Document 2RBBxX0weejGKeYRmx2jz2K5N
Ch; I 'lii) dI ; on r,ili(iii ;il Aroclor 1246 I <-)r I<,> i-,f>-r ' , '.-in
of SYSTEMS
Observe the manufacturers' recommendations for maintaining all equipment in the system and watch these additional points: Mechnical Check-points
D Keep all moving parts lubricated. Q Routinely check accuracy of readings shown by safety and
temperature limit controls.
B Periodically check heater components (heater tubes,
burner, refractory linings). Keep healer surfaces and fuel filters clean. Q Check water cooling of the circulation pump. Repack stuffing boxes as needed, according to supplier's recommendations.
Aroclor 1248 is very stable when properly used. Its condition is indicated by its viscosity (see Fig. 6 of Monsanto's booklet, "Aroclor 1248 Heat Transfer Data"). Once or twice a year take a sample of the circulating Aroclor fluid and make a viscosity determination. Most plants have the simple equipment needed for this operation. Others send it to an outside laboratory. The fluid will be checked free of charge if a one-quart sample properly packed is shipped to
MONSANTO CHEMICAL COMPANY Organic Chemicals Division Industrial Fluids Sales P. O. Box 478 St. Louis, Missouri In systems operating normally at temperatures not over 6008F. and not subject to frequent power failures (with consequent overheating of fluid), an annual check of the circulating fluid is usually sufficient. 2-390-0496-44 UTHO IN U
TOWOLDMON0030627 WATER_PCB-00015096
CwdN&.Jt
IMv tM Imt tmnfar syitMtt;
aiNIRAk KICOMMINDATIONS TOR
OPERATION! and MAINTENANCE
HIAT TRANSRIR SYRTIMR
.> i * ft ' v ^ v
/ v, V
'
The following instructions apply to all Aroclor heating systems and are supplemental to manufacturers' recommendations for the equipment proper.
QasEXEEHa&EBaHi (follow these instructions any time a system has been shut down long enough for the Aroelor to cool below 180"F.),
llStart circulation numn and check expansion tank (should be "l/4 full).
W Start burner on lowest heat and maintain full circulation until return fluid temperature reaches ISOT.
EJSet burner for full heat. Resume normal operation when fluid reaches proper temperature.
Shu...t.-..d...o...w.....n.....P....r..o...c...e...d...u...r..e...| (follow these instructions to prevent localized over-heating when system is being shut down).
E Shut burner off but maintain full circulation for at least 1/2 hour to dissipate high residual heat in combustion chamber.
0if air temperature is under 50F., keep fluid circulating constantly at 200 "F.
anwm
* PPnowwf>er failure automatically interrupts the burner operation. When power resumes, start the circulation pump to get rid of any vapor pockets that may have formed in the heater tubes. If fluid is still hot (above 180eF.), full heat may be resumed when pipe knocking (if any) has stopped.
If returning fluid has cooled below 180 F. during power failure and initial circulation, follow f\h>rt-np Procedure above.
MOMtAMT* CftllMCAt CCMVfARV*OrMl <*!<
IftlvttrldflvH* 1*1m, A tf tea
Inl>, JkJMQj'J
TOWOLDMON0030628 WATER_PCB-00015097
I
TESTING and CLEANING
aroclor
Ww nr overhauled vxstems must lx- TESTED FOB LEAKS und THOROUGHLY CLEANED OUT. This cun he dun,- in otnoperation as rollows:
1 ill lie eni[)i> -s u l- in with deanmg solution 1r> lbs. eaustie sixla and 5 IBs. of soda asTi in t-adi 1000 lbs. or 120 gal. of water i.
I lm['>'i-!iK \_en! tlie system to insure complete filling. ( jnse the vents and start the circulation pump.
''lari the 'uimer .0 has tire, heat liquid to ISO'F. Circulate solu tion at least 24 hours.
During this time, perinlh.ilK !r.iin >>il from a low spot some of the solution and replace"tnis volume with clear water. Do this until the fluid in the system is dear. This takes about 24 hours.
When clear, raise the c\it Muni tcnipcratui c to 215-223'['., tliei. turn tlie burner and ;mmi> nil.
Next or an the entire >_s oem and open all v cuts. Residual heat w ill dry out the moisture. When inspection shows the system is thoroughly dry. dose all drains mu' vents.
Now till the system nidi Monsanto \rudor [.is until tlie <-\p.,nsion tank gauge reads 14 full.
start the circulating pump and tarn the h.inter -m_d J_!_!T 1 `` Heat the fluid to 230F. (return temp.I over a two-Uour permd. During this time. sen', the lines every lo-lo niiimtcs to allow any residual water vapor and air to escape. Reimpect the entire system for leaks while fluid circulates. Again inspect the expansion tank to make sure it is 1.4 full.
hinally. set the burner tor full heat. Bring system up to normal operating temperature, \djust al! controls lor full modulation. I > iinii e all pipelines for expansion, adequate bracing and leaks. Proceed with normal operations,
O <N & O * o
TOWOLDMON0030629 WATER_PCB-00015098