Document 2JQMrxb6bzgxY49XGN1b12Em6
Moonto
W. C. Engman - WOK
November 5, 1970
STATUS OK PROGRAM FOR AROCl.OR POI.HITION CONTROL
TO . : Mr. J. R. Savage - G.O.
Messrs. D. C. Armstrong
G. I,, Bratsch C. F. Buckley/M. R. Forcsnmn B. W. Corlew
P. B. Hoclp.ee - G.O. D. W, Jackson W. A. Krull
R. M. McCutehan F. McDonald - Newport
A. I,. Rasmussen W. R. Richard - G.O. J. Cordcr - Anniston B. Young
This is the November 1, 1970 status of the FCil pollution control program.
] . PCB levels in Sewer:
A. For the period 9/22-10/15 losses to the river from
the treatment plant ranged from '157 to 2*16 ppb with
an average loss of 597 ppb for 8 samples. This Is equivalent to 86 peunds/day.
B. WGK laboratory's chromatograph for measuring PCB's lias been repaired and current schedule of 6 samples/ week will be maintained.
II. Projects to Reduce Sewered PCB's from Aroclor Peps rtmg'r.t
A. Blow tank demister (Hot. 2051) project completed and started up on 10/22. No mist downstream from the demister was detected using a in-ink mist sampler. Scrubber Jet samples have been sent to the laboratory for analysis to verify loss reduction.
B. Design package for the project to provide paving, curbs, trenches and catch basin in the tank car and truck loading areas will be completed In November.
Ill, Program to Eliminate Sewered PCB's from Uslrg Departments
A. Summary report covering losses from using departments in October will be issued by November 9. Only reported loss for September was 1 quart from Department 251. Facts concerning major loss on 10/25 at the Rip Track will be published separately by the investigation committee,
HONS 045879
Mr. J. H. Savage Status of Program for Arroocclloor Pollution CCoonntrol
Pago 2
November J, 1970 WOK
jB. Project (Est. 2457 for |.?4go expense) to provide 150,000 gallons of Interim storage for scrap Aroclor war. completed in October.
IV. Removal of Soluble PCB's from Sewer Stream (Reach 10 ppb)
No work. Waiting on process from Anniston Research.
V. PCB Levels in Atmosphere
A. Vapor sampler, taken to date are inconel ur.ive, Some sampling problems are Indicated. Sampling program to identify air looses will be completed In November,
VI. PCD Rework Project (Estimate 2095)
Design package completed and safety review held for phase III (installation of storage facilities for rework material).
/br
W. C. Engman Technical Services Dept.
HONS 045880