Document 2RDz8ZwMxN7e6waOJmQwEeJzg

filotiSfinto \ INM( LOCAKONI P. B. HodgO - General Offices October 9, 1969 DinmNei STATUS REPORT - AROCLORS CLEAN-UP OP PLANT EFFLUENTS TO : Mr. W. A. Kuhn (4) WKU11N Measre. . D. B. Hosmer - DHOSM W. R. Richard - WRICH . S. Tucker - quej-ny E. V. John - EJOUii M. W. Farrar - S. 2ND E. P. Wheeler - EV/1IEE This memorandum advlse3 progress and problems Involved with clean-up of Aroclors from the waste effluents at W. G. Krummrich and Anniston. W. G. KRUMMRICH PLANT A. Status With the changes In practice at Aroclor using departments plus the greatly Improved HC1 off-gas cooling at the pro ducing department chlorlnators, the only significant losses) now occur from handling at the producing department. Some of the changes In practice: 1. No spent heat transfer Aroclor is now deliberately sewered. Only losses are from leakage in pump pack ing glands, accidental handling losses, vapors, etc. The spent Aroclors are being disposed of In our toxic land fill -- a temporarily acceptable practice. 2. Aroclor heela from tank cars being washed at the re ' pair track are also collected and hauled to the land fill. At the producing department free Aroclor is visible In the sewer trenches. Sampleo of the affluent have been collected but, to date,-none have been analyzed. Based on material balances, -loss to sewer Is an estimated maximum of 50,000 pounds per year (137 pounds per day average). Actual loss Is probably . _ ' considerably lower due to soaking into chat spread ` " around the operating area. : B. Future Work 1. Waste Sampling In-plant water, plant effluent water and Mississippi River mud samples are being taken on a regular basis, but no analyses have been run in recent months. a^vzgeaa r^inJjogrldneKr ^lojgTjugTdd.e TnTtTrc nanmiinc. worw. as soon as we can rind out where we stand quantitatively, we will review the sampling points and, no doubt, do more comprehensive sampling of the Mississippi River, N *0 hfv tl.t* HONS 049095 2 . _) October 9, 1969 Including cross-section samples above our outfall and at a considerable distance below, o.g. Jefferson Barracks Bridge. No plans presently exist for air sampling, but these will be developed in the next several months, dependlng on priorities established as the whole Aroclor problem becomes clearer. 2. Waste Reduction ' An engineering study has been made to reduce losses at the production department. A number of sumps have been proposed which would virtually eliminate any sewering of "free" (undissolved) Aroclor by allowing the Aroclors lost to be settled out and to be inter mittently pumped to a waste trailer. The trailer contents would be hauled to the toxic land fill. Total cost of the projects would be $81,000. One sump (to cost $11,000) is estimated to collect 5096 of the total losses. This is the collection point for process area discharges. Installation of this sump would be a logical point to commence with the next round of clean-up activities with other projects to follow as Justified by actual measure ments. , ANNISTON PLANT ' A. Status . 1. Waste Reduction Numerous small changes have been made to eliminate any possibility of free Aroclor leaving the plant and depositing in Snow Creek (as previously experienced). These changes Include: a. Rehabilitation of the neutralization pit in the total (less Nlran) effluent flow leaving the plant. This will effectively prevent Aroclor losses above saturation and will stop future deposition in Snow Creek. l) To reduce losses to well below saturation, changes have been made to collect free Aroclors at points prior to dilution of the wastes. Included are: a) An existing sump at the end of the ware house is being utilized to trap Aroclors spilled from drumming and flaking opera tions . HONS 049096 Mr. W. A. KuhiQ -3- 3 October 9, 1969 b) A coalescer was installed in the muriatic acid flow from the HC1 absorbers. ' Primary purpose was to improve quality and ease of treatment of the muriatic acid, but a considerable amount of free Aroclor is being trapped following the coalescence. 2. Waste Sampling . A set of samples taken June 10 were analyzed recently. A full report will be issued soon. The most interest ing data are: a. Snow Creek, about 1 mile below our plant - Mud - 2.36^ PCB Water - 8.3 ppb PCB With this concentration of Aroclor in the mud of Snow Creek, we can expect leaching to continue for a long time, regardless of how well we clean up in the plant. b. Choccolocco Creek, about 10 miles below confluence with Snow Creek -- Water - 5.8 ppb PCB B. Future Work . 1. Waste Sampling Drs. Cunning and Suttkus, biological consultants from Tulane University, who have been making fish studies . for the plant, will be conducting a phase of their continuing study during late October. They will be requested to collect a variety of fish species above and below our outfall for PCB analysis by Dr. Scott Tucker10 laboratory. Collection of water and mud samples from Snow Creek, Choccolocco Creek and the Coosa River will be con tinued on an as-justified basis. Anraitednumber we re jm^_shut jpvm oi*ftr^lQr proriuctfSrm r.o MMDllBn losses wiTnout Aroclor production. Another full set SlBj In order to resolve .h resnU-.g from t.h jj (June 1(J, 1909T ______ Foil owing establishment ^^reason- ab^ rella1 e facTiE5~on present- receiving ;rcam int.l mip t.ct Kflmnl t about six ~ months inntervalsT As in the case at W. G. Krummrl ch. HONS 049097 2. Waste Reduction The next logical step In waste reduction lo to provide Bumps In the operating department to collect spillage from pipe leaks, pump packing, etc. Firm plans will be developed after we gain quantitative information on losses (about January 1, 1970). Meanwhile, efforts will be directed toward making maximum use of the collection equipment already provided (the warehouse sump and the coalescers). / // Paul B. Hodges acd HONS 049098