Document 26vvYdx4YKbo4vYyjmBXkQZR

maintenance, or Inspection procedures require operator .access. (Source: Added at 11. 111. .Reg. 7650.. effect We April 11. 1953). . Section 21S.48S teaks The owner or operator of a pharmaceutical manufacturing, pi ant Shall, repair, any, component from which a leak of volatile organic -liquid can be observed. The repair shall be completed as soon as practicable but no later than IS days after, the. leak is. found. If . the leaking component cannot be repaired until the process unit Is shut down., the leaking component must ttieii.be repaired before.the unit -is restarted. (Source: .' Added at 12 111. Reg. 7650. effective April 11. 1988) Section 215.486 -Other Emission Sources The owner or operator of a washer, laboratory hood, capsule coating operation,- mixing' operation, or any other process emission source not subject to Section 215.481- through 215.485 'of this Subpart, aiid used to manufacture pharmaceuticals shall control the emissions of volatile organic-material from.such:emission sources by: - a) Air pollution control equipment which reduces " by 81 percent or.more the volatile organic material that would,otherwise be emitted to the atmosphere, or b).A surface' condenser which .captures all the ..' volatile, organic material-which would ' otherwise be, emitted to the'atmosphere and . which meets the requirements of Section 215.481(a) of this Subpart. (Source:- Added at 12 111. Reg. 7650; effective April 11. 1988) Section 215.487 Testing a) The owner, or.operator of any volatile organic material emission source subject to this Subpart shall, at his own expense, demonstrate compl 1 ance to the Agency by methods or procedures listed tn Section 215.487(c). b) All test's pursuant to Section.215.487(a) shall be performed, in conformance with the procedures set forth In 35,111. Adm. Code 283. c) Test procedures to determine operation and maintenance compliance with this Subpart shall be consistent with EPA^4S0/2-78-041. Incorporated by reference In Section 215.10S. Procedures for testing air pollution control, equipment to'.determine compliance with this Subpart shall use Part 230. Appendix A Method 2S (40 CPR 60. Appendix fi. Method 2S). (Source: Added at 12 111. Reg. 7650.. effective April IT. 1988) Section 21 S'.488 Monitors for Air Pollution Control Equipment a) At a minimum, continuous monitors for the ^following'parameters shall be Installed on air pollution control equipment subject to ' this Subpart: 1) Destruction device combustion temperature: 2) Temperature rise across a catalytic afterburner -bed: 3) Breakthrough, of volatile organic.material os a carbon adsorptlon jintt. b) Each monitor shall be equipped with a ` recording device. . c) Each won+tor shall be- calibrated qoarterly. d) Each monitor shall operate at all.times while : - the associated control equipment Is operating.' (Source: Added at 12 111. Reg. 76S0, effective April ii. 1988) ;' '" / Section 215.489- Compliance Schedule----- a) The owner or operator of a<i-em1ss.1pn source subject to thisSubpart.the construction or modification of which has contnenced prior to April IS. 1988. must complete on-site construction or- Installation of .the emission -control or process equipment.-or.both, so as to operate In compliance With tlils Subpart by April 1. 1989. b) The owner and operator of any emission source subject to this Subpart, the construction or . modifIcatlon-of which hasThot-ewwcw*** prior to April IS. 1988. shall construct such source so that it will operate In compliance with thTs Siibpart.~ (Source: Added at 12 111. Reg. 7650. effective April 11. 1988) SUBPART U: COKE MANUFACTURE AND BY-PRODUCT RECOVERY' Section 215.500 Exceptions The provisions-..of Subpart K shall,, opt apply^to coke by-product recovery plants. (Source: Adopted at 9 111. Reg. 13960. effective August 28. 1985) Section 215.S10 Coke By-Product Plants. The owner oc opecator af. a.coke by-product recovery plant shall reduce the.uncontrolled emissions of volatile organic materials by at - 119 -