Document 2RQRN857n65DyVK4x2qooZgxR
Installation Guide
TRANSITE RING-TITE
J 0 M N S M A N VI 1.1.1;
PR.ODUCTS
Johns-Manville
1 )
i
*4
__ .
HOW THIS GUIDE CAN HELP YOU
' 1 HIS booklet was written especially for the men who direct and do the actual work of handling and install
ing Transite Ring-Tite Pressure Pipe. It explains how to
install Transite Pressure Pipe under average conditions so as to comply with the "Standard Johns-Manville Laying Specifications."
This guide is not intended to supply design information nor to assume the responsibility of the Engineer (or other customer representative) in establishing procedures best suited to individual job conditions so as to attain satis factory performance.
Engineers, Superintendents, Contractors, Foremen, and the laying crew will find much to guide them in following specifications so as to result in the most satisfactory in stallation of Transite Ring-Tite Pressure Pipe. The book let will also be of help in determining pipe needs when ordering.
0T*
Installation Instructor Service
As an added service, if a request is made with adequate advance notice (such as at the time of placing the pipe order), an Installation Instructor will be provided, with out charge, for such a period of time as Johns-Manville will consider necessary to furnish preliminary instructions as a supplement to the instructions contained in this guide. This service is offered, however, on the condition that by rendering it, Johns-Manville shall not be deemed to have approved or in any manner to have assumed responsibility for the engineering design of the job, supervision, inspec tion or quality of workmanship employed in the installa tion of materials.
COPYRIGHT 1960 JOHNS-MANVILLE CORP.
2
TABLE of contents
(For Index see Page 122)
Receiving and Handling........................... 4 Excavating Trench........................................... 15 Supporting Pipe............................................. 22 Lowering Into Trench................................... 28 Assembly of Pipe and Coupling............ 30 Use of Short Lengths...................................... 43 Cutting and Machining Pipe....................... 50 Assembly at Fittings...................................... 54 Thrust Blocks at Fittings................................. 62 Installation at Hydrants.............................. 69 Service Connections ...................................... 72 Backfilling and Tamping.............................. 80 Pressure Tests -- Leakage Tests.................. 87 Repairs To Damaged Pipe............................ 93 Pulling Pipe Through Casings.................... 97 Bridge Crossings............................................. 99 Appendix........................................................ 107
3
Receiving and Handling Pipe Shipments
Receiving and Handling
INSPECTION
Each pipe shipment should be inspected with care on its arrival. The pipe was carefully loaded at the factory, using methods acceptable to the carrier and it is his responsibil ity to deliver in good order. It is up to the receiver to make certain there has been no loss or damage.
Releasing the Load for Removal
The tally sheet which accompanies each shipment pro vides a complete list of all the items included. Check the load against the tally sheet and report any error to the transportation agent immediately and have proper nota tion made on delivery receipt.
r vT*
A bright yellow instruction sheet is included with each load as a service in reminding the man on the job of the following points in checking off the load:
1. MAKE OVERALL EXAMINATION OF LOAD. If load is intact, ordinary inspection while unloading should be enough to make sure pipe has arrived in good condition.
2. IF LOAD HAS SHIFTED or shows ROUGH TREATMENT then EACH PIECE must be CAREFULLY INSPECTED for DAMAGE.
3. CHECK TOTAL QUANTITIES of each item against TALLY SHEET (pipe, couplings, rings, fittings, lubricant, etc.)
4. Any DAMAGE or missing items MUST BE NOTED on DELIVERY RECEIPT and re turned to transportation company.
5. Also -NOTIFY CARRIER IMMEDIATELY and make claim in accordance with their instruc tions.
6. DO NOT DISPOSE OF ANY DAMAGED MA TERIAL--carrier will notify you of procedure to follow.
4
a
a
FJG. T -- Truckload
Truck shipments are secured with load binders and are usually released by the driver.
FIG. 2 -- Carload
In freight cars, straps are used to make tight shipping units. To release the pipe, cut the straps with heavy wire cutters, snips or a fine-tooth hacksaw. For either rail or truck shipments the couplings, if shipped separately, are stowed in a separate area or lined up to resemble full lengths of pipe and secured at the top of the load. Rubber rings are packed in cartons. Cartons should be opened, rings checked against the tally sheet, then put in a safe place to insure against loss.
5
Receiving and Handling
HANDLING PIPE
Keep all pipe under control during unloading. This will greatly reduce the possibility of dam age caused by careless handling. If a pipe section is accidentally damaged, mark it plainly and set it aside. Repairs (described on page 93) can be made later on, so long as any damage is noted at the time. The greater danger is in not noting and then installing such abused pipe. This could result in having to repair the line after installa tion is completed. Table A (below) gives the ap proximate weight of Transite Pipe.
Size Pipe Inches
3 4
6 8
10 12
14 16
WEIGHT OF TRANSITE PRESSURE PIPE
Class 100
Pipe
Wgt. Lt)$. Per Ft.
Cplg. Wgt. each
Class 150
Pipe Wgt. Lbs.
Per Ft.
|||
Class 200
Pipe
Wgt. Lbs. Per Ft.
Cpig. Wgt.
each
4.5 5.7
10.0 15.4
19.9 26.5
33.2 41.6
5.1 5.9
9.7 13.8
16.4 25.0
38.5 48.2
5.0 6.5
11.2 17.3
27.9 37.8
50.0 62.0
5.6 6.9
11.3 17.5
26.8 41.5
64.2 81.0
5.9 8.6
14.0 21.6
32.2 44.6
60.5 78.3
5.6 8.5
15.8 23.8
36.5 57.2
88.6 111.3
TABLE A
UNLOADING
Hand-Passing
Hand-passing (without ropes and skids) should only be used on small sizes of pipe. As a general rule, 75 lbs. is enough weight for one man to handle repeatedly. There fore two men, one at each end, can pass pipes weighing up to 150 lbs. Pipes heavier than this should be lowered with ropes and skids. (See Table A, for weight of pipe.)
Using Ropes and Skids
All sizes of Transite Pipe can be unloaded from flat trucks and cars with ropes and with skids set not steeper than 45 degrees. Always use two ropes, passing them under
6
Receiving and Handling
each end of each row outside the skid (as in Fig. 3). The ropes should be tied on the side opposite the unloading because the loop thus formed gives better control as the pipe goes "over the edge" onto the skids, and better con trol while pipe is rolling down the skids.
FIG. 3 -- Chock-block loose pipes as shown by arrow
Pipe should be lowered one length at a time. For larger pipe, snubbing stakes should be used. Two typical meth ods are shown in Figs. 4 and 5.
7
Receiving and Handling
rr^
Receiving and Handling
Narrower units (4 ft. wide) are used in some cases. These are loaded side by side to make up the full truck width. In unloading, take off the entire row from both units so as to save time in setting skids.
Nested rows, sometimes used where pipe is shipped un belled, can also be unloaded with skids and ropes. In this case, leave the chock blocks in place until the top row is rolled off, into the sling, and lowered--see Fig. 6. Then remove the chock blocks and lower the bottom row chock ing loose pipes as before.
T
:P
K
USING MECHANICAL EQUIPMENT
------------------------HOOKS------------------------
Do not use hoist hooks for lifting single lengths... They can damage the coupling groove and the pipe end.
Slings--For single lengths
If a sling is used, center it and adjust it so as to prevent the pipe tipping or sliding out. For example--with chain, cable or rope slings, a double bight with loops spread well apart is the most secure. (See Fig. 7.) If pipe is to be balanced in a single loop, keep the loop tight as in Fig. 8 (especially in the smaller sizes) so as to prevent slipping. In general, use single loops with the heaviest pipes only, because greater weight reduces the tendency to slip. Can vas slings are easy to place and are usually available in widths that will support pipe properly.
FIG. 6 -- Leave chock-blocks in place while unloading top rows.
FIG. 7-- This double-bight sling, with loops spread well apart, can
be used with all pipe sizes
FIG. 8 -- Keep single loops tight -- especially in the smaller pipe
sizes
9
V
Receiving and Handling
Slings for Units or Double Rows
Flexible slings, of cable or chain, should first be run through a length of hose to prevent abrasion of the pipe.
AS FACTORY LOADED
TIES CAN BE CHANCED
Receiving and Handling
FIG. 10-Ties can be charged by using strapping as shown. DO NOT nai) into end grain of wood -- it may not hold.
4^
Slings and Spreader Bars For single row or more
Spreader bars can be made up of channel iron as shown in Fig. 11. These are passed (flat side up) under the row of pipes and the slings attached to them. One row, or any number of rows within the lifting capacity of the equip-
BEARING PIECE
FIG. 9 -- When a sling is used, bottom two rows must be tied --see A and B
The sling loops can be passed in from the ends of the pipes--and should be snugged all the way in to the tim ber bearing piece. The sling can be located at any point indicated by the arrows in Fig. 9. Note that each bearing piece is tied to the separator above it--therefore they stay in place as the load is lifted. (If the sling is passed in at any other point, the timber will drop off as the load is raised and let the bottom row of pipes go slack.)
Pipe can be unloaded in smaller bundles (See `B'--Fig. 9) by tieing any two rows together with strap as shown in Fig. 10. This is sometimes desirable either because of limited lifting capacity of equipment or so as to distribute smaller unit stockpiles.
Here's an easy-to-remember rule for using flexible slings: At least two rows must be lifted and the tim bers must be tied (see Fig. 9).
10
--*
Fork Lifts
Pneumatic-tired fork trucks are often used to advantage in unloading. Chock blocks are left in place and pipe lifted off.
Usually the fork arms are short and so a part of the row is taken at each lift--rolling the balance toward the chock block for the next lift.
11
Receiving and Handling
Receiving and Handling
LOADING TRANSFER TRUCKS
Selecting and Preparing the Truck
Use fiat, stake-bodied trucks because they permit side loading and unloading. Table B can be used to determine the number of lengths of pipe that can be carried by trucks of various capacities.
Lay two timbers, spaced same as factory load, on the floor of the truck for each tier of pipe. This will prevent damage to pipe by bolt heads or uneven bottom. If fac tory units are being reloaded with mechanical equipment, the necessary timbers will of course be tied in with the units so that no other timbers will be required. Do not use short-bodied trucks which allow pipes to extend, unsup ported, for more than one-third of their length. If a tail gate is used, make certain it is adjusted so that pipe cannot ride on a sharp edge.
Generally pipe is stacked on the transfer truck in the same manner as it was stacked for shipment from the factory. Any chock blocks that may have been removed during unloading should be replaced in the re-loading.
Secure each tier with two chains and load binders. Locate them close to the timbers as shown in Fig. 12, NOT in the middle of the pile.
Feet Per Ton and
Lengths Per Truckload (including couplings)
Pipe Size
3
4
6 8
10 12
14 IB
Feet Per Ton
Class Class Class 100 150 200
400 360 310 341 287 229
192 165 131
130 107
85
93 66 57 71 48 40
54 36 29 43 29 23
Number Std. LEths ' Per Truckload
r Class 100
Class 150
Class 200
1 Ton 5 Ton 1 Ton 5 Ton 1 Ton 5 Ton
40 200 36 33 166 28
180 31 140 22
155
no
14 74 12 63 10 50 10 5G 8 41 6 32
7 36 5 25 4 21 27 3 16 3 15
4 21 2 14 2 11
3 16 2 11
8
'Data in this fable based on 10 ft. lengfhs for 3" and 4" sizes; 13 ft. lengths for all other sizes.
TABLE B
12
:B
FIG. 12 -- Locale binder chains dose to limbers--not in the middle of the pile
0<=
0
0 0 0 0s 0^ *9
DISTRIBUTING ALONG TRENCH
In stringing out pipe, keep these points in mind:
1. Line pipe as near the trench as possible to avoid ex cess handling later.
2. If trench is open, it is advisable to string pipe on the side away from excavated earth, wherever possible, so that pipe can be moved easily to the edge of the trench for lowering into position.
t
vr
3. If trench is not yet open, find out to which side exca vated earth will be thrown--then string out on the opposite side. (Leave room for excavator.)
4. Place pipe so as to protect it from traffic and heavy equipment. Also safeguard it from the effect of any blasting that may be done.
ere
13
Receiving and Handling
Excavating the Trench
About Couplings and Rubber Rings
ABOUT OPENING THE TRENCH
1. In those cases where pipe has not been factory-belled, the couplings, especially in the small and medium sizes, should be stored at a central point so as to avoid loss.
2. Store all rubber rings at a central point and distribute as needed. Keep them clean, away from oil, grease, ex cessive heat and electric motors which produce ozone.
3. If rubber rings are not to be used immediately for installation, store them in their cartons, as shipped, in a cool dark place and out of the direct rays of the sun.
STOCKPILES
Stockpiles should always be built up on a fiat base. If mechanical equipment is being used for handling, the unit bearing pieces provide an excellent base. If unloading by hand, secure two timbers for a base. Set them on a flat area, spaced same as factory load. Nail stop blocks at each end. Build up the stockpile in the same manner as it was stacked for shipment, transferring dunnage and chockblocks from load to stockpile. Un-belled pipe can be "can non-balled" on the base using either chock-blocks or sub stantial stakes driven into ground. Keep various sizes and classes grouped. Put short lengths in separate piles where they will be readily available.
0f~& 0^ grr"1#
0*~&
0~&
0^& 0~& 0^*0 0r*&
0*r& 0-^9 0*p0 0^9
As a general rule, do not open the trench too far ahead of pipe-laying. Avoiding long stretches of opened trench will often pay dividends. For example:
It may reduce, or even eliminate, pumping or sheeting; It minimizes the possibility of flooding the trench; It reduces caving caused by ground water; It helps avoid frozen trench bottom and backfill; It reduces hazards to traffic and workmen.
On many jobs it will be desirable to keep excavation, pipe laying and backfill close together, so as to reduce the cost of supervision. If this is done, one man can direct all operations. Transite Pipe can be assembled quickly and can generally be laid as rapidly as the excavator opens the trench.
Belled Pipe a Time Saver
Pipe which has been belled ahead either factory belled or belled on the job, (see page 40) speeds up installation because of faster in-trench assembly--especially valuable in trench conditions where it is desirable to "get in and out" quickly. Where belling is to be done on the job, the pipe crew can get started, even before the excavator has opened trench, by completing one half of the assembly "on top".
THE LINE OF TRENCH
0^0
The line of trench may include one or more curves. Such curves can often be made without fittings since the RingTite coupling permits the pipe to be deflected, either after assembly or during assembly as noted in Table C. The maximum recommended deflection that can be taken at any one coupling is given in Table C AND SHOULD NOT BE EXCEEDED.
SHF Note: Assembly in a deflected position should only be done with belled pipe.
14 4-a
15
Excavating Trench
Excavating Trench
FIG. 13--Assemble straight, then set the free end over
Pipe to be deflected, can be assembled straight as shown by the dotted lines in Fig. 13, and then set over as neces sary. (The trench can be dug a bit wider, on the outside of the curve, to provide room for this straight assembly.
&
"tt
Maximum Recommended Deflection at Ring-Tite Couplings
Ripe Size DEFLECTION
(Degrees)
During Assembly (Belled Pipe Only)
Thru 12"
14"S 16"
2 l>/2 After Assembly
5 4
TABLE C
0 0 *
A glance at Table D will show how many inches the end of a 13-foot length would be set over for various angles from 1 to 5 degrees. For example, for pipe sizes up to 12" the offset for 5 degrees is 13.6" and should not be exceeded.
0
Offsets for Pipe on Curves (In Inches)
If the offset exceeds the maximum recommended deflec tion, the curve is too sharp to allow the use of full lengths. Short lengths can be used if extra ones were ordered for this purpose. (But--be sure to check page 44 before using any short lengths on curves.) When short lengths are used, the maximum deflection at each coupling cannot be any greater than for the full length-but, since there will be more couplings in the same length of line, a sharper curve can be made. (See Fig. 14.)
MAX. OFFSET PER 13' LENGTH
TOTAL OFFSET = 20.4' BY USING TWO HALF LENGTHS
FIG. 14 -- Short lengths allow sharper curves
0- -= 0
To check the offset for lengths other than 13 feet use the column in Table D which shows the offset per foot. For example, for 5 degrees the offset for each foot of length is 1.0"--so a 10 foot length would be 10 times 1.0 making the offset 10.0"--an 8 foot length would be 8 times 1.0" or 8.0"--and so on.
*ApproxiwQtQ--to tenths of on inch.
TABLE D
16
If it is necessary to stake out, or re-adjust a curve, Table E shows the radius of curves for various angles and pipe lengths and includes an example of its use.
17
Excavating Trench
Excavating Trench
Minimum Radius of Curvature for Pipe on Curves
T* a
1. About Loads on Pipe--The wider the trench at the top level of the pipe, the greater the earth load on the pipe will be. It is desirable to keep earth loads on pipe lines at a minimum. Therefore, keep within the maximum width shown in Table F. As the drawing shows, no ad ditional earth load will result from wide, sloping trenches so long as the extra width is kept above the pipe. It's the width at the top level of the pipe that imposes the extra earth load.
How to Use
(1) Find the radius of the proposed curve by actual measure ment or by making a sketch to scale. (See diagram above.)
(2) Check the table to make sure the radius is not too small. For example: Assume the radius will be 188 ft. and that 8" pipe in 13 ft. lengths will be used.
Under the 13 ft. column the figure nearest 188 ft. is 186 ft.-- checking to the right we find this is equal to 4 degrees of deflection at each coupling. (Referring to Table C shows that 4 degrees is satisfactory for 8" pipe-)
(3) Then, by checking the offset column above, we find that the required curve can be made by offsetting each 13 ft. length 10.9".
Note: If the radius had been shorter, say 125 ft., the deflec tion at couplings would be too great and the curve should be eased up or short lengths used if they were available. The table (see second column) shows that 6V2' lengths on a curve of 125 ft. radius would give 3 degrees deflection per coupling.
WIDTH OF TRENCH
Sometimes a wide trench will be necessary. In other cases the soil will be such that a narrow cut could be made. Whatever width may be used at the top of the trench, be sure that, at the pipe-level, it is kept between the maxi mum and minimum widths given in Table F, page 20. There are two reasons for this:
18
ar
Hu 0* --
0.
0. 0*
4*^
0
0^ 0^ 0~*& 0~-Q
TRENCH CAN BE WIDENED ABOVE THE PIPE. -THERE WILL BE NO INCREASE IN THE EARTH LOAD.
BUT------ IF WIDTH IS INCREASED AT PIPE LEVEL. THE EARTH LOAD ON THE PIPE WILL BE GREATER
2. About Working Space--On the other hand, a trench that is too narrow will make assembly difficult and slow. Furthermore, a poor job may result. Lack of space also prevents checking of field-assembled rubber rings. In addition, if there is not ample room, backfill cannot be tamped so as to support the pipe-line prop erly as described on page 80. Use Table F to determine the minimum width.
If sheeting is used, maintain the minimum trench width inside the faces of the sheeting.
19
Excavating Trench
Excavating Trench
Trench Widths at Top Level of Pipe
PIPE SIZE (in Inches)
3- 4 6- 8
10-12 14-16
TRENCH WIDTH (In Inches)
Minimum
'
Maximum
18 28 20 32
24 36 30 42
*Widths should be maintained within these limits. Wherever, it seems
necessary to exceed these limits, provision should be made for the additional load imposed on (he pipe.
TABLE F
Plan Ahead for Thrust Blocks
At changes in direction a tee or bend may be needed and eventually a thrust-block will be built. Do not try to machine dig for thrust-blocks as the excavator will usually dig too far and damage the bearing surface of the trench. A small amount of hand digging just behind the fitting location will keep the trench-wall solid and undisturbed. This will simplify thrust-block construction later on (see page 67).
0" n#
DEPTH OF TRENCH
Note: In specifying the grade to which pipe is to be laid, the engineer will have considered such things as frost penetration, surface loads and earth loads. In those cases where this has not been done, weather records and local experience as to depth of frost penetration to gether with engineering reference books cov ering surface and earth loads imposed on pipe can be used to establish the grade of the pipe.
Grade of the Trench Bottom
As shown in Fig. 16 the actual grade of the trench bottom may be the same as pipe grade at (A) or may be below pipe grade (as in B) in which case earth mounds are used to support pipe during assembly. After assembly, soil is thoroughly tamped under pipe and couplings so as to pro vide uniform and continuous support for the entire line.
20
--a --a
In either case, the clearance under the coupling must be at least 2"___
1. To provide clearance under the couplings which move with the pipe during assembly.
2. To prevent any possibility of couplings resting on original trench bottom (which would result in pipes acting as beams-see "C" in Fig. 17 next page).
B
EXTRA FOR COUPLING FIG. 16
\mmmm
In Rock Excavation
In rock excavation, go 6" deeper than pipe-grade--then bring back up to trench-grade with tamped soil to pro vide the proper cushion for pipe.
21
Supporting the Pipe
m
METHODS OF SUPPORTING PIPE
The method used to support any pipe during installation is of great importance. To begin with, it establishes the actual grade of the trench bottom below the pipe-grade. Of even greater importance, it becomes the basis for final bedding of the completed pipe-line. This final bedding must be as uniform and as continuous as possible. Such support can be attained by following these two simple rules:
1. Couplings. NEVER ALLOW COUPLINGS TO REST ON, OR TO SETTLE DOWN TO, ORIG INAL TRENCH BOTTOM.
2. Pipe. MAKE CERTAIN THAT PIPE BARREL IS GIVEN AN EVEN BEARING FOR ITS FULL LENGTH.
Ii 1iii
. i
I
1
RIGHT
RIGHT
i
Mm
________ ____ __________n__
iii
s ii
IS
c "T WRONG
i
n
11i
I 1!
-i--n
D 1
wrong
Mil'!iMi
i mu
11 t
FIG. 17
Fig. 17 shows the difference between the right and wrong kind of support. At "A" and "B" the pipe is supported for its entire length--the couplings are kept off hard bottom with tamped backfill. At "C" the couplings rest on hard bottom. This is wrong! This pipe straddles from coupling to coupling and is supported only at the ends. "D" is also wrong!--the pipe rests on a "high spot"--and will be
22 0%
9^
V
Supporting Pipe
supported only at such high points. These lengths (C and D) will sustain much less load than the continuously supported pipes.
Which Method of Pipe Support to Use
Two methods of pipe support are described in this guide. Either can be used in stable soils as defined in the follow ing paragraphs. Soils that are unstable must be stabilized before actual installation.
STABILITY OF SOILS
General
Pipe installations are made in a wide variety of wet and dry conditions of loam, swamp, clay, sand and other soils. In this booklet the words "stable" or "firm" will indicate good or fair trench conditions such as normally damp loam, sand, clay, etc. The word "unstable" will indicate poor trench conditions such as soft mucky soils, dry lumpy soils, etc. In such cases soils should be stabilized or tests should be made to prove that the soil is capable of supporting the pipe line. (Some conditions are so bad that other means of support must be designed--such as mats, piles, etc. When such conditions occur the design engineer in cooperation with a J-M representa tive will have decided what method of support to use and will have included it in his specifica tions.) The actual supporting strength of any soil must be judged, on the job, by individual experi ence or by having tests made.
Unique Clay Soil Conditions
In a relatively few geographical areas there is a type of clay soil that is drastically affected by extremes of saturation and dryness. In changing from totally saturated to a completely dry con dition, these clays are subjected to extraordi nary shrinkage. This shrinkage is usually seen in the form of wide and deep cracks in the earth's surface and may result in damage to under ground structures, including pipe materials. The
23
FIG. 18
24 V
Supporting Pipe
The mounds should run right across the trench--and be at least 6" wide. (Skimpy mounds will not hold pipe in position.) When about the right thickness (between 6" and S'1')--tamp it lightly with the flat of the shovel. Then check to make certain it is high enough to provide a clearance of at least 2" under the coupling. If it isn't--put more soil on and tamp it again.
Note: If water tamping is to be used (see "Backfill and Tamping" page 80) the mounds should be built up somewhat higher to allow for settlement that will occur when water is flushed into the trench.
Remember that the mound must keep couplings up, off the hard bottom. The pipe invariably settles down into the mound a little, so it is best to make them a bit higher than required--then pipe can be worked down to accurate grade by merely lifting the end a bit and letting pipe drop. Its weight will settle it some and, at the same time, compact the soil even more. (This bedding down, into the mound, also keeps pipe from rolling sideways.)
Where the type of clay soil condition described on page 23 is encountered, do not use mounds. Instead, bed the pipes full length on the 4 inch sand bed, scooping coupling holes for assembly.
PIPE ON LEVELLED TRENCH BOTTOM
If soil conditions are stable, and the trench bottom is of a material that can be cut true and straight without too much difficulty, pipe can be installed using the trench bottom as support for the pipe barrel. When using the levelled trench bottom for support, the trench bottom must contact the pipe barrel continuously at every point from one coupling to the other. (As shown in the sketch irregularities, lumps, ridges, hollows, etc., will result in an uneven bearing.)
HIGH SPOT CAUSES UNEVEN BEARING FIG. 19 -- Trench bottom musl be levelled carefully to avoid
an uneven bearing
25
Supporting Pipe
Preparing Trench Bottom
ZBT Note: When pipe is to be supported by lev elled trench bottom the machine excavator should not dig to trench grade. Final grade should always be achieved by hand grading.
To prepare trench bottom, hand shape it to level with coupling holes deep enough to provide a minimum clear ance of 2" below the coupling.
As the pipe is laid, the use of a wood template (as shown in Fig. 20) is recommended to assure a straight trench bottom free of bumps or hollows and at the correct grade. Any irregularities in the trench bottom must be either levelled off or filled in with tamped soil.
!i 9
%
ftSf
*1 W 5
'i9
ir c
#i
0-
Supporting Pipe
bottom must be dug at least four inches deeper and then brought back to grade with tamped sand.
In unstable (soft) soils it will be necessary to dig deeper and refill with selected material (such as gravel or crushed stone) until pipe grade is reached. The design engineer should be consulted whenever soils are encountered about which there will be doubt as to the adequacy of the sup port provided.
When spreading refill soil on the trench bottom, make sure that coupling holes are left deep enough to provide a minimum clearance of two inches below the coupling. This allows room for tamping beneath the coupling and assures that the line is being supported for its full length, not at the couplings alone.
FIG. 20 -- The use of a template is recommended for ac
curate grading and levelling of the trench bottom
The trench bottom may also be prepared by digging at least 4" deeper than pipe grade and then bringing the trench bottom up to grade with selected refill material tamped to provide the proper cushion for the pipe.
If the trench bottom is extremely hard (such as shale, ledge, some types of hard pan, etc.) or is loose, stony soil where there is the possibility of pipe being subjected to "point" contacts, the trench should be excavated at least 6" below trench grade and then brought back to grade with selected, tamped, soil.
Where the type of clay soil conditions described on page 23 is encountered, the pipe should be enveloped in a minimum of four inches of sand. In such instances trench
4^
26
V
27
Lowering Pipe Into the Trench
The overall speed of installation can usually be increased if the trench crew and the "top" crew know their job and work together. For example:
1. The pipe-laying crew should have trench ready for pipe--mounds, or bottom, should be so placed and graded that a minimum of last minute adjustment is required.
2. The top crew should have pipes lined up, ready for lowering, ahead of time. If pipe is to be lowered with ropes, spot the lengths as close to their final position as possible--so as to cut down on movement in the trench--(where it is usually more difficult than up on top).
3. The top crew should "service" the pipe crew by having rubber rings, lubricant and assembly equipment ready to pass into the trench without delay when needed.
T*
"A trp
ft
Lowering Into Trench
Lowering Pipe with Ropes
Using two to four men, pipes weighing up to 800 lbs. per length can be lowered with two ropes--one at each end. In deep, sloping or crumbly trenches, skids will help keep dirt out of couplings. If pipe is laid on earth mounds, place ropes clear of the support points on the pipe so they can be pulled free after pipe has been lowered. In lower ing, tie stop-knots on the end of each rope and stand on them to prevent slippage (see Fig. 21). Stakes can also be used as anchors (see Fig. 22).
IW" Note: Coupling grooves must be clean before assembly can be made (see page 30). There it will save time to keep dirt out oi the couplings in lowering belled pipe into the french. This can be accomplished by lifting clear and lowering with mechanical equipment; by hand passing over edge of trench in small sizes, or by using ropes and rolling down skids in medium sizes.
PASSING BY HAND-WITHOUT ROPES
In hand passing, use only one man at each end. (More men will only get in each other's way and increase the possibility of dropping pipe.) 75 lbs. is considered a rea sonable weight for one man to lift repeatedly--so this method should only be used for pipes weighing up to 150 lbs.
Hand passing is best suited to straight-walled trenches with firm edges that will not crumble under the weight of men and pipe. The men in the trench must be able to reach the length easily--so this method should be used for trenches of 5 ft. depth or less. (Use ropes, even in the smaller sizes, if the trench-wall slopes or is crumbly.)
28
-H*
--a
--a
Where the trench passes through paved areas, or where sheeting is used--take two turns of the rope around each end. This provides better control of the pipe as it passes over the hard edge and starts to drop. Lower slowly and avoid striking couplings or machined pipe ends against rocks or boulders that may be imbedded in the side.
Lowering with Mechanical Equipment
Although all but the largest sizes can be lowered by hand with ropes, mechanical equipment is generally faster and requires fewer men. A cable can be used from an exca vator boom, but this ties up the excavator and slows progress. Transite assembles quickly and the contractor may find it to his advantage to use separate equipment for lowering (and assembly, pages 37,38). This is a mat ter of judgment, available equipment and trenching con ditions. In lowering with mechanical equipment, slings of wirerope, chain or canvas are recommended (see page 9). Pipe tongs are also popular and offer the advantage of quick release with nothing to pull out from under the pipe barrel.
29
Assembly of Ring-Tite Pressure Pipe
Assembly of Pipe and Coupling
The Ring-Tite assembly is a sliding assembly in which the lubricated pipe-end slides under the rubber ring and into the coupling. The machined shoulders and the com pressed, locked-in rings keep the pipe ends separated, automatically providing for expansion and flexibility.
Note: Although bells could be faced in either direction, the general practice is to face the belled ends forward, in the direction of laving. This helps keep dirt out, because the bell of the pipe already "in the line" doesn't move during assembly. Belling forward also prevents soil from being "plowed" into the bell of the next pipe, which does move during the assembly, because the back of the coupling moves toward any loose soil in the trench.
FIG. 23 -- Pipe end slides under ring until automatically stopped by shoulder
INSERTING THE RUBBER RING
When inserting the ring in the groove there are two im portant points to keep in mind: 1. THE GROOVE MUST BE CLEAN-dirt under the
ring will not allow it to seat completely and will cause trouble. One good way to make sure there's no dirt under the ring is to have the next length already low ered before inserting the ring. Then, any dirt that may have worked in during handling, can be cleaned out. 2. FACE THE RING IN THE RIGHT DIRECTION-- see sketch. Now smooth the ring into the groove, making certain it is faced properly and completely seated, all around.
30
rf*
irp* T*
FIG. 24 -- Enlarged view, with ring properly faced in groove
LUBRICATING PIPE ENDS
Before lubricating pipe ends they should be cleaned thor oughly by wiping the entire circumference back to the first shoulder. This allows lubricant to be applied directly to pipe surface. It will not function over caked dirt. Johns-Manville Ring-Tite lubricant should be applied to the entire circumference of the pipe back to the stop shoulder. (This includes the nose, taper and machined surface as shown in Fig. 25.) Apply lubricant thoroughly using either the hand, a cloth pad, a sponge or a glove. See illustrations. Coating should be about the thickness of a brush coat of enamel paint. Use lubricant as it comes from container--stir if necessary but--DO NOT THIN IT.
Note: Johns-Manville Ring-Tite lubricant has been tested and approved for use in potable water service. Do not use non-approved lubri-
FIG. 25 -- Apply lubricant to entire circumference, back to the stop shoulder
31
Assembly of Pipe and Coupling
*
Assembly of Pipe and Coupling
RIGHT -- Lubricant applied evenly.
Hand
Cloth
Sponge
Glove
WRONG -- Too much lu bricant -- unevenly ap
plied.
Sufficient lubricant is in cluded to do the job. DON'T WASTE IT.
Lubricant Requirements
The following table gives the number of BELLED pipe lengths that can be lubri cated from a VA quart can of lubricant.
PIPE SIZE
BELLED PIPE LENGTHS PER CAN
3 160 4 128 6 88 8 68 10 52 12 36 14 26 16 24
32
ASSEMBLY METHODS
General
Various methods are used--for example:
1. A bar and wood block can be used to assemble sizes through 10" if trench bottom is suitable. A bar does not work well in loose sand, hard shale or soft muddy bottom--nor on tamped soil over rock as described on page 26.
2. Pullers can be used under all conditions. There are two types: (1) a "lever" puller which pulls from on top of the pipe and (2) a "friction" puller which pulls from both sides of the pipe. Their use is described on fol lowing pages.
3. A third method is to hold the pipe suspended (by hand for small sizes --from a cable in larger sizes) and "swing" it into the bell using its own weight to force it into final position. This method (also called "stab bing" or "popping") requires care and accurate con trol of aim, angle and amount of swing.
Note: With any of the above methods, a fric tion puller will be needed to make closures.
Also, with the "swing-in" method, a puller will be needed for joining Ring-Tite fittings on to pipe. See page 58.
ASSEMBLY WSTH BAR AND WOOD BLOCK
With the pipe properly supported, line up the bevel-end so that it just "snugs" all around into the ring in the bell. Drive the bar in for purchase--then, using a wood block, shove the pipe home. See Fig. 26. The wood block gives a straight "center-line" push and also protects against damage by the bar.
FIG. 26
33
Assembly of Pipe and Coupling
$*
Assembly of Pipe and Coupling
CHECKING FIELD ASSEMBLY
With the ring completely seated in a clean groove and with pipe-end properly lubricated, the ring cannot be displaced during assembly.
To make certain that the field work is being done prop erly, the ring position should be checked with the feeler gage shown in Fig. 27.
FIG. 27
A .25" B 1.50"
C .75" Material: .016 x 1 i" Tempered Spring Steel
Insert the gage as shown in Fig. 28. The clearance (see arrow) proves that gage is touching the ring. Slide the gage all the way around the coupling. As long as the ring can be touched by the gage it is correctly assembled.
^'.T--
ASSEMBLY WITH LEVER TYPE PULLER
With rubber ring correctly inserted in a clean groove in the belled couplings, anchor puller to installed pipe length by setting binder chain in slots on puller base--see Fig. 29. (If pipe is laid on levelled trench bottom, dig a small channel under the pipe for clearance for the chain.)
The pipe to be installed should be lined up, ready for assembly and have end cleaned and lubricated. Wrap the pulling chain around the barrel of the pipe to be installed, fastening with grab hook as in Fig. 29. With the pulling-handle forward to provide travel for the pull, en gage pulling chain in hook on puller-handle and pull pipe into bell until movement is positively stopped. (A wider channel for chain travel under this length may be needed
34
FIG. 29 - To complete assembly anchor puller to installed length (A) and pull length being installed (B) into bell
if on levelled trench bottom--total travel is one-half the coupling length if nose of pipe is touching ring at start of pull.)
Check the field-assembled ring with the gage. See page 34.
ASSEMBLY WITH FRICTION PULLER
The friction puller consists of two jack bodies connected with chains so that there is one jack body at each side of the pipe--see Fig. 30. The length of the chains can be ad justed for various pipe sizes. Make the initial adjustments as shown in Fig. 31. The jack bodies should hang halfway up the pipe (the horizontal diameter). Once adjusted, no change is needed until pipe size is changed. Insert ring completely in a clean coupling groove of the belled pipe. Check line-up of pipe to be installed and clean and lubricate the end. Move it into position for as sembly (nose of pipe just started on to ring).
35
Assembly of Pipe ond Coupling
Set the puller on the pipe to be installed as shown in Fig. 30 with both jack bodies all the way back on the shafts so as to have enough travel for the pull. (To slide jack bodies, release the catches as shown in Fig. 34.)
T> T>
4-3
Assembly of Pipe and Coupling
handles ahead of the release catches as in Fig. 34. The binder chain is released by giving it a kick, at the top, toward the coupling. This loosens it so it can be unhooked.
FIG. 31 -- Supporting chains can be lengthened or short ened as needed. "Figure eight" link (in circle) opened to change length of coupling chain. At right (see A) remov able pins, passing through chain links, allow adjustment
of binder chain length
Engage coupling hooks at each side of coupling and then anchor the puller, as follows:
1. Cross the long chain under the pipe as in Fig. 32 (dig a channel for chain if pipe barrel is on levelled trench bottom).
2. Bring the ends up and around (keep the chain tight) and join with the grab-hook.
3. Take up slack by pulling back as in Fig. 33. Insert the puller handles in their sockets and move them in the same direction at the same time--pulling the pipe to which the puller is fastened into the bell until move ment is positively stopped.
Release the tension on the shafts by inserting the jack
SLIDE. BACK t
j
FIG. 34
FIG. 35
Reset the puller for the next assembly by holding the re lease catches back with the thumbs and sliding the jack bodies to the starting points at the ends of the shafts. See Fig. 35. (Use the coupling as an anchor for doing this.)
Check the field assembled ring position with the gage. See page 34.
ASSEMBLY BY "SWINGING IN"
An alternate method which can be employed if proper care is taken to prevent damage to either pipe end or coupling is the "swing-in" method.
This method requires that the pipe length be suspended (by hand or by cable --see illustrations) and ACCU RATELY aimed and swung into the bell, letting the
36
FIG. 36 -- Always use two men. AIM CAREFULLY Swing in STRAIGHT. If a miss is made RE-CHECK RING and RE-LUB-
RICATE pipe before trying again
37
C7
Assembly of Pipe and Coupling
Assembly of Pipe and Coupling
weight of the pipe carry it to final position.
Two men should be used, even when a cable supports pipe, to maintain the accurate control necessary to enter the bell without hitting coupling.
Keep the swing short, just enough to drive pipe all the way home but not slamming pipe ends together within the coupling.
Keep the pipe straight--as it enters the bell, deflection can be taken later, if needed.
IMPORTANT: If a "miss" is made and pipe does not go "home". . .
1. RECHECK RING AND MAKE SURE IT IS COM PLETELY SEATED BEFORE MAKING THE NEXT TRY.
2. RE-LUBRICATE THE PIPE END TO REPLACE ANY LUBRICANT THAT WAS SQUEEGEED OFF ON THE FIRST ATTEMPT.
3. IF THE PIPE END STRIKES THE COUPLING, BOTH SHOULD BE EXAMINED FOR POSSIBLE DAMAGE.
ALSO: After a "swing-in" assembly, "tamp up" earth mounds to make certain that clearance under pipe and especially couplings is maintained. (Earth mounds gen erally become flattened down during this method of assembly.)
Check the field-assembled ring with the gagesee page 34.
TRANSITIONS PROM SIMPLEX TO RING-TITE
For Class 150--Simplex
To make a transition from an existing Simplex line to Ring-Tite, first bevel the nose of the Simplex machined pipe to allow the ring to start onto the pipe easily. Line up a belled length of Ring-Tite as in Fig. 37. Insert rubber ring in coupling groove, lubricate Simplex pipe end. Set puller as shown and pull Ring-Tite pipe onto Simplex.
38
0F
0^
r-s
(A friction puller can also be used or, in the smaller sizes, a bar and wood block if bottom is suitable.) The Ring-Tite pipe can now be belled at the other end so as to have "bells forward"--or it could have been "dou ble belled" before lowering. Check the field assembled
FIG. 37 -- Transition from Simplex to Ring-Tite. Beveling the nose of the Simplex pipe will make assembly easier--(See Fig. 43)
For Classes TOO and 200--Simplex 1. Machine the end of 4", 6" and 8" Class 100 and 4" Class 200 Simplex pipe in the field with a machining tool with blades and holder set for Ring-Tite dimensions. 2. For other sizes use Simplex to Ring-Tite Adaptor.
LUBRICATING FOR UNDERWATER ASSEMBLY
Although not generally recommended, underwater assem blies are sometimes necessary. As noted on page 30, the usual practice is to have bells "forward" in the direction of laying. In this case the pipe to be assembled into the line will be above water--for lubricating. DOUBLE LU BRICATION IS RECOMMENDED. To do this, lubri cate thoroughly as described on page 32; wait 4 to 5 min utes and then RE-LUBRICATE,-then IMMEDIATE LY lower and assemble. If the end to be joined is a spigot end already immersed, double-bell the next length to be lowered (see page 40 for belling on the job.) Insert the ring in the groove and then lubricate all exposed surfaces of the ring. Then lu bricate the immersed spigot heavily and assemble IM MEDIATELY. The forward end will then already be belled--so proceed with double lubrication as in the pre ceding paragraph.
39
Assembly of Pipe and Coupling
%
%
\
Assembly of Pipe and Coupling
BELLING PIPE
General
Although pipe can be belled in the trench, it is usually done "on top". This speeds up the "in trench" assembly and, if all belling is done on the job, enables the crew to get started belling, even before the excavator has opened trench.
BELLING WITH BAR AND WOOD BLOCK
Set the coupling over the nose of the pipe so that the ring is partly started onto the taper--see Fig. 38. Note that the bottom of the coupling is angled about V2" to ward the pipe. Shove home with bar and block.
Check ring position with gage. See page 34.
'4
rn
t
Mill
pling by leaning against it, leaving hands free to place the coupling hooks in position. (Handle should be for ward [dotted line Fig. 39] so as to provide travel for the pull.)
Hold hooks firmly against side of coupling while helper drops puller chain into hook on puller handle. (A 2x6 board can be substituted for the coupling hooks if pre ferred.) As the pull is started, the coupling should be held slightly cocked with bottom about Vz" ahead of top (See A, Fig. 39).
PIG. 38 -- Belling with a bar. Bottom of coupling should be approximately 'A inch forward on pipe at start of assembly as shown on left. Note: The block can be 2"x4" or 4"x4" fas shownJ, A 4x4 requires less care to locate the bar at the right
point as it is driven in.
BELLING WITH LEVER PULLER
Set puller 4' to 6' back so as to have the least chain angle and, therefore, the straightest pull. Anchor puller to pipe with binder chain (Fig. 39).
Adjust the light connecting chain so that the coupling hooks hang at the horizontal diameter. (This adjustment need be made only once for each pipe size.)
Set coupling over nose of pipe with ring resting on pipe taper. In this position it will be easy to support the cou
mr-
r
H-*
0a
40
FIG. 39 -- Note that puller is set well back from the cou pling. This reduces the chain angle and results in the straight
est pull.
Pull the coupling on with a smooth, even pull. Control the riding angle of the coupling by pressure of foot or knee. Don't jerk. Coupling will stop, automatically, when it reaches the stop shoulder--do not force beyond that point.
Check ring position with gage. See page 34.
BELLING WITH FRICTION PULLER
Adjust the connecting chain so that the coupling hooks hang at the horizontal diameter of the coupling. Anchor puller to pipe as described on page 36.
Place coupling so that rubber ring rests on pipe taper. Engage coupling hooks at end of coupling. Move both
41
8
Assembly of Pipe and Coupling
Use of Short Lengths
operating handles in the same direction at the same time --this keeps coupling moving straight with a minimum of cocking to left or right. If severe up or down cocking takes place, the hooks are too low or too high. Re-adjust to pull on center. If coupling is removed to re-adjust, re-check ring seating and re-lubricate pipe before starting again. Once correct adjustment is made, no further changes should be necessary for that pipe size. To release jack bodies and binder chain see pages 36-37.
Check rubber ring position with gage. See page 34.
BELLING BY "POPPING" ON
By using care and with experience, pipe sizes through S" can be belled by sitting on the pipe and holding the cou pling straight out 10 or 12 inches, then pulling it back hard and straight onto and over the end of the pipe and into final position--ail in one stroke. As shown in Fig.40pull straight back, DO NOT SWING IN A CURVE. IMPORTANT: Whenever the attempt to "pop" on fails 1. RECHECK RING AND MAKE SURE IT IS COM
PLETELY SEATED BEFORE MAKING THE NEXT TRY. 2. RE-LUBRICATE THE PIPE END TO REPLACE ANY LUBRICANT THAT WAS SQUEEGEED OFF ON THE FIRST ATTEMPT.
Check rubber ring position with gage. See page 34.
FIG. 40-PUtl STRAIGHT BACK. DO NOT SWING IN A CURVE
42
Short lengths are used in Ring-Tite lines--
--at rigid structures --at rigid joint fittings --on curves --to replace a section of installed pipe --to make closures and locate fittings exactly.
Short lengths are not required at Ring-Tite fittings. With Ring-Tite fittings, full lengths can be used because the rubber ring joint at the fitting provides the necessary flex ibility. With rigid joint fittings and at rigid structures short lengths are required in order to provide a flexible joint close to the fitting or structure.
As shown and explained in Fig. 41, short lengths may be machined-over-all (MOA) or machined-each-end (MEE). Following is a listing of the lengths and type of machining available:
For 3"-4" & 6" pipe in 10' Igths......... For 4" & 6" pipe in 13' Igths........ For 8" thru 16" pipe..............................
For 18" thru 38" pipe (see appendix)
3'-3" MOA and 6'-9" MEE 3'-3" MOA and 6'-6" MEE 6'-6" both MOA and MEE 6'-6" MEE only
r~ i
MACHINED OVER-ALL
'[ ~
MACHINED EACH-END
0=^
***
Note that--
FIG. 41 -- Short lengths
1. The Ring-Tite coupling requires a pipe surface that is machined to a specific diameter--assembly on rough, unmachined pipe should never be attempted. Machined-over-all short lengths (MOA) can be cut at any point on the pipe barrel and. used because they are ac curately machined the entire length for Ring-Tite as sembly. (See page 50 for methods of cutting pipe).
2. As a general rule the number of all short lengths on a job is limited. Therefore, they should be set aside and
43
Short Lengths
Short Lengths
used only as planned when the pipe order is placed.
3. The use of a Transite adaptor eliminates the require ment for a short length at the fitting.
Use of Short Lengths*
Note: See page 54 Tab/e H to Determine need for short /engfhs of rigid joint fittings.
WHERE USED
3", 4" & 6" PIPE
S" THRU W PIPE
At Rigid Structures 3'-3" or shorter
6'-6" or shorter
On Curves
Use shorts or randoms, machined-each-end, on curves if use of standard lengths will exceed maximum deflection as recommended on paqe 16 and if planned on when order was placed. Do not use machined-over-all pipe on curves as it will be
needed for tie-ins and locating fittings.
Making Closures and Repairs
Use of short lengths will depend on situation--see section beginning below.
Locating Fittings Exactly
See section beginning page 48.
*7he Transite MJ-6 adaptor (used for both mechanical joint and poured bell fit tings) eliminates the need for o short length.
TABLE G
USING SHORT LENGTHS AT CLOSURES
To make a closure between two pipe ends, various com binations of short lengths can be used as long as the final piece inserted is machined-over-all or has ends "long ma chined" so that couplings can be pulled completely on to the ends of the pipe.
iSW* Note: Using a nipple less than twice the cou pling length plus 2" is not practical in making the final closure. Nipples that are too short can be avoided by using another MOA length at A, cutting it so that final nipple is long enough to handle.
Use Stop Marks When Joining Two MOA Pipe
In most cases the length used at A is machined-each-end, with shoulders to automatically stop and center the cou pling. However, if A is MOA then there is no shoulder-- in such cases stop-marks must be made to make certain
44
it*
L-* 'J*
rr>4 JW4 U
coupling is correctly centered over the pipe ends and that rubber rings are in the correct sealing position. The stopmarks are necessary for this since the ring checking gage will not aid in locating the rings with relation to the pipe ends. "X" in Fig. 42 gives stop mark locations. A bar is sometimes used at the stop-mark to make certain the coupling does not move too far on to one pipe.
FIG. 42 -- Closure made by installing any length at A. Then cut a machined-over-all section to length for closing gap. If A is MOA then stop mark must be used to make certain
coupling is centered over pipe ends- (See insert detail.)
Bevel Field Cut Ends The field cut ends are then beveled for ease in assembly. To do this use a coarse wood-rasp to form a taper approxi mately the same as that on the factory beveled end. A machining tool can also be used for beveling field cut ends. Then, round the nose (see insert, Fig. 43) to allow the rings to start sliding more easily.
45
Short Lengths
14^
Short Lengths
Lubrication and Assembly
To make assembly simpler, double lubrication (that is,-- after lubricating once, wait 4 to 5 minutes and re-lubricate) is recommended when making a closure so the rings will slide easier. In any case lubrication should always be closely followed by assembly as coupling may "freeze" if left longer than 30 minutes.
After inserting rings, lubricate heavily all exposed sur faces of the rings. Then double lubricate both pipe ends back nine inches so that couplings can be pulled com pletely onto the pipe until they are just Hush with pipe ends,-DO NOT PULL FARTHER.
Final Assembly
The insertion piece is then placed into the gap, and the couplings are pulled onto the ends of the pipe already installed, completing the closure (see Fig. 44). Assembly effort (greater with two rings) can be eased by "wob bling" the couplings slightly as they are being pulled. Operating the handles of the friction puller in alternately opposite directions will cause coupling to wobble.
of the coupling. Each end is then double-lubricated and the couplings pulled all the way on as described under Lubrication and Assembly on page 46. The section is then inserted into the gap and the closure made.
_________ _ --4_____4_____L_ 1
3
FIG. 45 -- Field machined fat B) pipe used in making a
closure. Make standard assembly at A. Swing pipe into line
and pull coupling (B) into position
Only one end need be "long machined" if trench is open so that at least one of the already installed pipes can be shifted temporarily to one side--see Fig. 45. First make a standard assembly at the offset pipe (A) --(no extra ma chining required). Next, double lubricate and pull a cou pling all the way on to the long-machined end (B). Then swing both pipes into line and complete the closure.
Removing Pipe From Line
If the reason for the closure is to replace a pipe section, the couplings are removed by breaking off as follows:
Check rubber ring position with gage. See page 34.
FIG. 44 -- After insertion piece is placed in gap, couplings
are pulled onto ends of adjacent pipes. A coupling puller is used for this purpose
Using Field Machined Pipe For Closures Standard or random sections (either full length or by cutting as needed) can be used for making closures if a field machining tool equipped with an extension cutter is on the job so that the ends can be machined the full length
46
9T* Or**
&C-
FIG. 46- First widen trench for
room. Hit coupling a series of smart blows with the ball end of o ball-peen hammer along each side. This splits coupling for easy
removal
Alternate method -- Crack coup ling along top with ball-peen ham mer. Complete splitting with bar using care so as not to damage
pipe ends
Remove the pipe from the trench and the rubber rings from the adjacent pipe ends. After the pipe ends have been wiped clean, the gap is ready for a closure.
47
Short Lengths
TO TIE-IN OR TO LOCATE FITTINGS EXACTLY
Iff" Note: For assembly at fittings see section start ing on page 54.
To locate fittings exactly or to tie into fittings already in a fixed location, combinations of MEE and MOA pipe may be used as shown in Figs. 47 and 48. (If an adaptor is joined to MOA pipe, stop-marks will be required to ac curately position the coupling--see page 45.)
DESIRED PINAL _ FITTING LOCATION
tp
LAST FULL LENGTH |Q| SHOWT LENGTH MEE |Q MOA CUT TO FIT I
LAST FULL LENGTH
n MOA CUT TO FIT
FIG. 47 -- To locate fittings exactly various combinations of machined-over-a!l or machined-each-end pipe can be used
IF A RING-TITE FITTING IS ALREADY IN A FIXED LOCATION, the tie-in is made by installing a full length at the fitting first, and then making the clo sure between this length and the run of pipe as shown in Fig. 48.
Short Lengths
___ muug is aireaay in a fixed location, this results in a "rigid joint" at the bell, requiring a quarter or half length (see page 56). In this case the method shown in Fig. 49 is used to tie into the fitting.
y
u
FIG. 49 -- When a rgid joint fitting is in a fixed location make tie-in by assembling MOA pipe at fitting and mak
ing closure as shown
FIG. 48 -- When tying into a Ring-Tite fitting (already in a fixed posi tion) install a full length at A and make a closure' at B (see Page 45')
48
49
Cutting and Machining Transite Pipe
Vh *
Cutting and Machining
Transite Pipe can be cut with hand pipe-cutters which use a cutting edge (do not use wedge-type roller cutters), motor-driven saws using abrasive discs, and with hand
saws.
USING PIPE-CUTTERS
Pipe-cutters which provide a true cutting action by means of a blade (not rollers) offer a means of making fast, accu rate cuts. The cutting tip of the blades supplied should be of tungsten carbide, which will make a maximum number of cuts before needing to be sharpened.
There are various designs of cutters availablethatprovide this type of long-lasting cutting blade. The frames of these cutters are adjustable to a range of pipe sizes. They are spaced around and attached to the pipe with roller wheels which are forced into the pipe so as to "track in" squarely on the first revolutions and automatically follow the cut thereafter. See Fig. 50. Instructions are usually included with the cutters.
In addition to standard vises, pipe can be held for cutting by twisting a bar tightly in a rope, or chain, loop (Fig. 51)--or by using a chain type pipe-wrench,
mr
9* mr
DIRECTION OF ROTATION
BLADE HOLDER
The following abrasive discs are recommended for use with Transite Pipe:
Beaver Falls-#C120-N-R91 Eveready Brick Saw--#BTF-303 Norton-# 37C 24-014BN Carborundum D5 or CF Skil Saw #11645 Disston #H-1210-5 Porter Cable--Green Label Stone Wheel
The pipe is usually set on planks, or any level spot, and rolled slowly toward the operator as the cut is made.
USING HAND-SAWS
Either one- or two-man cross-cut saws can be used--de pending on the pipe size. For best results and maximum number of cuts, the saw should be kept sharp and the teeth at twice their normal set.
Before making the cut, a mark should be made all the way around to assure cutting square and at the location de sired. The pipe should be supported to prevent breaking away as the cut nears completion. A 4' to 6' plank with batten strips nailed on as shown in Fig 52 is easily made, keeps pipe from rolling and provides good support. (A miter-box is also useful, both for guiding the cut and pro viding even support.)
FIG. 50 -This diagram shows the typical arrangement of cutters using a true cutting blade--not
rollers
FIG. 51 - Placing pipe across the trench provides plenty of room
for operating the cutter
USING ABRASIVE DISCS
Medium to coarse-grit abrasive wheels can be used suc cessfully where power is available. Cut dry and use care to avoid cramping the blade by twisting.
50
FIG. 52 -- A plank with two batten strips nailed on keeps pipe from rolling and provides good support
51
Cutting and Machining
USING MACHINING TOOLS
Field machining tools are available for machining the rough pipe barrel of Transite Pipe when it has been cut-- or for extending the Ring Sealing portion (D-2, Fig. 53) for use in making closures.
There are various designs of field machining tools all uti lizing the same basic principles consisting of:
--an adjustable arbor which is inserted into the pipe barrel and acts as a mandrel upon which the turning handle operates. --a turning handle with blade holders. --and tungsten carbide tipped blades. See Fig. 53.
Cutting and Machining
Field machining tools should be used in accordance with the manufacturer's instructions. The following suggestions are general and apply to all machining tools.
1. Use a factory machined end as a guide for setting blades.
2. Turn handle clockwise; never turn backwards when blade is in contact, as blade may break from carrier.
3. Check dimensions of field machined end (dimension table on page 104) to assure that machining tool did not loosen during operation. See Fig. 53.
4. Round the pipe nose with a coarse wood rasp to allow the rings to start easier. See A, Fig. 53.
u>
u
As the blade starts in on D2, the ring sealing area, machine about 2 , then check to make certain no "springing" has occurred, an t at
final dimension will be correct. (Dimension, page 104)
52
53
Assembly at Fittings
SUPPORT OF THE FITTING
Fittings should be supported independently of the pipe. Wood skids can be used for this purpose. They help to align the fitting with the pipe end during assembly. They make it easier to assemble the fitting onto the pipe end.
Hr-5
FIG. 54-- Wood skids can be used to support fittings and help align fitting during assembly. Note: valves may
require concrete-block anchorage--see page 67
Temporary supports (which are to be removed) should not be used because their removal, later, may result in throwing the weight of the fitting on the pipe. Set fittings on supports that will remain in place. Gate-valves, reducers and fittings with different diameters result in thrusts in the line. They may be supported on wood blocks if the line pressure is low. If considerable thrust, due to high pressure, is expected, the valve or other fitting should be set on, and anchored to, concrete blocks as shown under "Thrust Blocks," page 62. Hydrants should be set on solid, permanent foundations which act as thrust blocks as well as hold-downs against frost-heave--see page 70.
54
Assembly at Fittings
USE OF SHORT LENGTHS
Short lengths are to be used at each bell of each poured bell or mechanical joint fitting as outlined on page 44. Where adaptors are used, as described on next page, note that use of the Transite adaptor eliminates need for a short length because the adaptor itself is a short length which provides a flexible coupling close to the fitting.
ADAPTOR REQUIREMENTS
The following types of adaptors are available. (Table H indicates which, if any, adaptor is needed.) 1. MJ-B Adaptor--For connecting Transite to Mechani
cal Joint and Poured Bell Fittings. See Fig. 55. In or dering show size and class of pipe to be connected--as-- MJ-B Adaptor--8"-l50 (etc.). 2. Class to Class Adaptor--is a transition piece used to: 1. Change from class 100 to class 150 Transite in sizes
4" and 10"-thru-16" (not needed for 6" or 8"). 2. Join class 100 Transite to class 150 Ring-Tite fit
tings, in the same size range as above. In ordering show size only as--Cl. to Cl. Adaptor--10" (etc.)
FIG. 55 -- MJ-B Adaptor at -- A -- Poured Bell Fitting B -- Mechanical Joint Fitting
55
Assembly at Fittings
Short Length and Adaptor Requirements at Fittings
Note: S'-6" MEE shorts are available on order for pipe sizes 3", 4" & 6" in 10' Igths. These can be cut in two for use into poured bell fittings {see table). As noted on page 43, the standard shorts regularly shipped with these sizes are 3'-3" and G'-9" for making tie-ins and repairs.
Pipe Size and Class
Ring-Tite Hub
TYPE OF FITTING
Mechanical Joint
Requires Machined Pipe Surface
Poured Bell
3"-100 -150 -200
Cl to Cl Adaptor*
MJ-B Adaptor MJ-B '' MJ-B "
3'-3" MOA (1) 3'-3" MOA (1) 3'-3" MOA
4"-100 150 200
Cl to Cl Adaptor*
MJ-B Adaptor 3'-3" MOA 3'-3" MOA
3'-3" MOA (1) 3'-3" MOA (1) 3'-3" MOA
6"-100
--
3'-3" MOA
3'-3" MOA (1)
-150
3'-3" MOA
3`-3'' MOA (1)
200
3'-3" MOA
3'-3" MOA
8 "-100
MJ-B Adaptor
6`-6" (2)
-150
-- MI-B "
6'-6" (2)
-200
MJ-B "
6'-6" Machined
Surface only
Following are adaptor requirements lor sizes 10"-12"-14" and 16"
Class 100 " 150 ' 200
Cl to Cl Adaptor* -- --
MJ-B Adaptor MJ-B " MJ-B "
MJ-B MI-B
MJ-BAdaptor ' "
vSome manufacturers are supplying Class 100 liing-T/fe fiffrngs Tor which no adaptor would be needed.
(1) 6'-6" lengths (MEE) con bo col in two. Unmachrned barrel will fit info be/I. (2) foil lengths (MEE) can be cuf in two. Unmachined barrel will fit into be/I.
TABLE H
STEEL TO RING-TITE ADAPTOR COUPLING
When a transition from standard steel pipe to Transite Pipe is required, a Steel to Ring-Tite Adaptor coupling is used. This adaptor is machined on one end to allow for regular lubricated assembly with Transite Pipe. The other end is machined for a rolling assembly onto steel pipe.
To assemble the Steel to Ring-Tite Adaptor--
1. Bell the Adaptor on to the Transite (check this field assembled ring with the standard gage).
56
irp
Assembly at Fittings
2. Put a stop-mark on the steel pipe (see A, Fig. 56). 3. Put a round rubber ring on the end of the steel pipe
(see page 102 for "Placing Rubber Rings"). 4. Pull the belled adaptor onto the steel pipe over the
ring until the adaptor reaches the stop-mark. To make the assembly use either-- a. a friction puller anchored to the steel pipe end with
coupling hooks engaging Ring-Tite end of adaptor. b. a lever type puller, anchored to either steel or Tran
site--whichever is most convenient. 3** Note: Do not use a bar and block--a rolling
ring assembly requires more effort and a posi tive, slow, steady movement.
FIG. 56 5. Check the position of the rubber ring. The Ring-Tite
gage cannot be used for checking at the rolling end of the adaptor. A gage (as shown in Fig. 57) can be made
FIG. 57 -- Gage for checking rolling end of a "Steel to Ring-Tite Adaptor."
57
Assembly at Fittings
from a V2" wide steel band. Gage must touch ring all the way around. It must also be possible to hook the lip on the shoulder with tip of gage to assure that ring is not too far out.
6. Bolt the locking clamp on the steel pipe up against the adaptor. (This is to brace against the end thrust cre ated by the difference in diameters.)
ASSEMBLY AT RING-TITE FITTINGS
The bells of Ring-Tite fittings, like the Ring-Tite Cou plings, have grooves in which rubber rings are placed. The fittings are installed with the same sliding assembly as that used for the couplings. Full lengths can be used at Ring-Tite fittings because the rubber ring joint at the fitting is flexible. Use an un-belled length for joining to the fitting.
u
FHr
Hrnr
ji
a
ZJLM
4
r>9
B. Change puller, as shown, and puli pipe into the fitting to complete this assembly and to join to the branch of the tee or to any other fitting.
FIG. 58 - Assembly of Ring-Tite Fitting - Insert shows lugs
(arrow) on side of bell for use with coupling hooks
58
Assembly at Fittings
3IT Note: USE RING-TITE RINGS ONLY. Di mensions are designed tor R.T. rings--and no other ring should be used.
To assemble a Ring-Tite Fitting
-Clean groove in bell, removing dirt, excess tar, bumps and burrs.
--Insert rubber ring completely in groove. --Anchor puller on adjacent pipe length. --Lubricate pipe end as described on page 31. --Wrap pulling chain around the fitting and pull it onto
the pipe end. (Some fittings have lugs on the side of the bells allowing assembly with coupling hooks instead of puller chain--see insert Fig. 58 --Use a bar as shown in Fig. 58 to aid in guiding and pushing the fitting into place, and to prevent pull-out of last coupling assembled. --Check ring position to complete assembly.
ASSEMBLY OF MECHANICAL JOINT AND POURED BELL FITTINGS
Assembly of fittings other than Ring-Tite requires the use of short lengths (page 43) or adaptors (page 56) at each bell. Joints can be mechanical, or sealed with lead, or sulfur-base (self-calking) compounds. Standard tools and methods are employed. The following suggestions will assist in achieving the best results.
Assembly of Mechanical Joints
1. Clean dirt off pipe end. 2. Lubricate pipe end and entire rubber gasket. 3. Slip follower ring over pipe end with the lip side facing
the bell. 4. Slip gasket over pipe end with small side facing the bell. 5. Socket the pipe in the bell and push the gasket'into
position making sure it is evenly seated in the socket. 6. Insert bolts and finger-tighten the nuts. 7. Tighten bolts to uniform tightness with ratchet wrench.
Tighten opposite bolts in pairs to bring up follower ring evenly all around.
59
Assembly at Fittings
Pouring and Calking Lead Joints Metallic lead should not be over-heated. It is ready for pouring when it just reaches a cherry red. After making the pour, the lead must be calked to make up for normal shrinkage and secure a water-tight joint. Use the following suggestions to achieve the best results with Transite Pipe: 1. The "inside iron" is used first. It is important to hold
this iron fiat to the pipe as shown in Fig. 59. Use a 1 Vi to 2 lb. hammer and strike light, even blows.
FIG. 59 -- Note that calking iron is held flat to the pipe
2. In using the "outside iron" to seal the joint between the lead and the iron bell, calk just enough to overcome the shrinkage away from the bell. Then go around once more to pack the lead tightly--using firm, even blows. Excess lead at the gate is cut off with a flat chisel--and the lead underneath tightened up with the outside iron. Sulfur-Base (self-calking) Compounds
1. Such compounds have a lower melting point than lead --therefore use a small fire to avoid burning. If the com pound burns it must be thrown away.
2. Stir continually while compound is melting. As soon as it has melted, reduce the amount of applied heat.
3. Continue to stir until compound has a smooth, mirror like surface. Do not pour if any lumps or bubbles show. Keep stirring and heating until they disappear. While pouring, the compound should have a consistency of medium grade motor oil--so as to be free flowing or watery rather than thick or viscid.
60
Assembly at Fittings
FIG. 60 -- Always use a pouring gale and pour from a pot large enough to fill the joint and gate
in one pour
FIG. 61 -- Use o chisel in the slot provided, so that the cooled ma terial can be snapped off cleanly
4. Any one joint must be made aU in one pour. Always use a pouring pot big enough to more than fill both the joint and the pouring gate. See Fig. 60.
5. Always use a pouring gate--and fill it to the top. This provides enough pressure and surplus material to com pensate for shrinkage during cooling of the joint.
6. Wait until compound is cold before removing gate.
7. Do not break gates off with a blow of the hand--this may tear out some compound at the base of the gate and cause a leak. Use a chisel, first, in the slot--so that a clean break-away is obtained. See Fig. 61.
Adaptor, Ring-TIte to Flange
Full lengths can be used with this type of adaptor. Avail able for Transite pipe sizes 4" through 12" in Classes 150 and 200 and for 6" and 8" in Class 100. Flange sealing ring (A) is supplied with the adaptor.
61
Thrust Blocks at Fittings
c1 **
When Thrust-Blocks are Used
Blocks are installed wherever the pipe-line-- --changes direction, as at tees and bends, --changes size, as at reducers (also some crosses and tees), --stops, as at a dead-end, --or is expected to develop thrusts at valves (see page 67 )
+
SIZE AND TYPE OF THRUST BLOCKS
Their size and type depends on pressure, pipe size, kind of soil and the type of fitting--and will usually be indicated by the engineer.
The drawings on the facing page show how the area of a block for resisting horizontal thrusts must increase as the pressure and the pipe size increase. The top drawings show two sizes of 90 degree bends in place in a trench. Below each of these is shown the area of the thrust block needed to resist the different pressures.
First--compare the drawings downward--greater pressure for the same pipe size requires larger thrust-block area. Next--compare across--bigger pipe size (even though at the same water pressure) requires greater thrust-block area.
rr*
0* ^
arr*
-r*
How to Determine the Required Thrust-Block Area
If the size of a thrust block has not been specified by an engineer the following example shows the steps that are taken to determine the bearing area required:
First let's assume that the block is to hold against the hori zontal thrust at a 90 degree bend--for 10" Class 150 pipe. Let's further assume that the pipe line will be pressure tested at 200 lbs.
The soil, for this example is sand.
1. Check Table I, page 64. Find 10" Class 150 pipe sizemoving to the right (to the 90 deg. bend column) we find 15,200 lbs. for each 100 lbs. per sq. inch of water pressure. Since we are working on a total test pressure
62
Thrust Blocks at Fittings
A COMPARISON OF THRUST-BLOCK AREAS
fSEE FACING PAGE)
5 SQ. FT.
. FT.
6 CLASS 150
10'CLASS ISO FIG. 62
63
Thrust Blocks at Fittings
of 200 lbs.--double 15,200, making the total 30,400 lbs.
Thrust at Fittings in Pounds at 100 Pounds per Square Inch of Water Pressure
Size and Class
3"- -100 150 200
4"--100 150 200
6"- -100 150 200
8"--100 150 200
10"--100 150 200
12" -100 ISO 200
14" -100 150 200
16"--100 150 200
Tees
1,190 1,260 1,260
1,720 1,850 1.850
3,800 3.800 3,800
6,580 6,580 6,580
9,380 10,750 10.750
13.330 15.310 15.310
17,930 20,770 20.770
23,210 26,880 26.880
90 deg. Bend
1,690 1,790 1,790
2,440 2.610 2,610
5,370 5,370 5,370
9,300 9,300 9,300
13,270 15,200 15,200
18,860 21,640 21.640
25,360 29,360 29,360
32,820 38,010 38,010
45 deg. Bend
915 970 970
1,320 1,420 1,420
2,910 2,910 2,910
5,040 5,040 5,040
7.190 8.240 8,240
10,240 11,720 11,720
13,740 15,910 15,910
17,880 20.590 20,590
22Vi deg. Bend
460 485 485
660 720 720
1,470 1.470 1,470
2,550 2,550 2,550
3,640 4,170 4,170
5,170 5,940 5,940
6.960 8,060 8,060
9,000 10,430 10,430
TABLE i
For Class W0 pipe-add 50 for test-total 750. Table shows 73,270 lbs. for
Class 700 pipe at W0 lbs. pressure-so increase 13,270 half as much again fo obtain thrust at 750 lbs., the answer would be 79,905 lbs. fofaf.
2. Check Table J for bearing power of soils. It shows that each sq. ft. of sand will hold 2000 lbs.--then divide the total force (30,400 lbs.) by 2000--which shows the sq. ft. of area needed. In this case it is 15.2--or practically 16 sq. ft. for which a bearing area 4 by 4 ft. can be used.
OTHER THRUST AND ANCHORAGE PROBLEMS
Thrusts in Soft, Unstable Soils
In soft, unstable soils, thrusts are resisted by running tierods to solid foundations or by removing the soft material and replacing it with ballast of sufficient size and weight to resist thrusts. (Table I shows amount of thrust.)
64
Thrust Blocks at Fittings
\
Safe Bearing Loads
The safe bearing loads given in the following table are for horizontal thrusts when the depth of cover over the pipe exceeds 2 feet.
Safe 8earing Soil Load
lb. per sq. ft.
*Muck, peat, etc.................................................................................. Soft clay ............................................................................................ Sand..................................................................................................... Sand and gravel ............................................................................ Sand and gravel cemented with clay..................................... Hard shale .......................................................................................
0 1,000 2.000 3,000 4,000 10,000*
*ln muck or peat, all thrusts are resisted by piles or tie rods to solid foundations or by removal of muck or peal and replacement with ballast of sufficient stability to resist thrusts.
TABLE J
Upward Thrusts at Ring-Tite Couplings
Where thrusts act upward (as at vertical curves) the weight of the pipe, the water in the pipe and the weight of the soil over the pipe should be determined to make certain that the total weight is sufficient to resist upward movement. If there is not enough soil or if it will not compact over the pipe or it is too soft and mushy to resist movement, then ballast is placed or concrete may be placed around the pipe in sufficient weight and volume to counteract the thrust. (Table K shows the amount of thrust at deflected couplings.)
Upward Thrusts at Fittings
Where a fitting is used to make a vertical bend (see page 68) anchor the fitting to a concrete thrust block designed to key in to undisturbed soil and to have enough weight to resist upward and outward thrust, since the new-placed backfill may not have sufficient holding power (Table I shows thrusts at fittings).
See also page 70 for Hydrant Bases.
Side Thrusts at Ring-Tite Couplings
When the line is under pressure there is an outward thrust at each deflected coupling. Good soil, properly tamped, is usually sufficient to hold pipe from side movement. If soft soil conditions are encountered it may be necessary to provide side thrust-blocks or other means of anchor-
65
Thrust Blocks at Fittings
age. Table K shows the amount of side thrust at Ring-Tite Couplings. In such cases DO NOT RESTRICT THE COUPLING--run blocks, or anchors, to the pipe on each side of each deflected coupling.
Side Thrust at Deflected Ring-Tite Couplings Per Degree Deflection
At 100 ib. per sq. in. Water Pressure
Thrust Blocks at Fittings
Anchorage of Valves in Line Under pressure conditions given in Table L, all valves (including those in hydrant run-outs) require anchorage against thrust created when valve is closed. Area of undisturbed soil (arrows, Table L) should be adequate to withstand the thrust in whichever direction it will occur. See page 62 for area of thrust-blocks.
Pipe Size
3 4 6 8
Side Thrust (lbs.)
24
35 72
122
TABLE K
Pipe Size
10 12 14 16
Side Thrust (lbs.)
197 278 377 486
Anchorage of Pipe on Slopes
Pipe anchors on slopes are only needed when there is a possibility of the backfill around the pipe slipping down hill and carrying the pipe with it. Generally, good, welldrained soil, carefully tamped in 4" layers under and over the pipe right up to the top of the trench, will not require anchoring. Where the possibility of soil slippage does exist, anchors, keyed or tied into undisturbed soil, can be used at every third length of pipe.
If concrete anchors are cast around the pipe they, of course, become "rigid structures" which require short lengths as described on page43. This requirement is easily met as follows: In sizes below 6", use a 6'-9" or 6'-6" length for every third pipe; cast the concrete around these short lengths at the center--thus leaving 3' 3", or less, out of each side of the concrete anchor. For pipe sizes 8" and larger, use full standard lengths and cast the anchor at the center of each third length--thus automatically leav ing the required 6' 6" or less at each side.
(See also page 86 for backfilling of pipe on slopes.)
66
r
tiT5
32
s--
Anchorage of Valves
Working Pressure lb. per sq. inch
Size of Valve Requiring Anchorage
50-100 ............................................................................... 12 inch and up 101-150 .............................................................................. 8 inch and up 151-200 ............................................................................... all sizes
TABLE L
CONSTRUCTION OF THRUST BLOCKS
Thrust blocks are made of concrete, usually placed be tween the fitting and the trench wall. It is important to place the concrete so that it extends to undisturbed (freshly cut) trench wall--soft stuff will not hold.
The concrete mix used should be of adequate strength and will often be specified by the engineer. A typical mix consists of one part cement, two parts sand and five parts gravel. (Washed sand and gravel should be used.)
On the smaller sizes of pipe, the construction of horizontal thrust blocks requires only the simplest of forms. The concrete is mixed and placed fairly dry--thus making it easy to shape the block to a wedge with its widest part against solid trench-wall (see Fig. 62, page 63).
Concrete should be kept behind the bell of the fitting--do not let it run over against the pipe or in the joint. Larger blocks require some form-construction at sides and top to achieve the proper bearing area with a minimum of concrete.
67
Thrust Blocks at Fittings
LOCATION OF THRUST BLOCKS
The location of thrust blocks depends on direction of thrust and type of fitting as shown below. WITH FIT TINGS OTHER THAN RING-TITE, SHORT LENGTHS MUST BE USED. -See page 43.
Installation at Hydrants
Each hydrant run-out is normally equipped with a valve. The valve may be located at the main, at the hydrant, or in between. Whatever location is used, each fitting (branch-tee, gate-valve and hydrant) should be sepa rately supported.
When Ring-Tite fittings are used in a hydrant run-out, a single length of pipe can be used to connect two fittings because flexibility is provided directly at the fitting by the rubber rings.
If thrusts, due to high pressure, are expected, anchor valves os above (see also page 67).
At vertical bends, anchor to resist outward thrusts--see page 65.
68
Be sure to brace the hydrant firmly while the Transite connections are being made up--and until the final foun dation has been poured and has set. Do not make the pipe support the hydrant.
Fire hydrants present a special problem when installed in freezing climates. Frost in the ground causes a heaving action tending to raise the hydrant--this sets up shearing stress in the pipe leading to it which, under severe weather conditions, may prove excessive. Some fire hydrant manu facturers taper the barrel of the hydrant so that the frozen soil will pull away and not tend to raise the hydrant, but this device is not always effective.
Other stresses are sometimes caused by water from the drain in the base of the hydrant washing away the support from around and under the hydrant.
69
Installation at Hydrants
Still another consideration in proper hydrant installation is the overturning force that is created when a flexible fire hose is used. When the hydrant is opened, this overturning force tends to cause excessive flexural stress in the lateral pipe from the main to the hydrant.
All of these problems can be considerably minimized through the use of a concrete foundation of the type shown in Fig 65.
Installation at Hydrants
IF THE FITTINGS ARE NOT RING-TITE (ME CHANICAL JOINT OR POURED BELL) USE SHORT LENGTHS OF TRANSITE PIPE TO CON NECT THEM AND HAVE AT LEAST ONE RINGTITE COUPLING BETWEEN EACH FITTING TO PROVIDE FLEXIBILITY. --As shown by the typical examples in Fig 66.
FIG. 65 -- This type of hydrant foundation acts as a thrustblock, as an anchorage against frost-heave and eliminates
wash-outs from waste-water drain
This concrete foundation can be poured around the base of the hydrant after it has been set in position. With the anchor rods set into the concrete as shown in Fig. 65 the block will serve-- --as a thrust block --as a hold-down, or anchorage, against frost-heave and --as a foundation which eliminates wash-outs from the
waste water discharged through the hydrant drain.
Note that hydrant drain must be left clear when pouring concrete.
70
FIG. 66 With rigid joint fittings short lengths are used at each fitting--and at least one R-T Coupling is used between
any two fittings joined with Transite Pipe
71
Service Connections
Service connections vary in size from small services sup plying individual homes, to large outlets for industrial and other users. Transite Pipe can be tapped wet or dry, using standard water works equipment, for the insertion of corporation stops. The largest size corporation stop which can be tapped directly into the pipe is given in Table M. (Larger outlet size can be secured by using service clamps (page 75) or bossed sleeves (page 78). Corporation stops should be located at least one foot from pipe ends. If two inser tions are made, one on each side of the main, they should be separated (measured along the pipe length) by at least one foot.
CORPORATION STOPS
1. The machine used should be in good condition. It is important that the boring-bar does not wobble.
2. In selecting the drill-tap tool -- (a) For best results use a tool that has not been dulled by use on other materials--select a clean, sharp tool and set it aside for use with Transite Pipe only.
Iff'' Note: Special Tungsten-carbide-tipped drilltap tools are available for use with Transite Pipe from your supplier. These will make about twice as many taps in Transite as the regular tool will.
(b) BE ABSOLUTELY CERTAIN that the threads on the tap match the threads on the corporation stop. Do not mix iron pipe thread with standard corporation stop threads. Fig. 67 illustrates the effect of mismatch ing the threads. (c) Check to make sure that the drill portion is long enough to go completely through the thicker wall of Transite Pipe before tapping of the drilled hole starts.
Largest Size Corporation Stop Recommended
Pipe Sire
3" thru 6" Classes 100 & 150 6" Class 200
8" thru 16" Classes 100. 150 & 200
Corporation Stop
%" 1" 1"
Larger outlet size con be secured by using service-c/amps or bossed-s/eeves see pages 75-78.
TABLE M
72
Service Connections
If the drill tap tool becomes dull return it to the manufac turer for resharpening, or contact the manufacturer's rep resentative for instructions on sharpening tools in the field.
Making the Tap and Insertion
1. Make the tap at least 12" from the end of the pipe. Clamp the machine on firmly--and at an angle of about 45 degrees--as indicated by Fig. 68.
PIPE TAPPED FOR
CORP STOP THREAD
CORPORATION-
IRON-PIPE
THREAD USED THREAD USED
FIG. 67
2. Use graphite and oil as a lubricant during drilling and tapping. Mix powdered graphite and linseed oil to consistency of medium weight motor oil and brush it on to the drill-tap combination and also on the corpo ration stop.
3. DO NOT FORCE drill through pipe wall. Boring-bar should rotate freely at all times--use the follower very lightly--do not force the drill.
73
Service Connections
4. Transite has a thick wall and will therefore engage more threads of the corporation stop--so the boringbar must travel farther down in order to thread the corporation stop in properly. When the stop is inserted and tightened, there should be one to three threads showing--no more. (See Fig. 68.) (It may be desirable to make a "shop-tap" ahead of time, and make a new stop-mark on the boring-bar for use with Transite.)
Service Connections
for drilling pipe either dry or under pressure and they can also be attached directly to the service clamps for drilling when pipe is dry.
The clamps should be made of a ductile material and the straps should be flat. Rubber gaskets are required for all pipe sizes and classes. Do not use lead gaskets.
FEO. 68 -- A properly installed corporation stop--showing gooseneck in service pipe and detail of correct number of
threads exposed after tightening
5. Always insert the corporation stop with the machine used in drilling and tapping the pipe--even when mak ing a dry tap. (If the dry-tapping machine is used, the stop will, of course, have to be inserted by hand.)
6. Avoid over-tightening of corporation stops -- tighten just sufficiently to make a water-tight joint (50 to 65 foot lbs. with a torsion wrench).
Connecting the Service Pipe
Always put a bend or "gooseneck" in the service pipe to provide flexibility and "give" in the event of a load due to settlement or to expansion and contraction or other pulling and thrusting that may happen to the service pipe. (See Fig. 68.)
SERVICE CLAMPS
As shown in Table N, using a service clamp allows greater outlet capacity than is permitted with ordinary tapping. The drilling machines used attach to the corporation stop
74
mr jm
U J*
V,
rm l
K
Maximum Size of Outlet Recommended with Service Clamps
(Inches)
Pipe Size 3" 4" 6"
8"
10" 12"
14" 16"
OUTLET SIZE (Classes 100-150-200)
Single Strap
Double Strap
1" 1"
1"
iy2"
2"
1"
1w 2"
2" 2"
2" 2"
2" 2" 2" 2"
TABLE N
Before placing the clamp, file the surface of the Transite to clean off all loose material and provide a hard, clean sur face. Place gasket and clamp and tighten firmly.
Lubricate the drill with graphite and oil as described on page 73.
Do not force the drill with the follower.
rr3
CAUTION: The drills used on these machines are quite long--so be careful that the drill used does not go all the way through and make a hole in the opposite side of the pipe.
After removing the drilling machine, re-check the serviceclamp bolts to make sure they are still firmly (but not excessively) tightened.
75
1
Service Connections
s Service Connections
HEAVY COUPLINGFACTORY THREADED OUTLETS
These are made available to satisfy either of two needs: 1. To supply a pre-threaded coupling-outlet for customer
convenience.
2. To provide greater outlet capacity than can be ob tained by drilling and tapping pipe. (See table below.)
It may be ordered with threads for either C.C. (AWWA) thread or Iron Pipe Thread. Couplings are stencilled to show diameter of outlet and type of thread. Orders should clearly state the outlet size and the type of thread re quired.
Assemble into the line in the same manner as a standard Ring-Tite coupling. For house services the outlet is po sitioned at 45 off top center line. (See Fig. 69.) For irri gation systems the outlet is positioned at the horizontal dia. (Figs. 70 and 71.)
ppr
%r
OUTLET SIZES AVAILABLE
3" & 4"
Pipe
6" ttiiu 16" Pipe
W -- V' -- l'A" 3/V' -- 1" -- 1W' -- IV2'
TABLE O
Lubricate threads of corp. stops or iron pipe nipples be fore inserting. Use a thin paste of powdered graphite and lubricating oil.
Connection for House Service
Always put a bend or "gooseneck" in the tubing to pro vide for flexibility and "give" in the event of a load due to settlement or to expansion and contraction. See Fig. 69.
n
tv*
Connections for Irrigation Systems
Copper Tubing
When copper tubing is used as the riser connection to the irrigation valve, install it as shown in Fig. 70. With cop per tubing the radius of bend should not be less than shown in table.
Iron Pipe Connections for Irrigation Systems When iron pipe is used the riser should have a "swing" connection as shown in Fig. 71.
77
Service Connections
Service Connections
BOSSED SLEEVES
Bossed sleeves may also be used to obtain larger outlet capacity than is obtainable with ordinary tapping. Sleeves may be either solid or split.
Of course, solid sleeves must be slipped over the end of a pipe before the pipe is joined into the line. The AWWA sleeve is yarned at each end and poured as with any fitting. The sleeve shown in Fig. 72 is designed for Transite Pipe in sizes up to 12" and is poured solid--no yarn being required.
Split sleeves can be assembled on the pipe either before or after the pipe is joined into the line. Split sleeves are, de pending on the type used, either poured solid or, as with any poured bell fitting, yarned at each end and poured.
After placing and pouring these sleeves, the procedure for drilling the pipe is the same as with a service clamp. Here, again, the drill should not be forced and care should be taken so as not to drill too far. Such sleeves are quite heavy and should be carefully supported by a thorough tamping job all along the pipe length and under the fitting.
Or
tr-
a
When tapping sleeves are ordered from the manufacturer, the actual outside diameter of the pipe being tapped, the size of the outlet desired and the working pressure should be specified to assure that the sleeve furnished will be satisfactory.
I#*- Note: Before assembling, pipe barrel should be cleaned thoroughly with a wire brush to pro vide a smooth, hard surface for the sleeve.
Tapping sleeves should be assembled in accordance with manufacturer's directions. Drilling equipment can be bought or rented from sleeve manufacturers who also fur nish instructions and/or instructors trained in making such taps.
Tapping sleeves should be well supported independently of the pipe during the tapping and the support used should be left in place. Thrust blocks should be used as with any other fitting as described in section starting on page 62.
TAPPING SLEEVES AND VALVES
Tapping sleeves with either calked lead or mechanical joints can be used for making large taps in Transite Pipe under pressure.
78
79
Backfilling and Tamping
Backfilling usually follows pipe installation as closely as possible. This protects pipe from falling boulders, elimi nates possibility of lifting the pipe due to flooding of open trench, avoids shifting pipe out of line by cave-ins, and, in cold weather, lessens possibility of backfill material becoming frozen.
Keep in mind that the purpose of backfilling is not only to protect the pipe by covering it, but to provide firm, continuous support that will prevent the pipe settling or resting on the couplings. The essentials of a first class backfilling job can be summarized as follows:
1. Provide a continuous bed by carefully consolidating selected material under pipe and couplings and be tween the run of pipe and the trench walls.
2. Provide a cushion on top by hand-placing selected ma terial to at least 12" over the pipe--the balance can then be backfilled by machine.
INITIAL BACKFILL AND TAMPING
The first step in providing firm, continuous support for the pipe line is to tamp soil solidly under the pipe and couplings.
Choice of Methods
Tamping can be done either with tamping bars or by using water to consolidate the backfill material. Hand tamping is best accomplished with damp loamy earth or sand. Water tamping should be used only in trenches that are excavated in soils from which water drains away quickly and at the same time compacts the backfill material.
OBTAINING PROPER BACKFILL MATERIAL
The backfill material used should be free of stones, dry lumps and, in cold weather, free of frozen lumps. (Dry or frozen lumps will slump down when they become wet or thaw out--leaving the pipe with insufficient support or
80
Backfilling and Tamping
causing dangerous settlement. Generally a material that is slightly damp will pack more solidly under the pipe.)
Even in fairly stony areas, suitable material for initial backfill can often be shaved from the sides of the trench.
Where the type of clay soil condition described on page 23 is encountered the pipe should be enveloped in a mini mum of four inches of sand--then the initial backfill com pleted to at least 12" above the pipe with selected ma terial (see 2, above).
In cold weather, unfrozen material can often be found below the frozen crust of the excavated earth. If the ex posed material becomes completely frozen--then dry sand or other unfrozen material should be hauled in.
In bogs and marshes, the excavated material is usually little more than vegetable matter--and should not be used for bedding purposes. In such cases gravel or crushed stone should be hauled in.
u
HAND TAMPING
About Tamping Bars
Two types of tamping bars are required for a complete job. First a bar with a narrow head, or blade, is used to tamp under the pipe and couplings. Then a bar with a flat head is used to compact soil at the sides.
For packing soil under pipe and couplings, tamping bars should not be improvised from two-by-fours, shovelblades, pick-handles and the like. A good tamping bar should be long enough to handle easily, heavy enough to do the work but not wear out the man, and the right size and shape to pack soil properly. The tamping bars illus trated in Fig. 74 (next page) will do a good job, can be handled easily and are quickly made up in the shop.
Flat tampers are standard equipment. Either hand or pneumatic tampers may be used.
81
Backfilling and Tamping (I
Backfilling and Tamping
look all right from the surface, but it is easy to see that, when it occurs, support under the pipe is not provided. Next, another A" layer is shoveled in and tamped. This is repeated until the pipe is firmly bedded in compact soil--see Fig. 75B.
FIG. 74 -- Tamping bars of the type shown at "A" and "B" are used for tamping under pipe and couplings. The flat tamper "C" is used at the sides, between pipe and wall of trench. (Do not at tempt to use the flat tamper in place of A or B--it will not do
the work properly)
Placing and Tamping under the Pipe
A good tamping job can be done more easily than a poor job. The key to it is in the amount of soil that is thrown in--to be tamped under.
FIG. 75 (A)--WRONG! Too much soil. Tamp bar cannot compact it properly--and leaves a void un
der the pipe
(B) -- RIGHT--4" layers of soil-- which tamp bar can force under
pipe--thus getting a firm bed
This initial backfill is always placed by hand. It should be shoveled in evenly along both sides of the pipe, making a layer about 4" thick--NOT MORE. Then the tamping bar is used to tamp this soil firmly under the pipe. If more than A" of soil is shoveled in before tamping, the soil can bridge and fail to go under the pipe (Fig. 75A). This may
82
FIG- 76 -- When pipe firmly bedded--use flat tamper at sides. Continue flat tamping, in 4" layers, halfway up pipe.
Using the Flat Tamper
The next step is to provide lateral support by tamping soil firmly between trench-walls and the pipe. This, too, is done in A" layers but a flat tamper is used. (The tamper used under the pipe will not work properly at the sides.)
Hand-placing and flat-tamping is continued to a point halfway up the pipe-wall, see Fig. 76. When this point is reached, the tamping can be stopped.
WATER TAMPING
Note: Water tamping should be used only in trenches that are excavated in soils from which water drains away quickly and at the same time compacts the backfill material.
If water tamping is used the selected backfill material is first hand placed, filling all voids, under and along both sides of the pipe and couplings up to (but never higher than) the top of the pipe as shown in Fig. 77A.
Water is then flushed into the trench. The action of the water seeping through the backfill will tend to compact the soil, providing continuous support around the pipe and couplings. Care should be taken not to put too much water into the trench. If trench is flooded, the excess water may float the pipe.
83
Backfilling and Tamping
Backfilling and Tamping
A
RSGHT
`
A :J .
n<n 11nI
in N>h im;1>
ii
B
WRONG
-------------- --------- ;-----------------------
"> n-)
FIG. 77 -- (A) Backfill correctly placed by band filling all voids before water lamping. (B) Wrong--Bockfill is not placed evenly up to, but not higher than, top of pipe.
If the trench bottom is flat or is on a slight grade, the water may be put in at central points where it will reach and seep through all backfill material. If the trench bottom is on a fairly steep grade, mounds should be made at inter vals forming pockets along the line of trench to assure that the water does not run. off before seeping through
and consolidating the backfill material.
In Sheeted Trenches
If sheeting"is pulled after tamping, a hollow space will be left. This robs the pipe of the benefit of support given by
tamping.
H-
When hand-tamping--if sheeting is pulled, do it progress ively while flat-tamping is being done.
When water-tamping--pull sheeting progressively while backfill is being hand placed so that it is at the top of the pipe when the water is flushed into the trench.
COMPLETING THE INITIAL BACKFILL
Backfilling the selected material is continued, by hand, until there is a protective cushion of at least 12" of cover over the pipe. This completes what is called the "initial" backfill--the thoroughly tamped soil which provides a continuous, supporting bed for the pipe-line.
84
FIG. 78 -- (A) Soil famped in 4" layers or water tamped to the hori
zontal diameter of the pipe. (B) Hand-placed backfill completed to at
least 12" over the pipe--ready for machine backfill- (C) Couplings
can be left exposed for visual inspection during test, if required. (See
note below.)
Entire lower half of the pipe-line is thoroughly
tamped as at "A". Sufficient weight of soil is placed over pipe to
prevent movement under test pressure.
Note: If it is necessary to observe or inspect couplings during a test, only the top half of the couplings need be exposed. It is essential that the complete line, including the couplings, be tamped as described--up to the horizontal di ameter. Then the pipe is backfilled by hand so as to resist movement due to pressure, leaving the top halt of couplings uncovered as shown at "C" in Fig. 78. Even though no deflection is apparent, pipe should be weighted down with good soil at the rate of 1 ft. depth of soil for each 100 lbs. of water pressure. (See table on
page 66 for thrusts at deflected couplings.)
85
/ . ..
Backfilling and Tamping
Testing
COMPLETING THE BACKFILL
The balance of the backfill, which is usually placed by machine, need not be as carefully selected as the initial material. Care should be taken, however, to avoid the backfilling of too large stones which might damage the pipe in dropping in or by being forced down onto the pipe later. This is particularly important if couplings are left exposed (see "C", Fig. 78). Such lines should be inspected, before backfilling, to detect and remove stones which may have fallen in. The possibility of frost penetration should be considered wherever backfill is extremely stony.
PIPE ON SLOPES
Pipe in trenches on a slope should have extra attention to make certain that the new-placed backfill will not become a "blind-drain," in effect. Until backfill becomes completely consolidated there is a tendency for ground or surface water to move along this looser soil. If this hap pens to concentrate at one or more places, soil may be washed out from under the pipe, resulting in loss of sup port and, perhaps, a break. To reduce this possibility the backfill, for pipe on slopes, should be tamped with extra care--and the tamping continued in 4" layers right up to the top ground-line of the trench.
86
a
m
| u* m
u
27-
It is good practice, to pressure test portions of a line as it is installed before the entire line is completed. In this way any errors of workmanship will be found immediately and can be corrected at a minimum of expense.
All parts of the pipe-line must be backfilled and braced sufficiently to prevent movement under pressure. There are three parts of the line to consider:
1. The run of pipe itself.
2. Thrust-blocks at fittings.
3. Test-ends, used where the pipe-line does not connect into an existing line or structure.
HOLDING THE RUN OF PIPE
When the line is under pressure there is an outward or upward thrust at each deflected coupling. Good soil, prop erly tamped, is usually sufficient to hold pipe from side movement on horizontal curves. Where couplings are de flected vertically (as at the crest of hills) there must be enough weight of backfill on the pipe to resist upward thrusts. The weight needed can be determined from Table K on page 66 which shows the amount of thrust at 100 lb. pressure per degree deflection.
If the top half of couplings are left exposed for visual inspection, note that the entire bottom half should be backfilled and tamped as described on page 85. If the bottom of any coupling is left exposed, all loose stones that may roll in under must be removed and the bottom half of the coupling area backfilled and tamped with good soil before final backfill is begun.
AT THRUST BLOCKS
Since the purpose of testing is to test all parts of a pipe line, thrust-blocks at fittings are also subjected to the test pressure. Therefore, all thrust blocks forming part of the finished line should be permanent and constructed to withstand test pressure--and temporary bracing must not be resorted to.
Do not test against freshly poured concrete thrust-blocks --allow enough time for concrete to set before subjecting them to test pressure.
87
Testing
/C
\
C
Testing
AT TEST ENDS
The open end can be sealed temporarily with a mechani cal line cap (blind end coupling) shown in Fig. 79. Line caps are available in all sizes and can be used repeatedly merely by assembling on the last installed pipe length. Line caps are provided with an outlet to serve as an air relief vent or for filling the line--as may be required.
Lp
Bracing Test-Ends
The end of the pipe-line must always be braced to with stand the relatively powerful end-thrust that develops under pressure. A temporary thrust-block can be used for that purpose. Table P shows that this force may amount to many tons of thrust.
The first step is to establish the temporary thrust-block. This can be a timber mat against the end of undug trench, or--if the trench has been opened beyond the point of test --heavy timber can be notched into the sides of the trench, close to the bottom, see Fig. 80. In either case, the soil must be firm and there must be plenty of bearing surface
88
rH
a
tp.
$
FIG. 80-- Wedge pipe solidly to prevent kicking out--Using a plumb bob over point on pipe will check creeping when pressure
is built up
against it, to resist the thrust. (See table on page 65 for Bearing Power of Soils.)
The next step is to "fill in" between the end of the pipe line and the mat, or timber. This "fill-in" should be adjust able so that the last pipe length can be forced back to its original position if it starts to move out of the last coupling during the test. Short timbers and wedges can be used, but one or more jacks serve the purpose much better since they are so easily adjusted both before and during the test. ( See Fig. 80).
The last full length laid should be firmly wedged and braced to prevent kicking out under pressure. (All ex posed pipe must be wedged or backfilled, so as to hold it securely in line.)
Thrusts* at Test-Ends (Dead Ends) for 100 psi pressure
Transite Pipe Size and Class
3"--100 ISO 200
4"--100 150 200
6"--100 150 200
8"--100 150 200
Thrust (lbs.)
1,220 1,280 1.280
1,840 1,970 1,970
3,970 3,970 3,970
6,800 6,800 6,800
Transite Pipe Size and Class
10"- --100 150 200
12"--100 150 200
14"- --100 150 200
16" - 100 150 200
Thrust (lbs.)
9,660 11.040 11,040
13,660 15,650 15,650
18,300 21,170 21,170
23,630 27.330 27.330
'The thrusts shown hove been incroasccf fo allow for some mokes of end caps which seal on the larger, second, machined areo.
TABLE P
89
Testing
FILLING THE LINE WITH WATER
Filling for Both Pressure-Strength and Leakage Tests
The line can be filled from any available low-pressure source. The water can be introduced from lines in service directly through valved connections or by temporary con nections to hydrants or to taps made in the new line or at the connection in the line cap.
Filling for Leakage Tests
Dry Transite Pipe will absorb some water. Therefore, the line must be filled with water at least 24 hours before accurate leakage tests can be made.
Volume of Water Required for Testing
In some cases water for pressure and leakage tests may be difficult to obtain prior to connecting the pipe line to the source of supply. In these cases, Table Q indicates the approximate amount of water per 100 ft. of pipe line which must be obtained from other sources to conduct the tests.
VOLUME OF WATER REQUIRED in gallons per 100 feet
Pipe Size
3 4 6 8 10 12 14 16
Gallons' Per 100 Ft
47 82 184 326 510 740 1000 1310
' Approximate--includes on allowance for absorption and wastage.
TABLE Q
Relieving Air from the Pipe-Line
Air should be vented from all high spots in the pipe-line before making either pressure-strength or leakage tests.
Compressed entrapped air causes difficulty in pumping up to the required pressure for strength tests. Further more, a pipe-line may leak compressed air when it is ac-
90
Testing
tually water-tight--and if this occurs during a leakage test
it will cause erroneous results.
In pipe sizes 8" and smaller, hydrants can be used for venting if air-valves have not yet been installed. In the larger sizes air pockets can form along the top of the main and not be vented by hydrants unless the "blow-off' type of branch-tee is used. If ordinary tees are used, air should be vented by tapping corporation stops into the pipe at high spots in the lirie. If the line is filled from a test-end located at a high point, an additional outlet should be made there so as to relieve air at that point.
rrf
MAKING PRESSURE-STRENGTH TESTS
The purpose of a pressure-strength test is to make certain that the line will withstand normal working pressure plus reasonable excesses that may occur. In a properly de signed line, excess pressures will be kept to a minimum by the use of automatic relief valves, slow closing and opening of valves, slow pump starting, and other controls. A test pressure of 50% above the normal operating pres sure should, generally, be sufficient, unless the specifica tion calls for greater pressure.
The test pressure is built up by using a hand pump or a small power pump. Do not build up pressures greater than specified. This can happen if the pressure is read from a gauge located at a high point in the line. In such cases the actual pressure at low points will be greater.
For Converting Ft. Head of Water into Pressure per Sq. In.
Feet Head
1 2 3 4 5 6 7 8 9 10 15
Lbs. per Sq. Inch
.43 .87 1.30 1.73 2.17 2.60 3.03 3.40 3.90 4.33 6.50
Feet Head
20 25 30 35 40 45 50 55 60 65 70
Lbs. per Sq. Inch
8.66 10.83 12.99 15.16 17.32 19.40 21.65 23.82 25.99 28.15 30.32
Feet Head
75 80 85 90 95 100 110 120 130 140 150
Lbs. per Sq. Inch
32.48 34.65 36.81 38.98 41.14 43.31 47.64 51.97 56.30 60.63 64.96
Feet Head
160 170 180 190 200 225 250 275 300 325 350
Lbs. per Sq. Inch
69.29 73.63 77.96 82.29 86.62 97.45 108.27 119.10 129.93 140.75 151.58
TABLE R
91
\
Testing
Repairs to Damaged Pipe
MAKING LEAKAGE TESTS
The purpose of leakage tests is to verify the water-tight ness of the section of pipe-line under test and includes its joints and all fittings.
Transite Pipe will absorb some water, therefore the line must be filled with water at least 24 hours before accurate leakage tests can be made.
Normal operating pressure is applied for leakage tests, and this should be maintained as constant as possible all during the test. In every case, the pressure at the beginning and at the end of the test should be the same, because, if there is any air trapped in the line, a higher pressure at the end of the test wili show more than actual leakage because the air will compress, while a lower pressure will show less than actual leakage because the air will expand.
Generally, the engineer will establish allowable leakage and indicate methods and procedures for testing. If not, Table S should be used in establishing whether a satis factory degree of water tightness has been attained.
Pipe Dia. (inches)
3 4 6 8 10 12 14 16
LEAKAGE ALLOWANCE Gallons Per 100 Couplings Per Hour
50
1.15 1.54 2.30 3.07 3.83 4.60 5.37 6.13
75
1.40 1.87 2.80 3.73 4.66 5.59 6.52 7.45
Test Pressure
(psi)
100 125
150
1.63 2.16 3.25 4.33 5.41 6.50 7.58 8.66
1.81 2.42 3.63 4.83 6.04 7.25 8.46 9.66
1.99 2.65 3.98 5.30 6.63 7.95 9.28 10.60
200
2.30 3.07 4.60 6.13 7.66 9.20 10.73 12.27
225
2.44 3.25 4.88 6.50 8.12 9.75 11.38 13.00
* Evaluated on basis of 150 psi, this leakage is approximately equdl to 65 U. S. gol/ons per 24 hrs. per mile of pipe, per inch of pipe diameter for pipe in 13-foot lengths.
TABLE S
To determine total loss for a given length of pipe line;--ogainst pipe size and under test pressure, find gallons per 100 couplings per hour. Multiply this by actual number of couplings per hour. Multiply this by actual number of couplings (each fitting bell equals Vi coupling) and then by hours of test duration: For example, one mile of 10" pipe at 150 lbs. for 2 hours = 6.63 gals per 100 couplings per hour. Since there are about 407 couplings in one mile multiply 6.63 by 4.07 giving 27 gals per hour, times 2 = 54 gals allow able leakage in 2 hours.
92
Gr
9r
0
Get permission from the agent before moving damaged materials to the job site, because sal vageable material must be allowed for in any claim made against the carrier. Both the illustrations and the suggestions which follow should be referred to in making repairs. The paragraphs are numbered so as to make it easy to include all the suggestions that may ap ply to any drawing.
1. Bruises are caused by heavy impact against such things as timber and iron edges, rocks, other pipes and fittings. This can result in a breakdown by crushing of the pipe-wall under the bruise. The weakened spot may blow out under high pressure or may cause seepage through the pipe and a blow-out at some future time. This condition is usually indicated by bulging and broken structure on the inside surface of the pipe or by cracks. (See paragraph 4.)
2. Whether the blow results in a bruise or in a hole through the pipe-wall, some or all of the pipe will still be useable. As shown in Fig. 81, bruises and punctures can be repaired with repair-clamps.
93
Repairs to Damaged Pipe
About Repair Clamps If a repair clamp is to be used the full circle type with opposed bolt-line flanges is recommended (see Fig. 81) and should be installed in accordance with the manufac turer's instructions. When using a repair clamp the area on the pipe barrel around which clamp will be placed should first be cleaned with a wire brush. Apply Ring-Tite lubricant to the cleaned area--(to help seat the rubber lining smoothly during final adjustments). The two halves of the clamp are then put around the pipe with the nut position on top for easy access. After the nuts have been tightened lightly the clamp should be rotated slightly in the same direction as the overlap of the rubber lining to assure its smoothness. The nuts are then tightened so as to distribute the pull evenly on all the bolts and the repair is completed. 3. If the pipe has been broken cleanly into two pieces the
ends can be joined together with a repair clamp--or they can be squared and used at poured bell fittings (see page 56 for pipe requirements at poured bell fit tings.)
4. Chips that extend more than xh" in as shown in figure 84 should be trimmed off and the end re-machined with a field machining tool as described on page 52. Test with
94
Repairs to Damaged Pipe
a knife point to make certain that pipe is sound beyond the chip--or wet the area with water and, as the pipe dries, a crack will become visible because it remains wet longer. It is advisable, before field-machining, to trim an extra inch off to be certain of reaching un damaged material.
5. Cutting, or abrading, the pipe is another type of abuse that may require repair. This takes the form of goug ing, scratching, chipping and scraping actions which cut or wear away some part of the pipe surface. Such damage is caused by carelessly dragging pipe across sharp objects; by dragging heavy, rough objects across the pipe; or by constant friction against protruding bolt-heads, rubbing action of wires, etc.
CHIPPED END
RING AREA
>|
LuuJ
TRIM OFF TO SOUND PIPE AND REMACHINE
TRIM BACK BEYOND ANY CRACK THAT MAY EXIST
(SEE PARAGRAPH 4)
FIG. 83
6. On the machined end of the pipe (where water-tight
ness is attained by sealing with rubber rings) grooves
and scratches that run lengthwise, and would be in the
rubber ring area, will have to be repaired or trimmed
off and remachined. Refer to Fig. 83. Slight scratches
(not over '/IC" deep and no wider than
can be re
paired by sanding the sharp edges so that the rubber
rings will seat properly on the pipe. Wider or deeper
scratches will prevent the ring from sealing properly
and should be trimmed off.
95
Repairs to Damaged Pipe
7. Scratches that run around the pipe will not cause trouble if the rubber ring will fully cover the scratch (see Fig. 84)--but, if the ring will cross it at an angle, it would cause leakage and should be repaired or trimmed off as described in paragraph 6.
8. At other points along the barrel of the pipe (where the Ring-Tite Coupling and rubber rings are not used) a cut or abrasion that is larger than lA" deep, V2" wide and 2" long should be repaired with a clamp.
Pulling Pipe Through Casings
When Transite Pipe is to be installed in casings under highways and railroad tracks, skids are used under the pipe to make the pull easier; to prevent the pipe and couplings from snagging on the inside of the casing; and to keep the installed line from resting on the couplings.
About Skids
Skids should be 24 to 30 inches long and thick enough to allow for clearance between the couplings and the casing bottom. (See Fig. 85.)
FIG. 85
The leading ends of each pair of skids should be rounded as at A in Fig. 85. The center of the skids should be at points approximately lA the distance from each pipe end. Fasten skids with heavy strapping or wire to the bot tom of the pipe approximately 20 off center. Notch the skids as shown for the strapping or wire to pass through.
Pulling the Pipe
A cable is then passed through the casing and the first pipe length and.is fastened to a suitable wood crosspiece at the end of the pipe as shown. The cable is then pulled steadily (don't jerk) by a truck winch, tractor or other method until about 2 feet of pipe is left projecting out of the casing for assembly of the next length. (If cable is pulled at an angle make sure that the leading pipe end is protected from damage.)
The cable is then passed through the next pipe and the two pipes are assembled.
Check Rings Carefully
Extra care should be taken in checking the field assem bled ring location immediately following each assembly as a misplaced ring would be difficult to correct once the pipe has entered the casing.
96 97
Pulling Pipe Through Casings
Using Transite Pipe at Bridge Crossings
These assembled sections are then pulled into the casing leaving about 2' out for assembly of the third length. This operation is continued until the Transite Pipe is through the casing.
Minimum Size Casing Required With Transite Pipe (In Inches)
Pipe Size
3 4 6 8
10 12
14 16
Casing Size (inside diameter)
9 10 12 16
18 20
24 26
TABLE T
Greasing the casing or the skids, especially when install ing larger pipe sizes, will make the sliding easier. The casing can be greased by depositing a low grade grease at the end of the casing. Then attach rags to the cable and pull them through so that they act as swabs or spreaders. A rope attached to the cable will make it easy to retrieve.
After the line is through the casing it will be necessary to make a closure at one end (see page 44) to tie-in to the pipe already installed.
Backfilling
When the Transite Pipe is completely through the casing, the space in the casing under and around the pipe (three quarters of the distance to the casing top) should be filled with sand. This will prevent movement when pipe is under pressure. The sand can be forced into the casing with water, under pressure from a hose line. Care must be taken that not too much water is forced into the casing as there is the possibility that the pipe could float re sulting in uneven support of the completed line. Under no conditions should wedges be used between the top of the pipe and the underside top of the casing to keep the pipe from moving under pressure.
98
When Transite Pipe is used at bridge crossings care must be taken to follow the plans of the design engineer. The following information is general and should be of assist ance in following engineering specifications.
Pipe at bridge crossings should be supported by hangers or supports--two to each pipe length--at points approxi mately A of the pipe length in from each pipe end. The method shown in Fig. 86 is typical of those used in bridge crossings.
>rsL#
.j*.
.#
-* L#-
ri
FIG. 86--Typical method of supporting pipe at a bridge crossing
Whenever thrusts are expected in a line (at changes in direction, at reducers or at valves) bracing must be used to counteract the thrust. If at the point where the line comes from the ground to the bridge (or where it goes back into the ground) there are vertical changes of di rection, thrust blocks or anchorage must be used as de scribed in section beginning on page 62. Fig. 87 shows one method of using thrust blocks at vertical changes of direction.
99
Using Pipe at Bridge Crossing
EXPANSION & CONTRACTION
On bridges, allowance for thermal expansion and con traction of the structure is taken care of by expansion joints or gaps. Since the pipe is attached to the bridge (and will expand and contract with it) there must also be provision for expansion and contraction in the pipe line where it crosses expansion joints or gaps in the bridge. For this purpose the Ring-Tite expansion coupling is used.
As shown in Fig. 88 the Ring-Tite expansion coupling has one end machined for standard Ring-Tite assembly. The other end (without the groove) is machined for a rolling action to permit free longitudinal movement of the pipe within the coupling.
D" Note: The expansion coupling requires the use of an "end-trimmed" MOA length in the rolling end. Cut off the tapered portion of the pipe end to allow greater travel distance on the pipe barrel.
Assembly of The Ring-Tite Expansion Coupling
Select an un-belled length for use at A (Fig. 88). Bell the Ring-Tite end of the expansion coupling on to it, in the usual way. Check ring position. Next anchor the coupling to the pipe with the clamp--Fig. 88 to assure that all movement will occur at the rolling end of the coupling.
U1* Note: With the standard expansion coupling a total movement of three inches is allowable. If the total movement at an expansion joint (from fully contracted to fully expanded) ex ceeds 3" a special coupling must be ordered.
The expansion coupling must be set to the same relative position of expansion or contraction as the corresponding expansion joint in the bridge at the time of assembly. The "midpoint", referred to in Table U, can often be found by examination of the bridge expansion plate which will show evidence of the total movement. If the bridge is in a contracted position the coupling must also be in a contracted position. To do this stop marks are used on the MOA pipe to assure that the pipe end is set to the cor-
100
Using Pipe at Bridge Crossing
Location of Expansion Coupling
Schematic sketch showing location of Ring-Tite Expansion Coupling in relation to expansion joint in bridge. Pipe B is machined-over-all and with end trimmed to remove taper. (It could also be a standard length if one end can be long machined on job to provide for movement as indicated in
sketches below.)
Assembly of Expansion Coupling
CLAMP-^ _[
'A
Standard-machined pipe (A) is first belled and clamp attached
to coupling and pipe
CLAM A
\ /
[
STOP MARK 1
B
Stop mark location (on pipe B) varies with position of bridge. Refer to Table T for stop mark
location
Setting of Expansion Coupling
CL AM Ps^
I
1a
1
CLAMP^
T(
A
STOP MARK
rn
B
When bridge is expanded--pipe (B) must be assembled to same
relative position
STOP MARK
B
FIG.
When bridge is contractedpipe (B) must be assembled to
same relative position
(Sketches show maximum set tings--usually the bridge will be
at some "in between" point)
101
Using Pipe at Bridge Crossing
Using Pipe at Bridge Crossing
rect position. Table U gives stop mark locations and cor rect position of rubber rings after assembly. After the stop mark has been made the rubber ring must then be put on the pipe end.
RING-TITE EXPANSION COUPLING Settings for Stop Mark and for Final Position
of Rubber Ring (in inches)
1. Check bridge position (inches contracted or expanded from mid-point)
Pipe Size
(inches)
2. Under that meas
urement find
( 3 thru 12
STOP MARK LOCATION
\ 14-16
(see also Fig. 88)
3. Final ring position should check to this distance from coupling face (Ve")
(3 thru 12 \ 14-16
CONTRACTED (Bridge Joint
Open)
Mid Point
EXPANDED (Bridge Joint
Closed)
l>/2 1
>/2 0
1/2 1
1V2
3>/2 4
4 V2 5
S`/2 6
6>/2
4 4'/2 5 5`/2 6 6'/2 7
1V< 2
214 2 Vz 2% 3
3!/i
2 2`/4 2`/2 2% 3 3lA 3V2
Example: assume 10" pipe and, at time of installation, bridge con tracted IVj" from midpoint. Under the l'/2" contracted column read 35/2" for 4" thru 12" pipe. Mark this STOP MARK LOCATION on pipe B. Immediately below, against 4" thru 12" pipe find 13,4" which is the correct ring distance from face of coupling after assembly.
TABLE U
Placing Rubber Ring For Rolling Assembly
To place a rubber ring for the rolling assembly first catch the rubber ring around the bottom of the pipe-about V2" from the end. Snap it on to the pipe by pulling outward and upward as shown in Fig. 89. Let the fingers slide
along the ring--and pull outward just enough to keep knuckles clear of the pipe.
Set the ring at the end of the pipe by sliding it with the fingers (Fig. 90). Leave it at the end of the pipe for assembly.
FIG. 90
f'
a5
-tt
The MOA length, with the ring and stop mark in place is then pulled into the expansion coupling with a friction puller until the edge of the coupling is even with the stop mark.
2W Note: Tighten hangers on the MOA length be fore assembling the next length so that the posi tion of the MOA length in the expansion cou pling is not changed.
%
To check the ring position in the rolling end of an expan sion coupling first determine the correct assembled po sition of the ring in relation to the edge of the couplingsee Table U. Then insert the end of a steel measuring tape under the coupling until it touches the ring. The figure on the tape at the edge of the coupling will tell if the ring is correctly placed. Slide the tape all around the pipe barrel--do not jab as ring may be knuckled out in a small area. If it is, take it apart and re-assemble.
In Cold Climates
In cold climates where freezing may be a problem, lines at bridge crossings should be insulated, not only on the bridge itself but also where they enter or leave the ground and until they are below the depth of frost penetration.
VJ> 0 103 102
Trrrrrnrrn
APPENDIX
1. ASSEMBLY USING ROUND CROSS-SECTION RUBBER RINGS
2. ADDITIONAL INSTRUCTIONS AND DATA FOR PIPE SIZES 18" THROUGH 36"
Appendix
Appendix
1. ASSEMBLY WITH ROUND CROSS-SECTION RUBBER RINGS
(Applies to any pipe sire with which round cross-section rings may be used)
CHECK RING POSITION
After assembly check rings to verify that they are in the grooves all the way around. Insert feeler gage as in Fig. 1A. Note that there is clearance between gage and sleeve (see arrow) proving gage is touching ring.
First clean and lubricate pipe end as described on page 31 and clean the coupling groove.
The methods of assembly are the same as outlined in the section starting page 33 with the following special instruc tions when using round cross-section rings:
1 |ggg|M .\\\\\\\\\\\\
LUBRICATE RUBBER RINGS
Lubricate the ring before inserting it in the groove A thin coating is sufficient and is easily applied by hand, cloth, etc., just after lubricating the pipe end. See illus tration.
When inserting the lubricated ring, smooth it evenly, all around, against the back of the groove.
LM
&
FIG. 1A
.8 "-y1 w1
V
A .25"
B 1.S0" C .75"
Material : .01$ x `/i" Tempered Spring Steel
FIG. 2A
Now slide the gage all the way around. DON'T JAB AT INTERVALS. Ring may be displaced or knuckled out in a small area and could be skipped by jabbing. If gage fails to touch ring at any point (Fig. 3A-A) the ring is out of position and sleeve must be taken apart and reassembled.
*4! LUBRICATE RUBBER RING THOROUGHLY
108
FIG. 3A
109
Appendix
2. ADDITIONAL INSTRUCTIONS & DATA PIPE SIZES 18" THROUGH 36"
LUBRICANT REQUIREMENTS
Number of belled pipe lengths that can be lubricated from a 1 xh quart can of lubricant.
Pipe Size 18 20 24 30 38
Belled Pipe Lengths per Can 15 14 12 8 7
TABLE AA
X*
ASSEMBLY
Using the Lever Puller
In addition to the instructions given on page 34, the fol lowing practices are recommended when assembling the larger pipe sizes:
1. During the assembly take the weight of the pipe by the cable used for lowering. Then the assembly effort will be easier because the puller will not have to move the full weight of the pipe.
2. While pulling, have one man swing the free end slightly right and left. This "walking in" also reduces the as sembly effort.
DO NOT USE THE LEVER PULLER FOR BELL ING THESE LARGER SIZES OF PIPE-use the fric tion puller.
Using the Friction Puller
With the friction puller more force can be applied than with the lever puller. The friction puller will move the pipe and assemble it. It is not necessary to lift the pipe
111
as the pressure is applied. Use the friction puller for bell ing pipe on the job and for making closures. Use of the friction puller is described under Assembly, page 35,Belling, page 41 and Closures, page 46.
WEIGHT* OF PIPE AND COUPLING AND NUMBER' OF 13 FT. LGTHS. PER TRUCKLOAD
Size
18 20 24 30 36
18 20 24 30 36
18 20 24 30 36
Pipe Only per
13 ft Section
Weight Lbs.
Coupling Each
757 914 1269 1922 2723
69 82 113 187 261
1078 1324 1893 2948 4237
106 125 177 291 411
1541 1898 2720 4231 6090
147 169 236 393 565
Pipe Coupling
Class 100 826 996
1382 2109 2984
Class 150 1184 1443 2070 3239 4648
Class 200 1688 2067 2956 4624 6655
Number of Lengths
Per Truckload (including couplings)
5 Ton
10 Ton
12 24 10 20
7 14 49 36
8 16 6 13 49 36 24
5 11 49 36 24 13
'Rounded to nearest pound or number.
TABLE BA
rH
r' +
z-
Z*
Maximum Recommended Deflection at Ring-Tite Couplings
Pipe Size
Deflection (Degrees)
18"-20"-24"
30"-36"
During Assembly (Belled pipe only)
1V2 0
After Assembly
1
3'/2
3
TABLE CA
r
TRENCH WIDTH
Refer also to page 19 for importance of maintaining these widths at TOP LEVEL OF PIPE to provide working space and to avoid extra earth loads.
Pipe Size inches
18-20 24 30 36
Trench Width* (in inches)
Minimum
Maximum
33 45 36 48 47 60 54 66
'Widths should be mo/nfolned within these limits. Wherever if seems accessory to exceed them, provision should be mode for the additional earth load imposed on the pipe.
TABLE DA
CLOSURES
STOP MARK LOCATIONS FOR ASSEMBLY TO M.O.A. PIPE
(See also Page 45)
Pipe Size (inches)
18-20-24 30-36
TABLE EA
Stop Mark Position--X (inches from pipe end)
4`/2 5
Appendix
ADAPTORS
As described on page 55 the MJ-B adaptor is used for connecting to Mechanical Joint or Poured Bell Fittings. The class-to-class adaptor, in these larger sizes, is 6'6" long (see drawing) and is used to change from class 100 to 150 and from 150 to 200.
Appendix
FIG. 4A - MJ-B Adaptor at -- A -- Poured Bell Fitting B -- Mechanical Joint Fitting
STEEL TO RING-TITE ADAPTOR
The socket end of this adaptor is machined for a rolling assembly, using a round cross-section rubber ring, on to the steel pipe. (See Table GA for correct ring to use.) The other end of the adaptor is a standard machined end for assembly into a Ring-Tite Coupling.
To assemble:
1. Put a round rubber ring on the end of the steel pipe. (See page 102 for Placing Rubber Rings.)
2. Roll it back one turn so it can't be accidentally knocked off.
3. Put a stop mark on the steel pipe--see X in Table FA.
4. Line up a belled pipe in approximate position. (Pipe can be double-belled or coupling can be belled on to other end later, as preferred.)
5. Place a timber across the end of the steel pipe (set it
114
vertically so it will not interfere with puller). Hold adaptor in temporary position and use friction puller to pull belled pipe on to adaptor. (Lubricate adaptor end and ring as described under Lubrication, page 31) 6. Check ring position, release puller and remove timber. 7. Roll rubber ring to end of steel pipe, operate puller and pull pipe and adaptor on to the steel pipe until face of adaptor reaches stop mark. 54F Note: This is a rolling rubber ring assembly--
DO NOT LUBRICATE. 8. Check location of rubber ring, using gage shown in
Fig. FA. Gage must touch ring all the way around to make certain it is not too far in. Hook the shoulder of the adaptor with the hooked end of the gage to make certain ring is not too far out.
X*
115 >
Appendix
Pipe Size
18"-20" 24"
30 "-36 "
Stop Mark Position (X) From end of Steel Pipe
5"
5`/2"
6"
__ /"
\ Ring Gage for Rolling Assembly A B CD
1 >/2 " 2>/2" Vt" w
2" 2W Vi" Vb"
2 >/>" 3"
>A" Vb"
TABLE FA
Ring Size Steel to Transite Adaptor
(inches)
Steel Pipe Size
18 20 24 30 36
TABLE GA
Ring Size to use
16 18 24 30 36
Thrust at Fittings in Pounds At 100 Pounds Per Square Inch of Water Pressure
i
cs
Transite Pipe Size & Class
18"--100 150 200
20"--100 150 200
ISO 200
30"--100 150 200
36"--100 150 200
Tees
31,100 34,400 38,600
38,400 42,600 47,800
55,000 61,500 69,000
86,300 96,300 108,000
124,500 139,000 156,000
90 Deg Bend
44,200 48,500 54.400
54,200 60,000 67,400
78,000 86,700 97,200
122,500 135.800 152,500
176,800 196,000 220,000
45 Deg Bend
23,850 26,400 29,650
29,500 32,600 36,700
42,200 47,200 52,900
66,300 74,000 82,900
95,500 116,600 119,600
22 V2 Deg Bend
11,950 13,400 14,900
14,700 16,500 18,600
21,100 23,900 26,800
33,100 37.S00 42,000
47,700 54,000 60,700
TABLE HA
116
>
C
c Appendix
fr " 9T~+
*+
9r~*
Side Thrust at Deflected Couplings Per Degree Deflection
At 100 lb per sq in. Water Pressure
Pipe Size
18 20 24
Side Thrust (lbs)
665 790 1150
Pipe Size
30 36
Side Thrust (lbs)
1880 2660
TABLE IA
TAMPING UNDER PIPE Use a curved tamp bar, see illustration, to tamp soil in under the pipe. In all other respects follow the procedure outlined in the section starting page 80.
&
**T fr"*
Gr *r~* Or *" $r~*
17" ^ rp
In the larger sizes, use a curved tamp bar. It enables men to stand on trench bottom and work soil in under pipe and couplings more effi ciently than a straight bar. Follow with flat tamper at sides as described on page 83.
BRACING TEST ENDS
In the larger pipe sizes, testing is often done between line valves which have been permanently anchored. The thrust created, either during a test or at any time when valve is closed is of considerable magnitude (see Table JA) and the design of the valve anchorage should be done by the Engineer, taking into account the local soil con ditions.
Line caps, for testing in shorter sections, are also avail able. See page 88 for general comments on blocking, but provide heavier construction for these greater thrusts.
117
Appendix
Appendix
Thrusts at Test Ends (Dead Ends) tor 100 psi Pressure
Pipe Size & Class
Thrust (lbs)
Pipe Size & Class
Thrust (lbs)
18"--100 150 200
31,800 34,800 39,100
30"--100 150 200
87,000 97,100 108,600
20"--100 150 200
38,900 43,200 48,400
36"--100 250 200
125,100 138,600 156,800
24"--100 150 200
55,600 62,000 69,700
TABLE JA
VOLUME OF WATER REQUIRED FOR TESTING in gallons per 100 feet
Pipe Size (Inches)
18 20 24 30 36
Gallons* Per 100 Ft.
1650 2040 2940 4580 6600
'Approximate--includes an allowance for absorption and wostage.
TABLE KA
LEAKAGE ALLOWANCE Gallons Per 100 Couplings Per Hour
Nom. Pipe Die. (inches)
18 20
24
30
36
50
6.90 7.66 9.20 11.50 13.80
75
8.38 9.31 11.17 13.98 16.80
Test Pressure
(psi) 100 125
9.75 10.83 13.00 16.25 19.50
10.87 12.08 14.50 18.13 21.75
150
11.93 13.26 15.90 19.88 23.85
200
13.80 15.33 18.40 23.00 27.60
225
14.62 16.25 19.50 24.37 29.24
'Evaluated on basis of ISO psi, this leokoge is approximately equal to 65 U. S. gallons per 24 firs, per mile of pipe, per inch of pipe diameter for pipe in 13-foot lengths. To determine total loss for a given length of pipe line;--against pipe size and under test pressure, find gallons per 100 couplings per hour. Multiply this by actual number of couplings (each fitting bell equals one half coupling) and then by hours of test duration: For example, one mile of 20" pipe at 150 lbs. for 2 hours =: 13.26 gals, per 100 couplings per hour. Since there are about 407 couplings per mile, multiply 13.26 by 4.07 giving 54 gals, per hour,
times 2 = 108 gals, allowable leakage in 2 hours.
TABLE LA
118
H
4^
*4^
Minimum Size Casing Required with Transite Pipe (in inches)
Refer to Page 97 for "Pulling Pipe Through Casings"
Pipe Size
18 20
24 30 36
Casing Size (inside diameter)
32 35 40
so
58
TABLE MA
RING-TITE EXPANSION COUPLING (See page 100 for how to assemble)
Settings for Stop Mark and for Final Position of Rubber Ring (in inches)
Ripe Size (inches)
CONTRACTED
(Bridge Joint Open)
Mid Point
EXPANDE0
(Bridge Joint Closed)
I. Check bridge position (inches contracted or expanded from mid-point)
2. Under that
measurement find STOP MARK
LOCATION (see also Fig. 88)
( 18-20
<24 / 30-36
3. Final ring position
should check to this distance from coupling face (`/a")
l 18-20 <24 ( 30-36
l'/2 1
'/2 0
1/2 1
l>/2
4 4>/2 5 5`/2 6 6/2 7
4`/2 5
S'/2 S
6/2 7
7/2
5 5 Viz 6 6>/2 7 7/2 8
2 2>/4 21/2 23/4 3 3/4 3/2
2% 2>/2 2% 3
3/4 3/2 33/4
2Vz 2 3/4 3
3/4 3/2 33/4 4
TABLE NA
119
120 121
INDEX
Adaptors--requirements, 55--table of, 56 Ring-Tite to flange adaptor, 61 steel to Ring-Tite adaptor coupling, 56
Air--relieving for test, 90 Anchoring pipe in soft soils, 64; pipe on slopes, 66; of valves, 67 Assembly of pipe and couplings--general, 30, 31, 33
by "swinging" in, 37
Assembly at fittings--Ring-Tite, 58
poured bell 8s mechanical, 59
Backfilling and tamping, 80
on slopes, 86 Bars, use of, for assembly, 32
SEE APPENDIX INDEX
Bedding of pipe, 22, 80 Belling of pipe--general, 40
by "popping" on, 42
ON PAGE 124 FOR THE FOLLOWING:
with bars, 40 with friction puller, 41 with lever puller, 40-41
I. ASSEMBLY USING ROUND CROSS-SECTION
Bracing pipe for testing, 88
RUBBER RINGS
Bridge Crossings, 99
Casings, pulling pipe through, 97
II. ADDITIONAL DATA
Checking rubber ring locations, 34 Clamps--service, 74; repair, 94 Clearance--under pipe and couplings, 21
AND INSTRUCTIONS FOR PIPE SIZES 18"-36"
over rock excavation, 21
Closures, how to make, 44
Connection for house service, 76
for irrigation systems (copper tubing), 76
for iron pipe, 77
Corporation stops, 72
Couplings--see Ring-Tite coupling
Coupling pullers,
friction type, use of, 35
lever type, use of, 34
Curves--how to lay out, 16
offsets for pipe on, 16
Cutting Transite Pipe--methods, 50
Deflections, maximum recommended, 16
Dimensions of Transite Pipe and Ring-Tite coupling, 104
Distributing pipe along trench, 13
Drilling and tapping Transite Pipe, 72
Earth loads on pipe--effect of trench width, 19
Earth mounds, 24
Expansion-Contraction, general, 100
Expansion Coupling, 100
Fittings--adaptors at, 55
making joints at, 58-61
short lengths at, 55
support of, 54
thrust blocks at--size of block, 62
location of block, 68
Friction type coupling puller, 35
Frozen trench and backfill
avoiding frozen trench bottom, 15
avoiding frozen backfill, 80
Gage--for checking rubber ring locations, 34
Grade of pipe and trench, 20
Heavy coupling--factory-threaded outlets, 76
Hydrants--installation at, 69
Inspecting pipe shipments, 4 Joints at fittings--calked lead, 60
self-calking (sulfur base), 60 Leakage tests--see testing
122
C%
c% oJL
>
fte--&
Lengths of pipe, 104
Levelled trench bottom--bedding pipe on, 25 Lever type coupling puller, 34 Line caps for testing, 88 Loading transfer trucks, 12 Loads on pipe in trenches, 18, 20 Lowering pipe into trench, 28 Lubricating pipe ends, 31, 32 Machined pipe surface, 43 Machining pipe on job, 52
Maximum recommended deflections, 16 Methods of supporting pipe, 22 Offsets for pipe on curves, 16 Pressure--strength tests, 91 Pulling pipe through casings, 97 Radius of curvature for pipe on curves, 18 Receiving pipe shipments, 4 Removing pipe from line, 47 Repairs to damaged pipe, 93 Ring-Tite Coupling--general assembly, 30-33
assembly with bars, 33 assembly with friction puller, 35 assembly with lever puller, 39 Ring-Tite expansion coupling, 102 Rock Excavation--bedding pipe in, 21 Rolling Assembly (for expansion couplings), 102 Rubber rings-- checking final location, 34
placing of, for expansion coupling only, 102 storage of, 14
Service connections--corporation stops, 72 service damps, 74 sleeves, bossed, 78 tapping Transite Pipe, 72
Short length and adaptor requirements, table, 56 Short lengths--purpose of, 43
how to use, 44-49 Side thrusts at Ring-Tite couplings, 66 Stacking pipe on trucks, 12 Stop-mark on M.O.A. pipe, 44-45 Support of fittings, 54 Supporting pipe--methods of, 22-27
earth mounds, conditions suitable for, 24 levelled trench bottom method, 25
conditions suitable for, 25 how to use, 25-27 template for use with, 26 `Swinging-in" assembly method, 37
Tamping-hand, 81; water, 83 Tapping for corporation stops, 72 Tapping sleeve and valves, 78 Testing, 87 Thrusts at fittings (table), 64 Thrust blocks at fittings--size and type, 62
block location, 68 at test ends, 88, 89 Tie in at fittings, 48 Tolerances, 105 Transitions--Simplex to Ring-Tite, 38 Trench excavation--line of, 15 '
width of, 18-20; depth of, 20, 21 Underwater assembly of pipe and coupling, 39 Unloading pipe shipments, 6 Valve, anchorage, 67 Weight of Transite Pipe, 6
123
ADDITIONAL INDEX FOR APPENDIX ONLY
(Main Index, Pages 122-123)
I. RUBBER RINGS, ROUND CROSS-SECTION assembly with, 108 checking final position, 109 lubrication of, 108
II. PIPE SIZES 18" THROUGH 36" adaptors, 114 assembly with friction puller, 111 assembly with lever puller, 111 bracing test ends, 117 closures, 113 dimensions of, 120 expansion coupling, 119 leakage allowance, 118 leakage tests, 119 lubrication of, 115 maximum recommended deflection, 112 minimum casing sizes, 119 tamping under pipe, 117 testing, 117 thrusts at deflected couplings, 116 thrusts at fittings, 116 thrusts at test ends, 118 steel to Ring-Tite adaptor, 114 water volume for testing, 118
124
NOTES 125
NOTES 126
Vj-
f..
3
&-h*
&r 3
0r3 3
&-3 $r~ 3
"3 3 Op* *3 ^3 Sp- '"* ** ^3
%A3
gp+~3 ^3
x\
m*s*
0-3
NOTES 127
\ >
NOTES