OSHA CITATION ARMCO MIDDLETOWN MAINTENANCE CONTRACT
In response to your memo of October 13, 1988, I offer the following answers to the questions of responsibility concerning the OSHA cita tion for asbestos related work at Armco, Middletown.
(a)
McGraw's responsibility to investigate the work area of all
employees as it relates to asbestos has been established. We are
responsible for this investigative action.
We are somewhat
restricted by Armco, supervision-wise and financially.
(b)
McGraw did take reasonable steps to secure the necessary investi
gation, and it is my understanding that the investigation was
properly conducted.
Work continued as the investigation
progressed.
It is the type of repair project that requires
refractory to be removed from the top of a pot or ladle. (It may
be called a ladle since it moves on rails.) As the removal was
taking place, tests were conducted and asbestos fibers were
found. However, since McGraw did not have control of the super
vision at the time the asbestos was found, no action was taken to
provide the necessary protective systems.
(c)
The sampling as performed was sufficient to provide the positive
test result.
That in itself is enough to trigger the actions
required by the regulations.
(d)
Armco has not denied responsibility for the penalty; however, they have not stated that they will bear the cost. This could be negotiable. No indemnification has been stated or implied.
Attached are copies of the particle analysis by Armco Research and the
contractors work order for the work.
Also attached are the daily
payroll reports and summary report for the work order.
Enclosed you will find the Guide to Procedures and the Rules of Proce dure for the formal hearing to be held with OSHA.
CJR/cao
cc:
Harry B. Meran D. H. Kramer Mark Brewer Bill Brewer
McGCon 2298
RECEIVED OCT I 7 1988
MEMO
TO FROM SUBJECT
Jack Ryburn c0y w. Purcell
OSHA Citation
DATE October 13, 1988
I was able to confirm with an OSHA expert that OSHA asbestos regulations place a duty on a contractor to investigate for the presence of asbestos in certain situations where there is a heat source and piping involved. Although McGraw should raise the argument that it had no duty to investigate the back ground of the Armco furnace, it is likely that the hearing will proceed on the basis that McGraw did have such a duty.
The question then becomes whether McGraw took reasonable steps to investi gate. McGraw's argument that it took reasonable steps is based upon two factors. First, McGraw was informed that the furnace was relined in the past and no asbestos was used. Second, when material of questionable origin was encountered, it was sent for analysis, and McGraw was informed that the results were negative for asbestos. Mr. Brewer stated that OSHA's position at the informal hearing was that an industrial hygienist should have been used to take a more scientific or extensive sampling of suspect material. Was a more extensive sampling possible, or did work have to proceed before more material was uncovered to be sent for additional testing? Please explore this point with Mr. Brewer.
Has McGraw requested Armco to indemnify McGraw for the OSHA fines? If not, please let me know whether you would like me to raise this with Armco.
CWP/cp
cc: Harry B. Meran David H. Kramer Mark Brewer
. Purcell
McGCon 2299
September 23^, 1988
To: ^C1ndyitewart^' *APOHf-^ Middletown rWorksF
From:
D. 0. Phillabaum
Subject: Particle Analysis
CORRECTED COPY
Seven samples were submitted to our lab from the #4 coatings line by Tom Lay to determine if asbestos fibers were present. None contained any identification. You submitted four samples for asbestos identification. The results are as follows:
8-02-88 T. Lay
1 sample submitted
contained no asbestos fibers
8-10-88 T. Lay
2 samples submitted
one positive, one negative
8-11-88 T. Lay
4 samples submitted
contains asbestos fibers
8-12-88
C. Stewart
081188-1 081188-2 081288-1 081288-2
- contains asbestos fibers - contains asbestos fibers - contains asbestos fibers - contains asbestos fibers
Donald J. Phillabaum Research Biologist Chemical Technologies Research & Technology
DJP89/jh
Reference: Research Daybook 6223, pp 69, 72, 73
cc: C. C. Borland E. D. Gregory - 680 Bldg.
- -yci\r. :\l '"
McGCon 2300
McGraw Jobs at Middletown Horks - Contract No. 382
30907
Job No. (ME) .......................... 30907
Date Opened ............................ 07-29-88
Atiko Final Charge ............... 282-9268-5234-0000
Plant Code ............................. 062 Project Description ............. 4 ALUMINIZE LINE POT BRICKWORK
Use this Charge for Material Purchased at ARMCO Stores.
282-9268-3101-0000
Use this Charge for Material Purchased at McGRAN Purchasing.
30907-5234-0000 Per Instructions of TOM LAT
Eitension No. 3714
BRIEF INSTRUCTIONS
ASSIST ARMCO MASONRY AT #4 ALUMINIZING LIME ON POT BRICKWORK
V. Bell M. Hirsch G. Looney B. Brewer D. Collins C. Campbell T. Ponder T. LAY M. BREWER
- McGraw
- Arirco - Areco - McGraw - McGraw - McGraw - McGraw - ARMCO - MCGRAW
McGCon 2301
Summary Labor Report for Contractor Release
30907 *4 ALUMINIZE LINE POT BRICKWORK [iate 08-17-83
Date
Regular
Preoiu#
Worked..
Hours
Hours
COST..........
Page No. 1
OS-Ql-88 03-02-88 06-03-88 08-04-88 08-05-88 03-08-88 08-03-83 03-11-83
18.0 174.5 174.5 174.5 142.0 21.0 102.0 71.0
0.0 43.1 43.1 43.1 34.0 10.5 21.0 35.7
361.88 $4,192.49
$4,192.4? $4,192.4? $3,394.31
$593.71 $2,369.22 $2,027.33
877.5
230.5
$21,329.42
3 records listed.
McGCon 2302
Summary Labor Report for Contractor Release 30907 Date 03-01-88
Date
Regular
Worked.. Sect [vet 1 Craft Description... C Edge
Hours
Page No. I Preaiua Hours
08-01-88 08-01-88 08-01-8S 08-01-88 08-01-88 08-01-88 08-01-88 08-01-83 08-01-88
2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340
tt -
2685-2340
0 0 0 0 0 0 0 0 0
c 0597
c 0241 c 0250
c 0497 c 0603
c 0545 c 0237
c 0598 F 2021
2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
18.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0
COST..........
*39.06 *39.06 *39.06 *39.06 *39.06 *39.06 *39.06 *39.06 *49.40
*361.88
9 records listed.
18.0 0.0 *361.88
McGCon 2303
Sumaary Labor Report for Contractor Release 30907 Date 08-02-S8
Date
Regular
Worked.. Sect Detl Craft Description..,, c Edge
Hours
Page No. 1 Preaiua Hours
08*02-88 08-02-88 08-02-88 08-02-83 08-02-88 08-02-88 08-02-88 08-02-88 08-02-88 08-02-88 08-02-88 08-02-88 08-02-88 08-02-88 08-02-88 08-02-8?
2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340
H-
2685-2340
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c 0454 c 0214 c 0577 c 0578 c 0579 c 0581 c 0588 c 0597 c 0241 c 0250 c 0497 c 0545 c 0237 c 0598 c 0595
F 2021
11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 2.0
174.5
3.3 3.3 3.3 3.3 3.3 3.3 3.3 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 0.0
43.1
COST..........
$283.87 $283.S7 $233.87 $283.87 $283.87 $283.87 $283.87 $269.50 $269.50 $269.50 $269.50 $269.50 $269.50 $269.50 $269.50
$49.40
$4,192.49
16 records listed.
174.5
43.1 $4,192.49
McGCon 2304
Sugary Labor Report for Contractor Release 30907 Date 08-03-38
Late
Regular
Worked.. Sect Detl Craft Description... c Bdge
Hours
Page No. 1 Presiu* Hours
08-03-88 08-03-88 08-03-83 08-03-88 08-03-8S 08-03-88 08-03-83 08-03-8S 08-03-88 08-03-88 08-03-88 08-03-88 08-03-88 08-03-88 08-03-83 08-03-88
2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340
if -
2685-2340
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c 0454
c 0214 c 0577
c 0578 c 0579
c 0581 c 0588
c 0597 c 0241 c 0250 c 0497
c 0545 c 0237 c 0598 c 0595
F 2C21
11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 2.0
174.5
3.3 3.3 3.3 3.3 3.3 3.3 3.3 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 0.0
43.1
COST.........
*283.87 *283.87 *2-83.87 *283.87 *283.87 *283.87 <283.87 *269.50 *269.50 *269.50 *269.50 *269.50 *269.50 *269.50 *269.50
*49.40
*4,192.49
16 records listed.
174.5
43.1 *4,192.49
McGCon 2305
Suaaary Labor Report for Contractor Release
30907 #4 ALUMINIZE Lite POT BRICKN0RK Date 08-06-88
Date
Regular
Preaiua
Narked..
Hours
Hours
COST..........
Page No. 1
08-06-88 21.0 10.5 $598.71
21.0
10.5 $598.71
One record listed.
Summary Labor Report for Contractor Release 30907 Date 08-08-38
Date
Regular
Worked.. Sect Detl Craft Description... C Bdge
Hours
Page No. 1 Premium Hours
08-08-88 08-08-88 08-08-88 08-08-88 08-08-88 08-08-88 08-08-88 08-03-83 08-08-88
2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340
M-
2685-2340
0 0 0 0 0 0 0 0 0
C 0597
c 0241
C 0250
c 0497 c 0545 c 0598 c 0595 c 0214 c 0588
14.0 14.0 14.0 14.0 14.0 14.0 14.0 2.0 2.0
102.0
3.0 3.0 3.0 3.0 3.0 3.0 3.0 0.0 0.0
21.0
COST.........
*327.30 *327.30 *327.30 *327.30 *327.30 *327.30 *327.30
*39.06 *39.06
*2,369.22
9 records listed.
102.0
21.0 *2,369.22
McGCon 2307
Siuiaary Labor Report for Contractor Release 30907 Date OS-11-88
Date
Regular
Narked.. Sect Detl Craft Description... C Bdge
Hours
Page No. 1 Premia Hours
08-11-88 08-11-88 08-11-83 08-11-88 08-11-83 08-11-88 08-11-83
2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340
H-
2685-2340
0 0 0 0 0 0 0
C 0597
C 0598
C 0241
C 0250
c 0253 c 0606 c 0252
11.0 9.5 9.5 9.5 9.5 11.0 11.0
71.0
5.5 4.8 4.8 4.8 4.8 5.5 5.5
35.7
COST..........
313.61 271.75 271.75 271.75 271.75 313.61 313.61
2,027.83
7 records listed.
71.0
35.7
2,027.83
McGCon 2908
Suaaary Labor Report for Contractor Release 30907 Date 08-04-88
Date
Regular
Worked.. Sect Detl Craft Description... C Bdge
Hours
Page No. 1 Preaiua Hours
08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88 08-04-88
2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 2685-2340 -
2685-2340
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
C 0597
C 0241
C 0250
C 0497
C 0545
C 0237
C 0598
C 0595
C 0454
c 0214 c 0577 c 0578 c 0579 c 0581 c 0588 F 2021
11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11;5 2.0
174.5
2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 3.3 3.3 3.3 3.3 3.3 3.3 3.3 0.0
43.1
COST..........
*269.50 *269.50 *269.50 *269.50 *269.50 *269.50 *269.50 *269.50 *283.87 *283.87 *283.87 *283.87 *283.87 *283.87 *283.87
*49.40
*4,192.49
16 records listed.
174.5
43.1 *4,192.49
No records Beeting selection criteria found on the DATA.30907 File.
McGCon 2309