MONSANTO CHEMICAL COMPANY ORGANIC CHEMICALS DIVISIQH AMNISTOS, ALABAMA ELS VISION OF PHOSPHATE DIVISIQH ENGINEERING DEPARTMENT REPORT SO. 117 23 12 OHIT BIPHENYL PLANT AT ANNISTON, ALABAMA ' Dited: December 23, 1948 by " G. W. Jordan Analstoa Technical Services Department Report No. 729-68-9 by R. L. Hedvorth Dis trlbutiom: s H. Patrick - Hals Office M. Ellesbarg - Kiln Office R. M. Harris - Roberts Bldg. a. L. Hiackler - Roberts Bldg. R. S. Vobus - Roberts Bldg. F. J. Holzapfel - Roberts Bldg. L. l; Fallinger - Roberts Bldg. J. W. Gravis WGR (2) J. F. Sticklay-Robt*, Bldg. D. B. lamer C. K. Edelb1at J. H. Gould Jack Clegorn R. L. Hedworth Extra (3) DEFENDANTS DEPOSITION EXHIBIT . 4 -ZB os' DSW 462477 i r WATER_PCB-SD0000046073 INDEX Pg SUMMARY.............. ............. ...................................... .. DESCRIPTION OF PROCESS.......................................................1 - 5 EQUIPMENT DESCRIPTIONS... ................................................... Series 100: General Process..,..............6 - 40 Series 200: Bipheayl Units................ 41 - 65 Series 300: Bipheayl Stills......................66 - 81 Series 400: Instrmeeatatio*................... .82 - 89 Series 500: Utilities....................................90 - 98. FLOW SHEETS.............................................................................. DRAWING HUMBERS......................................................................99 -107 EQUIPMENT HUMBER LIST (DEPT.20).;.........................108 -117 MAINTENANCE SURVEY...................... .................................... Series 100: General Plant......................118 -124 Series 200: Bipheayl Uaits...................... 125 -128 Series 300: Bipheayl Stills................129 -131 Series 400: Imstnsaeatatiera................... 132 -134 Series 500: Utilities................................ 135 -139 DSW 462478 WATER_PCB \ (. gUHHA&Y Future Bipheayl-Santowsx requirements have necessitated an increase la Biphenyl production while maintaining approximately the same Santovax production. This productloa balance caa be achieved only by increasing the beneene feed rate. Numerous alternatives can be conceived on how this might be accomplished, bet before any evaluation can be made, it was necessary to determine vhat must be done to the existing plant to obtain continued production. Consequently, a Maintenance Survey was needed to determine the extant of the necessary repairs. In addition, the Phosphate Division Final Design Data Report for the existing Biphenyl plant, prepared in 1948, was out-dated and needed revising. To minimize the work load, these jobs were combined. ' ( This report describes in detail the equipment used' for the production of Biphenyl at Anniston. The equipment description is based on equipment inspection, firsthand knowledge, and oa- information supplied in Phosphate Division Engineering Depart ment Report Ho. 117, titled "Final Design'Data on 12 Unit ' Diphenyl Plant at Anniston, Alabama," dated December 23, 1948, by G. W. Jordan. The Maintenance Survey presented in this'report'is based on ' visual Inspection of each item and Includes only those repairs needed to put the plant in good operating condition. "Revisions to the process, equipment Improvements japing alterations, etc.j are'beyond the scope of"this report." These'alterations and/or additions will be presented in "subsequent reports and will be evaluated and Justified on their own merits. The words "Biphenyl" and "Diphenyl" are synonymous and are interchangeable in this report. RLH/fb ( 9/27/57 WATER PCB-SD0000046075 DESCRIPTION OF PROCESS I. INTRODUCTION Dtpheayl if produced by a pyrolysis reaction between two molecules of benzol in which one molecule of diphenyl and one molecule of!hydrogen are formed. The pyrolysis la brought about in this particular caae by stepwise vaporizing and super-heating benzol by bubbling the vapor through a aerie* of pot* filled with molten lead. The temperature to which the final lead pot or "converter" la heated determines the percentage of the benzol converted, which increases with higher temperature*. ' Several other pyrolysia reaction* also occur producing mainly terpheayl and also some more highly polymerized compounds. In addition, some free carbon is formed which deposits in the units causing considerable maintenance difficulties because of plug-ups. The percentage of terphenyl in the crude Biphenyl is rough ly the sane as the conversion percentage of the benzol. S7N0PS1S OF PROCESS Liquid benzol i shipped in tank car lots to the plant site and unloaded through the top dome by a siphon type pumping Arrangement delivering the benzol to storage tanka. The benzol delivery pipe la steam traced- and the storage tanks have steam coils to prevent the benzol from freezing in Che winter. Each of the five storage tanks has a sump pump for delivering benzol to the feed tank. These feed tanks are automatically refilled by a. continuous "let-down" control.Only one'of the storage tanks is allowed to feed the feed tank at a time. This choice of storage tank is manually determined by an operator. The single feed tank services all of the diphenyl units by means of a centrifugal pump fed from a bottom outlet in the tank. The benzol feeds a header where the individual feed are metered through orifices to the different units. Isopropyl alcohol is added to the benzene feed in concentrations of 0 to 0.5Z by weight, usually 0.15X is added. This isopropyl alcohol is pumped to the auction of the benzene feed pump where it Is mined and pumped to the omits. This material catalyzes the conversion, that is, a 40-60C. lower operating tempera ture. can be maintained when this material is added to the feed benzene. There are twelve diphenyl units of equal capacity, each consisting of a pipe coil vaporizer located In the flue gas exhaust stack, two preheater pots and a converter pot filled with molten lead and suspended in a firebrick setting for burning natural gas, and a fractionating column with a condenser and split flow box. In two of the units, Nos. 4 and 5, one of the preheater pots is replaced with a heat exchaagar. The units are numbered 2 through 13, there having been a No. 1 unit at one time. The present number of units were erected in five installments, Hot. 2 and 3 having been erected at dfffemnt tAndg, Nos. 4 and 5 together, Nos. 6, 7, 8, 9, and 10 together, and Nos. 11, 12, and 13 together eo that these groups are all DSW 462480 WATER_PCB -I 2. lightly different in some detail*. However, there are only actually two fuadamen tally different type* of unit. Ho*. 4 and 5 differing from the reat in that one of the preheater pot* i* replaced by a heat exchanger. Although, the heat exchanger effected a gaa savings aa predicted, it proved impractical due to carbon formation fouling the tabes and the idea was abandoned cm the subsequent unit*. After the benrol feed has been metered through an orifice, it passe* through the vaporiser pipe coil in the flue gas exhaust stack where the liquid benzol ia vaporized sad at the same time recover# some of the heat from the exhaust flue gases. The benzol vapor ia then babbled through molten lead ia the two preheater pots in series and the temperature stepped up to the pyrolysis reaction tempera ture. The hot vapors are converted to 10-301 diphenyl at they leave the converter pot, which ia similar to the preheater pots except that the molten lead is very carefully controlled at the desired reaction temperature, usually between 750 and 810C. The temperature ia ndjuated to give the percent, conversion needed to maintain the balance between Biphenyl and Saatowax needed to meet sales demands. After leaving the converter, the benzol and conversion products pass first through a lead trap (which is essentially a wide place in the line) for removing .entrained lead and then enter the bottom plate of a fractionating column. A considerable amount of carbon'adheres to the pipes between the converter and tl lead trap, and the lead trap and the fractionating column, necessitating the re moval and cleaning of the pipes every one to six souths. The super-beat in the vapors from the converter is utilized ia a fractionating column to effect a partial separation of the benzol from the conversion products The conversion products are later completely separated ia a batch distillation. The column top is maintained at(10Q C. by refluxing the condensed benzol vapors back to the top plate. The conversion product and same benzol is condensed in the column and allowed to overflow from a carbon trap on the bottom of the column to a crude diphenyl catch tank, for storage prior to batch distillation. The overhead vapors from the column are cooled by a partial condenser and the liquid benzol drained to a rotaweir for spitting the flow into reflux and benzol overhead which ia "run back" to the benzol feed tank by gravity. The rotaweir ia used to adjust the ratio between reflux and overhead. There are five differently sized and designed groups of condensers, a new design having been made for each install ment af units as mentioned earlier, and n different design used to replace some had condensers. In addition, these condensers have been shifted from one unit to smother to facilitate cleaning and repairing condensers. . The conversion product hydrogen, saturated with benzol vapor, la bled off from the condenser and rotaweir, collected in a common header, and passed through six coolers, connected in parallel, where soma of the benzol ia condensed and allowed to run by gravity back to the auxiliary feed tank. From the coolers the saturated hydrogen gas ia passed to a collecting tank in which more of the benzol condenses out and is drained to the benzol pump tank in the compressor room. The hydrogen from the collecting tank is compressed in two stages to 250-300#/in. . An intercooler and aftarcooler condenses the benzol vapor after each stage. . This benzol is collected in pressure receivers after each stage and periodically DSW 4624S1 WATER_PCB 3. blow by the hydrogen pressure oxer imto the pump task for return to the bemxol feed task. The hydrogen la -rested to the atmosphere or alae used la the wamufacture of EB-40, HB-20, etc. . Ia the aacoad type of unit (Hog. 4 tad 5) the flow of aaterltl ia eateatltlly the aiae aa that described abort except the vaporised benrol feed merging from the vaporizer coll paaaea through a heat exchanger ia Ilea of me of the preheaters. Tha conversion products aad beazol from the coaverter pot are also passed through the heat exchanger, coastercurrent to the benzol feed, thus transferring sensible heat fro the converted gases to preheat tie feed. The conversion products and vapors fro the converter pot then pass on to a colons as ia the case with the other units. Some of the onits have been altered since their installation. Unit So. 4 is being equipped witb a 4 foot extension on the converter. This exten sion to the converter will act. aa a sojourn section. This addition reaction space will provide additional reaction tine and pernit a temperature redaction of 30-60C. in the converter while maintaining the same percent conversion. This reduced temperature will Minimize carbon formation and reduce the heat exchanger fouling and unit clean-outs. The lead traps will b eliminated. Unit Ho. 11 has a large coil in the lower section of the column which acts aa a vaporizer. The flow is through tha large coil, the standard vaporizer coil in the stack, the three pots, and to the column. The hot gases fro the converter pot heat the benzene ia tha large coil and vaporize the benzene. The recovery of heat fro the converted gas stream has permitted an increased benzene feed rate of about 100 gallons per hour. The Increase Is due to better utilization of the heat input and the reduced heat load on tha column and condenser. Room for this large coil was made available by removing the two lower bubble cap plates from the column. Units Hos. 12 and 13 are equipped with this large coil but the coil is being by passed because the units surged sad caused excessive pressures throughout the unit, thus blowing the gaskets around the top of the preheater and converter pots. Ho. 11 unit also surges occasionally but since Ho. 11 unit Is equipped with a sojourn pot (the same as will be installed on Ho. 4 unit), the added space provides a cushion to absorb the sudden, expansion caused by rapid vaporization of benzene in the large coil. Ho. 11 unit Is being equipped with an automatic reflux control which will control the reflux rata to maintain a constant vapor temperature on tha third plate from the top of the column. Each unit is equipped with two orifice plates between the converter and column. These orifice plates are sized to give a pressure drop of about 40 psig aad thereby permit an increased pot operating pressure, increased . soujoum time, and a reduced operating temperature and minimize lead carryover from both entrainment and lead vaporization. The diameter of these orifices are 1.031 and 1.014 inches, the larger orifice being upstream fro the smaller one. DSW 462482 WATER PCB-SD0000046078 4. The tmp product from ell the columns is collected by gravity Is two crude diphenyl catch tasks. The pipisg to the task* ia steam jacketed to prevest the diphenyl from freezing asd haa a liquid trap to prevest vapor* from entering the catch task from the column. The tasks are vested iato the hydrogem header to equalise the pressor*. Tha two hatch still* each, consist of a horizontal, cyliadrical task surmounted by a fnctioaatiag column, a submerged Rums ay pump, and a gas fired coil heater. The pomp circulates the still charge from the task, through the coil heater aad back to the task. The rata of distillation of the crude diphenyl Is con trolled, by the combustion rate of natural gas is the gas fired heater, which is controlled by an adjustable automatic temperature recorder aad controller so as to give a temperature rise of 20-25C. betvaaa islet aad exit temperatures of the still charge through tha heater coil. If as attempt is made to increase the temperature rise above 25C., the coil becomes plugged with carbon. The vapors from the still are separated in a fractionating column. The first cut fra the column at 80C. is henrol which ia returned by gravity to a catch tank for subsequent return to the benrol feed tank ot recycling through the diphenyl units. The benzol cut ia not run directly back to the feed tank because of the possibility of not cutting the column at the proper time and allowing some con tamination to run back with the benzol. The next fraction, distilling between 80 and a distillate crystallizing point of 68.6C. is called "heads" and consists of light oils with boiling points nearing that of diphenyl. The diphenyl fraction is collected until tha temperature in the still pot reaches 340-350C. The tail cut Is collected until the distillate vappr temperature in the top of the column reaches 300C, The various distillation cuts are made with these reflux ratios: Benzol Cut Head# Cut Biphenyl Cut Tails Cut .- 201 501 201 151 The high boiler, remaining in the still as residue, ia pumped to the high boiler catch tank from which it is run into 55 gallon drums for storage or pumped to the Santowax still or Santowax storage tank. In order to prevent freezing of diphenyl In the condenser at the top of the fractionating column, the conseaser cooling water wait be at a temperature near the malting point of diphenyl (158?.). The flow of pond water ia adjusted to prevent freezing of the product. It ia generally necessary only to cut back the flow of pond water at the end of e distillation. The diphenyl production is measured in a catch tank and pumped te storage tanks or tank cars by a 2" Rumsey vertical lump pump. The heads and tails are collected and charged back to the next still batch. oSnN 462483 WATER_PCB-SD0000046079 5. GENERAL DISCUSSION The carbon formed i the diphenyl units partly deposit* 1* the pipe after the coaverter units, through the lead trap, La the pipe after the lead trap, and la the ffactionatlag coltwn. Theae pipe* become plugged with carbon aad must he dis^Mtled aad cleaned every one to six months. The lead trap and frac tionating column are cleaned out at more infrequent interval*. This so called "carbon" deposit analyzes as follows: Lead .......................................... Insoluble in HHO^....... (carbon included).... Insoluble, ignited............ Iron oxide, insoluble... Carbon, combustion........... 56.51 42.71 18.51 0.71 28.91 As much of this piping and equipment is above the melting point of lead, it la evident that the adhering carbon prevents coalescence of the molten lead drop lets. ' The amount of reflux returned to the fractionating column is controlled by the operator to maintain a temperature of about 100C. at the column top. The cooling vater to the condenser is operated s full capacity and as the heat duty of each unit is approximately the seme, it is apparent that the amount of reflux required vill vary according to the effectiveness of each condenser at a particular time. Vhea the temperature of the effluent vater exceeds 70C., the condensers are cleaned. The diphenyl units produce crude diphenyl by a continuous process vith a 24hour day operation. The number of units operated depends upon the diphenyl market or the maintenance required on the equipment. The crude diphenyl is collected and hatch distilled at intervals depending upon the rate of collection. The batch distilling requires 10-12 hours. DSW 462484 WATER_PCB SQPIPMKWT DESCRIPTIOK SERIES 100 - GEHERAL PROCESS EQP1PKEHT Item Ho. 101; Benzol Unloading Pump (1-Required) 6. August 1957 Function: Operation: Materials Handled: Control: Service: To unload benzol from railway tank car to the benzol storage tank. . Intermittent. About 5 hours is required for unloading one car. Prior to unloading, the car suit be chocked to prevent movement, and grounded to the pump to prevent formation of a static electrical charge. The pump inlet pipe is inserted through the tank car dame, the valve, nearest the pump suction is opened, and the pump is started. A small stream of water Is adjusted to pour over the pump bearings for cooling. After the tank car is unloaded, the pump is shut off, benzene is allowed to drain back into the pump suction line, and the valve nearest the pump auction ia closed. This benzene is left ia the line to prime the pump vfaea the next car is unloaded. Air pressure is cut into the lime which blows the benzol remaining in the line on to the storage tank. With the diphenyl plsat operating at peak capacity and all 12 units producing, it ia estimated that the pump will be required to unload an average of one car per day. ' Benzol at about 30 CM at the existing head which is estimated to be about 80' TDK. Manually controlled by a motor starting switch located at the pump. Approximately 10 KWH per day average. A negligible amount of priming and cooling water. A negligible amount of compressed sir. DS\N 462485 WATER PCB-SD0000046081 Item 101 Continued: Size and Type: Inlet Pipe: Strniners: Kjmfactor er: Materials of Comatractiem: Kotor: Drive: Location: 7. Westco tarbima pump with removable Users and impellers. The inlet pipe forms m arch with swivel joints so that it may be passed down through the tank, car dome. A platform is provided for the operator to manipulate the pipe. An Acme pump strainer is installed in both the pmp inlet and outlet. Westco Pump Corapany, Bettendorf, Iowa Linars and impellers are ni-reaist aad shaft is stainless steel. 3 EP, 1740 RPM, 3 phase, 60 cycle, 220/440 v. TEFC Allis-Chalmers motor vith #225 frame. Direct drive with flexible coupling. Located along side of railroad spur about 200 ft vest of the diphenyl building. DSW 462486 WATER PCB-SD0000046082 Item 102: Benzol Storage Tanks (5-Requlrad) 8. August 1957 Function: Operation: Material* . Bandied: Controls: Services: Sice and Type: Openings: - Hanuf acturer: Capacity: Katarlala of Construction: Steaa Coll: To provide benrol raw Material buffer storage between receipt and use. . Bemxol Is periodically fad into the storage tanka and Intermittently withdrawn a* needed to the benzol feed tank. The storage tanks provide about 5 days opera ting storage at mariatin plant capacity. Materials in: Benzol at approximately 30 GPM while unloading. Materials out: Benzol at approximately 500 GPM while operating plant at maximum capacity. See Item 104 Steam is furnished to steam colla as needed on cold days depending on judgment of operator. The three newer tanks axe 18' long x 10' I.D. horizontal tanka with dished heads. The two original tanks are slightly smaller(as ahown below)in capacity. Top: 2'0n dia. manhole 6" dia. ltd. pipe auction dia. ltd. pipe standpipe and feed 3" dia. thief hatch 1%M din. condensate and steam pipe 2" dia. vent and flame arrestor Adamson Company Three 10,800 gal. tanks and two 9,800 gal. tanks. 5/16" steel plate tank with 3/8" steel plate dished heads. Flat hairpin type steaa coil of 1" pipe installed in bottom of tank. DSW 462487 WATER PCB-SD0000046083 102 Continued: Location: References: 9, Located about 200' south of the diphenyl building. The five tuk> are 31' apart and each located la a *o*t with a cycline fence surrounding the group. Drawings Hoamto Details of Storage Tank Layout' of Storage Teaks Location of Present Storage Tanks Foundation and Fence Details Detail of Haw Benzol Storage Tanks 1 9C-7961 907960 90 6668 9C-6685 907961 osYJ 462488 WATER PCB-SD0000046084 Item 103: Benzol Truaftr Pumps (5-Required) 10. August 1957 Function: Operation: Materials ' Handled: Controls: Services: Sire and Type: Kanufacturer! Capacity: Materials of Construction: Motor: Reducer: Strainer: Location: To transfer benzol from the benrol storage tanks to the benrol feed tank. Each benrol storage tank has a separate benrol transfer pump and benrol is let down from oae tank at a time. The pump operates intermittent ly for about 6 hours per day when the plant is operating at maximum capacity. ' Benrol - Approximately 500 GPH (average) The operator manually sets a five point motor starting rvitch to select the storage tank from which, he desire* the automatic let-down system to feed. (See Item 104) Approximately 9 KITH per day (max.) Steam is supplies to copper coils surrounding the pomps or is blown, directly into the pump from a hose connection to prevent the benrol from freeling In the pump on cold days. Positive displacement pomps, model SO 100, nonsparking construction with 2%" flanged connec tions. Pump integral with reducer shown below. The pumps are self-priming by means of a stand pipe and prising tank integral with the pump. Blackaer Pump Company Viking Pimp Company 75 to 10O CPU of benrol rs. 25' TDK with a suctlom lift of about 11'. Bronxe fitted. 2 HP, 1800 RPH, 3 phase, 60 cycle, 220/440 v., TEFC explosion proof motor. Geax reduction unit furnished with pump to give 525 RPM when using 1800 RPM motor. A pump strainer is installed on the pump outlet. Mounted on benrol storage tanks. DSW 462489 WATER PCB-SD0000046085 Item 104: Isopropyl Alcohol Storage Tank (l-Requlred) 11. Auyu#t 1957 Fuxctloa: To provide buffer storage for isopropyl alcohol. Operation: ' Isopropyl alcohol is periodically fad into the storage tank and Intermittently withdrawn as seeded to the isopropyl alcohol feed tank. Materials Handled: The storage tank provides about 3 months opera ting storage at aaxiaum plant capacity. Material in: Isopropyl alcohol at approximately 30 GPM while unloading. (This material is unloaded at the benzol unloading dock. The benzol un loading pump is used for this purpose.) Katerial out: Isopropyl alcohol at approximately 4 gallons per hour while operating plant at maximum capacity. (Average) ( Controls: Hone provided. Sice & Type: Tank 10'6" dia. x 15'6" long equipped with standard manhead and nozzle for flame arrestor vent, top inlet and top discharge. Materials of Cons traction: 5/16" steel plate with 3/8" steel plate dished heads. Location: Located about 200 feet South of the biphenyl building and due east of the benzol storage tanka. Maintenance Required: None. ' DSW 462490 WATER PCB-SD0000046086 t Item 105: Isopropyl Alcohol Truifer Pump 12. August 1957 Function: To transfer Isopropyl alcohol to th isopropyl alcohol feed tuk. ' Operation: Isopropyl alcohol is pumped from the isopropyl alcohol storage tank to the isopropyl alcohol feed tank about oa.ee each shift. Materials Handled: Isopropyl alcohol Coatrola: The Operator manually starts and stops this pump as required. The switch is located near the isopropyl alcohol feed tank. Sire & Type: Positive displacement, self-priming by means of a stand pipe and priming tank integral with the pusap. Manufacturer: Blackmer Pomp Company Capacity: Approximately 10 GFM at a 25 TDH with a maximum auction of 11 feet. C Materials of Construction: Bronze fitted Location: Mounted on isopropyl alcohol storage tank. c DSW 462491 WATER_PCB-SD0000046087 Itea 106; Benzol Feod Tank (2-Requlred) August 1957 Function: Operation: Materials Handled: 1: to provide a source of benzol for feeding to the diphenyl units. 2: To provide a catch tank for the benrol re turned from the diphenyl process. Let-down from benzol storage tanks is intermittent. Run-hack from diphenyl units is continuous. Return from benzol recovery system is batchwise. Return from hydrogen coolers is continuous. This benzol returns to the auxiliary benzol feed tank and i periodically pumped back to the primary benzol feed tank. When returning recovered benzol to the primary benzol.feed tank from the benzol recovery system (hydrogen compressors), the distilled benzol catch tank or the auxiliary benzol feed tank, the operator must first cut off the automatic let-dovn from the'benzol storage tank and let the level of the benzol in the feed tank drop enough to provide for the additional benzol returned. In addition, the distilled benzol must be checked for clear color before returning it to the feed tank. The operator must manually once ar twice per shift drain off the water in the feed tank which comes from the water priming during un loading and from condensed moisture from the atnosphar*. Benzol: Out: 240 GPH per unit 2900 GPH (max.) 12 unit operating , In: 500 GPH from storage tanks 2000 GPH (avg.) returned from process Part of the benzol returned from the process is returned batchwise so that the above figures are only average. DSW 462492 WATER_PCB-SD0000046088 Item 106 Continued: Controls: Service* : 14. Water: Sosa water condenses from the atmosphere ia the storage task. Generally the amount of water Is significant whem the let-down control is switched to a new tank and diminishes to a negligible amount after the storage tank has been used awhile. The recycled-benzol also contains traces of water and finally divided carbon. The water is lightly corrosive as it contains 0.031 sulfates, 0.03% chlorides, and some undetermined reducing compounds which will react with oxygen. It is necessary to return the recycled benzol to the feed tank rather than the storage tanks as it has been determined that the' recycled benzol contains some undetermined catalyst which upsets the operation of the diphenyl units. There fore, an effort is made to blend the recycled benzol in. with the fresh feed in a more or less constant ratio to maintain smooth operation of the unite. An automatic level (let-down) control is provided for maintaining the supply of benzol in the feed tank. "When the level of benzol ia the feed tank recedes to 15" below the top, the automatic con trol starts one of the transfer pumps. The transfer pump is automatically shut off when the benzol level is 9" below the top of the feed tank. Another similar level control to that controlling the transfer pomp is provided for sounding a high and a low level alarm should the level exceed 3" . beyond the control level. . A. manually operated five-point selector switch la provided at the feed tank for selecting the benzol storage tank to furnish the benzol feed. Steam is provided to the steam coll during cold weather depending upon the judgment of the opera tor who nerely feels the side of the tank to determine if it feels vara. A negligible amount of electricity is necessary to operate the control system. DSW 462433 WATER_PCB- 15. Item 106 Continued: Sisa & Type:: 7*6" I.D. x 15'6" long, dished head horicoatal tanka installed is a concrete vailed enclosure about b' high to catch the benzol In the event of a tank rupture. The feed tanks are located on a concrete slab surrounded by a cyclone fence. Opening*: Top: ' 2 10" I.D. manhole centrally located for installation of the steam coils. (2) 8" flanged pipe nozzles for the automatic let-dovn control*. 2%" foan nozzle 2" vent to hydrogen coolers (Item. 110) A" benzol runback nozzle 4 benzol inlet nozzle (frost storage) 2" roddiag nozzle 2" thermal veil Bottom: 2" outlet nozzle extending 6" above bottom of feed tank. c 1" drain nozzle in dished veil (for draining water). Manufacturer: Capacity: Chattanooga Boiler and Tank Works 5,000 Gallons. Material* of Construction: 3/8" steel plate Steam-Coil*: Flat hairpin coils made from 1" 3CH seamless steel pipe forming three loops 5* long and With 1'0" pitch. The coils are supported on the bottom of the task vith one coil In each end. Location: Located about 30' vest of diphenyl building References: Drawings Monsanto Layout of Feed Tank Feed Tank Details Bill of Materials 9C-8205 9C-8206 9BM-54 DSW 462494 WATER_PCB J Ite 107: Benzol Feed Pump (2-R.eqalred) 16. August 1957 Function: Operation: Materials --BasdTedT Controls: Services: Size & Type: Manufacturer: Materials of Construction: Motor: Drive: Location: To deliver the benzol feed from the benrol feed tank to the benzol vaporizer coil of each diphenyl unit. One pump is operated continuously while the other pumps are held as spares. Benzol - Maximum rate required is 55 GPM with all 12 units operating at full capacity. The pump is manually controlled by motor starting switch. The rate to each diphenyl unit is automatically controlled and recorded by an orifice and flow recorder and controller. The approximate head required at the orifice is around 170 psig. Approximately 175 KWH per day electricityrequired. Two-stage Westco pump with removable liners. Kicro-Westco, Incorporated . Impeller* of Ki-Reaist and shafts of stainless *teel. 15 HP, 3740 RPM, TEPC, explosion proof Howell Electric Company motor. Direct drive with flexible coupling. Located on concrete pad next to feed tank. ( DSW 462495 WATER_PCB-SD0000046091 -2 (. ltea 108: Isopropyl Alcohol Feed Tank 17. August I9S7 Function: Operntion: Materials Handled: Control*: Capacity: Location: To proTide a source of isopropyl alcohol for feeding to the benzene feed. Let-down fro the isopropyl alcohol inter mittently. Isopropyl alcohol Out: 4 gal. /hour Float to indicate liquid level. 100 gallons Southwest comer of benzene feed tank area. ( , DSW 462496 WATER_PCB-SD0000046092 18. August 1957 I teg 109: Isopropyl Alcohol Feed Paap - Function: Operation: Kateri&Is Handled: Control*: Location: To transfer Isopropyl alcohol to the suction of the benzol feed pumps. Continuous Isopropyl alcohol The pump is manually controlled by a motor starting svitch. ' Hear Isopropyl alcohol feed tank. OSIV 4S24S7 WATER_PCB-SD0000046093 19. August 1957 Item 110: Hydrogen Coolers (6-Requircd) Fumctiom: Operatioa: Materials Handled: Size & Type: Manufacturer Location: Commsat* 1. To cool the gas ud vapors from the benzol condenser tm order to decrease the vapor load oa the hydrogea compressors. 2. To condense some of the benzol vapor from the hydrogea gas. Continuous. The condensed beazol Is coatlauously drained by gravity to the beazol auxiliary feed tamk. Hydrogen gas and beazol vapors from the diphenyl Units. Benzol vapors vented from the crude diphenyl sump tanks. Beazol vapors vested from the primary benzol feed tamk. Tvin 6-fin section coolers BSS-248 6-12 "B" type modified with an external water Jacket. The coofars are connected in parallel and installed horizontally. Griscota-Russel Company Installed ox the hydrogea compressor room roof. The coolers were modified in the field by the addition of an external water cooled jacket. 462*^ OSnH WATER_PCB-SD0000046094 20. August 1957 Item 111: Benzol Catch Tank (1-Required) ' . Function: 1. To trap comdeaaed benzolfrom the hydrogea ga* to insure it* aot reaching the hydrogea compressor*. 2. To provide a surge taak for hydrogea gas prior to compression. Operation: . Continuous. The condensed benzol trapped in the tank is continuously drained to the pump taak for return, to the benzol feed taak. Material* Handled: Hydrogea gas saturated with bearol vapor. Condensed benzol. Sire & Type: 4T-0" O.D. x 4 *-0" long vertical tank with dished heads. Top - (4) 1" threaded outlets (1) 4" flanged nipples Side - (2) 4" flanged nipples (1) l%n threaded outlet . Bottom - (1) l" threaded outlet Kanufacturer: Chattanooga Boiler Works Capacity: 56 ft.3 50 psig pressure Material* of Construction: 3/16" steel plate fabricated la accordance with. ASHE code for unfired pressure vessels. Location: Suspended fron the ceiling in the compressor room. References: Drawing* Monsanto Hydrogen Compressor Tanks 9C-7367 DSW 462499 WATER_PCB- 21. August 1957 Item 112: Hydrogen Compressors (3-Requlred) . , Function: To provide a means of recovering benzol from the by-product hydrogen gas. Operation: Continuous. The benrol is recovered by compres sing and cooling the hydrogen gas in two stages to 300 psig. The compressors automatically load at 3 psig and unload at ^ psig inlet pressures. Material* Handled: Maximum volume operating at maximum rating. (Condition* 2500 gal/hr. feed <3 217, coav.) 10,900 CFH hydrogen @ 30C.' and 7 60'bhu 13,000 CFH hydrogen plus benzol vapors (? 30C. and 760 mm ` 7.2# benzol/# hydrogen @ 15 psig, 30C. 0.8# benzol/# hydrogen @ 300 psig. 52C. 6,4# benzol recovered/# hydrogen compressed c 0.0179# hydrogen produced/# diphenyl Control*: Pressure controller control* intake. Pressure controller controls pressure of first and second stages. Services: Pressures are all indicated. Estimated electrical coa.aum.pttern is 700 KHH par day. Size & Type: Motor: (2) Clan* 11 AT serial 6965, size 9 and 4% x 9 Pennsylvania compressor*. Max. rpm 275; working pressure 350#-Rated Capacity 110 CFM ea (1) Two-stage Worthington Compressor. Rated-Capacity 75 CFM ' (2) 40 HP, 1175 rpm, type K6 motor with frame, #504 ' (1) 30 HP, 1175 rp, type K motor with frame, #444 - Drive: (2) 8 V-belt sheaves (1) 3 V-belt sheaves ' ^ Refetea.ce* : Bill of Material 9BH-47 ;\ ' . DSW 462500 WATER_PCB-SD0000046096 22. . Atigriit 1957 It-- 113; Inter-Coolar (3-Reqnlrcd) . Function: ' Operatic*: Heat Duty: Service*: Sise St Type: Kaaufacturer: Capacity: To condense benzol from the hydrogen g* after the first stage compression. Continuous. The hydrogen from the first stage compression of each of the three compressors may be delivered to either of the two coolers. 80,000 BTO/hr. approximate (Roper's report). . Cooling water. Wt. 160#, overall length 62-5/8" Amdale Engineering Company, Philadelphia, Pa. For 100# pressore DSW 462501 WATER PCB-SD0000046097 23. August 1957 Item 114: Low Pressure Receiver (3-B.equired) Function: Operation: Material* Handled: Controls: Site & Type: Opening: Kaauf actor er: Capacity: Material of Construction: Mott: To proride a trap aid collecting tank for the benzol condensed from the hydrogen gas after the first atage conpreaaion. ' The receivers are provided -with piping connec tions so that either of the three compressors can he connected to either of the two receivers. The benzol is periodically blown fro the re ceivers to the puap tank. Hydrogen gas saturated with benzol vapor and condensed benzol. Pressure - 65 psig A manually operated valve is provided in the pipe out of the bottom of the receiver. When this valve is opened the hydrogen pressure forces the benzol up into the pump tank. 3 '-O'* I.D. x 6 "-0" high, vertical tank vith ' dished heads. Top: 2%" standard pipe"extending through center of top down to the middle of the tank. Two 3/4" threaded outlets. Side: 6" handhole 2" flanged nipple 3/4" threaded outlet Bottom - 3/4" threaded outlet Chattanooga Boiler Works 100 psig pressure 45 ft.^ ' * 5/16" steel plate Fabricated in accordance`with ASMS Code for unfired pressure vessels. os^ WATER PCB-SD0000046098 I tea* 114 Comt tuned.: Loctio: . Reference*: Located 1* copre**or roo. Dr*wi*K* Mosiuto Hydrogea Copre**or Tank* 9C-7367-3 24. 0s* "*5S WATER PCB-SD0000046099 August 1957 Ita 115: After-Cooler (3-Required) Function: - Operation: Pressure: Heat Duty; Services: Size & Type: Hajaaf acturer: Capacity: To condense benzol from the hydrogen gas after the second stage compression. Continuous 300 psig operating pressure 42,000 BTU/hr. approx. (Roper's report) Cooling water - Wt. 160# - overall length 62-5/8" Andale Eagiaeering Company, Philadelphia, Pa. For 350# pressure DSW 462504 WATER PCB-SD0000046100 25. August 1957 Item. 116: High Pressure Receiver (3-Rcquirad) Functiorm.i To provide a trap and collecting tank, for benzol condensed from the hydrogen gas after the second stage compress ton. Operation: The receiver* are provided vith piping connec tion* so that either of the three compressors can be connected to either of the tvo receivers. The benzol is periodically blows. from the re ceiver# to the pump tank. Katerlals Handled: Hydrogen gag saturated vith benzol vapOr and condensed benzol (? 300 psig 52C. Controls: A nanually operated valve is provided in the bottom outlet pipe connection to the pump tank. Site & Type: 2'-0" I.D. x 6'-0" long vertical tank vith dished heads. All flanges are Crane #856E. Openings: Top: 2^" standard pipe extending through center dovn to the middle of the tank, tvo 3/4" threaded outlets. Side: 6" handhole 2" flanged nipple 3/4" threaded outlet Manufacturer: Capacity: Bottom: 3/4" threaded outlet Chattanooga Boiler Works 20 ft.3 350 psig pressure ' Katarlali of. Construction: 11/16" steel plate Iota: Fabricated in accordance vith ASHE code for an fired pressure vessels. Location: Located in compressor room. Reference*: Drawing* Hoaaanto Hydrogen Compressor Tanka C-7367-3 DSW 462505 WATER_PCB- It-- 117; Beagol Return Puap Taak (1-Required) ' 27. August 1957 Function: Operation: Materials Readied: Sire & Type: Opeaiags: Kaaufactuxar: Capacity: Material of Coastractioa: Hott: Location: Reference*: To collect the condensed benzol from the receivers and the benzol trap. . Thebeixol fro* the collecting task is coatiiaoiia'ly" xtw hack to the puap tail and the benzol fro* the receivers la periodically blovm back imto the pump tank. The.collected bearol la periodically pumped back, to the benzol feed tank. Approx. 4600# or 620 gal. of benzol recovered per day (max.). 3'-0" I.D. x 6'-0" high vertical taak vith dished heads. Top: 1%" threaded outlet Tvo 3/4" threaded outlets Side: Five 3/4" threaded outlets One 6n haadhole Bottom: 1};" threaded outlet Chattaaooga Boiler Works 45 ft.3 50 psig pressure 3/16" steel plate Fabricated La accordance vith ASME code for uaflxed pressure vessel*. Located la hydrogen compressor roo*. Drawlags Monsanto Rydrogea Coapressor' Tanks C-7367-3 DSW 462506 WATER PCB-SD0000046102 28. August 1957 Item 118; Recovered Bemgol Return Pump (2-Requlred) Function: Operation: Controls: Services; Size & Type; To return the recovered benzol In the pump tnnlc to the benzol feed tamk. Periodic. Manually controlled by motor starting witch. Estimated 15 KWH per day (max.) One Micro-Westco and one Worthington pomp connected in parallel. These are old pumps repossessed from another process and the identification marks are illegible. DSW 462507 WATER PCB-SD0000046103 ( lts 119: Crude Diphenyl Catch Tanks (2-Raquirad) 29. August 1957 Function: To catch, the crude diphenyl iron the diphenyl units and store it prior to batch distilling or delivery to crude diphenyl storage tank. Operation: The cntch tanks receive the suap product, crude diphenyl, from the columns as a continu ous overflow from the carbon trap. The crude diphenyl is periodically withdrawn fro the cntch tanks for batch distilling. Ho definite schedule Is followed ns the catch tanks become filled at indefinite intervals depending upon the number of units in operation.. Katerials Handled: Crude diphenyl of Che folloving approximate composition: Diphenyl 60.87X ( Hi-boiler Benrol 14.01X 22.49Z Head & Tails Oil 0.101 Fraction eventually lost 2.53% . 100.00% Oper. Temp. 120-130C. Oper. Pressure 2-5 psig Controls: Provisions are made for indicating the temperature of the crude dlpheayl. An enclosed tape is provided for indicating the level in the tank. An explosion disk (Protectosenl) is provided to prevent excessive pressure in the tank. Services: Steam colls are provided in the bottom of the tank. Comments: Considerable benrol flasks out of these tanks through a vent line connect to the hydrogen vapor system. e WATER PCB-SD0000046104 Item 119 Continued: 30 Size & Type: . 8 '-0" I.D. x 16*-0" long horizontal tank with dished heads. . Openings: Top: One 3'-0" manhole centrally located and coat aimlag three openings; one for the installation of the amap pmap, <me for the pump discharge and ome fb r the Protectosesl connection and Tent line. Four steam coil aozzlea are la the vertical side of the 3 maahole aozzlea. 0a 2'-0" maahole centered 6'-0" from the middle of the tank with the cover drilled for the installation of the "Varec" gage for measuring the level in the tank. Three 3" slip on welding flanges are provided 1'-0" apart 4 '-6" from the middle of the tank. The oataide nozzle is for filling the tank, the center for a vent (which is now sealed), and the inside one for the thermowell connection. Bottom: k 2" plugged pipe coupling drain la pro vided in the pump well. . Hiiufactorer: Chattanooga B. & T. Company (tank) Crane (steam coils) Capacity: 6,000 gal. ea. - tank, tasted for 25 psig Material Construction: 3/8" atael plate Insulation: The entire tank is covered by a 2" blanket insulation, followed by a V layer of Eagle 66, and a \n Insulceal, and with a metal Jacket protective sheeting. Steam Colic . Two 2" (iron pipe size) extra heavy seamless steel pipe coils approximately 64' and 56' long are provided in the bottom of the tank with inlets and outlets through the side of the center nozzle for the sump pump. Each coil consists of four hairpin turns 6'-0" long, 4" pitch and installed flat. The two inside coils for the "Varec" gage end of the tank are 2' short to clear the gage. DSW 462509 WATER PCB-SD0000046105 Itea 119 Continued: Location: Auxiliary Equipment: References: ." 31. Located in a reinforced concrete pit, 4*-6" deep, -with a 3'-6" vail between task* with * drain under the vail which can be cloaed off with * stopper from either aide. The pit is located east of the diphenyl building and has a high brick wall shield to protect the taaici against fire from the building. ' The H.W. corner of the pit contains a sump pump annually controlled. The pump la 'a Taber Ho. 2 -- Fig. B-148 sump pump with % HP,'1750 RFK motor. . The pit also contains a 1500 gal. catch tank for benrol. The pit is surrounded by a handrail and provided with handrailing and walkways over the tanks. Drawings Monsanto Layout of Crude Diphenyl Catch Tanks Layout of Pit and Foundations Crude Diphenyl Catch Tank Pit-Details 6000 Gal. Catch Tank Pit Handrail Platform (Sheet 1) Piping Walkway and Stairs (Platform Sh.2) Bill of Material 9C-8193 9C-8196 9C-8197 9C-8192 9C-8197 9C-8198 9C-8194 9C-8199 9BK-S4 DSVV4C2510 WATER PCB-SD0000046106 32. August 1957 Item 120: Still Charging Pumps,(2-Requirad) Function: Operation: Materials Handled: Control*: Services: Sire 6 Type: Manufacturer: Capacity: Katerialn of Construction: Drive: Location: Reference: To deliver the crude diphenyl from the catch tanks to the still. Periodically operated whenever the catch tank becomes almost filled. Crude diphenyl - ap.gr. approx. 1.041 Controlled manually by a motor starting switch. Approximately 20 KWH per day (max.) Vertical submerged type sump pump. Taber Pump Company 100 CPK vs. 50' TDH 5 HP, 1750 RPM, 3 phase, 60 cycle, 220/440 v. vertical explosion proof motor with ring base. Direct connected vith flexible coupling. Installed cm crude diphenyl catch tank. . Bill of Material 9BM-54 OSW 462511 WATER PCB-SD0000046107 C Ifcew 121: El-Boller Collecting Tank (1-Raquirad) 33. August 1957 Function: Operation: Materials Handled: Services: Sire & Type: Openings: Stem Coil: Capacity: Materials of Construction: Rote: Reference: To provide a receiving ad cooling tank for the distilled hi-boiler. At the completion of the erode diphenyl distillatiom, the hi-boiler forming the residue is. the still is pumped by the still circulating pump to the .hi-boiler collecting task. The hi-boiler is allowed to cool and at intervals reheated amd poured into drums for conveying to the crude Santowax storage area. Also, the hi-boiler aay be pumped to the Santowax plant for use, depending upon requirements. Hi-boiler constating mainly of terphenyl. Steam to steam coil when needed. 5'-6" I.D. x 5 *-6n high vertical tank with flat top and dished bottom. 4" inlet 4" vent 4" gaging batch 22" manhole 2" bottom outlet diameter seamless pipe coil approximately SO' long. 1000 gal. 1/4" stael plate One tank is now connected to service both stills. Drawings Monsanto Si-Boiler Taak 9C-7876 ( 0s^ WATER_PCB-SD0000046108 34. August 1957 Ita 122; High Boiler Pump (1-Rcquircd) Function: Operation: Materials Hud led: Control*: Serricas: Size & Type: Manufacturer: Motor: Drive: Location: To deliver hi-boiler fro the hi-boiler tank to the Sutovsx storage tank or the Siatowu till pot. Periodically Hi-Boiler Manually operated by motor tartiag svitch. A negligible amount of power com*maptlorn per day. Sump pomp Taber Pump Company 7% HP, 1735 rpffl, 3 phase, 60 cycle, 220/440 v. General Electric vertical motor . Direct connected with flexible coupling, Mounted on hi-boiler collecting taak. DSW 462513 WATER_PCB-SD0000046109 35. Augait 1957 Item 123; Distilled Benzol Collecting Tank (L Required) . Function: To provide a catch task for the benzol fraction ' digtlllad from the erode diphenyl. Operation: The firt fraction diatllled over from the erode diphenyl comes over at 80C. and 1 run by gravity into the benzol tank. The benzol is not run back directly to the feed tank beenuse of the possibility of making a mistake and a1loving sene of the heads to run back vith the benzol. Therefore, it is necessary to check the color of the benzol for clearness before it is periodically pumped back to the benzol feed tank. Material8 Handled: Services: Sire & Type: Openings: Benzol distilled from the crude diphenyl. Steam to steam coll. 7 1 -0" I.D. x 4,-5'1 high vertical tank vith dished heads. Top: 21i" I.D. manhole centrally located. Three 2" standard pipe couplings. Side: Four nozzles fabricated as follows: One piece of 4" dla. standard pipe x 3^" long welded all around outside to shall plate. One standard 3/4" pipe coupling (seamless) welded to shell plate and hole cat. 3/4" pipe is con centric to 4" pipe. (Nozzles are presently closed off). Bottom: 2" pipe nipple centrally located Manufacturer: John Hooter Boiler Works, St. Louis, Missouri Capacity: - 1500 Gallons - Working pressure 34 gas. Given Hydo. test (3 10# DSW 462514 WATER PCB-SD0000046110 Item 123 Continued: Materials of Construction: Insulation: Steam Coll: Location: Reference: 36. Mild iteal plnte - structural quality A.S.T.M. A10-34 The side* ud bottom Are Insulated with 2\" blanket insolation, V Eagle "66" Insulation and covered with a 22 gage blank Iron jacket. The atean coil is a removable unit fabricated to the manhole cover. The coil consists of 8 turns @ 4" pitch and la made from IV seamless steal pipe. The overall length of the coil measured from the bottom of the cover plate is 6'-4". Coil by Crane. Located la the crude diphenyl sump pit. Drawings ' Monsanto Details of Sump Tank Detail of Coil 9C-8152 9C-7874 Bill of Material ' 9BM-48 D sW 462515 WATER PCB-SD0000046111 Ite 124; Distilled Benzol Return Punp (l-Reqaired) August 1957 . Function: Operation: Materials Handled: Controls: Services: Size & Type: Manufacturer: Material of Construction: Motor: Drive: Location: References: To deliver the recovered bensol from the distilled benzol collecting tank to the benzol feed task. Periodic Benzol recovered fe> m the crude diphenyl., Manually coatrolled by motor starting switch. Estimated 2 KWH per day. Figure 3004, sire 2, aingle stage, end suctioa ceatrifugal pump mounted on bedplate. Gould Pump Company Standard except for stainless steel shaft. 3 HP, 1750 rpa, 220/440 v., 60 cycle, 3 phase, enclosed fan cooled, class 1, group D, type K, General Electric induction motor. Frame 225. Direct connection with flexible coupling. Located on concrete foundation In crude diphenyl sump tank pit. Bill of Material 9BK-48 DSVV 462516 WATER PCB-SD0000046112 38. . August 1957 Itea 125: Diphenyl Storage Tanks (2-Requlred) Function: To store distilled dipheayl prior to shipping. Operation: Continuous Materials Saadied: Distilled diphenyl at 7LC. aiaiaua temp. Controls: A thermometer veil is provided for use ia determining the temperature of the dipheayl. Services: . Steam for steaa coil*. Size & Type: 10'-6" O.D. x 37'-4" loag horizontal tank with dished head*. Openings: ' Top; Steam coil inlet, 3" sch. 80 pipe nozzle Measuring port, 2" sch. 80 pipe v/cap. Thermometer veil, 3n sch. 80 pipe nozzle . Pump opening, l'-9V I-D. flanged nozzle Diphenyl inlet, 2%M sch.80 pipe nozzle Manhole and relief opening, 2'-0n I.D. flanged nozzle Vent, 3n sch. 80 pipe Bottom: Steam coil outlet, 2" steam, coil . pipe velded Oral*, 3" flanged nozzle v/cover plate Steam Coil*: Hairpin type flat coil 36,-Orl loag vith eight runs xsacc of 2" sch. BO seamless steel pipe spaced at 6". A pomp veil is provided surrounded by two turns of %" copper tubing vith separate steam con nections. Manufacturer: Rogers and Wright, Incorporated Capacity: 25,000 gallons. Shell tested with 25# hydrostatic pressure Materials of Construction: 3/8" steel plate. DS'W^^1 WATER PCB-SD0000046113 % Itea 125 Continued: Insulatiam: Location: References: 39 Task 1 insulated vith 1%" Eagle blanket Insulation type 201 with Eagle 66 (K2) Applied at all butt Joiata of blanket insula tion where necessary to fill up cracks. Eatire surface is covered with 20 gage galvanized iron jacket. All the joiata oa top half are nude water tight by soldering. Tanka ars located 31'-6" apart centers and installed lengthwise in a HS direction. The center of the east tank is 61'-2-3/8" east of the center lime of the diphenyl building vest column row. The tanks are 30 '-0" south of the muriatic acid storage tanka measured frota end to end. Elevations: centerline of tanks 7 68 ' 4-3/16" grade 758'-0" top of dike 7 611-0" Drawings Monsanto Location plan diphenyl storage . tanks Details storage tanks Foundation details Diphenyl piping to and from tanks 9C-9076 9G-9057 9C-9081 9C-9083 Procurement Record 9PR.-87 DSW 462518 WATER_PCB-SD00000461 Item 126: Diphenyl Loading Pumps (2-Raqalred) 40. August 1957 . . /' . .... Function.: Operation: Materials Handled: Controls: Services: Sire & Type: Manufacturer: Materials of Construction: Motor: Drive: Location: Reference: To deliver diphenyl from the diphenyl storage tanks to tank cars for shipping. Periodic ' Distilled diphenyl Manually operated by motor starting switch. Estimated 15 EOT per day (max.) Figure S 1790-No. 2-type F sump pump measuring 11* -- S--3/S'* from bottom suction to underside of cover plate. Rumsey Pump Company Iron 5 HP, 1750 rpm, General Electric vertical motor. Direct drive with flexible coupling. Mounted on storage tanks (Item 125) Drawings Monsanto Pumps for storage tanks 9C-9088 SW 462519 WATER PCB-SD0000046115 SERIES 200 - BIPHENYL UNITS Itea 201; Benzol Vaporizer (1-Required per Unit) 41 August 1957 Function: Operation: Material Handled: Approximate Heat Balance: 1. To vaporize the benzol feed to each diphenyl unit. 1. To recover aengibis hcnt from the exhaust gases used ia'heating the preheater and converter pots. Continuous. The benzol makes a single pass through the vaporizer, flowing countercurrent to the hot flue gas. Benzol - Rate: 1700#/hr. 170 GPH Temperatare-In: 30C . approx, in feed tanks 0ut:200oC. approx. Pressure: Out: 100 psig approx. Exhauaa gas - Rate: Flue gas 1250#/hr. approx. Excess air 220#/hr. Temperature-In: 780C. . Out: 400C. Benzol: 1. Heating liquid to B.P. 1700 (136-30)(1.8)(0.34) = 110,000 RTG/hr. 2. Vaporizing benzol 1700 (150) = 255,000 . 3. Super-heating vapor 1700 (200-136)(1.8)(0.39) = ' 8.000 `Total 373,000 BTU/hr. Some of this heat load Is absorbed by passing the benzene through the small coil in the column before it eaters the vaporiser. No temperature data are available to determine the exact load on the vaporizer coil. 0S\N 462520 WATER_PCB-SD0000046116 Ite* 201 Continued: 4Z. Control*: Normally no control* are needed. However, it i* neees*ary' to avoid overheating the vaporizer when benzol is not being fed during atart-ups and shut-downs. . To prevent overheating during atart-ups, the exhaust gag i* diverted from the vaporizer by exhautting through a special by-pasg stack. During fhut-downa, cool air is vented into the exhaust stack to cool the vaporizer. The benzol feed outlet temperature, the ex haust gas inlet temperature, and the exhaust gas outlet temperature are recorded on the 12 point temperature recorded. Services: Hone required. ' Size & Type: The housing for the vaporizer coil is described separately (Item 209). The coils are all essentially the same in regards to purpose but the details of con struction vary as follows: Summary of Vaporizer Design Units 2,1 4,5 6,7,8,10 Outside Area, Ft.2 ` 123 186 180 9 11,12,13 180 240 Ho. Coil* Single Single Single Single Single Ho. Turns 36 38 37 39 37 52 Dia. Pipe HnxH 2 "xH 2 "xH 2 "xH 2 "xH 2 "xH Dia. Coil 2'6" 2'6" 2'6" l'liV 2'6" 2'6" Pitch 2V 3" 3n 3" 3" 3" Length 90' 95' 92.5' 78' 92.5' 130' Manufacturer: Nos. 6,7,8,9, and 10 units originally had a doable coil bat the inner coil burned out and is disconnected. Crane Company DSW 462521 WATER PCB-SD0000046117 I ten 201 Continued: Materials of Construction: Location: References: 43. Extra heavy standard steel pipe The vaporiser coil is located in a vertical stack lined with insulating refractory brick and containing a stainless steel inner shell designed to give a aaxlnum exhaust gas velocity over the pipe coil. Drawings Monsanto Vaporiser Assembly, Units 11, 12, 13 Vaporiser for Ho. 1 Unit Vaporiser for Ho, 4 Unit Vaporiser for Units 6,7,8,9,10 9C-9026 9C-6841 9C-7840 9C-8150 AS2522. 0=vN WATER_PCB-SD0000046118 44. August 1957 I teat 202; Heat Exchanger (1-Requlred) Installed oa Halts 4 & 5 Only Coosa eat: Function: Operation; Materials Handled: Heat Balance The use of a heat exchanger on units 4 and 5 deviated from, the prevailing design. The heat exchanger replaces the preheater and conserves fuel by recovering sensible heat from the converter vapora. 1. To further super-heat the benzol vapor from the vaporizer. 2. To recover some of the heat from the vapors leaving the converter. Continuous. The converter vapors make a single pass through the tubes, countercurrent to the benzol vapor making a single pass through seg mental baffles on the shell side. (The conditions stated wars taken from Phosphate Division. Engineering Report Ho. 117. Actually, the unit* may be operated up to a 240 gal./hr. Benzene Feed Rata.) Shell fluid: Benzol vapor - 1200#/hr. Tube fluid; Converter vapors - 120Q#'/hr. (benzol vapor) (diphenyl vapor) (hi-boiler vapor) (hydrogen gas) Shell fluid temperature: In - 160C, Out - 525C, Tube flnld temperature: In - 720C. Out - 405C. LKTD: 220C. Duty: 405,000 BTU/hr. Heat transfer coefficients (outiide surface) Tube film: 11 BTH/hr.sq.ft.F. Tube scale; 400 " Tube wall: 3300 " Shell film: 28 " Shell scale: S00 " DSW 462523 WATER_PCB-SD00000461 Itea 202 Continued: 45 Heat Balance Contd: Overall 0-theo: Overall P; 7.56 5.44 Total effective surface: 188 ft.^ 10'-0" eff. length Type: Note: Source of above data is report by D. A. Rober on Design of No. 4 Unit. Vertical packed expansion joint, removable tube bundle. Sire: Nozzles: Manufacturer: Design: Single section with 16" O.D. shell, vith seventy-two (72) 1" O.D. #12 BWG tubes at It" square pitch, and vith twenty-one (21) 3/16" thick transverse baffles spaced at 5" centers. Shell Nozzles inlet: 3" T&G Series 30 outlet: 3" T&G Series 30 Tube Nozzles inlet: 4" T&G Series 30 outlet: 4 T&G Series 30 Struthera-Wells Operating pressures - tubes: 5# ga. Shell: 45# ga. Max. Working Pres. - tubes: 50# ga. Shell: 50# ga. Max. Temperatures - tubes; 1400F. Shell: 1000F. Material of Construction: Shell: Tubes: Baffles: Steel 4-6 chr. 0.5 ao. Steel Insulation: The exchanger is insulated vith 3" of Eagle #88 rock wool, with bolted flanges exposed. References: Drawing 9SC-2577 Bill of Material 9BM-29 9BM-35 DSW 462524 WATER PCB- 46. August 1957 I Cm 203; Preheater (1-Raqnirad) #4 and #5 Paly Fraction: Operation: Materials Handled: Heat Balance: Controls: Services: To farther super-heat the benrol vapor coming from the heat exchanger to the reaction temperature necessary for pyrolysis. Continuous. The benrol vapor passes through a distributor pipe with the end eaersed ia eoIten lead in the preheater pot. The vapor bubbles up through the molten lead and is discharged through a gooseneck pipe to the converter. The pot Is suspended in a firebrick setting and the temperature of the lead maintained by burning natural gas ia burners extending through the firebrick, la addition, the hot flue gases from the converter are used to heat this preheater. (The conditions stated were taken from Phosphate Engineering Report So. 1L7'. Actually, these units may be operated up to a 240 gal./hr. benzene feed rate.) Benzol Vapor - 1200#/hr. Benzol vapor temperature: Flue gas temperature: In; Out: In: Out: 525C. 675C. 1800C. 1150C. IKTB: 850C. Ihttv: 374,000 BTU/hr. Overall P: 7,0 BTU/hr., ft.2, F. Total effective anrface: 35 ft.2 Temperature of lead recorded on 12 point recorder. Batumi gas, approximately 350# CFH. Kake-up lead baa to be added periodically. Osw 462525 WATER_PCB- Xtea 203 Continued: Size & Type: Manufacturer: Capacity: Material* of Construction: References: Comment*: 47. 24" 0.D x 72" long dished bottom pot filled with 37" to 42" of molten lead and suspended in a firebrick setting. The distributor pipe i* a straight 4" O.D. x 3" I.D. tube located in the center of the pot, A small baffle covers the.vapor outlet to prevent lead being splashed directly into the outlet pipe. The outlet pipe is 4" XH pipe. The top of the pot is welded carbon steel plate and is bolted to the pot. Blaw-Knox Company 100 lbs. of lead adds L%" to the level of the lead in the pot. Type 309 stainless steel plate 5/8" thick. Drawings Monsanto 9SC-2852 9SC-2575 The firebrick getting consist of one emit for both the preheater and the converter partitioned by a firebrick wall with an opening left for the flue gas to pass from the converter side to the preheater side. . DSVV 462526 WATER_PCB- (. i ( ., 48. August 1957 Item 204: So. 1 Preheater (1-Requlred per Halt) All Palts Except #4 and #5 Function: Operation: Material* Handled: Control*: Serrice*: Type & Size: Comments; To farther super-heat the beneol vapor from the vaporizer to a nid-polnt temperature between the vaporizer temperature and the re action temperature. Continuous. The benzol vapor passes through a distributor pipe with the end emerged in aolten lead in. the preheater pot. The vapor bubbles up through the molten lead and is discharged through a gooseneck pipe to the Ho. 2 pre heater. The pot is suspended in a firebrick setting and the temperature of the lead main tained by burning natural gas in burners ex tending through the firebrick. In addition, the hot flue gases from the converter and the No. 2 preheater are used for heating the No. 1 preheater. (The conditions stated were taken from Phos phate Engineering Report No. 117. Actually, theae units are operated at benzene feed rates greater than 1200#/hr.) Benzol vapor - rate: ' 1200#/hr. Temperature: In: Out: 140C. k25C. Temperature of lead recorded on 12 point temperature recorder. Natural gas; Make-up lead added periodically. . Identical to Item 203. The firebrick setting consists of one unit for Items 210, 211, and 212, partitioned by a . ' firebrick wall wth an opening loft for the flue gases to pass from the No. 1 preheater and converter to the No. 2 preheater. pSVNf 402527 WATER_PCB- 49. . August 1957 Itaw 205: Wo. 2 Preheater (l-Regulred par Unit) All Units Except #4 and #5 Function: Operation: Material* Handled: Control*: Services: Type & Sir*: Comments: > To super-heat the benzol vapor from the Ho. 1 preheater outlet temperature to the reaction temperature for conversion. . Continuous. The benzol vapor from Ho. 1 preheater passes throagh a distributor pipe with the end emerged in molten lead in the pre heater pot. The vapor babbles up through the molten lead and is discharged throagh a jumper pipe to the converter. The pot is suspended iu a firebrick setting and the temperature of the lead maintained by burning fuel gas in burners extending through the firebrick. In addition, the hot flue gases from the converter are used for heating the Ho. 2 preheater. (The conditions stated were taken from Phos phate Div. Engineering Report Ho. 117. Actually, these units are operated at benzene feed rates greater than 120Q#/hr.) . Benzol vapor - rate: 12Q0#/hr. Temperature: In: Out: 425C. 700C. Temperature of lead recorded on 12 point recorder. . Hatural gaa Make-up lead added periodically. Identical to Item 203. The firebrick setting consists of one unit for Items 204, 205, and 206 partitioned by a firebrick wall with an opening left for the flue gases to pass from the Ho. 1 preheater and converter to.the Ho. 2 preheater. SW 462528 WATER_PCB-SD0000046124 50. August 1957 Itaa 206: Converter (1-Required par Unit) - Function: To maintain the benzol vapor at the reaction temperature for a short sojourn time sufficient for about 20% conversion to diphenyl. Operation: Continuous. The benzol vapor passes through a distributor pipe with the end eaersed ia molten lead in the converter pot. The vapor bubbles up through the molten lead and Is discharged through a pipe to the lead trap. The pot is suspended In a firebrick setting by burning natural gas la burners extending through the firebrick. The exhaust flue gas passes through an opening in the firebrick partition to the chamber surrounding the Ho. 2 preheater. . Materials Handled: (The conditions stated were taken from Phosphate Div. Engineering Report Ho. 117. Actually, these units are operated at benzene feed rates greater Chan. 1200#/hri) . Material In: Material Out: benzol vapor - rate: 1200#/hr. Temperature: 700C. benzol vapor - 974#/hr. diphenyl - 181#/hr. Hi-boiler - 42#/hr. hydrogen - 3#/hr. diphenyl - 4344#/day Temperature; 750-8I0C- Controls: The temperature of the lead ia the pot must be maintained exactly at 750-810C. This Is done by a temperature recorder controller control ling the gas burners. Size & Type: Identical to Item 203 on all units except Units Hos. 4 and ll. The converts on Units 4 and 11 have a standard vertical pot section welded to the top of the standard pot to provide additional sojourn time. An extensive report has been prepared on the material* of con* tract ion of the converter pot. See Research. Report #2211, Interim Report on Alloy Testing and Biphenyl Pot Corrosion. Constructive criticism Is presented which may be of value in future construction. DSW 462529 WATER_PCB-SD0000046125 51. August 1957 Item 207: Burners (18--Reqaired on Units 2,3) (14 Required on Units 4,5) (19 Required on Units 6,7,8,9,10) _____ __________________ (24 Required era. Units 11,12,13) Function: To provide for the combustion of natural gss in the firebrick, setting housing the lead pots (Items 203, 204, 205, and 206). Operation: Continuous. Hozslea operate with It to 1-1/8# back pressure with 15# gas on the burner. Materials Handled: (The conditions stated were taken froca Phosphate Dir. Engineering Report Ho. 117. Actually, the burners are presently operated at approximately 25 psig. The actual quantity of gas being burned is not known.) Natural gat with about 155 excess air. (Ap- proximately 2000 CFH <? 25C. and 760 sa of gas is required for each unit.) ( Controls: The burners servicing the converter pot are automatically regulated by a single point temperature recorder and controller activated by the temperature of the molten lead in the converter pot. The gas flow is also auto matically cut down when the benzol flow is cut down (Units 11, 12, and 13 only). The burners servicing the preheater are manually regulated by the eperator to maintain the molten lead within the desired temperature range. The temperatures are recorded on a 12 point temperature recorder. Pressure gages are provided for indicating the gas pressure. Type: Surface Combustion, tunnel burners with high pressure inspirators. Size: \ #1333 tunnel burners, If1 nozzle #1333 TN alloy tunnel retainers #224-B, type 1, burner adapter casting* #N-54 high pressure inspirator sets #405 lighting hole assemblies DSW 462530 WATER_PCB-SD0000046126 Itea 207 Continued: Manufacturer: . Capacity: Material* of Coattractioa: Reference: 52. Surface Ctxnbuatioa, Toledo, Ohio 2850 CFH when burning aatural ga *t 20 pig Standard Bill of Materiel SSH-87 DSW 462531 WATER_PCB-SD0000046127 Itea 208: Start-up By-Pass Stack (L-Required par Halt) 53. August 1957 Function: Operation: Material Handled: Controls: Sire & Type: Kanaf&ctur&r: Materials Construction.: Location: Reference: . To provide a means of by-pasaing the hot flue gases around the cold vaporizer prior to beginning the benzol feed. Deed only daring it&rt-ap periods. Eat flue gates fro, the preheater and con verter traits. The flue gates are diverted from the exhaust stack to the start-up by-pass stack by means of a butterfly type valve. Tbe stack it constructed in two sections, a lover atack and an upper stack. The lover stack la 2'-6" I.D. x ll'-O" high and has an adjustable damper over the top. It is welded vertically to the horizontal header between the converter ttaita and the exhaust stack (Item. 209). A butterfly type valve is installed la the horizontal header between the by-pass stack and the exhaust stack. The upper stack is 2,-0" I.D. x 29,-6n high with a 4'-0" I.D. x 2'-6" high funnel at the lower end over the lower stack. . Southern Car & Manufacturing Co,, Birmingham, Ala. The lower stack is 1/4" steel plate and the upper etack 3/16" steel plate. The stack is installed vertically with its center A'-ll" from the center of the final preheater. Drawing Monsanto Detail of Stack 9C-7845 ' DSVV 482532 WATER_PCB- I tern 209: Exhaust Stack (l-Requlred per 0a.lt) 54. August 1957 Function: Operation: Materials Readied: Controls: Size & Type: Manufacturer: Materials of Cons Cruet iom: Insulation: Location: 1. To provide a means for exhausting the fine gaa from the preheaters sad con verter to the atmosphere. 2. To provide a means for passing the gas around vaporizer coils for heat recovery. Continuous except during start-up periods. Exhaust flue gases from the preheaters and converter. A door is provided at the bottom of the stack, for venting in air to cool the vaporizer coil when shutting down the diphenyl unit. Vertical stack lined with insulating refractory and containing a stainless steel inner shell, designed to give a maximum gas velocity over the vaporizer coils. The housing for the vaporiser is split and hinged for access to the coil.. Outer Shell: Inner Shell: Upper- Stack: Snyder Tank Company Birmingham, Alabama Decatur Iron & Steel Company Decatur, Alabama Southern Car & Mfg. Company Birmingham, Alabama All mild steel with the exception of the inner shell which is Type 304 stainless. The horizontal gas header between the exhaust stack and the converter shell is lined with 4%" of firebrick and the vertical vaporizer shell with 4" of Carey Ei-temperature #19 cement. . The center of the stack is 9'-1" from the center of the final preheater. OS\N 462533 WATER_PCB-SD0000046129 Item 209 Continued: Ref eareace*: Inflation: 55. Drawing* Hoag eat o Detail of Stack Detail* of Vaporiser Shall 9C-7S45 9C-9025 . The'horizontal ga* header between the exhaust tack and the converter ahell is lined with 4%" of firebrick and the vertical vaporizer shell with A" of Carey-Hi-temperature #19 c assent. DSW 462534 WATER.PCB-SD0000046130 1 Ifcag 210: Lead Trap (1-Repaired per Unit) 56. August 1957 Function: Operation: Katerial* Handled; Size & Type: Kanufacturer: Katerial* of Construction: References: To trap entrained lead coming over with the benzol vapor from the converter. Continuous. The trap is periodically cleaned out when, necessary while the unit is shut down. Benzol and reaction products from the converter. Entrained lead. Hew Design , 24" dla. welded steel pipe 3 '-1$;" long. Outlet is' a 3" Crane #1545 fig. to a 8" z 3" E.X. reducer with an 8" 309 S.S. nozzle extending l'-4" into trap. Inlet Is a 3" E.X. W.S. pipe, opening tangential to the trap and 9-9/16" down from. top. Old Design 24" dia. W.S. pipe vith 3" E.X. nipple on top for outlet with 3" Crane #1545 flange. Inlet is 3" E.X. pipe opening tangential to trap 9" down from top - 3" Crane #1545 flange. Callslian Grinding & Machine Company Anniston, Alabama Mew Design: 5/8" sides, bottom 3/4" top 309 S.S. outlet cylinder Old Design: 3/8" side, 3/4" top bottom Drawings Monsanto Lead Trap Details 9C-8143-4 < QSW 462535 WATER_PCB-SD0000046131 57. August 1957 Item 211: Fractionating Column (l-Reqolred per gnit) Function: Operation: Hj.taria.la Handled: Controls: 1. To function a a cooling column to condense the vapor* from the converter. 2. To utilise the heat in the vapor* from the converter to effect a partial separation of the benzol fro the converted product*. Continuous. The benzol fractionating column, is * 12 plate babble cap rectifying section with the feed i* on the bottom plate a* super-heated vapor. The liquid crude diphenyl containing hi-boiler tad liquid benzol is discharged from the bottom and benzol vapor and hydrogen from the top. The reflux is returned to the top plate. The column, is operated with the top temperature below 100C. (The conditions stated were taken.from Phos phate Div. Engineering Heport Ho. 117. ActuaLly, these columns are operated at rates greater than 1200#/hr.) In: .Benzol vapor Diphenyl vapor Hi-boller vapor Hydrogen gas 974 181 42 3 1200#/hr. Out; Bottom - Liquid benzol Liquid diphenyl Liquid Hi-boiler Top - Benzol vapor . Hydrogen gas 14#/hr. 181 42 980 ____ 3 1200#/hr. The temperature of the top of the column and the sump are recorded on the 12 point tempera ture recorder. The columa is controlled by the operation of the condenser and split flow box. DSW 462536 WATER_PCB- %' Item 211 Coatinuad: Size & Type: Manafacturer: Materials of Con itrue tier*: References: 58. 12 plate bubble cap rectifying eoltmn, 3 f-0" dia. with 12"tray spacing. (Omits 4,5 column Is 2,-6" dia.) Plata spacing Ho. of plates Ho. of bubble caps per plate Cap diameter Slot area/cap. Total slot area/plate 12 la. 12 28 3" . 3.43 ia.^ 0.666 sq.ft Riser pipe - 2" O.D. x 10 BWG Riser pipe area/riser - 2.35 ia.^ Total Riser Area^- 0.45 sq. ft. Liquid depth oa plates 1.5" Liquid height above slots 0.5" Tower height , 18' Hooter Boiler Works, St. Louis, Missouri (11, 12, 13) . Leader Iron Works (6, 7, 8, 9, 10) A.S.T.M. specification A-283-46T Grace C (A-10) steel. Drawings Monsanto Fractionating column (Unit Ho, 2) Fractionating column (Unit Ho. 3) Fractionating column (Baits Ho. 6 thru Ho. 12) 9C-5582 9SC-7279 . 9C-8131 DSW 462537 WATER_PCB-SD0000046133 59. August 1957 Item 212: . Benrol Condenser (1-Reqnlred per Om.lt) . Function: Operation: Materials Handled: 1. To partially condense the benrol vapor from the top of the column. 2. To control the top temperature of the column at 100C. by sub-cooling the con densed benzol which is refluxed to the column. Continuous. (The conditions stated were taken from Phos phate Div. Engineering Report Ho. 117. Actually, this equipment ia operated at higher rates than those stated.) Shell fluid - benzol vapor: 290C#/hr. (Usual rate under favorable conditions) Tube fluid - water: Usually operated at max. available pressure. DSW 462538 WATER PCB-SD0000046134 (. Item 212 Continued: 60 Heat Btluce: Controls: Size & Type: The condenser duty for *11 the unit* should be substantially the same and should consist approximately of the amount of super-heat in the vapors from the converter less the amount of heat lose from the surface of the fractiona ting column. This duty has been calculated to be about 625,000 BTTJ/hr. average based on a study as reported in a memo to Mr. J. F. Reeves, 5/25/48 written by Mr. G. W. Jordan. The present system, of control is to run the condenser with the water valve wide open and the split flow box adjusted to maintain the top of the column at 100C. The temperature of the cooling water and the efficiency of the condenser therefore deter mine the rate of benzol flow through the shell and the cooling water outlet temperature. This system of controlling has the advantage of simplicity hut does not provide the most effective use of the condenser and cooling water, . Summary Units Type Eff. Surface Shell Dia. So. Tribe* Tube Dia. (O.D.) Pitch Tube Length 3 2,5 4,6,8,9 11,13 7.10,12 Vertical 70 14" Horicontal Horizontal Vertical 113 162 90 20" 14" 132 139 1" 5/8" kn triangle 13/16"sq. 72" 97-7/8" Vertical 207 10-3/4" 88 3/4" - Manufacturer: Aad&le Callahan Callahan Andale Struthers Hells ( oSW 462539 WATER_PCB Item 212 Continued: Unit* 32^54.6,8,9 Capacity: Oper. Praf. - Tcbe* - Shell Max.Vk.Pres*.: - Tubes - Shell Hax.T*p-: - Tubes - Shell 75# ga. 1# ga. 75# ga. 75# ga. 130F. 17 6F. 11,13 7,10,12 15# ga. 100# ga. - 150# ga. 150# ga. 150# ga. 150# ga. 500F. Materials of Construction: Shell Tabes Steel *10 BWG Steel #12 BWG Steel #12 BWG Steel #10 BWG Steel #16 BWG References: Drawings Koas&nto Condenser Details, Sheet 1 Condenser Details, Sheet 2 (4,6,8,9) , 9C-8157 9C-8158 foreign Andale Condenser #13 X-A-36 type 206X Sketch #1261 Dwg. #5845 Strathers-Well* Type H Group 3 Site 10 HI2 61. DSW 462540 WATER_PCB-SD0000046136 Ite* 212 Continued: 62. The operating condition* of these condenser* after physical cleaning In 1956 were a follows: Bait Ho. Benzene Feed late gal./hr. X Reflux Benzene Reflux leap. 2 3 4 5 6 7 8 9*-* 10 11 12 13 175 165 245 245 230 210 220 220 245 330 250 180 70X 75 60 40 75 90 75 70 60 48 75 85 78G. 34 66 41 40 40 50 73 28 24* 42 42 Approximate Overall Water, GFK Coefficient 0. (Old data from Rpt.117) (Old data from Report Ho.117) 80 90 3.5 170 95 65 80 90 95 65 - '- 95 65 95 65 -- 75 250 -. - 75 250 it with coltwm coll *-* Ha. 9 condenser ia mounted vertically qS\N 462544 WATER_PCB-SD0000046137 63. August 1957 Itan 213; Split glow Box (1-Requirad per Quit) . Function: To control the mount of liquid benrol returned to the column ns reflux. Operation: Continuous. Ratio adjusted as necessary to maintain the top of the fractionating column below lOO^C. Materials Ha* died: Liquid henrol. Controls: Mechanically indicated ratio adjusted manually by operator to maintain temperature of top of fractionating column below 100C. Temperature of runback indicated by thermo meter well. Sight glasses provided in reflux and runback lines for checking flow. Sine A Type: The split flow boxes for Units 2 thru 5 are identical to the biphenyl still split flowboxes. Manufacturer: Units 11-13 ire provided with standard manu factured rotavmirs, figure 192-special, size 10 with one 2" horizontal inlet connection . and tvo 2" vertical outlet connections. Units 6-10 are slightly dissimilar. Units 6-13 famished by Fischer & Porter Company, Hatbero, Pennsylvania Capacity: . Outlets Capacities: Forward: Min. 100 GTH Horn. 150 GPE ' Max'. 250 GPE Reflux: Kin. 200 GPE Horn. 420 GPE Max. 750 GPH Material of Coast met 1cm: Cast iron fittings, stainless steel weir tubes and gears, and steel shelle. . DSW 462542 WATER_PCB-SD0000046138 Its*. 213 Comtlaaad: Location: Reference*: 64. Located near top of column on condenser platform. . Drawing* Honaanto Layout Rotawelr & Condenser Split Flow Box. Details Piping at Rotnwsir & Condenser Piping at Rotawelr & Condenser Details 9C-9055 9C-7836 9C-8163 9C-8164 Foreign 13" Rotawelr with metal ahell Rotaweir Rotawelr 5-6727 6-11591 S-4228 DSW 462543 WATER_PCB-SD0000046139 Item 214; Carboa Trap (1-Requlrad per Halt) 65. August 1957 Function: Operation: Size & Type: Openings: Kanufactorr: Material* of Construction: Location: References: T trap any carbon and (lodge la the soup product from the fractioaatiag column. Continuous. The erode diphenyl L decanted through a aide outlet is the trap and the carbon and dodge settled to the bottom from where it la drained periodically when necessary. A steel tank 18" O.D. r 3,-l-3/4n long with flat bottom and top. Top: 6" dia. XH nipple with flange, inlet. Side: 2" XH coupling, overflow. Bottom: 2" XH coupling, drain. Callahan Grinding & Machine Company Anniston, Alabama 3/4" steel plate, top 1/2" steel plate, bottom 18" O.D. x 3/8" thick W.S. pipe, side wall Bolted to bottom outlet of fractionating column. Drawings Lead trap details Honaaato 9C-8145 OSVN WATER_PCB-SD0000046140 SERIES 300 - BIPHKHTL STILLS 66. Aug-uat 1957 Item 301; Diphenyl Still (1-Required per Still) Function: Operation: Materials Handled: Controls: Senricea: Sire & Type: Openings; Kanuf acturer; . Capacity: Material* of Construction: Insulation: To provide a reservoir for heating the charge of crude diphenyl which la being distilled. ' Batchviae - time required for distilling one batch it approximately 10 hours, depending on operator. Approximately 30,350# or 4,120 gal. of crude diphenyl per batch. A thermowell is provided for recording the temperature of the crude diphenyl Steam to steam coils. (Biphenyl must be in liquid state before it can be circulated through still heater.) 7'-0" O.D. x 14'-0" long horizontal tank with dished heads. Par. tf-69 ASHE construc tion. 3" opening for thermowell 3" charging inlet 4" inlet from heating coil 10" vapor outlet 2" reflux inlet 22" opening for circulating pump 22" opening for steam heating coil R. D. Cole Manufacturing Company 4300 gals. Tested for 50# pressure at 750F. . 1/2" steel plate The still is insulated with 4" of rock wool, of Eagle 66 and covered with a sheet, metal Jacket. DSW 462545 WATER PCB-SD0000046141 I tea* 301 Continued: Steam Coil: Reference*: 1-1/4" pipe coil Drswings Diphenyl Still Diphenyl Still Body Bill of Material Moananto 9C-7873 9SC-2526 9BM-55 67. DSW 462546 waTER_PCB-SD0000046142 Item 302: Crude Diphenyl Circulating Pimp (l-Required per Still) August 1957 Function: Operation: . Materials handled: Controls: Services: Size & Type; . Manufacturer: Capacity: Motor: To cycle the crude diphenyl through the Still ud the heating coil of the gas fired heater. Continuous, during batch distilling operation. The crude diphenyl is returned to the still from the heating coil and is recycled until the distilling operation ia completed. Crude diphenyl Controlled annually by motor starting avitch. The rate of flov is not controlled but al lowed to seek its maxima*. Estimated 80 KWH per day (max.) Ho. 1 Still: Special Ho. 2, figure S1790 vertical, all iron, Ruasay snap pump with a 96" set length and provided with special water cooled stuffing boxes. Ho. 2 Still: 3" inlet x 2%" outlet, CV-5 vertical pump, figure 19,435 with cast iron water jacketed stuffing box where shaft passes through cover plate. Discharge pipe baa stuffing box not water jacketed. Pump is of iron, 96" long from bottom of cover plate to end of pump inlet with inter mediate cast iron hearings In the column. Shaft is of steel. Impeller of cast steel. Ho. 1 Still: Rumeey Pump Company Ho. 2 Still: Taber Pump Company Ho. 2 Still: 200 GPK vs. 70' TDH Ho, 1 Still: Ho. 2 Still: 5 HP, 1750 RPH, 3 phase, 60 cycle, 220 v., vertical explosion proof Ik HP, 1750 RPH, 3 phase, 60 cycle, 220 v., vertical explosion proof motor. DSW 462547 WATER PCB-SD0000046143 Item 302 Coatianed Drive: Location: Reference: 69. Direct connected with, flexible coupling Located on dipbeayl still * Drawings No. 1 Still Pump No. 2 Still Pump Bill of Haterial Taber - P-246A 901203 9BM-55 DSW 462548 WATER PCB-SD0000046144 Itaa 303: Gaa Fired Banter (l-Required par Still) 70. August 1957 . . Function; Operatic*.: Material* Handled: Heat Duty: Controls: ' Services: Sire & Type: ` Manufacturer: Materials of Cotta traction: 'Heating Coil: Gag Burners: Insulation: Location: To supply the heat required for distilling the crude diphenyl. Continuous during batch operation. Crude diphenyl - rate: 200 GPM approx. 400,000 BTO/hr. is the average net heat available fro* the still heater for heating and vaporising charge. The combustion rate of the fuel gas is con trolled automatically so as to raise the temperature of the liquid passing through the coil Approximately 20 to 25C. (difference between inlet and outlet temperatures in. the coil). Hatural gas - estimated requirement is 1,000 CFH (? 30C. and 760 mm (svg.) max. capacity approx. 3,200 CFH 41 -0" I.D. x 3 ' -- 3" high shell with an inner core and stack. Chattanooga Boiler Works Steal outer shell, 304 S.S, inner shell The heating coil consists of 18 turns of 2" W.I. pipe l'-6" in din. (approx. 53 sq.ft, of outside heating surface). The heater is fired with four Surface Com bustion #55 H.P. Inspirators with each inspirator supplying the mixture for two #1345 tunnel burners. The steal shell is lined with 9" of H&W #111 firebrick. Located at second floor level in the diphmyl plant machine shop immediately outside of the distilling rooms. DSW 462549 WATER_PCB- Item 303 Continued: 71. Drawings Monsanto Diphenyl Still Heater Shell, #1 Still 9C-6372 Diphenyl S till Heater Shell, tl Still 9C-8211 Stack Cover & Heater Core 9C-8078 Stack 9C-79 39 Heater Shell Bale 9C-8230 Platforms & Supports 9C-8217 Bill of Material 9BM-55 DSW 462550 WATER_PCB-SD0000046146 Ifcag 304; Still Column (1-Raqnired per Still) 72. August 1957 . Function: Operation: Materials Handled: Site & Type: To separate the crude diphenyl into benrol, hi-boiler, heads and tails, and diphenyl. Continuous during batch operation. The vapors from the still enter the bottom of the column. The lover boiling, fraction passes overhead to the total condenser and part re turned as reflux above the top plate. The high boiling fractions are returned to the till. The first product from the column is benzol, with the top of the column at 80C. The second product cut is taken until the crystallizing point of the distillate reaches 6S.6C. The next fraction, diphenyl, is collected until the still pot temperature reaches 340-350C. and then the balance is diverted into the heads and tails tank. The high boiler, remaining la the still an residue, is pumped to the high boiler catch tank. Crude diphenyl vhich is separated approxi mately into the following fractions: Diphenyl ' High Boiler Benzol Heads & Tail* Oil Haterial Lost 60.87X U.01 22.49 0.10 2.53 100.oat The still column is a 20 plate, bubble cap, rectifying column, 3'-Qn I.D. x 251-2M high. The plates are spaced 12n apart and each tray contains thirty-six (36) 3" dia. pressed steel bubble caps and two 4" dia. downspouts. . DSW 462551 WATER_PCB-SD0000046147 -s Item 304 Contiaaad: Openings: , Manufacturer: Materials of Construction: Insulation.: Reference: 73. Each plate la provided with hm 10" dia. handholes La. the shell. The vapor a from the still eater the column below the bottom plate through a 20" dia. combination nanhole aad vapor islet. The lower boiling products leave the top of the column through a 16" dia. manhole which is reduced to a 6" dia. vapor pipe. Reflux enters through a 3" aozsle above the top plate and the over flow from the bottom tray is returned to the still through a 3" line. Leader IronWorts Company Steel The column isinsulated with 4" of rock wool, of Eagle 66, and covered with a sheet steel Jacket. Drawings Monsanto Diphenyl Still Column 9C-7870 Bill of Material 9BK-55 DSW 462552 WATER_PCB-SD0000046148 74. Auguet 1957 Jim 305: Diphenyl Still Condenser (1-Reqalred par Still) Function: Operation: Haterial* Handled: Heat Duty: Sira (r Type: Hoxxles: ; Manufacturer: Material* of Construction: Insulation: References: To comd&ase the overhead vapor* frost the till colvzaa. . Continuous during batch distilling operation. The cooling water makes 8 passes through the tube* and vapor* condensed outside of the tubes. Tubes Shell 70 GFH City Water 408G#/hr. benzol. Shell fluid temp. - la: 176F. Out: 176F. Tube fluid temp. - la: 130F. Out: 150F. LKTD: 34 P. Duty: 690,000 BTU/hr. Overall heat transfer coefficient: 100 Total effective surface: 200 ft. 2 200 iq.ft. horizontal, floating head, re movable tube bundle condenser with 25" O.D. . shell and 152 tubes 1" O.D. constructed of #12 BWG tubing and pitched 1%". The shell has been enlarged to the same size as the floating bead bonnet and a special outlet added to insure complete drainage of each product from the condenser. Shall: Xalat 6" Outlet 2" Tubes: Inlet 3" Outlet 3" R. D. Cole Manufacturing Company Steel Shell insulated with 2" rock wool, %" of 68, and covered with a sheet metal Jacket. Drawings Monsanto Condenser Bill of Material 9C-7872 9BH-55 DSW 462553 WATER_PCB-SD0000046149 Ita 306; Split Flew Box (1-Reqatred per Still) 75. August 1957 Function: Operation; Katerials Handled: Controls: Services; Size & Type:" To ccmtrol the amount of condensate re turned to the column as reflax. Continuous during hatch distilling operation. The condensed vapor fro* the condenser is dis charged into a basket installed inside of a container with the bottom partitioned into 2 outlet!. The basket has holes drilled Ln the side so that by rotating the basket the discharge from the holes may be directed to either side of the bottom partition ia the shell. The split flow box is usually operated on a 1:1 reflux ratio. Eeat is supplied from a small heating coil when the diphenyl fraction, is being distilled. All of the overhead products from the column pass through the split flow box. The reflux ratio is controlled by a selector lever setting the position of the basket. in relation to the partition between the 2 out lets. The control of the basket is extended to the still operating floor by meant of a shaft and gears so that the reflux ratio may be changed during a distillation vithout ascend ing to the condenser platform. Steam for the heating coil. Shell casing: Basket: 18" O.D. x 18" high gas tight casing with dished heads. 12" X.D. x deep with a 9" I.D. concentric screen-parti- ticra. The basket haa 19 equally spaced dia. holes 7 apart. oS\N 46255A WATER_PCB- Item 306 Continued: Openings: Manufacturer: Capacity: Materiala of Construction: Gaskets: References: 76. August 1957 . Two 2" X.H.W.S, pipe outlets in the bottom, one for reflux aid the other for the product. A 5/16" plate partitions the reflux side of the shell casing from the product side. One 2" X.H.Vf.S. pipe side inlet for the con densed vapors from the condenser. One 2" X.H.W.S. pipe side nossle for vent through flame arrestor and conservation vent. Three 5-5/8" l.D. sight aociles using Pyrex glass. Two located oa top and one on the side for observing the flow from the basket. Stuffing box and gland 1-3/4" l.D. centrally located on top for selector lever shaft. Fischer and Porter Company 800 GPS normal capacity 1600 GPH maximal capacity The split flow box is made of steel except basket, screen, and packing gland which are made of monel metal. Gaskets are #901 Car lock, ring type, 1/16" thick and must not swell when handling hot diphenyl or benrol. Drawings Monsanto Split Flow Box Details 9C-7836 Bill of Material 9BM-55 DSW 462555 WATER_PCB Itea 307: Head & Tails Catch Tank (1-Requtred per Still) 77. August 1957 Function.: Operation: Ka.teria.la - Handled: ` Control*: Services: Sire & Type: To provide a catch tank and storage for the heads and tails distilled from the crude diphenyl. After the fcenrol fraction has been distilled off the crude diphenyl, the next fraction distilling between 80, a hold point of 68.6C. is diverted to the heads and tails catch tank. After most of the diphenyl has been distilled and the temperature in the still reaches about 30OC., the flow is changed again to feed into the heads and tails tank. The heads and tails that were collected are returned to the diphenyl still for re distillation with the next batch. The small amount of heads and tails ail left over Is discarded. The "heads" are light oils with boiling points nearing that of diphenyl and the "tails" Is diphenyl containing a little hi-boiler fraction. The heads and tails as collected is mainly diphenyl, which is recovered on redistil1stion. The amount of heads and tails oil produced is vary small, consisting of only about 0.11 of the crude diphenyl. The heads and tails tank ia provided with a 4" gaging hatch for measuring the level ia the tank. Steam for heating coil, 5' -0" O.D. x 5'-0" high vertical tank with flat top and dished bottom. " pS'Af A62.5&6 WATER_PCB- Item 307 Continued: Openings: Sterna Coil: Capacity: Insulation: Reference: 78. The tank i provided with 4" inlet nozzle, n 4" vent, a 22" I.D. nozzle for sump pmnp, a 4" gaging hatch, and a steam heating coil inlet and outlet. The steam coil couelets of about 30* of 1%" dia. standard seamless pipe. 800 gallon The aides and bottom of the tank are insula ted with 2" of rock wool, a 1," of Eagle 66, and covered with a sheet metal jacket. Draw-lags Heads U Tails Catch Tank Honaanto 9C-7876 DSW 462557 WATER_PCB-SD0000046153 Item 308: Head sad Tails Retarat Pmp (1-Required per Still) 79. August 1957 Function: Operation: Kateriala Handled: Controls: Services: Size & Type: Manufacturer: Materials of Construction: Motor: Drive: . Location: Reference; To return the heads and tails fro* the catch tank to the still for redistiliation. Periodic Heads and tails fraction from crude diphenyl distillation. . Manually controlled by motor starting switch. Estimated 3 KWH per day (maximum) 2|fn x 2" CL-4 vertical sump pump, 5'-6 long Taber Pump Company Iron casing with steel shaft and cast steal impeller. . 3 HP, 1750 E.FM, 3 phase, 60 cycle, . 220/440 v., TEFC explosion, proof vertical motor with ring base. Direct drive with flexible coupling. Installed in heads and. tails tank. Bill of Material 9BM-55 DS\N 462558 WATER_PCB-SD0000046154 -? 80. August 1957 Ite 309i Diphenyl Catch Tank. (l-Requirad per Still) Function: Operation.: Materials Bamdied: Ccratrola: Services: Site & Type: Opening*; Capacity; Materials of Construction: Issulatisn: Reference: To receive the dlpheayl fractio* from the crude diphenyl distillatiom. The operator sets the rvivel flow box to deliver to the diphenyl catch tank after the hold point of the distillate reaches 68,6C. The flow is changed again from the dlpheayl catch t&ak to the heads sued tails catch tank after the temperature is the still reaches 300C. Distilled dlpheayl The tank contain* a thief hatch for (Sampling the diphenyl. Steam to steam coil. 7*-6" I.D. x 6'-0n high vertical tank with a flat top and dished bottom. The task is provided with a 4" inlet, a 4" vest, a 22V* I .D. aorzl e for a sump pump, a 16" dia. annho1e, and a 6" thief hatch. 2100 gallons. 1/4" steal tank The sides and bottom of the tank are insula ted with 2" rock wool, a 1/2" of Eagle 66 and covered with a aheet metal Jacket. Drawings Monsanto Diphenyl Catch Tank 9C-7877 DSW 462559 WATER_PCB 81. August 1957 Itea 310; Diatilled Diphenyl Transfer Ptaap (1-Requlred per Still) Function: Operation: Materials Handled; Controls: Services: Sire & Type; Manufacturer: Materials of Construction: Motor: Drive: Location; Reference: To deliver the distilled diphenyl from the dipheayl catch, tank to the dipheayl storage tanks. Operated at the completion of the batch distillation. Distilled dipheayl at nppror. 100C. Manually controlled by motor starting rvitch. Estimated 15 KKH pr da.y (maximum) Ho. 1%B, figure S 1790 vertical sump pump vrith a length of 7'-3". Rums ey Pump Company Iron 3 HP, 1750 RFK, 3 phase, 60 cycle, 220 volt, vertical explosion proof General Electric motor. Direct connected by flexible coupling. Installed in diphenyl catch tank. Drawing , Foreign Rusaey Pump F-246-A 1 SW 462560 WATER_PCB-SD0000046156 -I SERIES 400 - IBSTROMERTATIOH 82. August 1957 Item 401: Automatic Let-Down Layel Control (1 Unit For Each Feed Tank) Function: Operation: Type: Manufacturer: To automatically maintain a supply of benzol la th feed task aad to souad an alarm la case of high or lcnr level. The operator must maaually select one of the five storage tanka from which to feed. A five-point pump switch located at the feed tank Is provided for this purpose which places the system in automatic control to feed from that particular storage tank selected. The automatic control system maintain* the level of the benrol in the feed 'tank within n range of 6""with the high-level"9" below the top of the'"tank, '"if the system falls ind the high or low level exceeds this range by 3", aa'nlarm'is "sounded by n separate level control system. Special TF-.2 P tandem magietrol control with glass float. Two"units are required, one for control and one for the alarm. Fred Hi'Schaub'Engineering Company, Inc. Chicago, Illinois DSW 462561 WATER PCB-SD0000046157 83. August 1957 Xtes* 4021 Benzol Feed Control Function: Ra-age: Type: Manufacturer: To automatically meter a specified quantity of beazol to each unit. 0-400 GPS - Units 4 through 13 0-250 GPS - Units 2 and 3 Each, control consists of: 1 - 12n M/10 Stabilog f lov controller type 7115 ' ' 1 - S.I. orificeplste for 1" line 1 - 1" A6A S 30 orifice flange 1 - Set liquid meter piping 1 - %" control valve, code 32110 BA 1 - Set liquid seal chamber* Fozboro DSW 462562 WATER_PCB-SD0000046158 84. August 1957 I tew 403: Twelve Point Temperature Recorder Function: Range: Type: Kanufacturer: To record the foLlowing temperatures: 1 - vaporiser coll outlet, inner and outer coils (if doable coil unit) 2 - exhaust flue gas to vaporiser - inlet and outlet 3 - Ho. 1 preheater pot 4 - Ho. 2 preheater pot . 5 - top of fractionating column 6 - condenser water outlet ' ' 7 - benrol "nm-back'1 from condenser 8 - bottom of fractionating column sump o-iooo8c. . #40362-17-special node! micromax tempera ture 12 point indicating recorder. Iron - Constantin #8759-S thermocouples Leeds and Horthrup DSW 462563 WATER_PCB-SD0000046159 85. August 1957 Itea 4(34: Slagle Poiat Temperature Recorder aad Controller Function: R.ange: Typa: Manufacturer: To indicate, record, and control the temperature o the converter by regulating the natural gas burners. 100-1100C. #40617-A2-H-83 Model S Hicroeiax tempera ture indicating and recordimg controller. Pneumatic control - Automatic droop correction - Motor 110 v. 60 cycles 3/4" Kasoa-Heilaa pneumatic -valves Haiion-Neila* valve repositlomers with air sets and part*. Ko. 8755 Iron-Coastaatin pipe type thermo couples vith' standard 778A element and P1-181A head, 66" long Leeds aid Horthrup oSvN A6254 WATER PCB-SD0000046160 86. August 1957 I tea 405: Baturai Gat Meter Function: Type: . Manufacturer: To record th.e quantity of gas consumed per ua.it r still. Ho. 35 B metric from case meter for maCural gas service. Top coamectioms. Maximum vorking pressure 100#. Aaericaa Meter Company DSW 462565 WATER PCB-SD0000046161 Item 406; Temperature Recorder - Diphenyl Still (1-B.eqaired per Still) Function: Type? Manufacturer: To record the following temperatures: 1 - still body 2 - still inlet 3 - outlet - circulating line 4 - top of colunm 5 ~ reflux to column 6 condenser vnter-out. #40356-55K-*pecial Kicronax 6 point 115 v. 60 cycle temperature recorder Leeds and Northrup DSW 462566 WATER PCB-SD0000046162 88. Align* t 1957 Item 407: Temperature Control Scill Heater Function: Type; Manufacturer: To control the temperature difference between the heater inlet ud outlet by regulating the gas burners. #40617 A3 - Model S Mlcromir (ingle point recording temperature controller Kason-Neilan #30 valve repoeitioners vith 3/4" pneumatic valve*, air sets and parts. Leeds and Horthrup DSW 462567 WATER PCB-SD0000046163 ag. August 1957 Itea 406: Blphemyl Quit - Automatic Safety Switches for Hatural G*b (1-H.aqqirad per Halt) Fumctlom: Manufacturer: To protect the equipment t the event of am emergency, by atoppimg the flov of natural gas to the Ho. 2 preheater when the temperature exceeds a pre determined waxisra*.. Forboro - Potentiometer Ccmtroller DSW 462568 WATER_PCB-SD0000046164 SERIES 500 - UTILITIES 90. August 1957 Itea 501: Lighting The diphenyl building housing the conversion unit* i* provided with Blightly better them general lighting. The lights are standard lights vith reflectors. The two still rooms are provided vith general lighting utilizing Appleton Electric Company Cat. #26537 explosion proof pendant' fixtures with'shallow dome reflector. hob size, 200 watt leaps. The hydrogen compressor room has no lighting facilities in the room but receives its lighting from the"outside from special explosion proof lights shining through the windows. DSW 462569 WATER PCB-SD0000046165 91- G August 1957 Iteni 502: Power Wiring k--' ' The marinu* coanected horaepover is about 180 EP aid the dally power consumption about 1845 H average at full productioa capacity, Wiring, relay switches, transformers, etc., are provided sccordimg to standard electrical practices. The control panel is located outside the building in a special enclosure. ( '( ' DSW 462570 WATER PCB-SD0000046166 c ( Itesi 502 Comtimaed: & . m p< u wc g5 I * H a51 0o 9 t>> 0 I Su u>00 9 0 N0 43 H M <X 44 (X 0 3 M tJ g 60 0 *4 H f--< u U ^ *M H 43 0 0 0 4J 0 fc ja uO i 0to |4 0 3 M co sd t> 04 3c U t*H G 0 0 0 43 G rH *-4 t4 U m nH 'Q rfHc, rH K 2* 43 43 A* CX **4 -*r4 OQ o os uo O r-4 io H r-- i O 1 CM r--1 0 O1 GO CM n in m rH r-H ao O os z z c s > cm cm o o o n *n m o r- h- r- p-v r> CO sd' H r--I rH rH t-C CO rH r-4 r*H o 'dO CM o CM CM CM OO *n m rH f--( oO CM CM CM CM Oo m *r\ r- rrH -4 o Oz CM CM Oo CM CM CM CM OoO tn wo v\ wo r-** Cs r- r-s --< H --i --4 ft! riNO * o o h is <r n *o CM tn W\ <o CO 00 tn IAHJ rH H CM H -4 rH H CM CM H C< M n cw a, 0 31 a. OS 61 a< Pn. 3 g p CU g a 04 IX 9 rr 1 &I 9u JX g i {X 04 0 0 tM cx 0 > 9 SM (x 03 i b (x tf o u 9 rt* u IX g 60 g rl 60 t4 e* g 4^3 t( u 4 04 rH 0M 0 H --0< 04 01 > H fi 0 j | o 9 04 S 9 fH 0d 03 u r* 9 d %4 H gm0 0 rH 0 3 H0 0u9 0 O u "d K' pH * 1O rH AH 9I ^4J o eo pH r*H 43 sH 60 U H g 69 rH M g 0 0 4 0 *d g *0 g gg g 0M o H C 03 m dJ CO CO 03 f D3 H ^ o Ei H fl ts I! o o o fs <3\ N H <o co o m r-4 er--44 COl CHM CM h On r^-4 CM h 92 DSW 462571 WATER PCB-SD0000046167 Item 503: Prodact Piping The benrol unloading piping and transfer piping is teio& traced and insulated. ill prodact piping including crude diphenyl, high boiler, nd distilled diphenyl are steam jacketed and provided with "homemade'1 diaphragm expansion joints between nil connections. The product piping from the carbon traps and the split flow boxes are constructed to for* a deep liquid trap to prevent hydrogen from venting into the feed or catch tanks frcm the column. . Piping is provided for the hydrogen gas fro the split flow boxes and condenser to the hydrogen coolers and compressor room. 93. DSW 462572 WATER_PCB-SD0000046168 Item 504; Water Piping 94. August 1957 Cooling water piping la provided from the PIamt water mala pump to the coadensert aad the hydrogem coolers. The return piping from the various units terminate in a connon header for drainage back to the general plant cooling" pondV The water from the cooling pond is strained .and pumped back to a codling tower. The wataf from the cooling tower is piped back to a booster pump for reuse. City water 'piping is provided for drinking' purposes and for the emergency showers placed at strategic points throughout the building. DSW 462573 WATER PCB-SD0000046169 * Item 505: Fuel Sm Piplmg Fuel gti pipimg is provided to the preheaters amd comvertara and to the ga* fired heater*. Am individual gas meter la provided 1m each lias. 95. Adjust 1957 Iteaa 506: Steam Limes Steam limes are provided to all the Jacketed product limes amd to the coils ia the catch amd storage tamks, amd to the split flow box. Also, a cbmmectioa is provided to the recirculated water syatest. Steam ia provided at 90-100# pressure. DSVV 462574 WATER PCB-SD0000046170 Iten 507: Building 96. August 1957 The diphaayl Halts, crude diphenyL stills, compressor reon, Aroclor plant, control rooms, office* md a*chime *hop mre all located it & 3-story itomdard ill building with a ome-story learn-to ca each aide. The main buildlmg section Measures 601 r 220', total area 110' x 220''accounted for by a 20' lean-to cm the west side and 10' canopy om the east side orer the loading platform. Am area'measuring 100 r x 180' at the south end 1* allocated to diphenyl operations. Construction is of steel throughout with hollow' tile aid stucco outside walla." Fire walls and fire doors separate' the diphenyl units into three groups and separate the diphenyl stills from, each other and from the rest of the plant. DSVV 462575 WATER PCB-SD0000046171 Item 508: Severe 97. Auguit 1957 Itea 509: Fire Protectlcm Equtpaeat Iteta 510: Graumde tad Gaaeral Area DSW 452576 WATER PCB-SD0000046172 98. August 1957 Item 511; Paimtlmg The control piping tm painted with diitinguishiag colors: bine for water, green for aaturai gu, and orange for benzol. Storage tanks are painted with one shop coat (outside only) of blue lead as per Monsanto specification. #1007. , Item 512: Insulation Itm 513: C0? Piping DSW 462577 WATER PCB-SD0000046173 WATER PCB-SD0000046174 /S i ' p p F / y y i /A / y D . 6 G / / , p p v & _ WATER PCB-SD0000046175 99. August 1957 Flowsheets and Diagram* B-5114 C-5240 C-5440 C-6258 C-6374 C-6830 C-4831 A-7812 9C-7850 9C-7851 9C-7875 9C.-8466 9C-8546 General Biphenyl Plant Flow Sheet Diagrammatic Layout Temperature Pressure Curves for Mercury, Diphenyl Diphenyl Plant Layout Diphenyl Plant Layout General Layout June 1935 Diagrammatic Flow Sheet ~ Heat Balance on Ho. 3 Unit Diagrammatic Flow Sheet for 4 Pot Unit Diagrammatic Flow Sheet for 2 Pot Unit Diphenyl Still Diagraamatic Flow Sheet '" Diagrammatic Flow Sheet Showing Pria. Equipment and Control System Map Diphenyl Area Water Plant Details of Steam Jacket Expansion Joint Thermo-well Detail Preheater Pot and Head Reaction Pot Preheater Terminal Bars Cast Alloy Reaction Pot Typical Diphenyl Unit Detail Reaction Pot Detail Pot Cover and Flange Chrome Steel Fittings for Lead Pots Detail Beams and Counter Fortes Lead Pot Setting Details of Fractionating Column Converter Da.it - Plate Structure Work Converter Omit Structure Frame Diph. Col. & Condenser Hanger for Lead Pot Flange Gooseneck for Still Connection " Hine Pass Expt. Tubular Converter Unit Brickwork Reaction Cover biphenyl Distributor Pipe Gasket for Benzol Still Stainless Steel Distributor Cup for Converter Cover for Reaction Pot Lead Bath and Ser. Converter Units Water Piping at Top Platform for 4 Units Fire Protection for Still and Benzol Tanks Pan for Diphenyl Detail Cast Steel Pot Cover 9AA-9058 9AA-8832 C-4092 B-4012 B-4052 C-4061 B-5205 C-5233 C-5234 C-5235 C-5236 C-5237 C-5238 C-5239 AA-5299 AA-5541 C-5760 C-5883 AA-6333 A-6497 AA-6699 C-6714 C-6815 C-7861 C7893 AA-806L 9C-8166 DSW 462580 WATER PCB-SD0000046176 100. All Welded Plpelln*, Inaulation and Jackets for Goosenecks Detail of Goosenecks Cover Plate Detail for Reaction Pot* AA-8531 9C-9085 9C-8147 9C-9019 3: Benrol Storage Benrol Underground Storage, Wooden Pump House Benrol Storage Tank Relocated Above Ground Detail benrol Storage Tank Aboire Ground Benzol Storage - Pimp Platform, Piping at Tank Benrol Storage Tanks, Cyclone Fence Beaabl Storage Tank, Hew Layout Benrol Storage Tank', Detail Benzol Storage Tanks 3, 4, 5 C-6259 C-6668 C-6669 C-6685 C-6691 9C-7960 9C-7961 9C-8252 4: Bentol Feeding Feed Tank and Pump Foundation Samp Tank Feed Tank Cover, Pipe Trough and Supports & Misc. Steel Benrol Feed Tanks, Piping Layout Benrol Feed Tanks, Piping, Supports & Jacket Benrol Feed Pumps, Piping and Peace Handrail'for Benrol Feed Tank Alterations to Pump Plate at Benzol Feed Tanks Fence for Benrol Tanks Piping fbr'Benrol Pump* 5 and 6 Benrol Feed Tank Platfom Benrol Piping Inside of Building Detail Housing Detail Housing Benrol Feed Tonka, Layout Benrol Feed Tanks, Detail Pipiig from Building to Tanka Piping at Control Room Piping at Building Line Benzol Feed Tank Foundation, Sheet 1 Benrol Faed Tank Foundation, Sheet 2 9C-7857 9C-7858 9C-7859 9C-7862 9C-7863 9C-7864 9C-7898 9C-8149 9C-8153 9C-8154 9C-8200 9C-8201 9C-8202 9C-8203 9C-8205 9C-8206 9C-8207 9C-8208 9C-82Q9 9C-8250 9C-8251 5: Units 1 and 2 ' C-5241 C-S580 AA-5581 C-5582 C-5583 Preheating and Vaporizing Colli Diphenyl Plant 2nd Unit - Reactor Pots Diphenyl Plant 2nd Unit - Detail Special Brick for Converter Unit and Traps Diphenyl Plant 2nd Unit - Detail of Fractionating Column Diphenyl Plant 2nd Unit - Setting for Converter Unit DSW 462581 WATER PCB-SD0000046177 101, C-5584 C-5585 B-5536 C-5587 C-5588 C-5589 B-5590 C-5S91 C-5592 C-5593 C-5594 C-559S C-559.6 C-6841 AA-7337 9C-7551 9C-7900 Diphenyl Plant 2nd Unit - Door and Burner Castings Diphenyl Plant 2nd Unit - Steel for Converter Omit Diphenyl Plant 2nd Omit - Stack for Canv. Omit and Location Burneri" Diphenyl Plant 2nd Omit - Stainless Steel Piping at Conv. Unit Diphenyl Plant 2nd Omit - Kiev. Steel Work Around Conv! Onit Diphenyl Plant 2nd Omit - Plan Steel Work Around Conv. Onit Diphenyl Plent 2nd Omit - Foundation for Conv. Onit and Steel Platform Diphenyl Plant 2nd Omit - Layout of Subvay Grating and Handrail' cm S ! G. Diphenyl Plant 2nd Omit - Inside Fitting* for Frac tionating Column - Diphenyl Plant 2nd Onit - Gas Piping for Conv. Onit* Diphenyl Plant 2nd Omit - Hot Water Storage and Heating"System Diphenyl Plant 2nd Omit - Layout of Auxiliary Piping Diphenyl Plant 2nd Onit.- General Layout ' Diphenyl Plant 2nd Onit - Benzol Vaporizer for No. 1 0a.it Diphenyl Plant Ho. 1 0ait - Cohn, t.o Lead Trap " Diphenyl Plant No. 2 Dait - Detail Support* for Cond. and Flow Box ' Diphenyl Plant No. 1 Dnit - Piping at Lead Trap 6: Dnit No. 3 C-7279 C-7280 C-7281 C-7282 C-7283 C-7284 C-7285 C-7286 C-7.287 AA-7322 9G-7335 9C-8139 Fractionating Column for Dnit No. 3 0nit No.' 3 - Diphenyl Still Diphenyl Plant - Omit No, 3 Diphenyl Plant - Dnit Ho. 3 Steel Kiev. Diphenyl Plant - Dait Ho. 3 Steel Sections Diphenyl Plant - Unit So! 3 Evaporator and Stack Diphenyl Plant - Dait Ho. 3 Lead Traps _ Diphenyl Plant - Dnit No. 3 Assembly Plans Diphenyl Plant - Unit Ho. 3 Assembly Kiev. Diphenyl Plant - Dnit No. 3 Adapter Flange - Cond, to Split Flow Box Diphenyl Plant Split Flow Box Installation on Diphenyl Still Column Diphenyl Plant - Dnit Ho. 3 Cooling Coils for Column 7: Unit So. 4 9C-7830 9C-7831 9C-7832 Dnit No. 4 General Assembly Dnit Ho. 4 Burner Setting 0n.it No. 4 30" Dia. 12 Plate Fractionating Column DSW 462582 WATER PCB-SD0000046178 102. 907833 907834 9C-7835 907836 9G-7837 9C-7838 907839, 907840 907841 907842 907843 907844 907845 907846 907847 907848 9G-7849 90 7852 907855 907856 9AA-7860 9AA-7865 07866 07867 07869 07935 7936 7937 9AA-7955 Unit Ho, 4 Shall for Converter Om.it No. 4 Gas Piping to Burners Unit No. 4 Piping at Top of Cols. 1 end 4 Unit No. 4 Split Flow Box Details Unit No. 4 Fire Brick Setting Unit No. 4 Lead Traps Omit No. 4 Seat Exchanger Omit No. 4 Vaporizer Omit No. 4 Section ead 2nd Floor Plea Omit No. 4 Section end 3rd Floor Plan - Omit Ho. 4 Floor Grating Omit No. 4 Holes for Burners in Shell Omit No. 4 Stack & Connection to Vaporiser Omit No. 4 Reaction Pot Aaseably Omit No. 4 Reaction Pot Details Omit No. 4 Carbon Trap Omit No. 4 Piping at Converter Omit Omit Ho. 4 Piping at Suiap Tank '' ' Unit Ho. 4 Condenser,"Trap, and Flow Box Support Oait No. 4 Foundations Omit Ho. 4 Condenser Support Oait No. 4 Burner Adapter Omit No. 4 6" dia. Coll. Hain for Ventilating Snap Tanks Unit No. 4 Gas and Benzol Feed Omit Ho. 4 Support for Vaporiser Unit No. 4 Fractionating Col. Jacket Unit Ho. 4 Emerg. Pipe Conn. Carbon Trap to Col. Omit Ho, 4 Alterations to Reaction Pot Oait No. 4 C. Steel Pipe Flanges Omit No. 5 9C-7970 9C-7971 907972 9C-7973 9C-7974 9C-7975 9C-7976 907977 9C-7978 9C-7979 9C-7980 Omit No. 5 Layout Oait Ho. 5 Steel Supports Omit No. 5 Steel Supports Omit No. 5 Floor Grating Omit Hoi 5 Detail Sheel For Converter Omit No. 5 Burner & Lighting Holes Converter Omit No. 5 Pipe from Converter Unit No. 5 Detail Pipe - Cols, to Snap Tank Oait No. 5 Gas Piping to Burner Omit Mo. 5 Detail of"Piping Oait No. 5 Benzol Feed Control Piping nsyV462583 WATER PCB-SD0000046179 103. 9 : Unit So. 6 9C-8131 908140 908141 908142 908143 908144 908145 908146 9C-8147 908148 9C-8150 9C-8151 908152 908155 9C-8156 908157 9C-8158 908159 908160 9C-8161 908162 9C-8163 9C-8164 Unit Ho. 6 Detail of Fractionating Column Unit Ho. 6 Layout Unit Ho. 6 Foundation Unit Ho. 6 Structural Steel Unit Ho. 6 Lead Trap* Unit Ho. 6 Piping at Col. and Comd., etc. Unit Ho. 6 Detail Converter Shell Unit Ho. 6 Layout S.S. Piping at Converter Unit Ho. 6 Detail S.S. Piping at Converter Unit Ho. 6 Assembly of Preheater Unit Ho. 6 Vaporiser Details Unit Ho. 6 Firebrick Setting Unit Ho. 6 Detail of Sump Tank Unit Ho, 6 Burner Setting Unit Ho. 6 Gas Piping to Burners ' Unit Ho. 6 Condenser Unit No. 6 Condenser and Covers Unit No. 6 Vaporiser Manhole Frame and Cover ' Unit Ho. 6 Piping and Layout for Sump Tank Unit Ho. 6 Detail of Vaporizer Coils Unit Ho. 6 Diphenyl Lina to Sump Tank Unit No. 6 Piping at Rotaweir and Condenser Unit Ho. 6 Piping at Rotaweir and Condenser Details Unit* 7, 8, 9, 10 9C-8190 9C-8191 9C-8192 9C-8193 9C-8194 9C-8195 9C-8196 9C-8197 9C-8198 9C-8199 9C-8202 9C-8203 9C-8467 Units 7, 8, 9, 10 Layout Unit* 7, 81 9, 10 Details of Vaporizer Shell Unit* 7, 8, 9, 10 6000 Gal. Catch Tank Unit* 7, 8, 9, 10 Layout Crude Catch Tank* Unit* 7, 8, 9, 10 Layout Diphenyl Piping Unit* 7, 8, 9, 10 Details Diphenyl Piping Unit* 7, 8. 9, 10 6000 Gal. Catch Tank Foundation Unit* 7, 8, 9, 10 6000 Gal. Catch Tank Pit H.i. Unit* 7; 8, 9, 10 Platform Sheet 1 ' Unit* 7, 8. 9; 10 Platform Sheet 2 Unit* 7; s; 9, 10 Detail Housing Units 7, 8, 9, 10 Detail Housing Diphenyl Units 6, 7, 8, 9, 10 11. Quit* 11. 12, 13 909021 909022 90 9023 909024 Diphenyl Omit* 12 and 13 Detail* Col. Fdn*. Diphenyl Unit* 11, 12, & 13 Converter Shell Det. Diphenyl Unit 11 Structural Framing Vaporiser Coil Detail SW 462584 WATER_PCB- L04. 9C-9025 9C-9026 9C-9Q54 9C-9055 9C-9056 9C-90S9 9C-9069 9C-9014 9G-9015 9C-9017 9C-9018 9C-9019 Vaporizer Shell Detail Vaporizer Assembly Unit a 11, 12, amd 13 11, 12, and 13 Gaa Piping to Burners Layout Rotaveir and Coadeaaer Diphenyl Piping Lead Trap to StorageTank Units 11, 12, and 13 Pipe & Support Detaila-Rotaweirs and Goad, . 11, 12, and 13 Layout Benzol Ruuback Lines Plot Plan Units 1, 11, and 12 Layout Units 1, 11, and 12 12 and 13 Structural Steel Framing 12 and 13 Structural Steel Framing Unit Assembly and Details Preheater 12: Hydrogen Compressor C-7363 Layout of Hydrogen Compressor C-7364 Hydrogen Compressor Structural Steel for Building C-7365 Hydrogen Compressor Boom C-7366 Hydrogen Compressor Room Wiring & Control Piping Diag. C-7367 Hydrogen Compressor Tanks C-7370 Compressor Room Foundation Plan G-7901 Relocating Hydrogen Condensers C-8014 Layout of Hydrogen Compressor Platform ( C-8040 C-8132 Layout and Detail Hydrogen Pipe from Cond. Ext. to Hydrogen Compressor Room Plans & Kiev, of Bldg. C-8133 Ext. to Hydrogen Compressor Room Struc. Steel for Bldg. C-8134 Ext. to Hydrogen Compressor Room Layout C-8165 Hydrogen Compressor Wiring and Piping Diagram C-8179 Hydrogen Compressor Plan and Elev. Bldg. C-8180 Hydrogen Compressor Floor Plan Sec. and Detail C-8181 Hydrogen Compressor Detail Door Frames , C-8182 Hydrogen Compressor Foundation Plan and Sections C-8188 Hydrogen Compressor Layout and Piping C-8189 Hydrogen Compressor Details and Bill of Material C-8279 Units 7, 8, 9, 10 Layout Hydrogen Piping 13: Crude Diphenyl Storage 9C-8152 9C-816Q 9C-8162 9C-8174 9C-8175 9C-8176 9C-8192 9C-8193 9C-8194 9C-8195 Detail of Sump Tank Piping amd Layout for Sump Tank Diphenyl Line to Sump Tank Steel Support & Platform for Crude Diphenyl Storage Storage Tank , Steam Coils & Thermowell Crude Diphenyl Storage Tank 6000 Gal. Catch Tank Layout Crude Catch Tank Layout Diphenyl Piping Details Diphenyl Piping ( Slv^s,s WATER PCB-SD0000046181 105. 9C-8196 9C-8197 908198 908199 908249 9G-8276 9C-8277 908278 6000 Gal. Catch Tank Foundation 6000 Gal. Catch Tank Pit Platform, Sheet 1 Platform, Sheet 2 " Sprinkler System for Crude Diphenyl Storage Sprinkler System for Crude Diphenyl Catch Tank Pent Piping for Crude Diphenyl Catch Tanka Crude Catch Tanka, Parec Gage 14: Diphenyl Distillation 907870 907871 90 7872 907873 907876 907 877 90-7878 907879 907880 9C-788I 907883 907884 907885 90 7886 907887 90 7888 907889' 9C-7890 90 7891 9C-7892 907895 907896 907897 9C-7939 90 7940 9AA-7941 907943 907944 908076 908077 908078 908079 90 8081 908264 Fractionating Column "" Hew Layout Still and Auxiliary Equipment Detail Condenser Still Detail Details Heads and Tails Tank and High Boiler Detail* Diphenyl Catch Tank Still Foundation Still Supports, Sheet 1 Still Supports, Sheet 2 ' Still Supports, Sheet 3 ' Wise. Pipe Details, Sheet 1 Floor Grating Kisc. Pipe Details, Sheet 2 Swivel Split Flow Box and Kisc. Steel Hi8c.' Pipe Details, Sheet 3 Condenser Details . Kisc. Pipe Details,. Sheet 4 Misc. Pipe Details, Sheet 5 Detail of Vents Misc. Details Assembly of Flow Box Control . Details of Split Flow Box Control Pent Fan for Swivel'Flow Box & High Boiler Drum Fill Detail Still Heater; Sheet 1 Detail Still Heater, Sheet 2 Flanges"for Still Piping Assembly of Heater Detail of Heater Inner Core Still Heater, Assembly Still Heater, Details Sheet 1 Still Heater, Details Sheet 2 Diphenyl Still Revision to Heater Platform Diphenyl Still, Heater Gas Piping New Stairs at Ho. 1 Diphenyl Still DSW 462586 WATER PCB-SD0000046182 106. 9C-8210 9C-8Z11 908212 908213 908214 908215 9C-8216 908217 908218 908219 908220 90 8221 9C-8222 9C-8223 9C-8224 9C-8225 908226 908227 908228 908229 90 8230 9C-8254 9C-8262 9C-8263 Layout of Ho 2 Diphenyl Still Ho. 2 Still Ho. 2 Still Ho. 2 Still Ho. 2 Still Ho. 2 Still, Ho. 2 Still, Ho. 2 Still, . Ho. 2 Still, Ho. 2 Still, Ho. 2 still : Section and Details Ho. 2 still : Ho. 2 still ; Stairs and H.R. Ho. 2 Still ] Ho. 2 Still 1 Ho. 2 Still, Details Vents and Piping, Sheet 1 Ho. 2 Still, Details Vents and Piping, Sheet 2 No: 2 Still, Details Vents and Piping, Sheet 3 No. 2 Still, Details Vents and Piping, Sheet 4 No. 2 Still, Details Vents and Piping, Sheet 5 No. 2 Still, Heater Detail Manhole Frame and Cover No. 2 Still, Layout of Piping Ho. 2 Still, Stair Details Ho. 2 Still, Stair Details 15: Distilled Diphenyl Stor&gi 9C-9057 9C-7882 9C-7894 9C-9071 9C-9082 9C-9071 9C-9083 , 9C-9076 9C-9088 9C-9087 Storage Tank 10'-6" x 37'-4" Detail Foundation for Diphenyl Storage Tank Storage Tank, Detail Loading Line Supports Pipeline to Storage Tanks Steel Platforms over Diphenyl Tanks Pipe Line Supports and Foundations Piping to and From Diphenyl Storage Tanka Location Pisa, 2 - 25,000 Gal. Tanks Pumps for Ster age links Steam Piping to Storage Tanks 16: Building C-5418 C-6378 C-7853 C-7868 9AA-7899 C-8183 . C-8184 C-8185 C-8186 C-8187 C-8264 Buildings - Elevations of Diphenyl Building Diphenyl Building - Asbestos Roof, S.E. Comer 2nd and Top Floor Plans Shoving Units, 1, 2, 3, and 4 Roof Truss Reinforcing . ' Diphenyl Development Bldg. Areas - Floor Lighting Diphenyl Building 401 Extension - Foundation Diphenyl Building 40' Extension. - Floor Drains Diphenyl Building 40' Extension - Lean-to Still Diphenyl Building 40' Extension - Framing for Units 7, 8,' 9, 10 ' Diphenyl Building 40' Extension - Framing for Units 7, 8, 9, 10 Nev Stairs at No. 1 Diphenyl Still DSW 462587 WATER PCB-SD0000046183 107. 17: Control* 908754 907942 907949 908204 908208 909060 909061 Wall* & Instrument Panels - Control Room Diphenyl Plant Control Room Diphenyl Plant Comtrol Panel - Detail Control Room Units 7, 8, 9, 10 Panel Benrol Feed Tanhn - Piping at Comtrol Room . Process Comtrol - Instrumentation Diagram General Plant, 1947 Additions - Power and Control 18: Power 9AA-8265 908266 908269 908539 9C-8540 908881 Diphenyl Plant - Power, Crude Diphenyl Power Panel Diphenyl Plant Service Room - Gas & Elec. Co*. Diphenyl Power Transformer Guard '" Ele'ctrical - Electric Services in Diphenyl Area ' Electrical - Power in Diphenyl Bldg. - One tine Diagram Power Distr. - Power Panels & Layouts & Schedules : Bills of Material 9BM-26 9BM-27 9BM-28 9BM-29 9BH-35 9BH-36 ' 9BM-44 9BK-47 9BM-48 9BH-50 9BH-51 9BK-52 9BM-53 9BM-54 9EM-55 9BM-56 9BM-57 9SM-63 9BM-74 9BH-87 . Benrol Feed Tanks Diphenyl Units 1-2 Hew Still and Accessories (No. 1 Diphenyl Still) 4th Diphenyl Omit 5th Diphenyl Unit Benzol Storage (907960) Diphenyl Still Heater (9C-8076) Hydrogen Compressor ' 6th Diphenyl Unit Crude Diphenyl Storage ' Diphenyl Quits - Extension to Building Relocating Hydrogen Compressor Benzol Storage . Four'Diphenyl Units Diphenyl Still Ho. 2 Water Supply . Power Supply High Boiler Line to Storage Pit Steam Line to Diphenyl Building Diphenyl Halts 11, 12, 13 DSW 462588 WATER PCB-SD0000046184 EQUIPMENT HUMBER LIST OF tfeg IH DEPT. 20 - BIPHKHTL Equipment Btaaber 17-7 17-10 17-15 17-16 17-17 17-20 17-21 17-22 17-23 17-24 17-25 17-31 17-32 17-33 20-1 20-64 20-107 20-110 20-113 20-126 20-220 20-226 20-230 20-234 20-235 20-247 20-263 20-264 20-274 20-275 20-276 20-285 20-286 20-287 20-288 20-289 20-290 20-291 20-292 20^293 20-296 20-298 20-335 Description ' Converter #2 Converter #3 Converter #4 Converter #5 Still Heater #1 Converter #6 Converter #7 Converter #8 Converter #9 Converter #10 Coil Heater #2 Still Converter #11 Converter #12 Converter #13 Split Flow BOx #5 Unit Storage Tank, Heads and Tails Catch #2 Still Storage Tank, Heads and Tails Catch #1 Still . Water Tank #1 Still . Hi-Bqileir #2 Still Tank Benzol Star age Tank - Tard Benzol Feed Tank. Air'Receiver 24" x 6' ' Inter Cooler - Receiver #2 Split Flow Box #1 Still Split Flow Box #3 Unit . Split Flow Box #2 Unit . Split Flow Box #4 Unit Benzol Storage Tank lO'-O" x 18' Receiver After Cooler #1 Comp. Receiver Inter Cooler #1 Cosap. Soap Tank #3 Benzol Storage Tank Benzol Storage Tank Benzol*Storage Tank ' Biphenyl Catch Tank Still #1 Biphenyl Catch'Tank Still #2 #2 Biphenyl Swap Tank South #1 Biphenyl Swap Tank North Benzol Catch Tank #1 - Cosap. Roc* Vienna Receiver - Conp. Room #3 Benzol Feed Tank Sump Tank - Cooling W*ter Biphenyl Storage Tank . DSW 462589 WATER PCB-SD0000046185 Equipment Humber Lift Continued: Equipment Humber Description 20-236 20-516 20-517 20-518 20-528 Biphenyl Storage Tank Benzol Recovery - Comp. Room Benzol Recovery - Comp. Room Benzol Feed Tank & Platform. Isopropyl Alcohol Tank 26-13 26-18 26-22 28-80 28-81 28-82 28-83 28-84 28-85 28-140 28-141 28-142 Stanp at Benzol Storage Tank - Yard Concrete Catch Baiia - #3 Benzol Feed Tank Safety Dike - #2 Biphenyl Storage Tank Rotaweir - #6 Omit Rotweir - #7 Unit Rotweir - #8 Unit ' Rotaweir - #2 Still Rotaweir - #9 Unit Rotweir - #10 Dnit Rotweir - #11 Dnit Rotaweir - #12 Unit Rotweir - #13 Unit . 33-60 33-79 33-84 33-129 33-135 33-137 33-138 33-145 33-156 33-157 33-158 33-165 33-166 33-167 33-168 33-169 33-170 33-171 33-177 33-215 33-216 33-218 33-246 33-261 Pump - Ramsey 26/37 Benzol Storage Tank Pump - Gould - Crude Storage Pump - Viking 1189619 - Benzol Storage #1 Pump - Ramsey 26811 - Biphenyl Storage Pump - Worthington - Still Room #1 Still pump - Ramsey - #1 H&T Tank Pump - Viking - #2 Benzol Storage Pump - Worthington - Comp. Room Pump - Worthington - #2 Still Pump - Blackmer 246737 - Benzol Storage #3 Pump - Blackmer 246738 - Benzol Storage #5 Pump - Taber 395 - #2 Still Pump - Taber 249 - Pit Pump Pwap - Taber 384 - Catch Tank Pump - Taber 384 - Catch Tank Pump - Westco BR507 - Comp. Room Pump - Taber 377 64 - Crude Storage Pump - Taber 37765 - Crude Stor age ' Pump - Westco 43036 - Benzol Unloading Dock Pimp - Taber 45132 - #1 Biphenyl Still Pump - Taber 45497 - Biphenyl Still (Spare) Pump - Viking - Benzol Storage #1 Pump - Gould 29QA048 - Benzol Feed (Yard) (3) Benzol Feed Pumps 109. DSW 462590 WATER PCB-SD0000046186 Eqaipaent Nuaber Lift Continued: Equipment Hmber Description 34-74 34-98 Poap - Gould 176415 - Benzol Feed (1) Puap - Gould 185143 - Benzol Feed (2) 35-22 35-33 35-34 35-37 35-45 Compressor #1 Hydrogea Compressor #2 Air Compressor #3 Air Compressor #2 Hydrogea Coapreasor #3 Hydrogea 51-17 51-24 Biphenyl Still #1 Blpheayl Still #2 52-6 52-17 52-22 52-23 52-27 52-28 52-29 52-30 52-32 52-33 52-34 52-36 52-37 52-42 52-43 52-44 52-45 52-53 52-54 52-55 52-56 52-57 52-58 S2-59 52-60 52-61 52-62 52-76 52-77 52-78 52-80 52-81 Vaporizer #2 Omit Vaporizer #3 Halt Vaporizer #4 Halt Condenser #3 Halt" ' Condenser #2 Converter Heat Exchanger #1 Still Heat `Exchanger #4 Halt Condenser #4 Halt Coadeaser #1 Still ' Heat Exchanger #5 Converter Coadeaaer #5 Converter Vaporizer #5 Halt Benzol Condenser - above Deck Sled Vaporizer #6 Halt Condenser #6 Halt Inter Cooler #1 After Cooler #1 Condenser #7 Coadeaser #8 Condenser #9 Condenser #10 Vaporizer #7 Halt . Vaporizer #8 Halt Vaporizer #9 Halt Vaporizer #10 Halt (in stack) Heat Exchanger #2 (Still) Condenser #2 (still) Vaporizer #11 Unit Vaporizer #12 Unit Vaporizer #13 Halt Condenser #11 Unit ' Condenser #12 Unit . ' . . 110. d5nN 46259^ WATER PCB-SD0000046187 Equipment Somber Llat Continued: Equipment H umbel' Description 52-82 52-88 52-91 52-92 52-147 52-148 52-149 52-150 52-151 52-155 52-157 . Condenser #13 After Cooler Inter Cooler - Comp. Roam After Cooler - Comp. Room Condenser - Cap. Roos Condenser - Comp, loos Sent Exchanger - Hydrogen Cooling Heat Exchanger - Hydrogen Cooling Preheater Coil - Biphenyl Column Heat Exchanger Heat Exchanger 53-13 53-14 53-15 53-17 53-18 53-19 53-20 53-21 53-22 53-23 53-24 53-26 53-27 53-28 Fractionating Colima #1 Bipheayl Still Fractionating Column #4 Converter Fractionating Column #2 Halt Fractionating Column #5 Converter Fractionating Column #6 Converter Fractionating Column #2 Biphenyl Still Fractionating Column #3 Converter Fractionating Column #7 Converter Fractionating Column #8 Converter Fractionating Column #9 Converter Fractionating Column #10 Converter Fractionating Column #11 Converter Fractionating Column #12 Converter Fractionating Column #13 Converter 55-177 55-291 55-295 Kan Cooler Fan Fan, Utility Blower - Hydrogen. Coap. Room 61-157 Hand Track - for Pots and Trap 63-93 63-134 Gear Box on Controller Speed Reducer - Flakar 64-40 64-41 64-47 64-48 64-57 64-58 64-66 Jacketed Process Piping Stems Feeder Piping - Storage and Loading Piping - Instrument Service Piping - Unit Piping Benrol Recovery Piping Benzol Unloading and Storage 65-21 65-74 65-75 Hydrogen Compressor Control Lines Process Piping Benzol Feed Tank Water Cooling Tracer 111. DSW 462592 WATER PCB-SD0000046188 Equipment Number Lilt Continued: 112. Equipment Humber Description 73-49 .73-84 73-94 73-95 73-96 73-99 73-104 73-105 73-106 73-107 73-108 73-109 73-123 73-124 73-125 Chain Hoiat #2 Converter Chain Hoist #3 Converter - Trolley Chain Hoist #4 Converter - Trolley Chain Hoist #5 Converter - Trolley Chain Hoist #5 Converter Chain Hoist #4 Converter Chain Hoist Chain Hoist - Trolley Chain Hoist - Trolley Chain Hoist - Trolley Chain Hoist - Trolley Chain Hoist - Trolley Chain Hoist #11 Converter Chain Hoist #12 Converter Chain Hoist #13 Converter 75-21 75-66 75-67 Hover Feeder - Underground to Biphenyl Storage Pumps Temperature Control Wiring - Units Motor Wiring 78-170 78-171 78-174 78-177 78-178 78-189 78-190 78-197 78-242 78-243 Power Panel #1 Converter Motor Control Cabinet #1 Converter Heat Control Board #1 Motor Control Board - Benrol Storage Pumps Motor Control Board - Compressor Room Control Cabinet - Compressor Room Control Cabinet - Control Room. Motor Control Board #2 - #1 Converter Room Power Cabinet - Benzol Feed & Hydrogen Compressor Motor Control Frame - Storage Tank Motors 79-18 79-106 79-152 79-157 79-301 79-308 79-414 79-519 79-531 79-561 79-571 79-589 79-593 79-610 . Motor - G.E. 5560247 - 40 HP - #2 Hydrogen'Comp. Motor -LA 311416 - 1% HP - on Viking Pump Motor -LA 3648018 - 1% HP - Benzol Storage Motor - Howell 5132 J 1 - 15 HP - Benzol Feed Motor - G.E, - 5 HP - Biphenyl Motor - G.E. - 5 HP - Biphenyl Motor - G.E. - 1% HP - Motor - Howell 5131 J2 - 10 HP - Feed Pump Motor - G.E. - 30 HP - #1 Hydrogen Comp. Motor - Allis Chalmers 52694 - 2 HP - Id 5 Bid. 27 Motor - G.E. 6768195 - 40 HP - #3Hydrogen Comp. Kotor - L A - 7% HP - #1 Still Motor - G.E. - 3 HP - Yard ' Motor - GE .- EM 2900 - 5 HP'- Biphenyl Storage DSW 462593 WATER PCB-SD0000046189 Equipment Humber List Continued: 113. Equipment Humber Description 79-612 79-614 79-642 79-683 79-712 79-758 79-824 79-878 79-914 79-922 79-923 79-926 79-927 79-963 79-975 79-976 79-978 79-979 79-980 79-987 79-1139 79-1192 Motor -LA. 368542 - 1 HP - Aroclor Boiler - Hyd. Comp.Room Motor - GE - Ml314 - 5 HP - Biphenyl Storage Motor - GE - FW879 - 5 HP - Clrc. Water #1 Still Motor - GE - EW2292 - 5 HP- Air Comp. Motor - Courtney - 1/6 HP Motor - GE- AP1990 - 3 HP - Flake D. Dryer Motor - GE - EP2055 - 3 HP - Biphenyl Tank Kotor Reducer - Foxboro - 1/6 HP - Control Room Motor - G.E. - 3 HP - Sump Tank Motor - G.E. - 5 HP - Catch Tank #2 Still Motor - GJK: - 5 HP Motor - G.E. - MR2065 - 3 HP - (on Gould pump) Motor - G.E. - MR2067 - 3 HP - (on Gould pump) Motor -LA- 7%'HP Motor - L A - 7\ HP - #2 Biphenyl Still , Motor - 1/2 HP -- Sump Tank Kotor - Howell 296186 - 2 HP - Blackaer Pimp Kotor - Howell 287229 - 2 HP - Blackmer Pump Kotor - Howell 306991 - 2 HP - Blackmer Pump Kotor - W'hee - 7 HP - on Hartzell Fan Kotor -LA 1827991 - 15 HP - on Benzol Pump 33-246 Benzol Feed Pump and Kotor 82-226 82-227 82-228 83-11 83-13 83-17 83-33 83-34 83-35 83-40 83-44 83-60 83-114 83-116 83-117 83-118 83-119 83-124 83-125 83-126 83-127 83-128 Watt Hour Meter G.E. 19366523 in Panel 78-170 Current Trans. G.E. 400/5 - in Panel 78-170 Current Trans. G.E. - in Panel 78-170 Controller - Benzol Comp, lad. Recorder - L&H 293220 Temp. Indicator - LAH 292382 - Control Room Temp. Controller - Wilaon-Macalea Temp. Controller - Wilaon-Macalen Temp. Controller - WilaonrKacaLea Temp, Controller - Wilson-Hacalen - 9575 H47A Temp. Controller - Wilson-Kacalea - Crows Heat leap. Controller - Wilson-Kacalen lad. Recorder - L&H 329967 Gas Control Valve Control Valve - Foxboro 49047 8 Control Valve - Foxboro 563776 Benzol Valve - Foxboro 563781 Temp. Recorder - L&H 350456 Temp. Recorder - LAN 338835 Gas Valve - L&H - #5 Converter Control Valve - Foxboro 619301 Control Valve - Foxboro 619302 DSW 462594 WATER PCB-SD0000046190 Equipment Humber Liet Continued: Equipment Humber 'Description 83-132 83il36 83-142 83-145 83-146 83-147 83-148 83-149 83-150 83-151 83-152 83-153 83-154 83-155 83-156 83-166 83-168 83-169 83-170 .83-171 83-172 83-174 83-175 83-176 83-177 83-179 83-180 83-181 83-182 83-183 83-185 83-186 83-187 83-188 83-189 83-190 83-191 83-192 83-193 83-194 83-196 83-197 83-198 83-253 83-256 Magnetic Valve - On Preheater #5 Pressure Balance Valve - L&H leap. Controller - L&H 350682 Pnewaatic Recorder - L&H 366481 Control Valve - Foxboro Potentiometer Controller - Foxboro C58872 - Hydrogen Comp.Em. Potentiometer Controller-Foxboro C-58873- Gas Valve - t&H Temp. Recorder - I&R 350738 . Temp. Recorder - L&H 350744 Gaa Valve - I&N Control Valve - Foxboro 697076 Control Valve - Foxboro 697077 Control Valve - Foxboro 697078 Control Valve - Foxboro 645409 Gas Valve- #2 Still ` Temp. Recorder - L&H 350802 Temp. Recorder - L&H 350803 Temp. Recorder - L&H 350805 Temp. Recorder - L&H 350796 Temp. Recorder - L&H 350784 Temp. Recorder - L&H 381S06 Temp. Recorder - L&H 381509 Temp. Recorder - L&H 381528 Temp. Recorder - L&H 381541 Temp. Recorder - L&H 350806 Temp. Recorder - L&H 381525 Temp, Recorder - L&H 350800 Potentiometer Recorder - L&H 381467 Potentiometer Recorder - L&H 381419 Potentiometer Controller - Foxboro C-63869 Potentiometer Controller - Foxboro C-63870 Potentiometer Controller - Foxboro C-63871 Potentiometer Controller - Foxboro C-63872 Control Valve - L&H - V/AB Air Set Control Valve - L&H - V/AB Air Set . Control Valve - L&H - V/AB Air Sat Control Valve - L&H - V/AB Air Set Control Valve - L&H - V/AB Air Set Control Valve - L&H - V/AB Air Set Ratox Preaa Controller - Foxboro C93641 Diff, Preaa Controller - Foxboro C66930 Kotor Controlled Valve - Foxboro 470763 Pxesaure Valve - L&H . . Rec. Temp. Controller - L&H 576007 DSW 462595 WATER_PCB-SD0000046191 Equipment Humber List Continued: 115. Equipment Huaber ________________ Description 83-257 83-258 83-259 83-260 83-261 83-262 83-263 83-265 83-266 83-267 83-268 83-269 83-270 83-271 83-272 83-328 Rec. leap. Controller - L&I 576010 Rec. Temp. Controller - L&H 576015 . Rec. leap. Controller - L&H 690411 Temp. Recorder - L&H 690470 Temp. Recorder - L&H 690473 Potentiometer - Foxboro F83911 Patentioweter - Foxboro F83912 lad. Pres* Controller - Foxboro 95626 - Hyd. Comp. Room Coat. Benzol Valve - Foxboro 1619914 Control Benzol Valve - Foxboro 1619963 Control Benzol Valve - Foxboro 1619976 Control Gas Valve-Mason-Hellan J-29871C8276 Control Gas Valve-Mason-Hellan J29872C8276 Control Gas Valve-Mason-Hellan J-29873C8278 Controlled Valve-Foxboro F25FB-Hydrogen Compressor Gas Controller - Foxboro J19649 84-18 84-19 84-20 84-23 84-24 84-28 84-29 84-30 84-31 84-32 84-53 84-54 84-55 84-56 84-57 84-58 84-59 84-60 84-61 84-62 84-63 84-64 84-65 84-70 84-71 84-72 Biphenyl Flow Controller - Foxboro - #4 Converter Biphenyl Flow Controller - Foxboro C33473 Biphenyl Flow Controller - Foxboro C32422 Biphenyl Flow Controller - Foxboro C37533 Biphenyl Flow Controller - Foxboro C37534 Biphenyl Flow Controller - Foxboro C55147 Biphenyl Flow Controller - Foxboro C63568 Biphenyl Flow Controller - Foxboro C-63569 Biphenyl Flow Controller - Foxboro C63570 Biphenyl Flow Controller - Foxboro C-63571 Pneumatic Transmitter-Foxboro F75356 Pneumatic Trailemitter-Foxboro F75357 Pneumatic Traasmitter-Foxboro F75358 Pneumatic Traasmitter-Foxboro F45926 Pneumatic Traasmitter-Foxboro F45927 . . Pneumatic Traasmitter-Foxboro F45928 Pneumatic Traasmitter-Foxboro F45929 Pneumatic Transmi11ar-Foxboro F45930 Pneumatic Transaitter-Foxboro F45931 Pneumatic Transaitter-Foxboro F45932 Pneumatic Traasmitter-Foxboro F45933 Pneumatic Transaitter-Foxboro F45934 Pneumatic Transaitter-Foxboro F45935 IntergTating Flow Contro1lar-Foxboro F75359 Interpreting Flow Controller-Foxboro F75360 IntergTating Flow Controller-Foxboro F75361 OSW 462596 WATER PCB-SD0000046192 Equipeat Number List Continued: 116. Equipeat Humber Description 86-2 86-5 86-7 86-17 86-24 86-29 86-30 86-31 86-32 86-33 86-49 86-50 86-51 Gag Hater - 016398 - #5 Unit Gag Meter - 016463 - #11 Omit Gaa Meter - 016489 -#13 Converter Gag Hater - 829070 - Biphenyl Still Gag Heter - 016397 - #12 Unit Gag Heter - 027352 - #7 Converter Gag Heter - 028002 - #4 Converter Gas Meter - 028003 - #6 Converter Gas Heter - 028004 - #2 Converter Gag Hater 028265 - #3 Converter Gaa Hater - 051935 - #10 Onit Gas Heter - 051936 - #9 Onit Gas Heter - 051936 - #8 Unit 99-20 99-26 Fence - at Benzol Storage Tank ' Fence - Storage Pit 106-132 106-253 106-276 106-283 106-365 106-377 106-391 106-525 106-533 Flood Lights - Feed Tank Clock Synchonous High Boiler Storage Pit - tTLake Clegora" Benzol Unloading Dome Transmitter Stand - Meter Room Pneumatic !Wrench "' High Boiler Storage Pit - Storage Crude Santowax Pipe and Coils for #12 and #13 Units Conversion Measurement System . 107-16 107-33 Fire Extinguisher - on. 2-Wheel Truck Emergency Foam Line - at Benzol Feed Tank 110-39 110-42 110-56 110-68 110-69 110-70 110-82 110-83 110-84 110-85 110-95 110-99 Platform at' Storage & Shipping Tank - S.E. Comer Bldg. Platform #2 to #6, and #11 Units - Hid. Coav. Room Supports for Benzol Feed Piping - S.W. Bldg. 27 Platform at #1 Still Platform at'Biphenyl Still Heater . Walking Platform, above Deck Shed Roof-Benzol Loading Platform 7,8,9,10 Units Platform #2 Biphenyl Still Platform Benzol Feed Tank Unloading Platform Platform'#12 and #13 Units ' Platform, Including Grating & Stairs, Towers to Handle Sub. Pump 27- 112-16 Control and Alarm System . -4SS*. DSW 462S97 WATER PCB-SD0000046193 Equipment Number Lit Continued: 117. Equipment Number Description 116^-98 Aroclor Heater (Fro* CC Job - At Ho Value) 117-201 Tool and Supply Locker (4) 206-57 206-72 Feed Pump Structure (Fence and Concrete Floor) Operating Structure-Biphenyl Sump Tank (Catch Basis, Fire Wall, Platform) DSW 462598 WATER PCB-SD0000046194 118. August 1957 r? MAIHTKNAHCE SURVEY SERIES 100 - GENERAL PLANT Item 101: Benzol Tank Car Unloading Pump (1 Required) Function: Maintenance Required: To onload benzol from railway tank cars to the benzol storage tanks. None Item 102: Benzol Storage Tanks (5 Required) Function: To provide Benzol raw material buffer storage between receipt and use. c Maintenance Required: None ' Item 103: Benzol Transfer Pumps (5 Required) Function: Maintenance Required: To transfer benzol from the benzol storage tanks to the benzol feed tanks. Maintenance will be dome on MRO - proposal has been made to test suction of pumps to , determine if a fewer number of pumps cam be used. - I tea. 104: Isopropyl Alcohol Storage Tank (1 Required) Function: To provide buffer storage for isopropyl alcohol. Maintenance Required: Home DSW 462599 WATER PCB-SD0000046195 Itaa 105; Isopropyl Alcohol Transfer Paap 119. August 1957 Functiom: Ksiateus.ce Required: To transfer isopropyl alcohol to the isopropyl alcohol feed tank. Rone Item 106: Beazol Feed Teak (Z Required) Function: Maintenance Required: 1. To provide a source of benzol for feeding the Biphenyl units. 2. To provide a catch tank for the benzol returned from the Biphenyl process. Rone I tea 107: Beazol Feed Pumps (3 Required) Function: Maintenance Required: To deliver the benzol feed from the beazol feed tank to the benzol vaporizer coil of each Biphenyl unit. . Rone Item 108: Isopropyl Alcohol Feed Tank Function: Maintenance Required: To provide a source of isopropyl alcohol for feeding to the benzene feed. Hone OS'M 4^600 WATER PCB-SD0000046196 Item 109: Isopropyl Alcohol Feed Paap 120. August 1957 Fraction: Maintenance Required: To transfer Isopropyl Alcohol to the suction of the benzol feed pumps. Hone Item 110: Hydrogen Coolers (6 Required) Fraction: Maintenance Required: 1. To cool the gas and vapors from the benzol condenser in order to decrease the vapor load on the hydrogen compres sors . 2. To condense some of the benzol vapor from the hydrogen gas. Clean each cooler on the vater side. This cleaning should consist of acid washing and inspection to determine if physical clean ing ia. necessary. It tea 111: Beasol Catch Tank (1 Required) Fraction: Maintenance Required: To trap condensed benzol from the hydrogen gas. Hone . Item 112: Hydrogen Compressors (3 Required) Function: Maintenance Required: To compress the hydrogen and condense the benzol vapors contained in the hydrogen. Hone DSW 462601 WATER_PCB-SD0000046197 Item 113: Inter Coolers (3 Required) 121. August 1957 Function: Maintenance Required: To condense benzol from the hydrogen gas after the first compression stage. None . Item 114: Lov Pressure Receiver (3 Required) Function: Maintenance Required: To provide a trap and collecting tank for the benzol condensed from the hydrogen gas after the first compression stage. Rone Item 115: After Coolers (3 Required) Function: Maintenance Required: To condense benzol from the hydrogen gas afteT the second compression stage. Hone Item 116: High Pressure Receiver (3 Required) Function: Maintenance Required: To provide a trap and collecting tank for benzol condensed from the hydrogen gas after the second compression stage. Visual inspection indicate no maintenance required. Hovever, thicknass ef these tanks should be checked. DSW 462602 WATER_PCB-SD0000046198 Item 117; Benzol Return Pomp Tank (1 Required) 122. August 1957 Function: Maintenance Required: To collect the condensed benrol from the receivers sad the benzol, catch tnnk. Home Item 118: Recovered Benzol Return Puap Function: Maintenance Required: To return the recovered benzol in the pump tnnk to the benzol feed tank. Hone (Larger benzol pumps are needed.) (A separate project ia being submitted.) Item 119: Crude Biphenyl Catch Tanks (Sump Tanks) (2 Required) Function: Maintenance Required: To catch the crude Biphenyl from the Biphenyl units and store it prior to batch distillation. Repair sheet metal weather-proofing over Insulation on Ho. 1 Sump Tank. Item 120: Still Charging Pumps (2 Required) Function: Maintenance Required: To deliver the crude Biphenyl from the catch tanka to the still. Hone DSW 462603 WATER PCB-SD0000046199 -I Ita 121: High Boiler Collecting Tank (1 Required) 123. August 1957 Function: Maintenance Required: To provide a receiving end cooling tank for the distilled high boiler (Santovax C), The insulation on this tank is saturated with Biphenyl, Remove old insulation and reiasulate. Provide new weather-prooflag. Item 122: High Boiler Pump (1 Required) Function: Maintenance Required: To deliver high boiler from the high boiler tank to the Santovax C Storage Tank. None . Item 123: Distilled Benzol Collection Tank (1 Required) Function: Maintenance Required: To provide a catch tank for the benrol fraction distilled from the crude Biphenyl. None Item Distilled Benzol Raturn Poap (1 Required) Function: Maintenance Required: To deliver .the recovered benzol from the distilled benzol collection tank to the benzol feed tank. Repair motor casing where it has corroded through. DSW 462604 WATER PCB-SD0000046200 Iteg 125.: Biphenyl Storage Tanks (2 Required) 124. August 1957 Function: Maintenance Required: To store distilled Biphenyl prior to shipping. Hone Itaa 126: Biphenyl Loading Pumps (2 Required) Function: Maintenance Required: To deliver Biphenyl from the Biphenyl storage tanks to tank cars for shipping. Hone OSVd462605 WATER PCB-SD0000046201 125. August 1957 - SERIES 200 - B1PHKHYL TOITS Item 201; Baqzol Taporizar (1 Requirad pet Dnlt) Function: Maintenance Required: 1. To vaporize the benzol feed to each Biphenyl Halt. 2. To recover sensible heat from the exhaust gases used in heating the preheater and converter pots. Unit Ho. 2 through 13: Check each vaporizer coil core and coil support. Suspend all vaporizer coils from the top and support each turn of the coil. Replace the S.S. coil cores as required. Item 202; Heat Exchanger (1 Required on Units 4 and 5 Only) Function: Maintenance Required: 1. To further super-heat the benzol vapor from the vaporizer. 2. To recover heat from the vapors leaving tha converter. Unit Ho. 4 and 5: Hone OSW 2606 WATER PCB-SD0000046202 126. Angus t 1957 Ittaii 203, 204, 205 , 206, and 207: Ftra Box and Associated Preheater Pots, Converter Pot, Burner*, ate. Function: Maintenance Required: To super-heat the benzol vapor* to the pyroly*is temperature. Firebox: Check brickwork in firebox of Units 1 through 13 and repair as required. Burners: Unit Ho. 4: Replace broken Inspirator on preheater. Unit Ho. 5: Replace missing burners on converter. Unit Ho. 7: Replace missing burners on converter. Replace broken Inapirator on Ho, 1 preheater. Unit Ho. 8: Replace missing burner on Ho. 2 preheater. Unit Ho'. 9: Replace broken Inapirator on Ho. 2 preheater. Unit Ho. 10: Replace broken Inspirator on con verter and Ho. 2 preheater. Unit Ho. 11: Replace broken Inspirator on Ho. 2 . preheater. Unit Ho. 12: Replace broken Inspirator on converter. DSW 462607 WATER_PCB-SD0000046203 Item 208: Start-Up By-Pass Stack) (1 Required par Quit) 127. August 1957 Fraction: Maintenance Required; To provide a neans of by-passing the hot flue gases around the cold vaporiser prior to beginning the benzol feed. ' Clxeck the butterfly type valve in the horizontal header between the by-pass stack and exhaust stack of Units 2 through 13. Repair aa required. Item 209; Exhaust Stack (1 Required per Unit) Function: Maintenance Required; 1. To provide a means for exhausting the flue gas from the preheater and converter to the atmosphere. 2. To provide a housing for the vaporizer coil. Check the firebrock in the exhaust stacks of Units 2 through 13 and repair as required. Repair all holes in these stacks. Item 210; Lead Trap (1 Required per Unit Except Unit Hoa. 4 and 11) Function: Maintenance Required: To trap entrained lead coming over with. the benzol vapor from the converter. No maintenance required. (These lead traps will be eliminated as soujourn pot sections are installed on the converter pots.) DSW 462608 WATER_PCB-SD0000046204 128. L' August 1957 ltea 211, 212, 213 and 214; Fractional:lag Column Carbcra Trap, Condenser and Split Flow Box (1 Required per Oa.lt Function: . Maintenance Required: 1. To function a* a cooling system to condense the vapors from the converter. 2. To effect a partial separation of the benrol from the converted products. Check the supports on the #2 Unit column. and provide additional supports as necessary. These supports should be adequate to support the column and associated equipment when the column Is filled with water. / ( DSW 462609 WATER PCB-SD0000046205 SERIES 300 - BIFHEHYL STILLS 129. August 1957 Item 301: Biphenyl Still Pot (1 Required par Still) Function: Maintenance Required: To provide a. reservoir for heating the charge of crude Biphenyl which, is being distilled. Still Ho. 1: Hone Still Ho. 2: Hone Item 302: Biphenyl Still Circulating Pump (1 Required per Still) Function: Maintenance Required: 1, To circulate the crude Biphenyl in the still pot through the heating coil of the gas fired heater and back to the still pot. 2. To pump the residue in the still to the high boiler collecting tank:. Still Ho. 1: Hone Still Ho. 2: Hone Item 303: Gas Fired Renter (1 Required per Stlll^ Function: Maintenance Required: To supply the beat required for distilling the crude Biphenyl. Still Ho, 1: Recondition or replace two bad inspirators sad reconnect to gas line. Still Ho. 2: Hone DSW 462610 WATER PCB-SD0000046206 130. August 1957 Itm 304 , 305, aad 306; Biphenyl Still Coltma, Condenser, aad Split Fl-gw Box (1 Set Required par Still) Function: HaiaCaauce Required: To separate aad condense the crude Biphenyl vapors into beacol, high boiler, aad Biphenyl. Still Ho. 1: None Still Ho. 2*. Hone Item 307:__ Heads aad Talla Catch Tank Function: Maintenance Required: To provide a catch tank and storage for the heads aad tails distilled froa the erode Biphenyl. Still Ho. 1: Hone Still Ho. 2; Hone Item 308: Heads and Tails Ratu.ru Pump (1 Required per Still) Function: Maintenance Required: To return the heads aad tails from the catch tank to the still pot. Still Ho. 1: . Hone Still Ho. 2: Hone Item 309: Biphenyl Catch Tank (1 Required per Still) Function: Maintenance Reqairad: To. receive the Biphenyl fraction-and temporarily store the Biphenyl during . the distillation. Still No. 1: Hone Still Ho. 2: Hone DSW 462611 WATER PCB-SD0000046207 131. August 1957 Itm 310: Distilled Blpheayl Traaafer Pump (1 inquired per Still) Function: Maintenance Required: To deliver the distilled Biphemyl froa the Biphenyl catch tank to the Biphenyl storage tasks. Still Ho, 1: Hone Still Ho. 2: Hone r ( DSW 462612 WATER PCB-SD0000046208 SERIES 400 - IMSTROHEKTATIOH AHD CONTROLS 132. August 1957 Itea 401: Automatic Let-Down Laval Control (1 Required era Primary Feed Tank Only) Function: Maintenance Required: To automatically smintain a supply of benzol 1b the feed tank aad to sound an alarm In case of high or low level. Nose Item 402; Benzene Feed Control (1 Required per Quit) Function: Maintenance Required: 1 . To automatically meter a specified quantity of benzene to each unit. 2. To automatically shut off the natural gas flow when the feed stops. . Hone Item 403: Twelve Point Temperature Recorder (1 Required per Unit) Function: Kalmtenance Required: To record the critical temperatursa. Check the instrument on each unit and repair as required. Each instrument is to record: 1. The cond'enser water outlet temperature. 2. The vapor temperature on the top plate. 3. The flue gas temperature leaving the vaporizer coil section of th.e exhaust stack. 4. The temperature of the material flowing through the sump line. DSW 462613 WATER PCB-SD0000046209 Item 403 Costinued: Maintenance Required Con tinned: 133. 5. The temperature of material leaving the vaporixer coil. 6. The temperature of the lead in. the No. 1 preheater. 7. The temperature of the lead in the No. 2 preheater. 8. The temperature of the flue gas entering the vaporiser coil section of the exhaust stack. Item 404: Single Point Temperature Recording Controller (1 Required per Unit) Function.: Maintenance Required: To indicate, record, and control the temperature of the converter by regula ting the natural gas to the burners. Hone ' Iteg 405: Natural Gas Meters (1 Required per Unit and 1 Required per Still) Function: Maintenance Required: To record the quantity of natural gas used on each Biphenyl Unit and each Biphenyl Still. Clean, recondition, and check all gas meter*. Relocate one of the two meters now on Ho. 12 Unit to Ho. 7 tJait. DSW 462614 WATER PCB-SD0000046210 -I 134. August 1957 I tea 406: Biphenyl Still Twelve Point Temperature Recorder Function: Maintenance Required: To record the critical temperature* em the Biphenyl Stills. Still Ho. 1: Hone Still Ho. 2: Hone Item 407: Biphenyl Still Furnace Temperature Recording Controller Function: To control the temperature differential between the heater inlet and outlet by regulating the flow of gag to the burner*. Maintenance Required: Hone c Item 408: Biphenyl Pnlt Automatic Safety Switches for Natural Gag (1 Required per Unit) Function: Maintenance Required: To protect the equipment la the event of aa emergency, by stopping the flow of natural gas to the Ho. 2 preheater when the temperature exceeds a predetermined maximum. Check, clean, recondition and repair as required. r DSW 462615 WATER PCB-SD0000046211 Itea 501i Lighting Maito**e Required: SERIES 500 - UTILITIKS 135. August 1957 1. Install adequate lighting in. benzene unloading dock area. 2. Provide adequate lighting in Biphenyl Omit rocss, 1st, 2nd, and 3rd floor. Lighting should be of the flood light type and ahould be located near walla and windows ao that the light* do not overheat. Item 502: Power Wiring Maintenance Required: 1-, Install insulated switch button* on benzol unloading pump switch. 2. Replace the insulation button on the high boiler catch tank pump starter switch. 3. Replace the insulation buttons on both the Ho. 1 and Ho. 2 still heads and tails return pump starter switches. 4. Replace the insulation buttons on the No. 1 still Biphenyl transfer pump starter switch. 5. Replace the ennvmierable conduit covers throughout the entire area. DSW 462616 WATER PCB-SD0000046212 Itan 503; Process Piping . Maintenance Required: 136. August 1957 1. Extend the lag in the benzene run-back lime from the roof cooler to make lag 81 high. (Completed) 2. Remove the swivel flow box froa each till cad install in their place a sight glaaa (steam Jacketed) and a 3-vay, "Y" type, ralve. Provide a sample port in the line. (This change will reduce Biphenyl aublimatioa in the area and eliminate a source of product contamination.) . 3. Repair eanumerable steam leaks through out the area, 4. Replace the beat sump tank vent header so that condensed benzene can run back to both sump tanks. Item 504: Plant Water Piping Maintenance Required: Dismantle copper tubing to benzol feed pomp bearings and install 1/4" steel piping. I tea 505:' natural Gas Piping Maintenance Required: Ho maintenance is required except for general renovation of unusable valves, gauges, and general wandering pipe runs. QSW 462617 WATER PCB-SD0000046213 137. August 1957 Item 506: Stem Piping - Bcnnol Load lag Dock Area lialataaMca .Required: 1. Install steam trap on tuk car un loading line tracer near pump. Supply item to this tracer near base of pump and trap near this point. Condensate will drain back down the tracer to trap. 2. Dismantle copper tubing feeding tracers om bnnsol feed pump discharge line and Install in spheaetrical fashion. 3. Survey all steam traps in the area and repair or replace those sot operating. Item 507: Building Maintenance Required: Removal of the walls In the Biphenyl Unit area is desperately needed. This report is hy no means presenting the design for that undertaking because it is beyond the scope of this survey. However, the author does encourage those concerned to act upon the removal of these walls at their earliest opportunity. . Item 508; Severn Maintenance Required: Provide sewer for benrol feed tank drain. SW^2618 WATER PCB-SD0000046214 138. August 1957 Item 509: Fire Protection Equipment Including Sprinklers Maintenance Required: This equipment is in fairly good condition bat line of the equipment should be replaced with up-to-date equipaeat. Item 510: Grounds sod General Area Benrol Unloading Dock Area: Maintenance Required: 1. Renew guard rail around tank car dome a ling. . ' 2. Renew the 2 heaieie pipe line supports due south of hydrogen compressor room nearest the Muriatic Acid area. 3. Extend fence around benrol storage tanks to include isopropyl alcohol storage tank. 4. Repair steps to north Benrol feed tank. 5. Repair benrol feed tank dike. 6. Remove the float valve from the atn^p pump at the concrete dikes around sump tanks and benrol receiver. Provide a . annual switch so the water cam be' drained frcrn this dike. (A project has been submitted for the renewal of the Biphenyl transfer line and the pipe supports.) Item 511: Painting Maintenance Required: Painting of the Biphenyl Plant ist in general, needed. This, however, is beyond the scope of this survey. Painting in this area should be on a scheduled basis and should begin immediately. DSW 462619 WATER PCB-SD0000046215 Item 512: Imsulatloa Kaimteanc Required: Item 513: CO, Riping Kaiatenence Required: 139. August 1957 Iaaulate: ' 1. all liaes betveea vaporizer coll aad I, 1 preheater 2. all liae betveea the Ho. 1 preheater *sd the No. 2 preheater 3. all lines between the Ho. 2 preheaters aad the coavert era, aad 4. all liaea between the converters aad the columas. Insulate all steam jacket plpiag. (A project hat beet approved for the installation of CO2 diatributioa piping. Consequently, ao recommendation* for ia- . proving the present system will be aide.) DSW 462620 WATER PCB-SD0000046216