Document 28noqQj4x4vRzZeQrKygRyw7

;<ri ..... W'--- /' ' .. : - WoGilkSS REPORT - W. C. Schrichte : '*.. ' " TECHNICAL SERVICES DEPT. -N. . KRUMMRICM PLANT | JO* MO. 91370:4238 REPORT MO. 2 IOATE M.O. KRUMMRICH PLANT 1^^ GENERAL OFFICE OTHERS ]QG.L. Bratsch SR.M. McCutchJ VO ^QD.V. Jackson EP.E. Harris E TaW.. Dalton 1EM.D. Dealy .... m O E.R. Billen D. Weber e|2 B.W. Corlew 3.B. Maurer ' B *EJ G.C. Vincent B.J. Hoffman ' B tJ W.C. Engman W.W. Ban B *E G.K. Dimkoff (gff.A. Krull B 'ti -- `' ......; - . B M.P. Lux Anniston gj D. Danna (4) *B J.C. Landwehr *B D.B. Hosmer/ Nitro F.J. Holzapfel B3H.L. Williams B R.E. Howard S. 2nd St. H.C. Carder 12P.0. DeGarmo E E.M. Potter DT.M. Patrick B J.R.,Savage *B J.F. Quinn E R.R. Sorrell BJ.W. Boehm i B agj C.J Koenig <0F.M. Elliott i B TO NKCMivt oktail section - *E J.E. Smith *B R.L. Wiese *EM.A. Terpstra/ D.K. Lynch title. DEPARTMENT 218 (MURIATIC ACID) - STATUS - EVALUATE HCl RECOVERY personnel. W. C. Schrichte (W. M. Dowden, D. C. Armstrong) problem. summary , Evaluate recovery of by-product HCl generated in Department 248 (Phosphate Esters) and unrecovered by-product HCl generated in Department 236-7 (Chlorophenols). Based on the current production requirements for Depts. 233 (Chlorobenzenes), 246 (Aroclors), 248 (Phosphate Esters) and 236-7 (Chlorophenols), an additional 15*9 M lbs/year of by-product HCl could be recovered with an adiabatic absorber unit installed at WGK. The acid quality (thus the salability) will have to be determined by pilot plant tests, which will cost an estimated $26 M. C.E.D. has estimated the capital cost for adiabatic absorption facilities at $750 M + 20#. The estimated new earnings based on shipping all the additional muriatic acid to customers in Chicago, Illinois is $154.4 M/year. The estimated ROI from the new earnings is 20.58# before taxes. By 1973 the HCl being sewered will have to be neutralized. The recovery of the 15.9 M lbs/year would save $65.5 M/year in future neutralization cost. The estimated ROI from new earnings and neutralization cost savings is 29.31# before taxes. DSW 299037 o COMPANY CONFIDENTIAL INFORMATION Thla document li the property of Monsanto Company and Ua recipieat la raapoaafele for ita aafekaepiac ad disposition. It contains confiden tial information of Moaaaato Ctapuy which ant aotbo reproduced, revealed to naaathoriaad paraoaa or aaat outaide tha company without (ropor authorization. Eithar ratals ia aacuaa Alas or doatroy. '` WOMM WOK 000 REV-2/M STLCOPCB4068949 V 91370:4258 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY .... Page 2 1/26/71 WGK CONCLUSIONS AND RECOMMENDATIONS: 1. The estimated return on net investment appears to justify the proposed adiabatic absorption project. 2. The success'of the project depends on the quality of the acid. Therefore pilot plant tests are justified. ' 5. Approval for pilot plant test is recommended. 4. Proceed with project depending on pilot plant results. &'JLi c W. C. Schrichte Technical Services Department /tm dSNN 299038 STLCOPCB4068950 91570:4258 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY *r*' Page 5 1/26/71 WGK V>: TABLE OF CONTENTS Page I. BACKGROUND.......................................................................................... 4 II. HC1 AVAILABLE FOR MURIATIC ACID.......... .......................... 5 III. DESIGN CONSIDERATIONS............................................................... 6 A. General B. Capacity C. Storage C D. Loading 7 7 8 9 E. Design Uncertainties 9 IV. COSTS......................... A. Capital Cost Estimate 9 9 B. Manufacturing Cost Estimate 9 V. ESTIMATED RETURN ON INVESTMENT........................................... 15 VI. CONCLUSIONS AND RECOMMENDATIONS....................................... APPENDICES: Page A. Theoretical HC1 Generation B. Estimated HC1 Recoverable C. HC1 Distribution System with Adiabatic Absorption D. Estimated Muriatic Acid Production With 20 21 22 Adiabatic Absorption \ E. Equipment and Other Required Materials List 25 vr F. Flow Sheets for Adiabatic Absorption G. Plot Plan and Major Equipment Layout ., , 29 52 H. Manufacturing Cost'Estimates ,, 54 I. Incremental Cost Estimate 55 DSW 299039 STLCOPCB4068951 91570:4238 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY Page 4 1/26/71 WGK I. BACKGROUND Hydrogen Chloride (HC1) Is produced as a by-product at the W. G. Krunaarich Plant from hydrocarbon chlorination in Depts, 233 (Chlorobenzenes), 246 (Aroclors), 236-7 (Chlorophenols) and 265 (Chloroacetyl Chloride). By-product HC1 is also pro duced in Dept. 248 (Phosphate Esters) from the reaction of POCI3 with Phenol and Cresol. Hydrochloric (or muriatic) acid is produced by absorption of HC1 gas in water. At the present time, only HC1 from Dept. 233, 246 and 236-7 is being recovered. The HC1 from Dept. 235 is almost exclusively recovered in Dept. 218 (Muriatic Acid) with an occasional recovery in Dept. 217 (Chlorosulfonic Acid) when Dept. 236-7 is down. The HC1 from Dept. 246 is recovered in both Dept. 218 and Dept. 217. The HC1 from Dept. 236-7 is recovered only in Dept. 217 with the excess being sewered. The recovery of the HC1 from Dept. 248 and the excess* HC1 from Dept. 236-7 for Muriatic Acid is economically attractive at this time because of the increased sales demand as evidenced by our present ''sold out" position. This increased sales demand Is due in part to the steel mills converting their pickling lines over to using Muriatic Acid instead of Sulfuric Acid. Recovery of Dept. 248*s and Dept.s 236-7 unrecovered HC1 will reduce WGK*s stream pollution and future neutralization cost. Neutralization of HC1 in WGK's sewers will be required by 1/1/75 (See TSD Report 91341:9000(6) by M. Pierle dated 3/15/70.) Dept. 265*8 HC1 is not recovered because: (1) the department is remotely located (North area) relative to Dept. 218 (main area), (2) the department's off gas is highly corrosive and, (3) treat ment facilities are already in use. ' The success experienced by the Delaware River Plant of adiabatically absorbing their HG1 off gas from their Benzyl Chloride operation, tends to indicate a high success of making high quality acid from Dept. 248*s and Dept. 236-7*s unrecovered HC1. However, the expected quality of acid made by adiabatically absorbing Dept. 248*s and Dept. 236-7*s unrecovered HC1, cannot be stated without pilot plant results. 14 DSW 299040 STLCOPCB4068952 *1 . -'.r- -;!; A.ii ji- i-. ... - 91370:4238 (2) .... DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HCl RECOVERY Page 5 1/26/71 WGK II. HCl AVAILABLE FOR MURIATIC ACID The normal HCl generation rates at the Krummrich Plant are: 1. Dept. 233 - 4500 to 5500 lbsAr. 2. Dept. 246 - 3000 to 3500 lbs/hr. 3. Dept. 248 - 3500 to 4000 lbs/hr during 3 hours of an 8 hr. batch cycle time. 4. Dept. 236-7-4500 to 6000 lbs/hr during the first 2 hours, .. 3000 to 3500 lbs/hr during the next hour, 1500 to 2000 lbs/hr during the next 2 hours and 750 to 1000 lbs/hr during the last 4 hdurs of an 11 hour batch cycle time. The current production requirements (1971 thru 1975) for the HCl generating departments above and the corresponding theoretical HCl produced are shown in Appendix A. The total thepretical HCl produced (1971 thru 1975) and the estimated HCl recoverable is shown in Appendix B. The estimated HCl recoverable (Appendix B) is based on continued achievement of 85# recovery of Dept. 233*s and Dept. 246's HCl. It is also based on achieving 80% recovery of Dept. 236-7*8 HCl and 80# recovery of the available HCl from Dept. 248. With an adiabatic absorption unit installed, the HCl leaving the generating departments will be collected and distributed to the using departments as shown by the diagram in Appendix C. Distri bution of HCl (normally) will be as follows: 1. Dept. 233*8 HCl will be recovered in the existing facilities and as needed to maintain a minimum feed rate (discussed in Design Considerations) in the adiabatic absorption facilities. The capability of recovering Dept. 233's HCl in Dept. 217 will still be maintained. 2. ::i- . - Dept. 246*s HCl will be recovered in the proposed adiabatic absorption facilities and as needed in Dept. 217. When Dept. 217 is down the HCl will be recovered in the falling film facilities. - - -v : 3. All of Dept. 248*s available HCl will be' recovered in the adiabatic absorption facilities. . 4. Dept. 236-7*8 HCl will be recovered in Dept. 217 primarily with the excess being recovered in the adiabatic absorption facilities. - . The existing automatic sewering valves will be kept in the generating departments the same as before. DSW 299041 STLCOPCB4068953 91370:4238 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY Page 6 1/26/71 NGK II. HC1 AVAILABLE FOR MURIATIC ACID (Continued) ? Muriatic Acid production will continue to be limited by the availability of by-product HC1 gas. Therefore, muriatic acid production will be set by the demand of the generating products rather than acid requirements. The estimated muriatic acid production with adiabatic absorption is shown in Appendix D. III. DESIGN CONSIDERATIONS A. General An adiabatic absorption unit to recover Dept. 248,s1'HC1, Dept. "246's HC1 and Dept. 236-7*s unrecovered HC1 will be designed to handle a maximum of 9300 lbs/hour (100$ HC1). This will permit recovery of the HC1 available when the batch departments generate simultaneously. A unit designed to handle 9300 lbs/hr (100$ HC1) will require a minimum feed rate of 1900 lbs/hr (100$ HC1) to operate efficiently. Below the minimum feed rate, the tail gas losses will increase slightly. The existing water softener unit will be replaced with a unit capable of supplying both absorption units. The existing carbon charging system will be replaced or^modified to supply the existing and new carbon towers. The crude acid leaving the bottom of the adiabatic absorber at its boiling point will be cooled to approximately 100F. Two carbon towers in series will be used to remove residual organic impurities. Two 30 M gal. tanks will be used for intermediate storage and as receivers. Ion exchange facilities will be required to remove iron contamination when present. The acid will be stored as 20 Be' acid. A list of equipment and other required materials is attached as Appendix E. Flow Sheets for the proposed adiabatic absorption process are attached as Appendix F. All customers (the steel mills in Chicago, 111.) will be supplied by tank car shipments. DSW 299042 STLCOPCB4068954 ^.-v-.v,,---..-;.: J^v;v',:`. r < '- "S:. : '}>, '.:... " ' - - - -i r -\:-.-V.:: .-? ' - ; -. .--- '.>. r-':'- ' - ' ' . .. - . ^ ' . ' ' '- . . '. .. - - .- V- - --= -;. , - _^---/-v-y ; --.- - --- . :-. - - . ' '' .................... '= - . " `` -`,J - ` - : ."-'V 91570:42^8 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY : ':;Y iu' Page 7 1/26/71 WGK .. \-w--u-..MaVS *--r -ai-- sSIKyty III. DESIGN CONSIDERATIONS (Continued) - B. Capacity ' The design capacity feed rate and average feed rate (1975) are as follows: On Stream Time # Yield Design Rate Average Rate Feed Rate (100# HCl) 100# 100# 9500 Lbs/Hr 5690 Lbs/Hr "Feed Rate (100# HCl) 90# 95# 8125 5150 Lbs/Hr Lbs/Hr Daily Rate (100# HCl) 90# 95# 195 M 75.6 M Lbs/Day Lbs/Day Daily Rate (20* Be*) 90# 95# 62.9 M Gal/Day 24.4 M Gal/Day Monthly Rate (100# HCl) 90# 95# 4.68 M 2.27 M Lbs/Mo. Lbs/Mo. Annual Rate (100# HCl) 90# 95* 56.16 K Lbs/Yr. 27.21 M Lbs/Yr. The total acid production with adiabatic absorption plus the existing unit is estimated to reach 54.4 gal/day of equivalent 20 Be* acid by 1975. ` C. Storage The finished product acid from the adiabatic absorption unit will be stored as 20* Be1 acid in the existing 280 M gal. storage tank (Item No. 750). The finished product acid from the falling film absorption unit will be stored in two of the 17*000 gallon tanks and the three 40,000 gallon (existing tanks). When the storage for the falling film unit is full, the finished product acid will be diverted to the 280 M gal. storage tanks as 20* Be1 acid. The proposed assignments of storage tanks are as follows: *& O t .- ' tat - ' DSW 299043 STLCOPCB4068955 91370:4238 (2) ' DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY .. Page 8 1/26/71 GK . . . -- ----- . -......... .. - - ;................... --1-: -- - - ----- s-- III. DESIGN CONSIDERATIONS "-1C. - Storage (Continued) PROPOSED ASSIGNMENTS OF STORAGE TANKS Tank (Item No.) Volume Use New 30 M Gal. Receiver and intermediate storage for adiabatic unit New 30 M Gal. Receiver and intermediate storage for adiabatic unit 715 17 M Gal. Receiver for existing absorption unit 7i6 717 17 M Gal. 17 M Gal. 25* Be' Acid (food grade) * Commercial Grade Acid 718 40 M Gal. 20* Be1 (Food Grade) 719 722 40 M Gal. 40 M Gal. 22* Be* (Food Grade) 20* Be* (Food Grade) 730 280.M Gal. 20* Be* Acid from adiabatic unit TOTAL 511 M Gal. D Loading / - . - Five acid tank car spots would be provided on the existing acid loading dock by relocating the monochlorobenzene tank car loading spot to a new dock along sub track 2A. A line from the 2o0 M gallon storage tank would provide a total of v . -- two loading lines to the dock. . , . . OS\N 299044 STLCOPCB4068956 *V r *" ' - 91570:4228 (2) ....... DEPT* 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY Page 9 1/26/71 WGK III. DESIGN CONSIDERATIONS (Continued) ; E. Design Uncertainties _. Neither anticipated carbon usage nor expected acid quality can be stated without pilot plant results. The estimated pilot plant costs are: Equipment................. ............. .. $10,000 Research Time (2 man-months).... 8,000 TSD Time (4-1/2 man-months).......... 6,500 A.R. & D. Time.................. 1,500 TOTAL $26,000 Delivery of a pilot unit from Haveg would take approximately 10 weeks after receipt of order. Therefore, the`earliest that pilot plant results could be available would be approximately 6 months. IV. COSTS A. Capital Cost Estimate The Central Engineering Department estimated the capital cost to be $750 M + 20$. A detailed estimate was not provided. B. Manufacturing Cost Estimate The manufacturing cost estimate for the adiabatic absorption unit is based on recovering 25.2 M lbs/year (1971* Appendix D). The estimated cost would be: * ' Raw Material.......... .................. ......,$1.571/cwt Direct Conversion........................... 0.628/cwt ) Indirect Conversion.......................... 0.526/cwt TOTAL MFG, COST $2.725/cwt DSW 299045 STLCOPCB4068957 91370:4258 (2) DEPT..218 (MURIATIC ACID) STATUS - EVALUATE HCl RECOVERY ^^ ^ Page 10 1/26/71 WGK IV. COSTS B. Manufacturing Cost Estimate (Continued) ^ The manufacturing cost estimate for the falling film unit .would change since some of the HCl, which would normally be absorbed in it, would be absorbed in the adiabatic unit. The estimated cost for a production of 51.5 M lbs/year (1971/ Appendix D) would be: Raw Material................. ...........................$1.722/cwt Direct Conversion.................................. 0.535/cwt Indirect Conversion...................... 0.558/cwt TOTAL MFG. COST $2.6l5/cwt The manufacturing cost estimate for the adiabatic absorption unit plus the falling film absorption1 unit (56.7 Si lbs/year - 1971 basis) would be: Raw Material............................................. $1.655/cwt Direct Conversion............ .. 0.576/cwt Indirect Conversion.^. 0.453/ewt TOTAL MFG. COST $2.664/cwt The manufacturing cost estimates above are shown in Appendix H. The manufacturing cost estimates were deter mined as follows: Raw Material . - Standard yield of 95# on HCl gas and a unit price of $0.0155/lb. was used for both units. Carbon usage of 1.0 lbs/cwt of HCl (same as 1971 Std.) was used for the falling film unit. A carbon usage of 0.5 lbs/cwt of HCl was assumed for the adiabatic unit. The price of $0.2867/1^ (same as 1971 Std.) was used for the carbon. oSVM299046 STLCOPCB4068958 ."v* - - ,> ,_. ;;_i`ii!v1?^l't>y-'"^' -. s,<.i'> - -- -*- .*/*'?r.'-v . 'r* 91370:4258 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HCl RECOVERY >- - Page 11 1/26/71 WGK . . iv. costs - . ,. ~ ' B. Manufacturing Cost Estimate (Continued) -- -A--' Steam - Steam usage for the adiabatic unit was based on Haveg's design. 25# extra was used for miscellaneous losses, etc. The price of $1.155/K BTU (1971 Std.) was used. Electricity - The cost for the adiabatic unit was assumed to be approximately the same as the falling film unit. Water Purchased Water usage for the adiabatic unit was based on making 20* Be* acid and allowing 25# excess for vaporization. The usage for the falling film unit was determined based on the estimated production. The price of $0.176/M gal. (1971 Std.) was 0 used. * Water Plant Water required for the adiabatic unit was assumed to be half that required for the falling film unit. The price of $0.055/M gal. (1971 Std.) was used. Labor - The labor cost was estimated based on adding one man on day shifts for loading tank cars and tank trucks. The cost was split equally between the two units. Salaries - No additional supervision was assumed. The salaries (1971 Std.) was split equally between the two units. Payroll Overhead - The hourly payroll overhead cost (25.296# of labor cost for 1971) and the salaried payroll overhead cost (19# of salaries for 1971) were split equally between the two units. Supplies - The supply cost was. determined by assuming a 50# increase in the 1971 cost. . The total cost was then split equally between the two units. DSW 299047 STLCOPCB4068959 91370:4238 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HCl RECOVERY Page 12 1/26/71 WGK IV. COSTS - ' ' B. Manufacturing Cost Estimate (Continued) Laboratory The laboratory cost (1971 Std.) was adjusted to the production level for each unit. Clothing & Laundry The cost on the 1971 Standard was increased by 21# (the percentage labor increased) and split equally between the two units. Clothing & Laundry Safety Handled the same as clothing and laundry ab ove. Technical Services - No increase in Technical Services was assumed. Cost (1971 Std.) was split equally between the two units. Research - A cost of $500/month for research follow-up from pilot plant was assembled for the adiabatic unit. The falling film unit had no cost allocated for it. Mechanical Expense -The mechanical expense for the adiabatic unit was estimated by averaging the past four years actual mechanical expense for the falling film unit. The average was inflated by 15# and assumed representative of the mechanical expense. The mechanical expense for the falling film unit was assumed the same as the 1971 Standard. Depreciation - The adiabatic unit was depreciated by using a ten year straight line with no scrap value. The 1971 Standard depreciation for the falling film unit was used. . Factory Indirect Expense - The FIE for the adiabatic unit was assumed to be approximately the same as for the falling film unit (1971 Std.) The incremental cost for the additional production* of O 1.33'H lb s/mo. are $38,798/month as shown in Appendix I. DSW 299048 STLCOPCB4068960 Page 13 1/26/71 WGK V. ESTIMATED RETURN ON INVESTMENT The estimated new earnings based on shipping the additional acid to the Chicago marketplace is: New Earnings => (Profit/Lb.) x (Production) Selling Price = $27/sol ton 20 Be' * $4.293/cwt (100# HC1) Delivered Cost: Incremental Cost *= $2.917/cwt Less By-Product Credit = 1.350/cwt $1.367/cwt Freight* c Freight to Chicago (T/C) $5.29/sol. ton 20 Be1 * Terminal Charge 0.92/sol. ton 20 Be* Freight to Custo mer from Terminal (T/T) 2.85/sol. ton 20 Be* Total $9.06/sol. ton 20 Be* - $1.440/cwt SARE (2.5# os sales price)** = 0,107/cwt * Source: E. M. Potter Fineuace Charge (4.4#/Yr. of remaining net investment)** ^ = $0.208/cwt Total Delivered Cost = $3.322/cwt Profit (sales price - delivered cost) ** $0.971/cwt Estimated New Earnings at 15.9 K lbs/year ** $154,389/Year ** Source: S. H. Hinds 0s\N 299049 STLCOPCB4068961 91370:4238 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY .......... ......... Page 14 1/26/71 WGK V. ESTIMATED RETURN ON INVESTMENT (Continued) . The estimated return on the net capital investment based only on new earnings is: Net Capital Investment *= $750,000 ROI before taxes ** 20,58# ROI after taxes at 50# * ' 10.29# By 1973 the HC1 being sewered will have to be neutralized as noted earlier. To neutralize the above would cost: Lbs. of CaC03 required to neutralize 15.9 M lbs/yr. Mol. Wt. CaCOa x 2 x Mo. Wt. HC1 HC1 - 21.82 H lbs/Yr. '' * Neutralization raw material cost at $0.003/lb CaC03 = $65,460/Year The return on the net capital investment based on new earnings and neutralization raw material cost savings is: New Earnings + Neutralization Raw Material Cost Savings ** $219,849/Year Net Capital Investment = 750,000 ROI before taxes = 29.31# ROI after taxes at 50# * 14.66# VI. CONCLUSIONS AND RECOMMENDATIONS 1/. ^ : 1. . ,-V: \;'il - - 2. The estimated return on net investment appears to Justify the proposed adiabatic absorption project. The success of the project depends on the quality of the acid. Therefore, pilot plant tests are Justified. DSW 299050 STLCOPCB4068962 g;K;:;?3;P3:ir~-;:y7r. 91570:4258 (2) DEPT. 218 (MURIATIC ACID) STATUS - EVALUATE HC1 RECOVERY Page 15 1/26/71 WGK CONCLUSIONS AND RECOMMENDATIONS (Continued) 3. Approval for pilot plant test is recommended. 4, Proceed *ith project depending on pilot plant results. W. C. Schrichte Technical Services Department ( -v"~ /tm Appendices Attached O t . y-*i - DSW 299051 STLCOPCB4068963 Page 16 . . ----- -- DEPT. 233 - PRODUCTION REQUIREMENT (M LBS/YlQ* ' V~.: Product MCE 1971 116144 1972 II6889 1973 125218 1974 132814 1975 137506 DCS 16506 16811 16858 17133 17335 DEPT. 233 ~ THEORETICAL HC1 GENERATION (M LBS/YR) - From MCB From DCB 1971 37631 8187 1972 37872 8338 1973 40571 8362 1974 43032 8508 1975 44552 *9094 TOTAL 45818 46210 48933 51540 53646 . 3N:~' * : HC1 Generation Factors: 0.324 Lbs HCl/Lb MCB 0.493 Lbs HCl/Lb DCB -v. . .. - -i - ...... * Source - A. Nagel - Org. Div. 5 Yr. ProducM tion Pl. an (1/4/71) * '-'3^ 0-^ O 0SMO*>oW STLCOPCB4068964 ' O ... .. ;.... ................... .... ...... .. : APPENDIX A -" (Continued) ...... ^ page 17 , DEPT,. 246 - PRODUCTION REQUIREMENT (M LBS/YR) * Product 1221 1242 1254 1260 1971 2289 40504 8375 2672 1972 2880 39945 8373 2557 1973 3357 41570 8038 2557 1974 3450 43411 8830 2542 1975 3566 45194 8995 2527 DEPT. 246 - THEORETICAL HCl GENERATION (M LBS/YR) From 1221 From 1242 From 1254 From 1260 1971 494 18137 4915 1747 1972 622 17975 4915 1672 1973 725 18707 4718 1672 1974 745 19535 5183 1662 *1975 770 20337 5280 1653 TOTAL 25295 25184 25822 27125 28040 HC1 Generation Factors: 0.216 Lbs Hcl/Lb 1221 0.450 Lbs HCl/Lb 1242 0.58? Lbs HCl/Lb 1254 0.654 Lbs HCl/Lb 1260 I ' Source: Manufacturing Manager of Functional Fluids (1/18/71) * \ . DSW 299053 STLCOPCB4068965 V Page 18 APPENDIX A (Continued) DEPT,, 248 - PRODUCTION REQUIREMENTS (M LBS/YR) * Product S-140 CDP TPP TCP 1971 12902 3385 2851 8411 1972 9657 2000 2661 6946 1273 9984 2000 2908 7006 1974 10627 2000 4164 7079 1975 11027 2000 4522 7075 DEPT. 248 - THEORETICAL HC1 GENERATION (M LBS/YR) From S-140 From CDP From TPP From TCP 1971 4147 1088 956 2497 1212 2104 964 1227 2062 1973 3209 964 1310 2080 1974 3419 964 1396 2102 1975 3544 964 1516 2101 TOTAL 8688 7275 7553 7881 8125 HC1 Generation Factors: ........................ 0.2214 Lbs HCl/Lb S-140 or CDP 0.2352 Lbs HCl/Lb TPP O.2969 Lbs HCl/Lb TCP Source: A. Nagel - Org. Div. 5 Yr. Production Plan (1/4/71) DSW 299054 STLCOPCB4068966 \.*i - V. ^. . .. ~:;s,a2ps:. . >r Page 19 .....` .:<? - f-~ - .\.. ' " ' ' APPENDIX A (Continued) -A DEPT. 236-7 - PRODUCTION REQUIREMENTS (M LBS/YR)* Product 1271 Ortho 6 Para 4232 Refined 2,4-DCP 500 Molten Penta 23286 Penta 60 325 1972 5 4424 525 22396 425 1973 5 4572 550 23542 500 1974 0 4737 575 25875 550 1975 0 4910 600 28360 550 DEPT. 236-7 - THEORETICAL HC1 GENERATION (M LBS/YR) 1971 From Ortho 2 From Para 1202 From Refined 2,4 DCP 224 From Molten Penta 15951 From Penta 60 216 1972 1 1256 235 15341 282 1973 .1 1298 246 16126 332 1974 0 1345 257 17724 365 . 1975 0 1394 268 19427 365 TOTAL 17593 17115 18003 19691 21454 HC1 Generation Factors: 0.284 Lbs HCl/Lb Ortho or Para 0.447 Lbs HCl/Lb Refined 2,4 DCP 0.685 Lbs HCl/Lb Molten Penta 0.664 Lbs HCl/Lb `Penta 60 * Source: A. Nagel - Org. Div. 5 Yr. Production Plan^ (1/4/71) D3W 299055 STLCOPCB4068967 'V- ...... , .V" *` 'r*. - ~f?-- ^'r,'` - Page 20 APPENDIX B M >; THEORETICAL HC1 GENERATED (M LBS/YR) . 1 AT WGK BASED ON PRODUCTION REQUIREMENTS DEPT. 233 246 236-7 248 1972 45818 25293 17393 8688 1972 46210 25184 17115 7375 1973 48933 25822 18003 7553 1974 51540 27125 19691 7881 1975 53646 28040 21454 8125 TOTAL 97392 95884 100311 106237 111265 ESTIMATED HC1 RECOVERABLE (M LBS/YR) # DEPT. RECOVERY 233 85 246 236-7 85 80 248* 64 1271 38945 21499 14074 5560 1972 39279 21406 13692 4720 1973 41593 21949 14402 4834 1974 43809 23056 15753 5044 *- 1975 45599 23834 17163 5200 TOTAL 80078 79097 82778 87662 91796 20# of HC1 generated per batch comes off under vacuum and is not available for recovery. Thus, 80# recovery of 80# available is equivalent to 64# recovery. DSW 299056 STLCOPCB4068968 / o APPENDIX C (Page 21) r DEPT ' T. ] Sewcv, - .i'' ,236-7 i .... ....,.* , : . 11 ; : .' .i ' DEPT <1 - << . z\n DSW 299057 ! Hf WRl&tfTW WITH r' ABSORPTION (? >,/ P: If 0 / ir/ />!. * f STLCOPCB4068969 -' >..=. ;;j-- - . .............. >vvi.S.-* Page 22 APPENDIX D ESTIMATED MURIATIC ACID PRODUCTION WITH ADIABATIC ABSORPTION (M LBS/YR.)* HC1 required for Chlorosulfonic Acid (Dept. 217):* 1971 1272 1973 1974 From Dept. 246 12903 15541 11519 10863 From Dept. 236-7 10578 10224 10770 11837 1975 10385 12951 TOTAL 23481 25565 22089 22700 23556 HCl recovered as muriatic acid in the falling film absorption unit (Department 218): 1971 1972 1975 1974 1975 From Dept. 233 31451 31620 35482 35266 -` 56707 TOTAL 31451 31620 33482 35266 36707 HC1 recovered as muriatic acid in the proposed adiabatic absorption unit: 1971 1972 1973 1974 1975 From Dept. 233 From Dept. 246 759^ 8596 7659 8065 8111 10630 8543 12195 8892 13449 From Dept. 236-7 3496 3468 5632 5916 4212 From Dept. 248 5560 4720 4834 5044 5200 .TOTAL 25146 23912 27207 29696 51753 * The HC1 gas splits are based on average HC1 f^ows from the generating - departments and to the using departments. Thei distribution of the HC1 is estimated with adiabatic absorption facilities included. The above splits do not reflect the existing HC1 distribution system. ** Based on Inorganic Sales Forecast and Queeny Plant's requirements. HCl usage of 0.326. ; dSNN 299058 STLCOPCB4068970 ixl~ . ,w--if-'--*'--..- .*. .. s... ---. inr-.; -;'': - APPENDIX E Page 25 INSTRUMENTATION: - 1. Two back pressure controllers and valves to control the flow of HC1 from Depts. 236-7 and 248. 2. A flow recorder controller with an orifice (accurate at 2500 #/hour flow) to control Dept. 233 HC1 flow. Dept. 233fs HC1 off-gas would only be used to maintain a minimum of 2500 #/hr flow to the adiabatic absorber. 3. A ratio controller to ratio the water to the HC1 feed when the HC1 feed rate changed abruptly up or down (e.g. Dept. 236-7 or Dept. 248 in that portion of cycle when HC1 is not generated or start generating again). This controller would over-ride the temperature control instrumentation provided by Haveg. 4. A multi-point recorder and indicator capable of reading tempera ture (8 points) and pressure (3 points) throughout the absorber separately. 5. A high temperature alarm in line after acid cooler. 6. A level recorder controller in the sump of the absorber and control valve to maintain level in the sump. 7. Two delta pressure indicators across the carbon towers. 8. Level indicators for each (2) receiver tank. 9. A density indicator in line bypassing the carbon tower discharge line to the receivers. Also one in the recirculating line (Dynatrol). These would be used to indicate acid strength. 10. A flow totalizer in the process water line to the receiver tank for diluting the acid. 11. A level indicator for the bulk acid storage tank. 12. High level cut-offs (conductance probe type) for six loading spots. These should be light weight so the operator can clamp them to the dome of the tank car or truck and should also be , _ mounted inside a tube. ............... & 13. Safety shower alarms (approximately 2). I. o STLCOPCB4068973 ... jji*. APPENDIX E - Continued Page 26 FOUNDATIONS: -v - 1. A slab (approximately 15* x 16*) with curb and drain for ground level of operating structure. A slab on the above slab for the base of the absorber (approx. 4* x 4). Also on the above slab, two footings for the supports of the acid cooler. All of the above to be lined with acid' proof brick. 2. Foundations for the two receiver tanks. 3. Slabs for the ion exchangers and the final filters. These to be epoxy coated. 4. Slab for the HC1 booster blower in Dept. 248. 5. Modifications to existing slab for water softener unit (new). STRUCTURAL: 1. Steel work to bring the existing structure up to four levels. The loading on the uprights and cross members will be the carbon towers fully loaded (wt. of towers + 9000# of carbon each) and the adiabatic absorber's lateral load. Stairs for the four levels will be required. 2. A walkway extending from the operating structure across the top of the two receiver tanks with a ladder extending to the ground. 3. Modifications to the existing structure for the water softener unit. (All structural steel and grating to be epoxy coated for protection from acid.) PIPING: HC1 Pistribution Piping: " 1. 400* of 6" steel pipe from Dept. 248 along existing pipe bridge to SE corner of Bldg. CT. 2. 930* of 6" steel pipe from SE corner of Bldg. CT across top of building, across existing bridge to power house, around and over power house (same route as Dept. 246 line), across existing bridge from power house (Vest side), to and across existing bridge, heading South out of Dept. 236-7 to the adiabatic absorber. DSW 299062 | STLCOPCB4068974 .Jj5*"- - -. - -' -.- -O-. ' ' ....... -. .-. . . -. ^ V> .-'/. '....\. ::; - . ' ;:;. . ::>. r:- .y ' ". - ` . - * ' ,- ` * ' ;JJ.. . AP] DIX E CONTINUED Page 27 PIPING: HC1 Distribution Piping (Confd): 3. 175* of 6" steel pipe from tie-in to Dept. 236-7 distribution line across existing bridge to the adiabatic absorber. 4. 1001 of 6" steel pipe for alterations to Dept. 246 & 233 lines for feed to the adiabatic absorber. Process Area Piping: 1. 301 oT 1" polypropylene lined steel pipe. 2. 200* of 2" polypropylene lined steel pipe. 3. 800' of 3" polypropylene lined steel pipe. 4. 350* of 4" polypropylene lined steel pipe. City Water Piping: >v 1. 100* of 1-1/2M steel underground pipe; for safety showers in operating area. 2. Approximately 50* of 2" steel pipe for alterations at water softener unit. Process Water Piping: 1. 2501 of 2" steel pipe traced and insulated (acid proof). Steam Supply Piping: 1. 100' of 1-1/2" steel pipe traced and insulated (acid proof). Well Water Piping: 1. 50* of 1-1/2" steel pipe traced and insulated (acid proof). To be used with drowning Jet. Cooling Tower Water Piping: 1. 80* of 3" steel pipe from header to acid copier and return. Tall Gas Piping: x;;:x 1. 60' of 6" polyester pipe lined with polypropylene. Drains and Sewers: ' ... ' `4 f *. 1. 25* of sewer piping from floor of operating area to sewer box at NW corner of structure. DSW 299063 2-&.I STLCOPCB4068975 "-' .'.:; .-. .. ' '-. . " :--' ' .> v -v.. '-.-i .?': . ... *.>:* -a Page 28 1. 400* of cable from panel at N3 corner of Falling Springs Road and 3rd Street to operating area to supply power for pump motors, lighting and instruments, etc. Main disconnect and push button starters in operating area. PILINGS: 1. Pilings for each of the receiver tanks. 2. Soil samples - receiver tanks area. O I os***064 STLCOPCB4068976 STLCOPCB4068977 (C o n t'd ! STLCOPCB4068978 DSW 299067 STLCOPCB4068979 STLCOPCB4068980 Air'lJJt;WL)JLX. Ct ^ContJd) rcmoN TOWERS y ' i* r DSW 299069 Monsanto Company THIS DRAWING AND THE INFORMATION CONTAINED HEREON. IS CONFIDENTIAL AN6. IS THE PROPEtTY OF MONSANTO COMPANY. IT IS LOANED WITH THE EXPRESSED AGREEMENT THAT IT WILL NOT RE REPRODUCED. COPIED, OR OTHERWISE DISPOSED OF. DIRECTLY OR INDIRECTLY, AND WILL NOT RE USED, IN WHOLE OR IN PART. TO FURNISH ANY INFOR MATION FOR THE MAKING OF APPARATUS OR THE PRACTICING OF ANY PROCESS OR ( jHERWSE WITHOUT WRITTEN PERMISSION OF MONSANTO COMPANY FIRST OITAINEB ORGANIC CHEMICALS DIVISION -xMONSANTO, ILLINOIS ---------- - 1 ' .------------------------ TITLE ADI4&WC ABSORPTION LAYOUT. -.JO SPEONC At TO EACH CASE, THE ACCEPTANCE OF THIS DRAWING WILL * CON STRUED AS AN ACCEPTANCE OF THE FOREGOING PROVISION. - . wr . OATS- 1 ' - DRAWN 8 scmcnm 8 aped. - ' DATE SCALE. Mff.fe JOS NO. (ENTITY I PST. | NO. DRAWING NUMBER CKO. DSGN. AW'D. Iappd. . Iappo. | TS-A- REV. STLCOPCB4068981 Page 34 APPENDIX H 0 MANUFACTURING COST ESTIMATES :..; based ON 1971 DISTRIBUTION IN APPENDIX G Facility Falling Film Adiabatic Falling Film + Adiabatic Monthly Production 2,630,000 2,100,000 4,730,000 Product Cost Unit Raw Material Steam Electricity Mater Purchased Water Plant Labor Mfg. Salaries Payroll OH Supplies Laboratory Cloth & Laundry Cloth & Lndry Sfty. Tech.. Services Research ^ i>chanical Exp. Total Direct Conv. 1 [V) 1.722 V) ~ > F) 0.016 V) 0.005 F) 0.045 F) 0.110 B) 0.024 F) 0.030 f) 0.007 V) 0.062 F) 0.001 F) 6.001 F) 0.056 F) [B) 0.178 0.535 Depreciation [B) Factory Indir. Exp. (B) Total Indirect Conv. 0.176 0.182 0.358 Amount 45289 - 411 135 1189 2889 624 792 188 1624 18 1480 -- 4680 14064 4638 4794 9432 Unit 1.571 0.005 0.020 0.005 0.028 0.138 0.030 0.037 0.009 0.062 0.002 0.001 0.070 0.024 0.195 0.628 0.298 0.228 0.526 Amount 32991 109 411 148 595 2889 624 792 188 1302 34 18 1480 5 00 4100 13190 6250 4794 11044 Unit 1.655 0.002 0.017 0.005 0.038 0.122 0.026 0.033 0.008 0.062 0.001 0.001 0.063 *0.011 0.186 0.576 0.230 0.203 0.433 Amount 78280 109 822 283 1784 5778 1247 1584 376 2926 68 36 2960 500 8780 27253 10888 9588 20476 Total Product Cost 2.615 68785 2.725 57225 2.664 126009 Total F & B Cost Total Variable Cost 0.827 1.788 21737 47048 1.080 1.643- 22675 0.939 34550 . 1.725 44411 81598 .i" DSW 299070 STLCOPCB4068982 . _*' Page 35 . APPENDIX I . O INCREMENT COST FOR ADDITION PRODUCTION ....................................... .... Existing ..isirr....................... Existing Facility (1971 Std.) + New 00* -=t k Monthly Production 000 4,730, 000 Product Cost Raw Material Steam Electricity Water Purchased Water Plant Labor Mfg. Salaries Payroll OH Supplies Laboratory Cloth. & Laundry Cloth. & Lndry Sfty. Tech. Services Research Mechanical Exp. bal Direct Conv. V V F V [F (F B F V V F yF [Bj Unit 1.722 .- 0.012 0.005 0.035 0.140 0.037 0.040 0.007 0.062 0.002 0.001 0.087 - 0.138 O.566 Amount 58548 - 411 174 1189 4783 1247 1551 250 2100 55 50 2960 4680 19230 Unit 1.655 0.002 0.017 0.005 0.038 0.122 0.026 0.033 0.008 0.062 0.001 0.001 0.063 0.011 0.186 0.576 Amount 78280 109 822 283 1784 5778 1247 1584 376 2926 68 36 2960 500 8780 27253 Depreciation Factory Indir. Exp. Total Indir. Conv. Total Product Cost 3) 0.136 (]3) 0.141 0.277 2.565 4638 479^ 9432 89210 0.230 0.203 0.433 2.664 10888 9588 20476 126009 Total F & B Cost Total Variable Cost 0.776 1.789 26388 60822 0.939 1.725 44411 81598 Incremental Increase 1,330, 000 Unit Amount _ 19732 - 109 - 411 -- 109 -- 595 - 995 -0 - 232 - 126 - 826 - 13 -6 -0 _ 500 * * 4100 - "8022 -- - 2.917 6250 4794 11044 38798 - 18023 - 20776 ,= " ^ V >V n J DSW 2990^1 STLCOPCB4068983