Document 2RGrqeY9gwR0VMrowd7Xgzmj5
conoco
Petrochemical Department
Continental Oil Company V C M Plant P.0. Box 605
Westlake. Louisiana 70669 (318)882-0550
July 22, 1971
To: R.H. Gerlach
Subject:
Oxy Catalyst Recharge - June 1971
The three primary oxychlorination reactors were given to maintenance at 7:00 a.m., Monday, June 14. Water blasting and drilling of the tubes on R-302 and R-303 was completed by 6:00 p.ra., Thursday, June 17; R-301 was not completed until 6:00 p.m., Friday, June 18. At these times the catalyst support screens were bolted on and the tubes were then steam dried.
Loading of R-302 and R-303 was started by midnight, Thursday, June 17; the loading of R-301 did not start until 7:00 p.m. on Friday, June 18 because of the difficulties encountered in cleaning it. Loading was complete on R-302 and R-303 by 1;00 a.m., Monday, June 21, for an elapsed time of 73 hours, while the loading of R-301 was complete at 5:00 a.m., Monday, June 21, for an elapsed time of 58 hours. The exceptionally fast loading time on R-301 was accomplished by using 10 men/shift thoughout the loading on this reactor; and, in addition, the best, most experienced loaders were used. Eight men were used on the other two reactors.
Loading Details
A. R-301
12..
3. 4.
.5. -
6
7.
1/2" Raschig Rings - 7" deep, 13 hours 100% catalyst - 26" deep, 10 hours 65% catalyst - 26" deep, 11 hours 45% catalyst - 26" deep, 10 hours 32% catalyst - 40" deep, 12 hours Silica - 19" deep, 1 hour Thermowell tubes, 1 hour
B. R-302
.1. . 1/2" Raschig Rings - 7" deep, 18 hours
2 100% catalyst - 52" deep, 20 hours 3. 65% catalyst - 26" deep, 14-1/2 hours 4. 45% catalyst - 40" deep, 15-1/2 hours
.5. Silica - 19" deep, 1 hour
6 Thermowell tubes, 1 hour
CCR 000034294
C. R-303 1. 1/2" Raschig Rings - 7" deep, 23 hours 2. 100% catalyst - 91" deep, 21 hours 3. 90% catalyst - 12" deep, 10 hours 4. 100% catalyst - 15" deep, 11 hours 5. Silica - 19" deep, 1 hour 6. Thermowell tubes, 1 hour
Special Comments Long delays were encountered at R-302 and R-303 because the catalyst retaining screens had to be welded in places to the reactor. This procedure caused a 6-7 hour delay in the recharging of these reactors. The welds are necessary because many of the screen support bolts are missing on these reactors. These bolts should be replaced during the next catalyst outage. No special tubes were loaded during this turnaround. Pressure drop measurements for the reactors are attached. An air flow rate of 14 on the rotameter was used to make these tests. This represents a 39.2 scfh actual flow at 80F.
D.C. Skokna Process Engineer bs' cc: DOP-RDG-GTH-JDM-RWC
%-L 2>:APPROVED :
'CCR 000034295
NOTE: One traverse from the center to the west edge along the centerline, measuring every third tube, was used to obtain the tube
pressure drop on each reactor. The No, 1 tube is nearest the center. The pressure drops shown below are in inches of water.
Pressure Drops - R-301
1. Thermowells
NE NW SE SW Avg:
2. Tubes
1 2 3 4 5 6 7 8
10 11 12 13 Avg:
Pressure Drops - R-302
1. Thermowells
NE NW SE SW Avg:
Spent Catalyst
P >25"
% Deviation -
Missing
-
10.6
26 low
18.0
26 high
14.3
Fresh Catalyst P % Deviation 4.2 1.9 low 4.8 12.1 high 4.2 1.9 low 4.4 2.8 high 4.6 7.5 high 4.2 1.9 low 4.2 1.9 low 4.2 1.9 low 4.1 4.2 low 4.2 1.9 low 4.1 4.2 low 4.2 1.9 low 4.3 0.5 high 4.28
Fresh Catalyst P % Deviation 4.1 3.8 high 3.7 6.3 low 4.3 8.9 high 3.7 6.3 low 3.95
Spent Catalyst
P % Deviation
8.7 6.8 low
11.2
19.9 high
>25"
-
7.7 17.6 low
9.7 13.8 high
10.1
8.1 high
9.8 4.9 high
11.8
26.3 high
>25"
-
7.5 19.7 low
8.4 10.1 low
8.5 9.0 low
--
9.34
Spent Catalyst
P % Deviation
23.0
18.9 high
14.6
24.4 low
>25"
-
20.4
5.5 high
19.3
Fresh Catalyst
P % Deviation
4.0 28 low
3.2 43 low
3.6 36 low
11.8
111 high
5.6
\
'CCR 000034296
2. Tubes
1 2 3 4 5 6 7 8 9 10 11 12 13 Avg:
Pressure Drops - R-303
1. Thermowells
NS NW SE SW Avg:
2. Tubes
1
2
3 4 5 6 7 8 9 10 11 12 13 Avg:
Spent Catalyst
p 13.4
% Deviation 26 high
8.5 20 low
9.4 11.5 low
10.8
1.5 high
12.0
12.8 high
11.4
7.2 high
11.2
5.3 high
10.8
1.5 high
8.9 16.2 low
8.9 16.2 low
10.1
4.9 low
12.1
13.8 high
10.6
Fresh Catalyst
,P % Deviation 4.9 10.4 high 4.3 3.2 low 4.5 1.4 high 4.2 5.4 low 4.3 3.2 low 4.6 3.6 high 4.3 3.2 low 4.3 3.2 low 4.4 0.9 low 4.6 3.6 high 4.6 3.6 high 4.3 3.2 low 4.4 0.9 low 4.3
Spent Catalyst P % Deviation >25" >25" >25" >25" >25"
Spent Catalyst P % Deviation >25" >25" >25" 20.1 22.5 23.1 >25" >25" 24.7 >25" >25" >25" >25" >25"
Fresh Catalyst P % Deviation 3.4 5.6 low 3.6 0 3.8 5.6 high 3.6 0 3.6
Fresh Catalyst P % Deviation 4.4 2.3 high 4.4 2.3 high 4.4 2.3 high 4.1 4.7 low 4.6 7.0 high 4.3 0 4.2 2.3 low 4.2 2.3 low 4.2 2.3 low 4.2 2.3 low 4.2 2.3 low 4.2 2.3 low 4.2 2.3 low 4.3
CCR 000034297