Document 2JGYmD63nO8KG4rNByK8gpr5N
FILE NAME Owens Corning OC
DATE 0000 DOC OC219
DOCUMENT DESCRIPTION Recommended Health Safety Practices for Asbestos
RECOMMENDED HEALTH SAFETY PRACTICES
For Handling
And Applying
Thermal
Insulation Products
4
- s.
Containing
:
! Asbestos ea,
nima
nimnaima
nima
nima
on
nima
nima nima AS OCIATION
nima
INTRODUCTION
me.
"
er
ma The modern mass production of hundreds of
natural and synthetic materials such as asbestos has brought the need to protect workers from certain health risks known or suspected
Manufacturers of Thermal Insulation Products containing asbestos have for years been taking protective measures to eliminate excessive exposures to inhalation of dusts that may
be injurious
Based on the fact that all materials can be handled safely the National Insulation Manufacturers Association recommends the follow-
ing practices for handling and applying Thermal Insulation Products containing asbestos and other potentially injurious materials to protect the worker
Insulation contractors and applicators are urged to study these recommended practices carefully and to see that they are observed by all workers handling insulation materials As with Safety Regulations it is in the interest of both employer and employee to see that health protection practices are strictly ob-
served
Prepared By COMMITTEE ON SAFETY AND HEALTH
Se NY EE TD af TE NATIONAL INSULATION
NIMA atl
petit
NIMA
MANUFACTURERS ASS'M
td a Pat tre Ail ena Crete
Se
reset
2
tm
er
CONTENTS
INTRODUCTION .. careeeoon eevceseees
2nd COVER
HOUSEKEE.P ..I ..N 0.G0 c ce eee ree|
PIPE AND BLOCK
INSULA.T . cI ecO e N cccS cccccens e000 5.8
CEMENTS oer wacnes te ceees 9-10
SPRAYING OF THERMAL
INSULATION
ne cceeve e soe eeeas . 11-12
STRIPPING OF THERMAL
INSULATIO. N cece ee eeee 13- ese1134 -14
RESPIRATORY EQUIPMENT 15
FOR HEALTH SAFETY'S
SAKE
Three major points to keep in mind in the handling and use of materials containing asbestos
Take every precaution to keep
dust to minimum
Wear U.S. Bureau of Minesapproved Respirators when exposed to excessive dusts See Page 15
Maintain good housekeeping
at all times
Bem
mew
ee
we
bs
HOUSEKEEPING
PIPE AND BLOCK
ww
ot
INSULATIONS
Warehousing Storage and Handling
Under normal conditions the handling storage and ware-
housing of undamaged cartons of . pipe and block insulations containing asbestos present no
health safety problems If cartons are broken or materials damaged while insulation is being handled the following steps
should be taken
_
An organized housekeeping program
should be maintained in all areas and on
all operations at all times
A major source of excessive airborne dust is from loose materials scrap and debris distributed throughout the job area and disintegrated by trampling on running over etc. Much of the airborne contamination can be eliminated by exercising simple good housekeeping practices
Specific standards and practices
designed for providing safe clean and orderly working conditions should
be defined
Efficient supervisory control planning of systematic cleaning plus day to day follow are the basic requirements for dust control and injury prevention
1 If spillage occurs debris should be cleaned up immediately Repack usable materials
2. Care should be taken to avoid generating dust when piling stacking or placing pieces into
,
containers
3 When cleaning spillage vacuum equipment
is recommended for picking up dust and small particles
4 If large quantities of spillage occurs and cleaning involves sweeping and shoveling that could create excessive
airborne dust Respirators should be worn
5 Only usable material should be returned from the job site to the warehouse
6 When returning material from the job site
clean dust and debris off cartons Repack
odd lot pieces Close cartons
ete
aaa
Bursau of approved respirators See page 15
ee
--
em
mee
ta
a)
Te
ee gee epee
Pipe and Block Insulations cont'd
Pipe and Block Insulations cont'd
Fabrication In Warehouse and Job Site Shops
Open and remove the material from
cartons with care
Handle and stack pieces of material in a manner that will avoid generating dust and breakage
Mechanical dust collecting systems adequately designed to remove dust at the
source should be installed on operated fixed and portable equipment in the
warehouse shop and in the job site shop
All machines should be furnished with
suitable waste containers for the collection
of scrap and waste to prevent the material
from falling on the floor and generating
dust
fabricated pieces of Thermal
Insulation such as fittings segments etc. should be placed in containers Care should
be taken when handling these pieces
during piling stacking and packing
oe
ry
6 Containers should be closed after packing
ae
rte and remain closed until the material is used
Application Procedures
Unpacking and application the material
should be done in a manner that will
minimize airborne dust
Avoid dropping throwing or unnecessary rough handling of insulation materials
Keep floors and surfaces clean of scrap shavings and debris Put unusable material into waste containers immediately
Hand sawing cutting jacket stripping etc.
should be done in a manner that will create minimal airborne dust Use of proper
methods and tools will help considerably
towards dust abatement
When working in confined spaces portable dust collectors or exhaust blowers should be provided to remove dust from the source
Continued on Next Page
Cm Vee
Pipe and Block Insulations cont'd
CEMENTS
Se
2
Application Procedures Cont'd
Warehousing Storage and Handling
Handling and storage of closed bags containing cements do not present health safety hazards provided bags are
unopened and not broken .
6 If conditions prevent collecting or exhausting dust from the source use exhaust blowers to provide general room air changes
7 Avoid exhausting into other working areas
8 confined spaces if mechanical exhaust
equipment cannot be used Respirators
should be worn
9 When wiring or banding insulation and applying jackets or facings care should be taken to avoid generating excessive dust using the precautionary measures
described above
10 Surplus usable materials should be placed in cartons which should be closed and
returned to the warehouse
Bureau of approved respirators See page 15
8
e - e tet eal Cn
fe ok oe ee
1 When unloading railroad cars and trucks
if there is excessive loose material
resulting from opened or broken bags
Respirators should be worn during clean and unloading
Troe 2 Spillage should be cleaned up and open broken bags repacked resealed or discarded
o-
immediately to prevent distribution
of dust into other areas
3. If bags are damaged and spillage occurs in the warehouse material should be cleaned up immediately to prevent
distribution into other areas Vacuum
equipment is recommended for this cleaning
4 If large quantities of spillage occurs and cleaning involves sweeping and shoveling that could create excessive dust Respirators should be worn
Bursau of approved respirators See page 15
CF
9
ee
a ne ON RE OR
te a eee
wa
Cements cont'd
Application of Cements
Opening dumping and discarding of bags should be
done with the utmost care to
avoid generating excessive dust
1 Open the bag wide enough to empty
without shaking
.
2 When dumping keep bag on the mortar
box mixing level to avoid dropping
3 Do not shake bags
4 Place empty bags in a container wet down contents and discard
5 Mixing area should be well ventilated but free from heavy drafts that will cause dry material to become airborne
6 Material should be mixed in a mortar
box pail or tub and not on the floor
7 Wet the material and mix into a slurry as
quickly as possible
8 When mixing cement in confined space where proper ventilation is inadequate Respirators should be worn
Cleaning 1 Bag breakage cleaning up dry cement
and discarding bags at the mixing area
should be done in the same manner as
recommended under Warehousing Storage and Handling
2 Wet down tools mortar boxes wheelbarrows mixing containers and any spillage before scraping and cleaning
3 Cements should be handled wet whenever possible Wet material will create no dust problem
Bureau of approved respirators See page 15
meow
10
ee cre we ee
~ emt me
me
ett
SPRAYING OF THERMAL INSULATION
Spraying Areas
Spraying of Thermal Insulation Products containing asbestos
requires special precautionary
measures Refer to the Sprayed
Mineral Fiber Manufacturers
Association for Sprayed Fiber Application Practices
1 The equipment and machinery to be should be shielded by adequate wind sbprreaaykesd and where practicable drop cloths to
prevent excessive dust and contamination in adjacent areas
2 Workers not engaged in the spraying operations should wear Respirators when
enterinagn area within 15 feet of the spraying
machine nozzle or equipment
3 Where Sprayed Fiber Application Practices
cannot be followed and excessive airborne dust is generated it is recommended that
portable mechanical exhaust ventilation be
used to remove airborne dust Exhaust
be located to avoid
must
contamination of other
occupied areas
Application
1 All personnel in the immediate area engaged in the machine feeding and spraying
operation should wear Respirators
whether in confined or open areas ventilated or not ventilated
2 Respirators should be worn after the
spraying operation has been concluded and
until the generated dust
has cleared
concentration
approved Mineral Fiber
Westfield Westfield New MJaenrusfeayc0t7u0r8e0rs Association AssocAsociaition aAsociationtAsociationion PP. .O O.. Box
*
Bureau of respirators See page 15
17
Spraying of Thermal Insulation cont'd
e
STRIPPING OF THERMAL INSULATION
Other Workmen All personnel not involved with the machine feeding and spraying operation should be kept from the spraying area until the generated dust concentration has cleared
Cleaning
Stripping Area
Careful work methods use of proper tools and wetting
down will minimize excessive
dusts in stripping operations
The area in which stripping takes place
should be confined by means of curtains
portable partitions etc. to prevent
excessive dust contamination in adjacent areas
If area cannot be confined only workmen engaged in stripping should be permitted in the work location
1 Spillage and excess spraying materials should be cleaned up immediately after spraying operations have been completed
2 Settled dust and fly material should be
removed from all surfaces to avoid
airborne contamination Vacuum cleaning
is recommended for this purpose
3 Scrap spray material should be wet down and placed in closed containers for disposal
4 Tools ladders etc. should be cleaned wet
5 Avoid brushing sweeping and shoveling dry material whenever possible
6 Respirators should be worn during clean
Bureau of approved respirators See page 15
Stripping and Tearing Off
All personnel in the stripping area engaged in tearing off handling cleaning and disposing of material should wear Respirators
Where circumstances permit materials should be wetted down prior to and
during removal
Where applicable portable mechanical
exhaust ventilation should be used to remove airborne dust
4 Avoid unnecessary handling of scrap
Continued on Next Page Bureau of approved respirators See page 13
12
' Ry ete me me ee,
18
ee ee rr i ee wr
vs
Stripping of Thermal Insulation cont'd
ae
eee
ae
vrmie
RESPIRATORY |
EQUIPMENT
Stripping and Tearing Off cont'd
5
"
Locate truck dumpster bucket or final
disposal equipment as close to stripping
site as possible
oad
6 Wet down scrap material before shoveling
. hauling or dumping
7 Do not permit accumulation of scrap and debris on floor and other surfaces
8 Vacuum equipment is recommended for
cleaning up during and after stripping
( .
Other Workmen
1 Personnel not involved in the stripping and tearing off operation should not be permitted in the stripping area
2 If is essential for other workmen to
be in the work area Respirators should be worn by them
Bureau of approved respirators See page 15
14
~ mw
~e
| Avmnamninps |
re eOe e ee oe
Only U.S. Bureau of approved respiratory equipment is recommended for use with asbestos silica and other pneumoconiosis dusts Approved respiratory equipment must be used at all operations where dust control is not sufficient
to maintain airborne dust concentration within allowable limits for asbestos and other
pneumoconiosis dusts as established by governmental and professional agencies
The efficiency and effectiveness of respiratory equipment is dependent upon proper care cleaning and maintenance A systematic procedure should be established
to assure that this is done
Lists of currently approved respiratory
equipment can be obtained from
Bureau of Mines
United States Department of the Interior Nineteenth and E Streets N.W.
Washington D.C. 20240
American Industrial Hygiene Association 14125 Prevost Detroit Michigan 48227
15