Document 2RGkJr8Ge708MmV9rd3kqR02r
Use 'em over and over again
Oarf's True flail Joint Ma&cs the Difference
\
Dart Unionj are leakproof on ibe pipeline and on the pocketbook. They're spherically ground to a true ball joint with wide, true-beoring surfaces. Because seats stay unscarred and true, these unions won't leak---and you can use them on job after job.
QUICK FACTS
SEATS of special olloy brontc proride high resistance to pitting and corrosion
. BODIES AND NUTS are practically indestructible. They're airrefined, high test iron
SHOULDERS are tough and heavy -- made to take the most violent wrenching
Ask your supplier for Darts. You'll save money and leaks. And, if you do the install ing job yourself, you'll save muscle and sweat also!
DART UNION COMPANY
Providence 3, Rhode Island The Fairbanks Co. -- Distributors Boston'New York'Pictsburgh*Romc,Ga.
90S
ON8
| fiGHT POWER COSTS'
hove taken a lung tep |, ' ducing investment cotti 0
"Feedwater treatment greatly plant to plant, ^ ore obvious. If you can y, powerhouse needs into qq( mem system, you reduce e men! coats. But li'i % high},
"Piping, which embrse*, eri, anchors, expansion j( drains, traps, vents and Ian ways Impresses me. It about 24% of the total vestment. We constantly sia Ashing standards that glvauj eat piping construction conus codes and satisfactory surfo
"Our figures, Table 111, do Bl any facilities for electric ^ Here we cover necessary frlbutfon elementa, instrument* trols. We mako every effort individual devices to the a< used elsewhere In the plans, maintenance men from bsvioi a number of different designs the same function. Wbat's am, duces required storeroom stocks.'
" Building-construction costs W the grealeat ores for siringi (s' years. - The reason, of eoona, trend towards outdoor eons everywhere. This idea hubeeo to ihe point whero one of ear plants has got away with i btuk vestment only slightly over 10ft
CONSTRUCTION COSTS
Foornilde and Choneyi "We gineera frequently called upas 'off the cufT estimates of total* a proposed power plant Foribe, trial you can't tie it to boiler a]
because it has no relationship output, nor for that matter does site check with condensers. So tried to establish three simple one each for boiler plant, turbioej reent and condenser installation gear capacity has a definite ref with turbine site so we consider U
of the turbine plant. "Better-known manufacturers
you on fairly short notice ccal mates of current purchase boiler?, turbines, switchgear deniers. Total eosis of cot eluding field labor bear a more, constant relolionsbip l of these major equipment pi*6* this background ond a 11st 0 costs of completed projects, '* all types and sizes of job* to 1952, a series of factors worked up. And this is what
"The fsetors are simplT ' which you apply lo a singkj
Efficiency of FLUOR COUNTERFLO Cooling Totcers begins at the top
Heavy stainless steel fan blades ore'finely balanced, resist jdofl and ire mourned on shafts whose exceptionally high fatigue strength ibeen'iubjismiifed by strain gauge tests and actual use. Pitch it adjustable freflcknily handle required air volumes at minimum tip speeds and horse* &cr requirements - more air per kilowatt. Speed reducers incorporating fiftii bevel gears feature oil-bath lubrication and dry-air breather. The low-
peed fqo shaft is mounted on special steep angle thrust with radial bearings oiike'the combined gear thrust, fan thrust and weight of fan assembly. ROrjirtitg mechanisms are built for hard-wearing, maintenance-free performance & d for smooth, quiet operation.
Vibration Cut-out switches, exclusive with Fluor Cooling Queers, are an emergency safely device that slops the motor should excessive
mibn'accidentally occur, preventing possible damage lo the tower or r'isn(dU equipment. Design employing Internal gusset plates duplicates U used in wooden bridge construction. These connectors add greater tensile Jjxf'Cotnpressive strength to structural members, lower the total weight of ftri, require less erection time and materially increase tower life. Sloping Rfa decks of rough-finished redwood with minimum one-inch dimension are K,`~ed is scaffolding during erection end provide maximum deck surface with
liable air pressure drop through the tower.
Air distribution ta controlled at every sUgo of-Ito travel through th tower. Louver height Is designed to obtain
Uta desired intake velocity end wlnd-deflactore Inside the lower uniformly direct olr currents to ell areas.
Approach to tha desired wet-bulb temperature is easily accomplished and performance to customer's specifica
tions Is guaranteed In every ease.
Only Fluor Counterfto Cooling Towers ore completely prefabricated. All cutting, drilling, and nailing is performed at the factory and lower parts are "packaged" for rapid delivery, marked for orderly assembly. More efficient control of the quality of straight-groined heart of California redwood and excellent workmanship in Fluor towers are maintained through prefabrication. Inexperienced craftsmen and laborers under Fluor'a supervision can erect a Fluor tower in a minimum of lime and at considerable savings In erection costs. Prefabrication means standardization; parti that may become worn or damaged over the years may be replaced economically. Uniformity of appearance os well as performance is assured.
jpxBS SUBS WITH
Ppo0wwci*
ti
j-
11