Document 2R1kzZqY4dnygdaKbn5nE0QJa
i flNTL'R-OFFICE MEMO TENNECO CHEMICALS, INC
to G.I. Rozand (2) F.W. Kanzler
from r.A. Lojewski
subject VCM Personal Monitoring
Charcoal Tube Measurements
October, 1975
~
AT Piscataway Burlington
AT Flemington
date November 7, 1975
,copy to
w. F Gabel
P. A. lobo P.M. Reed F.X, Ritter P. R. Scarito o<f.T. Sweeney
F. Toca File
- Burl. - Flem.
Da Da
Attached are the VCM personal monitoring results for the Flemington and Burlington Resin Plants and the Burlington Compound Plant, by job classification, for the month of October, 1975.
It should be noted that during the month of October, 15-minute sampl ing was discontinued and an expanded program of 8-hour charcoal tube sampling instituted.
Attachments FWK-RAL/jst
F.W. Kanzler/R.A. Lojewski
013123
FLEMINGTON RESIN PLANT PERSONNEL MONITORING SUMMARY
PPM VCM BY CHARCOAL TUBE METHOD (8-Hour Sampling Period)
PERIOD:
October, 1975
Distribution: P.M. Reed G.I. Rozand j.t. Sweenev
Q.C. File
Job Classification:
RESIN PLANT
Shift Foreman
Polymerization Foreman
Reactor Operator
Utility Operator
Dryer Operator
WAREHOUSE
Warehouse Foreman
Warehouseman
Baqqer MAINTENANCE
4
Maintenance Foreman
Maintenance Clerk
Mechanic
Q . C. LAB
Q. C. Lab Supervisor
Q. C. Technician/Days
Q. C. Technician/Shift
Monitorinq Analyst
BOILER HOUSE
Boiler Lead Operator
Boiler Operator
mis
*
0.9 0.8, 0.2 0.9, 2.1, 0.6, 1.4, 1.6 0.3, 0.6, 2.1 0.5
ND ND 0.4
*1 0.1 1.1, 7.9
0.6 O.i 0.1
ND 0.1
*i
-
*
1
**
1
013124
2
ILOT PLANT
Pilot Plant Group Leader
*
Pilot Plant Enqineer
PMot Plant Technician
Pilot Plant Maintenance
0.3 0.3 ND, 0.5 0.9
QUARTERLY R. D. Personnel
QUARTERLY Office Personnel
y
*
.
'
013125
FLEMINGTON EIGHT-HOUR CHARCOAL TUBE TWA BY JOB CLASSIFICATION OCTOBER, 1975
Job Classification
Resin Plant
Polyforeman Shift Foreman Reactor Operator - charging Reactor Operator - dumping, Reactor Operator - relief Utility Operator Dryer Operator Warehouse Supervisor Warehouseman Bagger
TWA . , Time in ppm Air Mask
0.9 5 minutes
0.2 -
0.6 -
1.4 25 minutes
1.6
-
2.1 20 minutes
0.5
-
ND -
ND --
0.4 90 minutes
General Area
Maintenance Foreman Mechanic - shift Mechanic - day Lead Boiler Operator Boiler Operator Maintenance Clerk Effluent Man Quality Control Technician - day Quality Control Technician - shift Quality Control Supervisor
0.1
1.1 7.9 ND 0.1 0.1 0.1 0.1 0.1 0.6
-- -- _ --
_ -
Group Leader Engineer Technologist Technician
Maintenance Technician
Pilot Plant
0.3 0.3 ND 0.5 0.9
_
--
M
R.A. Lojewski 11/6/75
01312 B