.1017 and LAD S&LP S-206, medical approval, frequency of fit testing, frequency of cartridge change, the policy that breathing air is used only with potential exposures to vinyl chloride7.and add the Scott-O-Ramic. With completeness of this written program it'should be referenced as part of training documentation.
Respirator program will be updated by 1Q92. Responsibility:
itrt> cHm&c-
2. Respirator fit testing needs to be completed in 1991.
To be completed by the end ofthe year. Responsibility:
" ***
* 3. The SCBA units stored in the control room area need to be cleaned and placed in plastic bags. Masks need to be supported and not stored hanging by straps.
Complete
4. Scott-O-Vista respirators stored in personal lockers need to be stored in tight closing plastic bags, name of individual on facepiece and date cartridges were installed and stored so as not to distort mask.
Update and communicate respirator storage policy. Audit of lockers for compliance by 12/31/91. Responsibility:
CcvA PctETcL
5. When Vallen does annual inspection/service, include all of the community air line respirator regulators in this program. One of the egress air cylinders (in control room) is due for the 5 year inspection.
We will add community respirators to Vallen's inspection and have Vallen
complete cylinder inspection by 12/31/91. Responsibility:
Cgw| P^E-TC.
6. We support your continued efforts to engineer out potential exposures to EDC with vent recovery on pumps and closed loop sampling.
EDC TLVproject to be completed by 4Q92. Responsibility:
7. To ensure that the proper respirator cleaning procedure is followed, it would be helpful to post the procedure on the cabinet above sink at the designated cleaning station. Consult manufacture's guidelines and recent division guidelines communicated through the Safety/I.H. network.
C--Dk CD CoD
INDICATES PRIORITY ITEM
Page 22
We will post the respirator cleaning procedure at the cleaning stations by
11/30/91. Responsibility:
On**
VENTILATION PROGRAM:
Special lab operations, such as working with vinyl chloride are done in a hood. The hood is equipped with a flow sensing device which alarms in the control room if air flow is lost. Ventilation fans have been installed in several of the analyzer houses.
RECOMMENDATIONS:
* 1.
Only one of the four lab hoods is equipped with a functioning flow indicators and
all hoods need them. This needs to be completed ASAP so that hood surveys
can be performed by I.H. and proper operation conditions obtained. It has been
over a year since the last surveys.
*"
Permanent flow indicators will be installed on the lab hood by 1Q92.
Responsibility:
OnrA^r^
2. We agree with your plans to implement weekly sensing device inspections and annual maintenance on your hoods (per the checklist).
After devices are installed, these will be added to the weekly checklist.
Responsibility:
c&wkPust^.
Maintenance and fume hood audit will be conducted annually.
Responsibility:
tzf^( Oswfis-rE-
3. Housekeeping of the lab hoods need to be stressed. Shelves are being used to keep items up allowing air flow to the bottom baffel which is very good.
Weekly housekeeping audits will be conducted starting immediately.
Responsibility:
SrrpvTEO.
c
Several wall mounted fans and floor fans provide ventilation in the shop during welding. Floor fans disperse fumes rather than capture them and monitoring should be conducted to evaluate if current ventilation is good enough. Local ventilation at the source of the fume is the best engineering control.
Shop ventilation will be evaluated by personnel monitoring by 2Q92.
Responsibility:
to f q
HEARING CONSERVATION:
Qu,(L(hSZi fa jTMsr
2,
Due to the number of areas with noise >90 dB(A), hearing protection is required in most areas outside the control room (signs posted on door). The plant layout has been designed to strategically reduce noise levels. Personnel are included in hearing
redacted
CONFIDENTIAL
R&s 149561
im::. '
rR iyrity item
Page 24
PERSONAL PROTECTIVE EQUIPMENT:
Personal protective equipment is required by job procedures and by safe work multipermit.
RECOMMENDATIONS:
1. All of the different types of PPE used for various job tasks should be listed and then reviewed with Industrial Hygiene to ensure the proper selection was made for the task and that back-up test performance data is available where applicable.
The types ofPPE will be listed and reviewed with Industrial Hygiene by 1Q92.
Responsibility:
^ cn**k>-
2. A topic for a safety meeting might be on how to properly wear, care for and limitations of PPE. The training video "We've got you Covered" available frpm I.H. may be an appropriate resource.
Iftape is available, will be reviewed in Safety Meeting by 12131 /91. Responsibility:
DATA GENERATION AND MONITORING:
The I.H. contact performs exposure monitoring for the block. An early warning device system for VCM and EDC using a sequential area air monitors is used to alert personnel if a leak should occur.
RECOMMENDATIONS:
* 1. An annual Industrial Hygiene report is currently being written for activities conducted in 1989 and 1990. This needs to be completed ASAP.
This report will be completed by 12 / 31 f 91. Responsibility:
^0%, fromc 72>
2. As part of the planning process we agree with your plans to develop a current set of written process description, simplified flow sheets, floor layout and job descriptions with notations of potential sources of exposure.
A written plan will be developed which will identify potential sources of
exposure by 1Q92. Responsibility:
yvA> CHA+-P&
3. On-going monitoring activities should be identified (using CPAI) and annually structured to include such examples as VCM, EDC, alpha-tri, beta-tri, noise, welding fume and solvent cleaning operation.
t O H
2 >
tr*
XR
CD
COCDDl
I'D
INDICATES PRIORITY ITEM
Page 25
An annual monitoring program will be developed and implemented by 1Q92.
Responsibility:
A/t> CtftWOE-
4. We suggest you consider using Environmental Services Lab 3502E to analyze your I.H. samples. A lot of time is required for you to comply with Good Laboratory Practices that could be used on other I.H. related programs.
We will use the Environmental Services Lab for ourIJl. samples stamina in 1Q92.
5. A helpful tool may be to develop a plant "I.H. - 9" (similar to the C-9) checklist to organize and keep track of I.H. activities.
These items have been included on the environmental checklist (E-9).
,,i
Complete.
tMwrHVL *C7r*>
6. You should consider replacing some of the personnel sampling equipment as some pumps are fourteen years old and many have been repaired several times.
Monitoring equipment is being evaluated and will be replaced as necessary by
1Q92. Responsibility: .
S CHa-*J6.
ASBESTOS:
The plant asbestos management survey was updated in preparation for this audit. Transite siding, gaskets, oven insulation and floor tile glue are the known asbestos* containing materials in the plant and there is an active program to replace the gaskets
with non-asbestos gaskets. We were impressed with the "purple" cabinet of removal supplies and disposal container.
RECOMMENDATIONS:
1. We suggest you move the personnel footlockers and tailgate activities from the proximity of the asbestos gaskets area. A more protective location is needed to prevent the escape of any friable fibers. Is it practical to consolidate all asbestos gaskets to one location? (We found some garlock gasket stored on a shelf in the material controllers area). Petrin can provide a service to vacuum the area on a regular basis.
Relocating tool boxes away from asbestos gasket storage area and use ofPetrin to vacuum area will be evaluated by 12/31/91. Responsibility:
(CMAPUZTE- t^-faL I
2. Asbestos warning signs should be posted in the asbestos gasket storage area.
.. g > O ^ O
n O
2
e M2H
33
CO
iCAnO
CD CO
Page 26
Warning signs will be posted in the asbestos gasket storage area by 11130/91.
Responsibility;
Ow PltL/TtL
* 3. Asbestos-containing materials (transite) should be labeled or asbestos signs posted at block entrances.
Signs will be posted in appropriate areas by 12/31/91. Responsibility:
QyA?a,TE-
4. The Asbestos Training documentation that we inspected also needed more detail agenda information and the name of presenter.
A new form will be developed to provide for more detailed documentation of the Industrial Hygiene training classes by 12/31 /91. Responsibility:. ^
REDACTED
RADIATION:
Th r are no radiation sources in the block.
GENERAL - INDUSTRIAL HYGIENE:
There are designated areas for storing food and eating lunch and washrooms are strategically located. Dermatitis has not been a problem in the block. Solvents used for degreasing are used outside in well ventilated area and then immediately and properly disposed of.
The catalyst change-out using Catalyst Technology by vacuuming tubes has eliminated a labor intensive and dusty operation. The VCM closed sampling loop and reduced sampling frequency on tankcar loading has reduced the potential employee exposure.
RECOMMENDATIONS:
1.The I.H. policy could be updated to include "good personal hygiene of washing before eating and using tobacco products".
Policy will be updated by 12/31/91. Responsibility:
CcmPtexL.
* 2. HAZWOPER items discussed during this section.
a. The written program has been written but needs to be typed.
Program was typed by 11/91. Responsibility:
CcrM PlLVz---
b. A summary of employee training needs to be developed to verify the 24 hours initial and 8 hr. refresher training.
CONFIDENTIAL
R&S 149564
* INDICATES PRIORITY ITEM
Page 27
REDACTED
Training summary will be developed and documented by 12131191.
Responsibility:
Ccr^l
c. Certificates need to be issued to all employees hired since March, 1990 who complete the training that satisfy the HAZWOPER requirements.
Certificate will be developed and issued by 12 / 31 / 91. Responsibility:
d. HAZWOPER training needs to be included on the operator's checklist just as it is for technical employees.
This will be included on checklist by 1H /92. Responsibility: . *
3. There may be opportunities for ergonomic evaluations of physically demanding jobs such as the loading rack. The plant should take advantage of the ----- . opportunity to have Kent Smith evaluate this area and they should poll the operations personnel regarding other potentially strenuous physical tasks. It is possible that some limited interventions such as a pre-work stretching program could decrease the likelihood of musculoskeletal injuries.
Rail car loading audit was scheduled and completed by 10122 f 91. Responsibility: Based on the results of this audit other areas of the plant may be studied.
MEDICAL:
The block adheres to the Division Medical Department's requirements for medical surveillance and testing. Results of medical tests are communicated to employees in a timely manner.
RECOMMENDATIONS:
1. All employees need respirator fit testing, and this should be completed in 1991. Prior to performing these fit tests, the plant I.H. contact should get in touch with the Medical Department to be certain that all employees have medical approval for fit testing.
Fit testing will be completed by 12 / 31191. Medical Department has been
contacted to identify employees who are not approved for respirator fit testing.
Responsibility: _
COiaPcSTE-
2. In the future, contractors will be responsible for their own medical surveillance. We will need to develop an auditing system (at the Division level with verification
CONFIDENTIAL
R&S149565
Page 28
by the plant) which will allow us to be certain that necessary medical surveillance and training is being performed.
Vinyl II will work with Division to develop audit system.
NON-DOW EMPLOYEES:
All non-Dow employees receive indoctrination training which includes required PPE, emergency response; and hazard communication. Hearing protection and gloves are supplied to permanent in-block contractors. Non-Dow employees are included in I.H. monitoring program and results are communicated in a timely manner.
RECOMMENDATIONS:
1. Earlier comments regarding documentation of training would also apply here.
Training documentation for non-Dow employees will be upgraded alongwith
the documentation for Dow employees.
.}n pa.&7htL
VINYL CHLORIDE:
Other than Asbestos, vinyl chloride is the only OSHA regulated chemical used in the block. Vinyl chloride is handled in a closed system minimizing the potential for exposure (an example is the closed sampling loop). Breathing air is used as respiratory protection for potential exposures to VCM .
RECOMMENDATIONS:
1. Comments in the Data Generation and Training Documentation sections as the annual report documentation, on-going monitoring strategy, and training _ documentation with detailed agenda apply here.
jUo f'U(flXHVL rfcri Upgraded training documentation will be implemented as previously defined.
* 2. We need to work with the Technology Center on the practical implementation of key elements of the vinyl chloride standard.
Tech Center will be consulted on this by 12/31/91. Responsibility:
O/hHSbC 7D
2- -
])tS /a/
jj
<s> 0dto1*
REDACTED
CONFIDENTIAL
* INDICATES PRIORITY HTM
SAFETY/SECURITY AUDIT (Thursday, September 12, 1991-7:30 a.m. to 11:30 a.m.) Audit Team:
Presenter: _ Attendance:
Page 29
REDACTED
Writer: SAFETY PROGRAM FUNDAMENTALS: The plant has a safety mission statement. Also, a written safety policy.
RECOMMENDATIONS: None at this time.
EMPLOYEE RESPONSIBILITY FOR SAFETY: Safety is.a part of every job description. Individual safety goals are set and reviewed at least twice a year. RECOMMENDATIONS: * 1. Complete Safety JPR's for all employees in the plant per Safety Phase III.
Cancelled by Division.
PROGRAM STRUCTURE - ORGANIZATION - PLANNING: The safety program is organized in accordance with the plant safety goals and set by a safety committee composed of a good cross-section of plant personnel (management, supervision, operations, etc.). Daily tailgate and monthly safety meetings along with good measurement and incentives strongly reinforce the program. RECOMMENDATIONS:
CONFIDENTIAL
REDACTED
Page 30
1. Utilize the Safety Performance Improvement Process (SPIP) in the plant and individual safety goal setting process.
The results of the initial SPIP survey will be reviewed and communicated to
plant teams by 12 / 31 / 91. Present goals already were addressing most areas
that were deficient on the SPIP. Responsibility:
'<>wijpc.Te_
2. Consider more involvement from operators in the goal setting process.
1992 preliminary goals will be submitted to operations for review and input
prior to finalizing. Responsibility:
66ms cuieuuxto 75
6Ya>*\ -
SAFETY TRAINING:
All new Dow and contract employees receive a block safety indoctrination. Daily tailgate,
weekly and monthly safety meetings are used effectively. Staff JSA's are also effective.
Special training is utilized in critical areas.
--.
RECOMMENDATIONS:
* 1.
Update block indoctrination video relative to harnesses and respirators. -Also, 4aya|iap-qnd fitili7, Q togtto choek TMmprehcPgir>n of what is discussed in the^ indoctrination session (including video). An IPT modulo would be holpful.-----
An IPT module will be developed on the existing indoctrination video by
12131/91. Responsibility:
The ir doctrination video and module will be updated by the end of3Q92.
Responsibility:
/iA>
2. Check on the use of training aids for vessel entry, line opening and hot work.
The safety coordinator will check with the safety department to identify~any
available, useful training aids by 12/31/91. Responsibility:
CCMPc&Tf
3. Obtain the updated LAD Safety & Loss Prevention Standards IPT and utilize.
S & LP IPT modules are currently undergoing revision. The updated modules
will be obtained for Vinyl U use when revision is complete. Responsibility:
Safety Coordinator
jjo c
* 4. Develop a training documentation system for documenting training at meetings, on procedures, on IPTs, etc.
A system for training documentation will be developed and implemented by
2Q92. Responsibility:
rj 0 ch*9aJ6
CONFIDENTIAL
* INDICATES PRIORITY ITEM
Page 31
5, Develop a timetable for completing all IPT modules.
The IPT program status is currently being updated. Yearly goals for IPT
development will be set. High overtime for operators (25%) has caused this to
be a low priority. Progress will be slow until manpower can be increased.
Responsibility: OPERATING PROCEDURES:
Safety & Training Coordinator rtffmtH - /W
>0 SotOc, QuvC
7W(S ACTTo*J CtMPLtTL-
Operating Procedures , Safe Job Procedures and Red Tag Procedures are utilized. Operators write/up-date procedures with involvement of supervisor and Safety Coordinator.
RECOMMENDATIONS:
* 1. Develop a plan for updating all procedures that are out of date and implement a system to assure updating on a regular basis.
The operatingprocedures manual has not been updated due to conversion to
Mod5 and high operator overtime. No effort planned on operatingprocedures
until ModS conversion complete. The C-9 checklist currently calls for yearly
procedure review / update ofother procedures. A better documentation system
is needed along with more specific responsibilities. A documentation guideline
for plant procedures will be developed and implemented by 2Q92.
Responsibility:
fjb CH^bC.
REDACTED
EMERGENCY PLAN:
A block emergency plan exists. Emergency drills are held on a quarterly basis.
RECOMMENDATIONS:
CONFIDENTIAL
* 1.
Update block emergency plan and address explosions. Place a copy of the updated plan in the plant's copy of the LAD Emergency Plan Manual. Also, send a copy to Delaine Rawlings for the EOC.
Block emergency procedures will be incorporated into a plant emergency plan by 12/31191. Responsibility: _
2. Add review of the block emergency plan to the C-9 Checklist to assure updating and reviewing with employees on a yearly basis.
Emergency procedures are currently reviewed annually as part of C-9. This check will be modified to include review of the emergency plan in 1992. ObM ^T(r
ID
C0
t-o*tCOoJli
* INDICATES PRIORITY ITEM
Page 32
Responsibility:
* 3. Conduct a "hands-on" emergency drill at least once a year.
This will be included in the plant 1992 safety program when it is developed.
Responsibility:
Safety & Training Coordinator
chahoe.
4. Develop an IPT for the block emergency plan.
This will be included in the IPTprogram development guideline by 12131/91 and should be developed by 1Q92. Responsibility: ......... p
ACCIDENT/INCIDENT INVESTIGATION REPORTING:
Accidents/incidents are investigated promptly. Learning value is communicated and
follow-up work is tracked to completion. Employees are encouraged to report minor
injuries.
-----
RECOMMENDATIONS:
1. Write-up accidents/incidents in Safe Working Style format
>
O H W O
The plant routinely does a thorough job ofincident investigation. There are
no plans to implement this format at Vinyl 77.
,j0 p
^6 j
SAFETY STANDARDS, GUIDES* REQUIREMENTS:
LAD Safety & Loss Prevention Standards and safe job procedures are utilized.
RECOMMENDATIONS:
* 1. Update safe job procedures.
The operatingprocedures manual has not been updated due to conversion to Mod5 and high operator overtime. No effort planned on operatingprocedures until ModS conversion complete. The C-9 checklist currently calls for yearly procedure review / update of otherprocedures. A better documentation system is needed along with more specific responsibilities. A documentation guideline for plant procedures will be developed and implemented by 2Q92. Responsibility:
O -.-Oz
3
m zH >r
2. Develop a plan for modifying sample points with quick open valves
The new EDC sampling system with quick opening valves is considered the safest alternative available. Other sampling systems have tubing directed
ID
TM g O
INDICATES PRIORITY ITEM
Page 33
alternative available. Installing new sampling systems wherever practical. Most should be replaced by 4Q92. Responsibility: Area personnel /Jo CMMtce.
HAZARD DETECTION PROGRAM:
Inspections are made by the Plant Superintendent, Engineers and Supervisors on a regular-basis. C-9 Checklists are used as a tool. Staff JSA's are also effective.
RECOMMENDATIONS:
* 1. Assure that all identified hazards are tracked to completion and the documentation exists to support the fact.
Procedures for follow-up documentation for internal audits, USCR's, incident
investigations, etc. will be defined and implemented by 12131191. Vinyl II
J'
will implement the Division form for housekeeping audits and follow-up
which is currently being developed. Responsibility:
fJ&d FcjImS
fyp /i/i (
SAFETY SUGGESTION SYSTEM:
A Saf ty/Environmental Suggestion System exists. All suggestions are reviewed and tracked to completion.
RECOMMENDATIONS:
1. Develop a system to be used in prioritizing suggestions.
This was developed and in place by 11 j 30191. Responsibility:
AWARD/RECOGNITION SYSTEM:
The block has a safety incentive program for which awards/recognition is given. Also, outstanding safety/environmental and process suggestions have awards/recognition quarterly.
RECOMMENDATIONS: None at this time. CONTRACTOR SAFETY:
CONFIDENTIAL
- INDICATES privity item
Page 34
Contractors follow the same policies/standards as Dow employees. All contractors receive the block safety indoctrination. The contractors also have their own safety incentive program.
RECOMMENDATIONS:
1. Involve contractors more in plant safety programs.
An active plant contractor program exists. More participation in Safety
Committee meetings by contractors is currently being stressed.
Responsibility:
{jjWlPL&TC-
OFF-THE-JOB SAFETY:
Off-the-job safety is emphasized. Off-the-job safety is included in regular and tailgate safety meetings. Also, in the block safety incentive program. RECOMMENDATIONS:
None at this time.
COMMUNICATIONS:
Closed circuit TVs and bulletin boards are utilized to communicate. RECOMMENDATIONS:
1. Develop a system (initial and date list, etc.) to communicate new or revised procedures, learning value items, new or revised regulations, JSA's, inspections, etc.
A documented review procedure will be developed for use in plant communications by 12191. Responsibility:
HOUSEKEEPING:
1r (W<=} j
Control Room:
*Overall housekeeping is excellent. Some cleanup needed on catwalk behind the board.
Completed by 11 /91. Responsibility: w
Active red tag masters are kept on a clipboard in the permit office and they are readily accessible to operators as well as contractors.
d
> n
H H d
o oz wo
H
r>
173 Ul ro
i\nir.-\T:>; pri^ty item
Page 35
Long term masters are kept on a separate clipboard. Suggested they consider disabling some equipment to reduce the number of long term masters.
Audit red tag masters by area personnel bv 12 / 31191 Responsibility:
REDACTED
All masters were checked and we found no discrepancies.
Permit area organized and neat.
* A couple of the permits checked indicated that no on-site inspection was done and that lines to be opened had not bean positively identified. When questioned the issuers said that both had been done, if so we should mark the permit as such.
Complete. Stressed with permit writers.
Office Area:
All offices, conference rooms, closets and storage areas organized and neat.
Bulletin board postings current. OSHA posting present - GOOD!!!
One comer in the men's dressing room being used to store a box of air conditioner filters, some P&ID's and some other paraphernalia. Rubber boot and old stencils in showers.
Some things complete. Completed the remaining items by
11/91. Responsibility:
OjM
* Ladies room had a slicker suit on the wash basin counter. -
Complete.
Operating Area: progress.
Safety showers visible and in good condition, painting program in
* Noted one ladder missing safety gate, suggest audit for others.
Safety gate will be installed on RE230 by 12 / 31 / 91.
, puyrC.
Responsibility:
Audit ladders throughout plant by 12/31191. Responsibility: (jyM Pt&CC-*
* Oil absorbent pads throughout need replaced.
J3
CO
4CcOn^ conI
CONFIDENTIAL
VDIC'ATLT PRIORITY ITUM
Page 36
REDACTED
CONFIDENTIAL
Ongoingprogram part of written outside round, a/p puftTh&A- /tar7o?J
* Some bleeds not plugged.
These are audited at least once per year. Sample points addressed in Safety Section ofthis audit.
*4cn<rJ
Trash In all of vessel skirts.
Some completed. Others to be completed by 1211191.
Responsibility:
~
Some water standing in Oxy area.
Not considered a serious problem. Will address by 2Q92.
Responsibility:
_
J, SA >
* Some unlabeled utility stations.
To be labeled by operations by 1Q92. Responsibility:
--_
hfo CHtf+teE- ,
* Plenty of signs (caution, directional, etc.). Many are faded and
need restenciling or replacing.
/jb
To be completed by operations by 1Q92. Responsibility:
* Wooden ladders laying against switchgear in MCC, electrical onelines need updating, one MCC had unsealed cables leading into building.
Wooden ladder removed. Other items addressed in the Electrical
Section ofthis audit.
X/i> Fv.tarHt'#-
Warehouse Area:
* Warehouse work area clean and neat, grinder tool rests needs adjusting (to far from wheel). Warehouse east storage area needs attention, it's full and pretty cluttered, the bin areas looked good. Have some things stored against open walls that need to be properly stored.
Warehouse area audit will be completed by 12 / 31 / 91. (jTyt4 PLCTfZResponsibility:*
* Noted some flammables improperly stored on open shelves.
* INDICATES PRIORITY ITEM
R&S149574
REDACTED
Page 37
Proper storage to be investigated by 1Q92. Responsibility: Ido ctfA/oce
Fiammables storage area O.K., need to verify proper amounts. No fire extinguisher in area.
Addressed in Lab Section of this audit. Fire extinguisher
,
available inside lab.
FwVTHZ-fi- MenokI
Lab Area:
* Housekeeping fair.
* Hoods cluttered and dirty.
Addressed in Lab Section ofthis audit.
Aft
ifrvncid"'1
* Fiammables stored under hood which also has 1 lOv lights under it.
To investigate an alternate to NVM test by 3Q92. Responsibility: tft> opmPu&t
* Doors on hoods were opened beyond the 1.8 inch limit.
Safety Files:
Install removable stops by 2Q92. Responsibility: CcvapccjtC t'Jil
* OSHA "Star" information needs to be compiled into one box (three years plus current). Need to initial and date paperwork upon completion of follow-up actions.
The OSHA Star information will be compiled and updated as
noted by 12 /31 / 91. Responsibility:
Xjo^a FcCTE.
Good system for tracking follow-up test for plant indoctrination.
In the process of developing a follow-up test for plant indoctrination. Responsibility:
^ (J^M Lx-
* Posted C-9 checklist in not up to date, Safety coordinator keeps a master copy and it is up to date.
Keeping the C-9 checklist in the permit office up to date was
emphasized . Responsibility:
Gow\ PUYHL
EMPLOYEE SURVEY SUMMARY:
CONFIDENTIAL
R&S149575
* INDICATES PRIORITY ITEM
Page 38
There were 27 safety surveys returned. The safety definitions indicated a good safety attitude at Vinyl II. Eighty eight percent rated supervisors views on safety high to excellent. Starting up and shutting down equipment was thought to be the part of the job that required the most caution and that a fall would be the next serious accident. When asked if they notice a fellow employee performing work in a unsafe manner would they intervene, 100% of surveys said they would. 85% said they would explain other ways of performing the work in a safer manner. Some even stated some of the "Safe Working Styles" One Minute Manager Techniques. Only 30% of the surveys indicated that accidents could be prevented ji the time and 70% some of the time.
CONFIDENTIAL
* INDICATES PRIORITY ITEM
Q3o3
GO
CAO 0v057j
HAZARDOUS MATERIAL TRANSPORTATION REVIEW (HMTR) (Thursday, September 12,1991 12:45 p.m. to 2:20 p.m.) Audit Team:
Presenter:
Attendance:
Page 39
Writer:
The Vinyl II plant made an excellent HMTR presentation. Thanks to Bud Balentine and his in depth knowledge of the products and handling procedures.' Information concerning the distribution process was thorough and clear. Pre-planning and teamwork was evident in the way the plant conducts its business.
RECOMMENDATIONS:
1. As noted in the review, there was concern generated relative to the correct materials of construction for marine vessels. Due to the recent increased attention being brought to our capabilities for emergency response, we would like to emphasize that the plant continue to work with the Marine Tech Center to identify the weakest areas that needs the most attention.
w .. W
n
Plan to revise Vinyl IIVCM ship requirements including material of construction issue by 2Q92. Responsibility:
Cc^A QUtML
i/?h i
2. Consider conducting some sort of "Distribution Standards Audit" on all non-Dow
shippers involved in swaps, tolls or trades.
Both major swap partners have been visited at least twice during the last two
years. Will coordinate with product steward and marketing function and E/R
by If 93. Responsibility:
ccwiPuerE
* 3. Initial and retraining for loading/unloading as well as for tankcar securement should be documented and reviewed.
Evaluate D.O.T. film and training plan I documentation by 1192. Responsibility:
jjZ ^ cc-4no
* INDICATES PRIORITY ITEM
CHEMICAL EXPOSURE INDEX AUDIT (Thursday, September 12, 1991-2:15 p.m. to 4:00 p.m.)
Audit Team:
Page 40
Presenter: Attendance:
ii I
Writer:
CHEMICAL EXPOSURE INDEX:
Th operator interview, emergency drill, and documentation review were completed in a pre-audit meeting Wednesday, 9-4-91. The actual CEI Review on 9-12-91 concentrated on exceptions to the pre-audit questionnaire. In general, the Vinyl II plant appears to be in excellent shape from a CEI stand point. Plant documentation is almost all up to date, operators are well trained and motivated, emergency procedures and drills are practiced, and many plant programs are in place that would act to decrease the potential of a CEI incident
Two potential problems with the calculation methods used were noted. First
US Area Loss Prevention Manager, asked if our dispersion models used the
dense gas phase corrections developed in Texas (contact
). Secondly,
noted that our spill calculation methods across the LAD are not consistent and
are not consistent with methods published in open literature such as Perry's. Both of
these questions will be turned over to the appropriate engineering functions for
resolution.
o
-
zhrjI a w zH
>r
INDICATES PRIORITY ITEM
XpI
CD
CODl
CD
Page 41
ACCOMPLISHMENTS/MAJOR CHANGES SINCE LAST REVIEW (1989):
Th following notes are meant to be a supplement to _
presentation at the
CEI Review and to cover the portions of the review that took place in the pre-audit
meeting.
1. No major changes have occurred in the plant to change the CEI scenarios since the review and follow-up in 1989.
2. Seven worst case credible scenarios resulting in releases of the following with CEI results as shown,
CHEMICAL
CEI VALUE
HCL VCM EDC CL2
162 192 144 288
3. Three of the above chemicals have odor thresholds that will extend past the fence line (HCL, EDC, and Chlorine).
4. An extensive area monitoring system exists for EDC and VCM (in addition to flammable gas detectors). No system exists for the detection of HCL and chlorine.
5. Several general Safe Job Procedures and policies books were readily available.
6. Most plant process type documentation was in very good shape. Many P&IDs were out of date.
7. Operators take a great deal of pride in their ability to run the plant. Self-directed work team concept has been a great success. Superb teamwork was shewn during the Chlorine release drill.
8. Operators feel the plant training program is effective and gives them all the information they need to operate the plant.
9. Operators mentioned that the Project Review meeting is a great way to get ideas considered.
10. Operator training modules exist for many jobs. IPT concept partially implemented.
11. Carrying of personal respirators is no longer required in plant. Safety indoctrination film is out of date.
* INDICATES PRIORITY ITEM
CONFIDENTIAL
REDACTED
JJ
C/3
A tn <0-nI
Page 42
12. Talk-through emergency drills are done on at least a quarterly basis by each shift.
13. Plant preventative maintenance program was in good order. Monitoring of critical process piping for corrosion/erosion is being done.
14. Very good emergency communication procedures exist within the plant. The procedures were posted and followed.
15. Emergency contact telephone list was out of date.
16. MOD V control 30% implemented.
17. Installed new Chlorine distribution header and KO pot Added electrical heat tracing.
18. Replacing corroded pipe sections with monel as required.
19. New throx scrubbers installed.
20. Ordering new E-140 to replace exchanger.
RECOMMENDATIONS:
* 1.
Plant management should review the need for an area monitoring system covering HCL and chlorine releases in light of the CEI numbers and other reviews.
* 2.
This will be evaluated by 12131191. Responsibility:
"TE-ST
(U
awLt r<i
Add updating of the emergency contact phone list to a C-9 checklist.
This will be updated by 12 / 31 / 91. Responsibility:
CoM PiCfE^
3. Plant management should review the need to carry a personal respirator in the plant and should update the plant indoctrination film accordingly.
This has been evaluated and we do not feel there is a need to carry personal
respirators at Vinyl II due to the design and layout of the plant. Respirators
are available for anyone desiring to do so. The plant indoctrination film will
be updated by 3Q92. Responsibility:
fjb El.
4. The plant should consider conducting a periodic walk-through drill simulating a CEI type incident
REDACTED
CONFIDENTIAL
R&S149580
INDICATES PRIORITY ITEM
Page 43
We will have hands-on drill once per year in addition to our quarterly desk top
drills. Responsibility:
fjo CHW6 6-
5. Review training of all plant personnel in the use of protective equipment for protection from liquid spills and vapor releases.
Will be included as a safety meeting topic during 1992. Responsibility:
'/J6
* 6. 7.
Update the plant emergency communication procedure to include specific detection levels of VCM and EDC that require notifying.
This is not done nor is it planned at Vinyl II due to the fact that these are not
immediately life threatening chemicals in any realistic scenerio. up
ttenmJ
Review the policy for installing leak-clamps in the plant to guard against over stressing pipe and vessel nozzles. Update the installation checklist if required to include Dow engineering review of unusual installations.
We use present checklist out of the Division S&LP which includes evaluating
stresses. This would be a good addition to the Division checklist. ^
/fen
Th following were copied from completeness.
presentation and are included for
8. Complete 1PT modules for entire plant.
See answer Safety Training #5.
fjt>
9. Video-tape or photograph leaks of different size to aid in estimating hole size.
Will do by 12/3H91. Responsibility:
(pep P(0
10. Add shoes or teflon sheets to existing pipe supports.
Planning to audit and correct hazardous service piping by 4Q93.
Responsibility:
pjo Crl^tJZiF
* 11. Evaluate double seals or seal-less pumps.
Will implement as required by regulation. /Ct> FumH&L
coj
12. Review spill scenarios with contractors and neighboring plants.
Review worst case CEI scenarios with LHC III, Poly C, LGTI, Cell Service and contractors by 12131192. Responsibility:
CONFIDENTIAL
R& si4 9 5 8 i
INDICATES PRIORITY ITEM
Page 44
13. Involve plant security in regular drills. Will be invited to participate in annual hands-on drill. Responsibility: do Ctf
14. Develop written procedures for spill mitigation.
Generic procedure to be developed by 12131192. Responsibility: Jjo
15. Review E/R personnel protective equipment with Industrial Hygiene.
See Industrial Hygiene Recommendation #1.
section
on
Personal Protective
Equipment
/lb
Fu&m&dZ. c4cTIokJ
REDACTED
CONFIDENTIAL
` INDICATES PRIORITY ITEM