Document 2NmaO6ro0JQvkwzEajaoLRp36

Company: DOW CHEMICAL CO. ^-ocess: HDPE - POLY B Worksheet HAZOP-PC 1.00 Node: 17 Page: 1 -f----------------------------- ----------------------- -------------- ----------------------------------------------- --------------------------------- ---------------------------- -------------- ----------------------------------------- ------------------ ~+ Node: 17 Heating Water to DR-2007 (Including E-2017) Parameter: Flow +-------------------------h Intention: As Required to Vapor. Isop. |GUIDEWORD DEVIATION POSSIBLE CAUSES i"------ No No Flow Pump trip. Valve blocked in. Control valve failure. D-2811 low level. CONSEQUENCES Lead to shutdown of train. High volatiles in powder and transfer system. RECOMMENDATIONS BY | Put manual valve GH in pump discharge Operator training RF Make discharge AOV fail open. GH Develop standby procedures following maintenance. RF More Less More Flow Less Flow Control upset. No Problem See No Flow MOD redundancy * OtherThan OtherThan Flow + ------------- +------------------ +--------------------------- +-----------------------------+---------------------------+---- + DO A 120973 CONFIDENTIAL Company: DOW CHEMICAL CO. T'~ocess: HDPE - POLY B Worksheet HAZOP-PC 1.00 Node: 17 Page: 2 Node: 17 Heating Water to DR-2007 (Including E-2017) Parameter: Temperature Intention: 102 Deg.C |GUIDEWORD DEVIATION POSSIBLE CAUSES +----------------- More Higher steam control Temp valve failure. Temperature control upset. Steam valve bypass open. CONSEQUENCES Fuse polymer. Lead to a Train shutdown. Rotor damage. Plugged transfer system. Loss of heat transfer. Slurry to hydroclone due to loss of flow. RECOMMENDATIONS BY | Operator training RF Cascade temperature and cond. level control system. * Shutdown feed to dryer on high temperature. * Multiple alarms designed into control system. * Less Lower See No Flow Temp H---------------- +---------------- V----------------------------- +--------------------------------1------------------------------+-----+ DO A 120^* CONFIDENTIAL Worksheet HAZOP-PC 1.00 Company: DOW CHEMICAL CO ' ocess: HDPE - POLY B Node: 17 Page: 3 -------------------------------------------------------------------------------------------------------------------------------------------------------------------- -- Node: 17 Heating Water to DR-2007 (Including E-2017) Parameter: Pressure Intention: 50. psig at Jacket +-------------- +--------------- 1-------------------------------+-------------------------------+------------------------------ H-----+ |GUIDEWORD|DEVIATION| POSSIBLE CAUSES | CONSEQUENCES | RECOMMENDATIONS |BY | +-------------------+---------------------+---------------------------------------+-----------------------------------------+----------------------------------------+-----+ More Higher D-2811 pad/depad Overpressure dryer System pressure KW Pressure valve failure. jacket. alarms installed. Water makeup Low level in valve failure. D-2811 PSVs installed. GH PSV on dryer jackets open. Evaluate jacket/ GH shell differential indication. Determine and RF communicate response to high drum pressure. +--------------+-------------- +---------------------------+---------------------------- +---------------------------+---- + DO A 120975 CONFIDENTIAL