Document 2NqkEYkpOvXeO79R1Z7da5z7b

Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 8/24/2023 Water CWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County: Facility Phone Number Facility Contact: City of University Park Wastewater Utility Department City of University Park, 3800 University Boulevard University Park, TX 75205 3800 University Boulevard University Park, Texas 75205 Dallas 214-987-5465 Jodie Ledat Interim Director of Public Works jleda@uptexas.org FRS Number: Permit Number: NAICS: SIC: 110010815591 TXU000123 221320 4952 Personnel participating in inspection: Jodie Ledat City of University Park Jacob Speer Harry Shearouse Alan Vaughn Damon McElroy City of University Park City of University Park EPA Region 6 EPA Region 6 Interim Director of Public Works (PWD) Retired September 1, 2023, (PWD) Infrastructure Maint. Superintendent Enforcement Officer Enforcement Officer EPA Lead Inspector Signature/Date Supervisor Signature/Date Digitally signed by ALAN ALAN VAUGHN VAUGHN {Inspector name} Date: 2023.10.11 15:25:03 -05'00' Date ROBERTO BERNIER Date: 2023.10.11 15:36:28 -05'00' Digitally signed by ROBERTO BERNIER {Supervisor name} Date 6ENFORM-019-R8.2 (02/12/2020) 1 Section I - INTRODUCTION City of University Park Wastewater Utility Dept. Inspection Date August 24, 2023 PURPOSE OF THE INSPECTION EPA Region 6 inspectors Alan Vaughn and Damon McElroy arrived at the City of University Park Utilities Services Center, located at 4420 Warcola, at about 9:00 am on August 24, 2023, for an announced inspection. We (EPA inspectors) met with the city official indicted above and illustrated in the Appendix 1 sign-in-sheet. We presented our federal credential identifications. I (Alan Vaughn) informed the group this was an EPA inspection to determine compliance with the Clean Water Act regarding sanitary sewer overflows (SSO) from the wastewater collection system. The scope of the inspection is a compliance evaluation to determine if operations and maintenance is sufficient to prevent SSOs. FACILITY DESCRIPTION The City of University Park (UP) serves approximately 25,200 people through 7,409 residential, 256 commercial, and 1 categorical industry. The City's collection system is comprised of gravity sanitary sewer pipes ranging in size from 6-inch to 30-inch. The city discharges its sanitary sewage to the Dallas Water Utilities (DWU) Central WWTP, through the Town of Highland Park's collection system. The gravity mains are comprised of the following: University Park SS Pipe Material Estimate Table: Pipe Material Approx. Composition (%) VC 66 PVC 33 Other < 1 SSO's: The City has not had an SSO in 4 years. Section II - OBSERVATIONS The city primarily is either rehabilitating or replacing existing infrastructure. UP's goal is to continue to rehabilitate or replace the collection system to prevent failures. Repair, maintenance, monitoring, and maintaining proper sewer system flow within the collection system are the city's responsibility. Wastewater maintenance falls under the City's Public Works (PW) department. Below are Capacity, Management, Operation, and Maintenance (CMOM) program related observations: x The city has a goal to replace 1 mile of sewer/utilities/water per year. Since most of these utilities are in alley's, under the road, it is most effective to address all at the same time. 2 City of University Park Wastewater Utility Dept. Inspection Date August 24, 2023 x Annual smoke testing is done on about 25,000 LF per year. x The city typically CCTV's around 20% of its collection system every year. The video is reviewed, problem piping video is forwarded to the Infrastructure Maintenance Superintendent for further analysis and determination of proper course of action. x Code Enforcement handles and addresses any Fats, Oils and Grease (FOG) and the city does not have a current problem in their collection system. x The city staff completes TCEQ approved training and testing to receive its licensing. x The city has standard operating procedures for responding to SSOs. x The city utilizes Beehive program for asset management. All sewer repairs, inspections, replacements, overflows, and clean-up efforts are logged in the application as it serves as both the city's asset management and work order system. x There are adequate utility funds budgeted annually to account for operations, maintenance, emergency repairs and replacement. x The homeowner is responsible to maintain lateral lines from the tap in the street ROW to the home. Section III - AREAS OF CONCERN There are No areas of Concern. Section IV - SUGGESTIONS 1. EPA suggests UP use these supplemental EPA informational resources found on the web-site, if needed:: https://www.epa.gov/npdes/sanitary-sewer-overflow-ssoadditional-resources Section V - FOLLOW UP There was no follow-up after the inspection. Section V - LIST OF APPENDICES Appendix 1 - Sign-in Sheet 3 City of University Park Wastewater Utility Department Inspection Date August 24, 2023 Appendix 1 Sign-In Sheet