Document 2RDVXbRRazq6n1vjGoo3Opn9r

G';-Oi .CIA* >ACIFXO COitlPORATl 0; i Interdepartmental Conramfcation TO; Kr. G. 8. Wilson FROM: K. W. Brown SUBJECT; 1966 COMTOTMEHTf: cc; E. B. Hollingsworth * ?aoll T. W. Richards Paoli BATE; LOCATION: LOCATION: November 18, 1556 Paoii Acme Complying with your request that you be kept: up to date on the progress of the 1966 cost reduction program. Acme admits the following report. 9 Monti 9 Month Commitment Estimated ; vIdrs Gain or (Loss) 1. Board Perfect s up to 96% $ 11,898 ;0 We are falling short of oar goal: perfects 05.45% on 10-1-65. .2 (a) Board weight reduction 27,383.00 Vcr 10% Reduction of Overt lass Poor business conditions have inflated this figure. 5,922.00 $ (503,00) 70,384.65 13,375.00 3. 00 Installstion of Kntoleter Demand for this product has been very low. 3,321.00 1,486.00 <d> Reduction of mn on Fireatop runs 900.00 Started on July 26, 1966. * 271.00 <f) Paper hauling with G-P Trucks 37,500. >0 This commitment was improperly classified. It should read; Hauling of all products with G-P Trucks, 33,0-40.00 4. Joint. System Department (a) Reduce freight rate Ho ectlon wan taken due to lnabl)ity to find local vendors. 473,00 *v`* 0>) Increase production by 9% High volume and an increare of over 1% accounts for this figure. 779.CC- 4s14102 (c) Pack all textures In department Packirg still being done in packing department,, 5. General Tla\i > Yard 297,DC SGP 0002776 ('a) Eliminate one yard truck & driver and minimise janitor requirements. 8,709.CO 2,860.00 Caiiaaittner.t *- wfHW'KIi**** 7. Quarry 9 Month Estimated Saving (a) Reduce prill usage $ 440.00 8. Board Warehouse 'a) Fiber corner protectors Reduced shipments causing us to run below projected estimate. 1,125.00 (c) Crew Utilization 6,520.00 9. Office (a) Reduce Overtime 360.00 (h) Reduce phone bill 720.00 TWX charges were not considered when commitment was taken. 10. Board Manufacturing (a) Reduce unloading labor and pulp costs 3,258.00 (b) Fuel 752.00 (c) Electric 1,203.00 (d) Reduce Talc K50.00 11. Maintenance (a) Reduce repair labor & material 5% 6,099.00 Projects planned for second half of this period will offset some of the gain shown. (b) Reduce maintenance delays 5% 237.00 12. Packing Department (a) Reduce manpower requireroe&t3 614.00 (b) Efficient use of electric power 65.00 Kovei ib&r 18, 9 Month Gain or (X.oss) $ 481.00 758.00 6,280.00 326.00 (1,997.00) (147.00) (4.938.00) (2.382.00) 1.00 19,021.00 161.00 305.00 46.00 SGP 0002777 -3*. HojGiib&r 18, 1% 9 Months Estimated Savings 13. Quality Department (b) Reduce starch usage Higher reduction than estimated was possible. $ 2,025.00 <e) Reduction of complaint cost 975.00 A new quality program will reverse the first 6 month trend, however corsaitment cannot be obtained. 9 Months Gain or (Loss) $ 9,671.75 (3,439.00) 9 MONTHS TOTAL PROPOSED SAVERS EROGTnM Prqpo^aefi $ 121,725.00 *ctv."' $ 149,152.42 % of Goal Attained 123% KHBsom K. V. B. # SGP 0002778