Document 2RDVXbRRazq6n1vjGoo3Opn9r
G';-Oi .CIA* >ACIFXO COitlPORATl 0; i
Interdepartmental Conramfcation
TO; Kr. G. 8. Wilson
FROM:
K. W. Brown
SUBJECT; 1966 COMTOTMEHTf:
cc; E. B. Hollingsworth * ?aoll T. W. Richards Paoli
BATE; LOCATION: LOCATION:
November 18, 1556 Paoii Acme
Complying with your request that you be kept: up to date on the
progress of the 1966 cost reduction program. Acme admits
the following report.
9 Monti
9 Month
Commitment
Estimated ; vIdrs Gain or (Loss)
1. Board Perfect s up to 96%
$ 11,898 ;0
We are falling short of oar goal:
perfects 05.45% on 10-1-65.
.2 (a) Board weight reduction
27,383.00
Vcr
10% Reduction of Overt lass Poor business conditions have inflated this figure.
5,922.00
$ (503,00)
70,384.65 13,375.00
3. 00 Installstion of Kntoleter Demand for this product
has been very low.
3,321.00
1,486.00
<d> Reduction of mn on Fireatop runs
900.00
Started on July 26, 1966.
*
271.00
<f) Paper hauling with G-P Trucks
37,500. >0
This commitment was improperly
classified. It should read;
Hauling of all products with G-P Trucks,
33,0-40.00
4. Joint. System Department
(a) Reduce freight rate Ho ectlon wan taken due to
lnabl)ity to find local vendors.
473,00
*v`*
0>) Increase production by 9% High volume and an increare of
over 1% accounts for this figure.
779.CC-
4s14102
(c) Pack all textures In department Packirg still being done in packing department,,
5. General Tla\i > Yard
297,DC
SGP 0002776
('a) Eliminate one yard truck & driver and minimise janitor requirements. 8,709.CO
2,860.00
Caiiaaittner.t *- wfHW'KIi****
7. Quarry
9 Month Estimated Saving
(a) Reduce prill usage
$ 440.00
8. Board Warehouse
'a) Fiber corner protectors Reduced shipments causing us to run below projected estimate.
1,125.00
(c) Crew Utilization
6,520.00
9. Office
(a) Reduce Overtime
360.00
(h) Reduce phone bill
720.00
TWX charges were not considered
when commitment was taken.
10. Board Manufacturing
(a) Reduce unloading labor and pulp costs
3,258.00
(b) Fuel
752.00
(c) Electric
1,203.00
(d) Reduce Talc
K50.00
11. Maintenance
(a) Reduce repair labor & material 5% 6,099.00 Projects planned for second half of this period will offset some of the gain shown.
(b) Reduce maintenance delays 5% 237.00
12. Packing Department
(a) Reduce manpower requireroe&t3 614.00
(b) Efficient use of electric power 65.00
Kovei ib&r 18, 9 Month
Gain or (X.oss)
$ 481.00
758.00
6,280.00
326.00 (1,997.00)
(147.00) (4.938.00) (2.382.00)
1.00
19,021.00
161.00
305.00 46.00
SGP 0002777
-3*. HojGiib&r 18, 1%
9 Months Estimated Savings
13. Quality Department
(b) Reduce starch usage Higher reduction than estimated was possible.
$ 2,025.00
<e) Reduction of complaint cost
975.00
A new quality program will
reverse the first 6 month trend,
however corsaitment cannot
be obtained.
9 Months Gain or (Loss)
$ 9,671.75
(3,439.00)
9 MONTHS TOTAL PROPOSED SAVERS EROGTnM
Prqpo^aefi $ 121,725.00
*ctv."' $ 149,152.42
% of Goal Attained
123%
KHBsom