USE THIS BOOK r / FOR REFERENCE WHEN ERECTING BOILER, ORDER ING PARTS AND FOR OPERATION NOTICE MR. STEAMFITTER! U*e regular steel nuts and fiat washers for assembling boiler. Apply oil or grease freely to tie bolt threads while assembling sections to prevent stripping of threads on bolt. After drawing up boiler, remove steel tie bolt nuts and place sheet metal COMPRESSION WASHERS on bolts with open (cupped) side against regular washer. -Place BRASS SAFETY NUTS on bolts against compression washers. Lubricate nuts well and tighten with FINGERS ONLY. FAILURE TO OBSERVE THIS MAY RESULT IN DAMAGE TO BOILER ^COMPRESSION -WASHER BRASS SAFETY \ ' NUT / BOILER TIE ROD LUGS IMPORTANT! When boiler sections have been assembled, it is essential that boiler be tested before platework, jacket or piping is installed. BEFORE FIRE IS STARTED IN BOILER, plug all boiler tappings and fill entirely with cold water. Subject to at least ten or fifteen pounds pressure. Where local water supply pressure does not exceed sixty pounds, boiler may be connected direct to supply line. EXAMINE BOILER CAREFULLY, INSIDE AND OUTSIDE, to insure against leaks through concealed breakage caused in shipping and handling'. This precaution is for your protection and will simplify handling of necessary replacements and adjustment claims. _ EXTERNAL HEATER TAPPINGS Steam boilers are provided with V/i" tapping below water line for "EXCF.LSO" external water heater. CAUTION--WATER BOILERS Expansion tank should not be set in cold or exposed place. If pipe leading to tank freezes, the system will be sealed; this will likely cause breakage of boiler or radiators, because of pressure created by expanding water. 14165 ECTING DIRECTIONS NEW IDEAL ARCO BOILER n 1. Level base in final position with regard to chimney. Place firepot on base and engage pilot lugs on bottom with holes in top of base. Clean nipples and nipple openings with kerosene or gasoline and apply good lubricating oil. DO NOT USE PAINT OR RED LEAD. Cut shows LONG extended nipple partly inserted in firepot. This type nipple used on STEAM BOILERS only. No. 1 CAUTION-STEAM BOILERS Be Sure to Insert the Long Extended Nipple in Right Hand Side of Firepot --^ ^ ' 2. Drive nipples SQUARELY into nipple openings, using block of wood and hammer. Regular nipple (used on left hand Bide of Steam Boilers and on both sides of Water Boilers) must project above fin ished bearing pad on firepot (or section) one-half of its length. Extended nipple, which is used only on right hand side of Steam Boilers, must project same distance above finished bearing pad as regular nipple. Use rule or gauge to insure that nipples project outside of opening equally all around. Most nipple leaks are caused by tilted or cocked nipples. Place a roll of boiler putty about x/l" in diameter around the top of the firepot just inside of the rib. Putty should be placed around out side of nippies as shown. Do not allow putty to cover any of the bearing pads on top of firepot. Install coil hole cover plates and brackets if water heater is not used in firepot. No. 2 1 14166 ERECTING DIRECTIONS No. 3 NEW IDEAL ARCO BOOB i 3. Cut shows top view of firepot and intermediate sec tion. Intermediate section is not used with Nos. 222, 252 and 282 boilers. Location of bearing pads is indicated by arrows. It is VERY IMPORTANT that all of these pads contact with part assembled above. This is accomplished by carefully following^directions in pulling down dome with tie boltB as directed in OPER ATION No. 5. CAUTION-STEAM BOILERS Boilers Having Intermediate Sections -- Be Sure to Insert the Short Extended Nipple in Right Hand Side of Section -- See Cut Below 4. Clean and oil nipple openings in intermediate section or dome (depending on assemblage) and place same in position on nipples in firepot. Note--(Intermediate Section must be assembled with bearing pads to top). Drive section to approximate final position with heavy block of wood, striking directly over nipple openings on alternate sides to in sure nipples remaining straight and forming perfect joints. Cut shows SHORT extended nipple partly inserted in interme diate section. This type nipple used on RIGHT SIDE of Steam Boilers only. Drive nipples in place as directed in OPERATION No. 2. No. 4 14167 ECTING DIRECTIONS____________ NEW IDEAL ARCO BOILER No. 5 5. If boiler has intermediate section, place roll of boiler putty around inside of rib as outlined for firepot, before placing dome in position. Do not allow putty to cover any of the bearing pads on top of section. See that dome rests LEVEL on nipples of intermediate section or firepot. Oil threads and insert con necting bolts with regular flat steel washer top and bottom. Place nuts and pull all four bolts up hand tight before using wrench. IMPORTANT Pull both FRONT BOLTS down 1/3 turn together, then pull both REAR BOLTS down 1/3 turn together. Alternate from front to rear bolts until dome contacts with bearing pads of section below. 6. Cut shows part view of boiler with intermediate section. Front bearing pads are indicated. If dome has been pulled down as directed in Operation No. 5, front v bearing pads will contact slightly / ahead of bearing pads on nipple hubs and possible damage to boiler and nipples avoided. Remove nuts from tie bolts and add sheet metal compression s washers, open or cupped side down, against regular washers. Place brass safety nuts on bolts against compression washers. Lu bricate nuts well and tighten with FINGERS ONLY. Failure to do this may result in damage to boiler. 3 No. 6 14168 ERECTING DIRECTIONS eNEW IDEAL ARCO BOILE No. 6 7. Remove doors from frames and fill channels around frames with boiler putty. Attach frames and make bolts only moderately tight. Tighten bolts evenly to avoid distortion of frames. 8. Try front jacket panel on boiler. Cut shows method of placing front panel over door hinges and then swinging panel into position over door catches. See that panel rests squarely on base and that frames line u;- with openings in jacket. Proper adjustment can be obtained by tapping frames lightly with hammer. Remove front jacket panel and tighten door frames in final position with bearing pads at bolts resting squarely against boiler. Replace doors on frames. Doors should lift over catches easily and seat firmly when closed. If frame has been distorted from tightening bolts unevenly door will not seat properly and will require loosening of bolts which are too tight. Com plete all adjustments and remove doors. Bolt smokehood frame in position. Side marked "TOP" indicates proper setting. Boiler is now ready to seal with putty. Press putty into all open joints be tween sections, around door frames, smokehood frame and draft pouch. Putty around firepot at base. Ail joints should be well filled and made smooth to prevent leakage of air and gases. It is important that this operation be done properly. Install front jacket panel. NOTE: JACKET TOP AND INSULATION MUST BE IN PLACE BEFORE CONNECTING SUPPLY PIPE. Jacket top will not interfere with installation of jacket if supported above boiler as shown. 4 14169 ECTING DIRECTIONS 9. After front jacket panel is installed, follow with left panel. Engage joint locking device and insert jacket screw at bottom. Install right panel -- REMOVE . KNOCKOUTS FOR GAUGE GLASS ) AND TRI-COCK FITTINGS ON STEAM BOILERS. Draw panels together in back and insert upper jacket screw under smokehood collar. Insert ^ lower jacket screw. Lock joints at top with jacket clips. NEW IDEAL ARCO BOILER No. 9 No. 10 5 14170 ERECTING DIRECTIONS i No. 11 NEW IDEAL ARCO BOILe( < 11. Attach doors, smokehood and boiler trim. STEAM BOILERS: Place sheet metal jacket washers on gauge glass fittings and tri-cock6 before screwing into boiler. Automatic steam regulator is connected to bushing by means of y2" nipple packed in steam trim box. If "Excel*oM external heater tapping is not to be used, attach cover cap by pushing same over head of plug. Grout between bottom of base and floor with PORTLAND Ce ment. Cut No. 11 shows steam boiler assembled complete. No. 12 6 14171 ftTOMATIC DRAFT CONTROL NEW IDEAL ARCO BOILER INSTRUCTIONS FOR ATTACHMENT AND OPERATION OF AUTOMATIC DRAFT CONTROL Cuts showing attach ment of draft control for either steam or water boilers -- cut at upper left shows in stallation from regu lator to cold air check door -- cut at lower right shows lower end of regulator rod at tached to draft door. 1. Face regulator with rocker arm to rear of boiler. NOTE -- Use wrench on hex agon end for turning or adjusting regu lator -- NEVER use regulator lever. 2. Insert regulator lever with notch on top; end with hole to rear. Tighten screw in rocker arm so that it engages notch in regulator lever 3. Attach clevis to rear end of regulator lever with flat head pin. 4. Attach loop or hook end of jointed regulator rod to draft door (on base) and run plain end thru eye of lever on cold air check damper (on smokehood). 5. Place ball collar on regulator rod and insert rod in clevis. 6. Adjust counterweight on regulator lever so that front end of lever is held down. 7. Adjust regulator rod so that door on base has approximately the same opening on both sides or slightly more than half open. Tighten set screw in clevis. 5.Hold draft and cold air check doors closed as shown and adjust ball collar on regulator rod so that it is a trifle above eye on cold air check door lever. Tighten set screw. 9. Counterweights are adjusted on regulator lever to suit temperature require ments. Before starting Are in boiler, set weights so that front end of regulator lever is held down but requires only slight effort to raise. After Are is started in boiler and temperature rises to approximately 160 degrees on water boilers as indicated by combina tion altitude gauge and thermometer or approximately 2 lbs. pressure on steam boilers as indicated by steam gauge, regu lator lever should raise, thereby dosing draft door. Further rise in temperature will cause regulator lever to raise higher and open cold air check door on smokehood. This will short circuit draft and check Are. To obtain more heat, move FRONT WEIGHT further from regulator. To obtain less heat, move FRONT WEIGHT closer to regulator. REAR WEIGHT acts as a counter bal ance and after setting does not require changing while regulator is operating within the ordinary temperature range. If higher temperatures are desired than can be obtained by shifting front weight to extreme front of regulator lever, then rear weight should be shifted closer to regulator and in extreme cases it may be removed and placed on front with other counter weight. 7 14172 BOILER NUMBERS Dimension 222 223 252 253 282 283 A 32% 32% 35 35 39 39 B 55% GO 56% 61% 58% 63% C 29% 29% 32% 32% 36% 36% D 47 51% 48% 53% 50% 55% E 44% 49% 45% 50% 47 52% F 51 55% 51% 56 J s 55 60% C 39% 44 40% 45% 41% 46% H 14% 14% 15% 15% 15% 15% J 8 8 8% 8% 9 9 K 14% 14% 15 15 17% 17% L 8%xl3 8%xl3 8%xl3 8%xl3 8%xl3 8%xl3 P 9 9 9 9 12 12 Outlets 1-4" 1-4' 1-5" 1-5' 1-5' 1-5" Inlets 2-3' 2-3' 2-4" 2-4' 2-4" 2-4' Distance from Floor Line to Top of Flow Tapping Boss 55% 60 56% 61% 58% 63% Note: D--Indicates Height of Water Line. L--Indicates Size of Fire Door Opening. P--Indicates Dipmeter of Smoke Pipe. No. 222-252-282 Boilers consist of Base. Firepot and Dome Sections. No. 223-253-283 Boilers consist of Base. Firepot, Intermediate and Dome Sections. 8 14173 Oration and care NEW IDEAL ARCO BOILER STEAM BOILER Fill boiler with water until 2 to 2Vz inches shows in gauge glass. After fire is started in boiler the water will rise due to expansion caused by increase in temperature. This level should be maintained while boiler is in operation. Never draw water from boiler while in use. Boiler should not be operated when water does not show in gauge glass, otherwise damage may result. WATER BOILER ^ Keep entire system filled with water up to one-third of expansion tank. This insures complete circulation of water and safeguards against breakage. Expansion tank should not be set in cold or exposed place. If pipe leading to tank freezes, serious damage may result. Never draw water from system while in use. NOTE--IMPORTANT: If closed type water system is used make sure relief valve is adjusted and operates below 30 pounds pressure, otherwise pressure may ^ build up in system and cause damage. STEAM AND WATER BOILERS FUEL RECOMMENDATIONS Kind Hard Coal Coke Soft Coal With Average Chimney Draft Stove, Small Egg Esrg Lump, Egg With Strong Chimney Draft Stove, Chestnut, Pea Egg, Chestnut, Pea No. 2 Washed Nut, Mine Run FIRING Fill boiler or system with water as directed. Place kindling on grates and light. Add fuel in small quantities until fire is burning well. Continue to add fuel gradually until entire grate is covered to approximately half the depth of the fire pot. Type of fuel largely determines height of fuel line in firepot for best results. If hard coal or coke is used firepot may be filled up to approximately center of fire door. If good clean egg or lump soft coal is used fuel level can be carried up to fire door ledge. Cheaper grades of soft coal containing considerable slack cannot be fired as high as the better grades. Best results will be acquired by keeping fuel line as high as found practical. Fi.*e should receive attention at regular intervals. When boiler is operating under average heating requirements, grates should be shaken once each day unless weather is mild in which case grates may be shaken only as required to sustain fire. At regular attention interval, observe the following: 1. Open pipe (choke) damper in smokehood fully. 2. Close draft and check draft doors. 3. Release catch which holds grates in level position. 4. Shake grates until fire shows in ashpit. 5. Engage grate locking catch and add fuel. After fuel is added to fire, open slide damper in fire door. For hard coal or coke use of this damper is not so essential as when burning soft coal. The ad ditional air admitted thru this damper is required in order to burn the volatile gases which form when fresh fuel is added. Length of time which damper should be open depends upon fuel and rate at which fire is burning. Regulation of this damper must therefore be found by practice to obtain best results. Use of pipe (choke) damper in smokehood depends upon chimney and type of fuel used. This damper is provided to reduce draft thereby placing an additional check on fire if needed. 14174 OPERATION AND CARE NEW IDEAL ARCO BOILl cWhen using soft coal do not close this damper entirely until fuel is partly burned and practically smokeless. Where poor chimney conditions prevail, it may be necessary to have choke damper open wide at all times. Best results in setting this damper will be found by practice. The Automatic Regulator, with counter weights adjusted as directed under "Instructions for Attachment and Operation of Automatic Draft Control'' (page ) will control fire without further attention. GENERAL RULES FOR BOILERS 1. Give fire regular attention, especially in severe weather when boiler is oper ating under full load. 2. Observe firing instructions. 3. Do not smother fire with fresh fuel and close dampers tight. 4. Do not overshake or poke fire in mild weather. 5. Do not leave fire door open in order to check fire. Correct adjustment of Automatic Regulator and Choke Damper in smokehood will regulate fire to supply amount of heat desired. 6. Remove ashes daily. If ashes are allowed to accumulate in ashpit, warped or burned out grates may result. If accumulation of ashes is allowed to remain in ashpit, same will absorb moisture and cause corrosion of metal parts with which ashes may come in contact. 7. Keep boiler surfaces and flues clean. Soot and dust are insulators and prevent boiler surfaces from absorbing and delivering full amount of heat to radiators. 8. If fire does not bum evenly over the entire grate and seems sluggish in starting up after grates have been well shaken, a thorough cleaning is required. This is done by allowing fire to bum down until a thin layer of fuel is left on grate; shake well and remove slate and clinkers left on grate with poker and scraper. 9. If fire has been neglected for some time and grate becomes covered with slate and clinkers massed together, quickest way to get active fire is to break up mass and dump grate. Then build an entirely new fire. Occasionally this clinker mass will hold together and may be removed thru fire door in one or more pieces. If this can be accomplished, building of new fire may be avoided. 10. If hard clinker or piece of coal lodges between the grate bars, do not force shaking mechanism too hard. Dislodge the obstruction with the poker and avoid breakage of parts. 11. The liability of material lodging between grates is greatly reduced if grates are not shaken to the dump position or limit of their movement. Ordinary shaking of fire can be accomplished by part movement of tb*. shaker handle. 12. At beginning of heating season open drain cock and permit sufficient water to run from system to remove sludge accumulation at bottom of boiler. Refill boiler as directed under "Operation and Care" before starting fire. WHEN BOILER IS NOT IN USE (Summer Months) 1. Remove smokepipe, clean thoroughly and replace in the fall, making ail joints tight with boiler putty or asbestos cement. 2. Clean all flues; remove soot and ashes from boiler and at base of chimney. 3. Oil all door hinge bearings, damper bearings and regulation parts. 4. Leave doors partially open all summer to avoid sweating and rusting of interior surfaces. 5. On water boilers--keep system filled with water as directed under "Operation and Care." On steam boilers--fill boiler with water until water runs out of safety valve. Note: Safety valve lever should be held up when boiler is nearly full to avoid over filling. WHEN BOILER IS NOT IN USE (Winter Months) If boiler is not to be used during winter, draw off all the water in the entire system. If water is permitted to freeze in boiler or radiators, breakage may result. If further instructions are needed, consult your heating contractor or the American Radiator Company. 10 14175 eration and care NEW IDEAL ARCO BOILER BLOWING OFF STEAM BOILERS Oii, grease or grit in a new system causes a Steam Boiler to foam, prevents proper generation of steam, and produces an unsteady water line. Therefore, it is necessary to BLOW OFF THE BOILER, UNDER PRESSURE, to clear the system of oil or any foreign matter in Radiators, Mains and Boiler. This should be done WITHIN A SHORT TIME AFTER THE BOILER IS IN STALLED and in operation. If one blowing off does not result in a CLEAN WATER GAUGE GLASS, proper generation of steam and a steady water line, the boiler should be blown off a second, and if necessary, a third and fourth time. The following method for cleaning Steam Boilers under pressure will be found helpful. '* WHEN WATER SUPPLY PRESSURE IS AVAILABLE Remove aafety valve from boiler. Connect a pipe at least l1// in diameter to safety valve tapping, extending the pipe to the outside of the building or some suit able drain. Close off all the Radiator Valves connected with the system, or if the main flow and return pipes are equipped with Gate Valves, these valves may be closed in place of closing the radiator valves. Fill the boiler with water to the top of the gauge glass. With a hot Are in boiler, blow hot water and steam out through safety valve tapping and pipe referred to above. Maintain as much steam pressure as pos sible in boiler up to fifteen pounds, as indicated on steam gauge. Carefully supply makeup water to the boiler. Continue the blowing for about two hours. Then close off the Water Feed Valve and drain the water through the draw-off down to the proper water line in the boiler. Remove the Blow-off Pipe and replace the Safety Valve, open the Radiator Valves or the Gate Valves on the flow and return pipes, as the case may be, and then the heating outfit is ready for operation with the boiler thoroughly cleaned inside. WHEN WATER SUPPLY PRESSURE IS NOT AVAILABLE Remove safety valve from boiler and insert nipple and tee fitting. Replace safety valve in top of tee and use side opening of tee for blow-off line. Connect a pipe at least 1 '/2 ' in diameter, provided with a gate valve, to the blowoff opening in tee and run it to the nearest drain. Close all Radiator Valves and boiler Return Valve. Fill the boiler with water to the top of the gauge glass. With the valve in the blow-off line closed, start wood fire and build up steam pressure from five to ten pounds. Open valve in blow-off line and dose it when pressure has dropped to zero. Carefully supply fresh water to the boiler to maintain the proper level and con tinue to repeat the above process for two to four hours. At the end of this time draw fire quickly and with at least ten pounds pressure, drain boiler through bottom draw-off. Remove the Blow-off Pipe, Nipple and Tee Fitting, and replace the Safety Valve. Allow boiler to cool, then refill with water to proper level and open Radiator Valves and boiler Return Valve before starting fire. At times, one blowing off will not give the desired results, so that this process must be continued until the boiler is thoroughly cleansed. -___ -____ _________________________ 11----------------------------------------------------- 14176 PACKING AND PARTS LIST NEW IDEAL ARCO BOIL] COMPLETE BOILER CONSISTS OF: 1 FIREPOT SECTION 1 INTERMEDIATE SECTION (For No. 223-253-283 Boiler* Only) 1 DOME SECTION 1 BASE CRATE 1 BOX PLATE CASTINGS 1 BOX TRIM (STEAM OR WATER) 1 JACKET CRATE 1 BUNDLE FIRE TOOLS (3 Pieces) 1 SMOKEHOOD CRATE (No. 282 and 283 Boilers Only) GIVE BOILER SIZE AND SERIES NUMBER WHEN ORDERING REPAIR PARTS ( BASE CRATE 1 Base, Complete with Grate Bars 1 Grate Connecting Arm 1 Angle Lever 1 Angle Lever Bracket 1 Connecting Arm Catch 1 Ashpit Door, Hinge and Catch Plate 1 Draft Pouch Complete, consists of: Pouch, Frame and B-Fly Draft Door (Inside and Outside Half) I Smokehood Frame 1 Smokehood Complete (22' and 25' Boilers Only) consists of: Smokehood with Check Draft Frame, B-Fly Door (Inside and Outside Half), Balance Weight, Lever, Choke Damper and Cap 1 Shaker Handle 1 Regulator Lever 1 Regulator Rod (2-Piece, Jointed) PLATE BOX 1 Slice Door Frame with Slice Door, Baffle, Hinge and Catch Plate 1 Upper Cleanout Door Frame with Cleanout Door, Baffle, Series Plate, Hinge and Catch Plate 1 Fire Door Frame with Fire Door, Baffle, Slide Damper, Hinge and Catch Plate (For No. 222-252-282 Boilers) 1 Combination Fire and Lower Cleanout Door Frame with Fire Door, Baffle, Slide Damper, Hinge and Catch Plate, Lower Cleanout Door, Baffle, Hinge and Catch Plate (For No. 223-253-283 Boilers.) 4 Tie Bolts with Hex Nuts: %x 4 ' for No. 222-252 and 282 Boilers ysx 9'A' for No. 223-253 & 283 Boilers 8 y' Std. Flat Steel Washers 1 Bag (4) Compression Washers and,(4) Brass Safety Nuts 1 Bag Bolts, Coil Hole Covers and Sundry Small Parts 1 Flue Brush Lbs. Putty 12 SMOKEHOOD CRATE (28' Boilers Only) 1 Smokehood Complete* consists of: Smokehood with Check Draft Frame, B-Fly Door (Inside and Outside Half), Balance Weight, Lever, Choke Damp er and Cap STEAM TRIM BOX 1 Automatic Steam Regulator I Set Water Column Trimmings 1 Pop Safety Valve and Bushing 1 Steam Gauge 1 Water Seal and Nipple 2 Regulator Weights 1 2 x */2# Bushing / For 1 V2r Nipple \ Regulator Nippies--3' Regular Nipples--4* Regular Nipples--3' Extended for Firepot Nipples--4' Extended for Firepot Nipples--3' Extended for Interm. Sect. Nipples--4' Extended for Interm. Sect. 1 ' Regulator Rod Clevis and Ball Collar Jacket Washers f'.r Gauge Cocks 2 Jacket Washers for Tri-Cocks WATER TRIM BOX 1 Automatic Water Regulator J Combination Altitude Guage and Ther mometer 1 Extension--for Gauge 2 Regulator Lever Weights 1 2#x l1/?' Bushing 1 2' Rad. Plug 2 V20 Flush PlugB 2 Flush Plugs Nipples--3' Regular Nipples--4' Regular 1 Regulator Rod Clevis and Ball Collar 14177 v- > <*iV DRAINING BOILER If boiler is not used during winter, entire system should be drained. When boiler piping is installed, fitter should connect return line to boiler with pipe same size as return tapping in boiler. This pipe should hare tee fitting or similar arrangement facing downward with plug at lowest point, so that water can be drained from boiler to lowest possible level. If water in boiler is allowed to freeze, boiler and piping may crack or break. OIL BOILERS Oil Burning Boilers are shipped less Grate Bars, Connecting Arm, Catch, Angle Lever, Bracket, Regulator, Weights, Regulator Lever and Rods, Poker, Flue Scraper, and Shaker Handle. Cover Plates for Connecting Arm and Angle Lever Bracket Openings in- "/ eluded with Base. NOTE: All parts for this boilar hare been carefully inspected and packed. In case of shortage, make sure that all parts hare been removed from shipping container and examine packing material thoroughly. - If part cannot be found, report shortage to your dealer, giving boiler size, series number, date, inspector's number and packer's number. (See Parts List on Page 12 and Packer's Check Ticket on this Cover.) PACKER'S CHECK TICKET BOILER SIZE ...____ ___________ SERIES No______ '____________ DATE INSPECTED BY______ ________ F PACKED BY GIVE BOILER SIZE AND SERIES NUMBER WHEN ORDERING REPAIR PARTS American Radiator Company revised lieu yOffices in AUm Principal Cities . ^* -f* JiJ 11 . I___________, ... . g:-' _____ 14178 -.1,, NEW IDEAL ARCO BOILER Jr 22-25-28 INCH SECTIONAL CONSTRUCTION FOR ALL FUELS Erecting Directions . . s 'V Operating Instructions '**:& X.`i - i- Parts List *. r-V American Radiator Company offices in all principal cities v. -X *t T FORM B. P. 2005 !M ll- WM. J. KELLER. INC. ... , ^ 'x-fv'v . 14179 13 c IDEAL ARGO BOILER . -/..y.i.fM'.ys.'vf ; 18-20-22 INCH .(# 1K ONE-PIECE CONSTRUCTION . '. *. * ,,_ ,. FOR ALL FUELS C - -y. ic TIONS American Radiator roMPANY OFFICES IN ALL PRINCIPAL CITIES 14180 USE THIS BOOK FOR REFERENCE WHEN ERECTING BOILER, ORDERING PARTS/AND FOR OPERATION IMPORTANT! ( It is essential that boiler be tested before platework, jacket or piping is installed. BEFORE FIRE IS STARTED IN BOILER, plug all boiler tappings and fill entirely with cold water. Subject to at least ten or fifteen pounds pressure. Where local water supply pressure does not exceed sixty pounds, boiler may be connected direct to supply line. EXAMINE BOILER CAREFULLY, INSIDE AND OUTSIDE, to insure against leaks through concealed breakage caused in shipping and handling. This precaution is for your protection and will simplify handling of necessary replacements and adjustment claims. DRAINING BOILER " If boiler is not used during winter, entire system should be drained. When boiler piping is installed, fitter should connect return, line to boiler with pipe same size as return tapping in boiler. This pipe should have tee fitting or similar arrangement facing downward with plug at lowest point, so that water can be.drained from boiler to lowest possible level, if water in boiler is allowed to freeze, boiler and piping may crack or break. i EXTERNAL HEATER TAPPING Boilers are provided with V/i' tapping below water line for "EXCELSO" external water heater. . ^ . CAUTION--WATER BOILERS Expansion tank should not be set in cold or exposed place. If pipe leading to tank freezes, the system will be sealed; this will likely cause breakage of boiler or radiators, because of pressure created by expanding water. 14181 ECTING DIRECTIONS No. 1 NEW IDEAL ARCO BOILER 1. Level assembled base in final position with re gard to chimney. 2. Place body casting on base. Locate by means of bead on top of base and cutouts in bead for return tapping bosses. Install coil hole cover plates, if hot water coil is not used in firepot. No. 2 1 14182 ERECTING DIRECTIONS No. 3 NEW IDEAL ARCO BOILE' 3. Remove doors from frames and fill channels around frames with boiler putty. Attach frames and make bolts only moderately tight. Tighten bolts evenly to avoid distortion of frames. c ( No. 4 2 14183 ;recting directions NEW IDEAL ARCO BOILER No. 5 o 5. Try front jacket panel on boiler. Cut shows method of placing front panel over door hinges and then swinging panel into position over door catches. See that panel rests squarely on base and that frames line up with openings in jacket. Proper adjustment can be obtained by tapping frames lightly with hammer. Remove front jacket panel and tighten door frames in final position with bearing pads at bolts resting squarely against boiler. Replace doors on frames. Doors should lift over catches easily and seat firmly when closed. If frame has been distorted from tightening bolts unevenly, door will not seat properly and will require loosening of bolts which are too tight. Complete all adjustments and remove doors. Fill channel around smokehood frame with boiler putty and bolt frame in position. Side marked "TOP" indicates proper setting. Boiler is now ready to seal with putty. Press putty into all open joints, around door frames, smokehood frame and draft pouch. Putty around body at base. All joints should be well filled and made smooth to prevent leakage of air and gases. It is important that this operation be done properly. STEAM BOILERS--Screw fittings for gauge cocks and tri-cocks into boiler. See instruction tag in trim box. WATER BOILERS--Insert plugs in gauge cock and tri-cock tappings. NOTE: JACKET TOP AND INSULATION MUST BE IN PLACE BEFORE CONNECTING SUPPLY PIPE. Jacket top will not interfere with installation of jacket if supported above boiler as shown. 3 14184 erecting directions 6. Install front jacket panel. Follow with left panel. REMOVE KNOCKOUT IF "EXCELSO" EXTERNAL HEATER TAPPING IS TO BE USED ON STEAM BOILERS. IF TAPPING IS NOT USED, INSERT PLUG IN BOILER. REMOVE KNOCKOUTS FROM REAR OF JACKET IF HOT WATER COIL IS TO BE USED IN FIREPOT. Engage joint locking device and insert jacket screw at bottom. Install right panel. REMOVE KNOCKOUTS FOR GAUGE GLASS AND TRICOCK FITTINGS ON STEAM BOILERS. Draw panels together in back and insert upper jacket screw under smokehood collar. Insert lower jacket screw. Lock joints at top with jacket clips. NEW IDEAL ARCO BOILE No. G No. 7 4 14185 RECTING DIRECTIONS No. 8 NEW IDEAL ARCO BOILER 8. Attach doors, smokehood and boiler trim. STEAM BOILERS: Place sheet metal jacket washers on gauge glass fittings and tri-cocks before screwing into boiler. Automatic steam regulator is connected to bushing by means of V2 * nipple packed in steam trim box. Grout between bottom of base and floor with PORTLAND Ce ment. Cut No. 6 shows steam boiler, assembled complete. No. 9 5 14186 AUTOMATIC DRAFT CONTROL NEW IDEAL ARCO=BOlS( tINSTRUCTIONS FOR ATTACHMENT AND OPERATION OF AUTOMATIC DRAFT CONTROL Cuts showing attach ment of draft control for either steam or water boilers -- cut at upper left shows in stallation from regu lator to cold air check door -- cut at lower right shows tower end of regulator rod at tached to draft door. 1. Face regulator with rocker arm to rear of boiler. NOTE -- Use wrench on hex agon end for turning or adjusting regu lator -- NEVER use regulator lever. 2. Insert regulator lever with notch on top; end with hole to rear. Tighten screw in rocker arm so that it engages notch in regulator lever 3. Attach clevis to rear end of regulator lever with flat head pin. 4. Attach loop or hook end of jointed regulator rod to draft door (on base) and run plain end thru eye of lever on cold air check damper (on smokehood). 5. Place ball collar on regulator rod and insert rod in clevis. 6. Adjust counterweight on regulator lever so that front end of lever is held down. 7. Adjust regulator rod so that door on base has approximately the same opening on both sides or slightly-more than half open. Tighten set screw in clevis. 8. Hold draft and cold air check doors closed as shown and adjust ball collar on regulator rod so that it is a trifle above eye on cold air check door lever. Tighten set screw. 9. Counterweights are adjusted on regulator lever to suit temperature require ments. Before starting fire in boiler, set weights so that front end of regulator lever is held down but requires only slight effort to raise. After fire is started in boiler and temperature rises to approximately 180 degrees on water boilers as indicated by combina tion altitude gauge and thermometer or approximately 2 lbs. pressure on steam boilers as indicated by steam gauge, regu lator lever should raise, thereby closing draft door. Further rise in temperature will cause regulator lever to raise higher and open cold air check door on smokehood. This will short circuit draft and check fire. To obtain more heat, move FRONT WEIGHT further from regulator. To obtain less heat, move FRONT WEIGHT closer to regulator. REAR WEIGHT acts as a counter bal ance nd after setting does not require changing while regulator is operating within the ordinary temperature range. If higher temperatures are desired than can be obtained by shifting front weight to extreme front of regulator lever, then rear weight should be shifted closer to regulator and in extreme cases it may be removed and placed on front with other counter weight. ( < 6 14187 iOILER DIMENSIONS m PIPE TAP FOR EXCELSO, 0 NEW IDEAL ARCO BOILER 0 0 0 FLOOR LINE --> BOILER NUMBERS Dimension 161 201 221 A 26'/2 28 '/2 314 B 46 5 v 464 474 C 24'/. 26'/, 29 D 38s k 383 y 384 E 39'./2 39'/; 40 F 45 45 46',2 G 36 36 35'/2 H 14'/2 141/2 14'/2 J 64 64 7'/2 K 114 114 144 L 84 x 11 4 84 X 11'/2 84 X 11' 2 P 7 79 Outlets 1-3 1-3 1-4 Inlets 2-3 2-3 2-3 Distance from Floor Line to Top of Flow Tapping Boss 46' f2 46'-2 48 Note: D--Indicates Height of Water Line. L--Indicates Sire of Fire Door Opening. P--Indicates Diameter of Smoke Pipe. 7 14188 OPERATION AND CARE NEW IDEAL ARCO STEAM BOILER ^ Fill boiler with water until 2 to 2Vz inches shows in gauge glass. After fire is started in boiler the water will rise due to expansion caused by increase in temperature. This level should be maintained while boiler is in operation. Never draw water from boiler while in use. Boiler should not be operated when water does not show in gauge glass, otherwise damage may result. WATER BOILER Keep entire system filled with water up to one-third of expansion tank. This insures complete circulation of water and safeguards against breakage. Expansion tank should not be set in cold or exposed place. If pipe leading to tank freezes, serious damage may result. Never draw water from system while in use. NOTE--IMPORTANT: If closed type water system is used make sure relief valve is adjusted and operates below 30 pounds pressure, otherwise pressure may build up in system and cause damage. STEAM AND WATER BOILERS FUEL RECOMMENDATIONS Kind With Average Chimney Draft With Strong Chimney Draft i Hard Coal Stove, Small Egg Coke E&g Soft Coal Lump, Egg Stove, Chestnut, Pea Egg, Chestnut, Pea No. 2 Washed Nut, Mine Run FIRING Fill boiler or system with water as directed. Place kindling on grates and light. Add fuel in small quantities until fire is burning well. Continue to add fuel gradually until entire grate is covered to approximately half the depth of the fire pot. Type of fuel largely determines height of fuel line in firepot for best results. If hard coal or coke is used firepot may be filled up to approximately center of fire door. If good clean egg or lump soft coal is used fuel level can be carried up to fire door ledge. Cheaper grades of soft coal containing considerable alack cannot be fired as high as the better grades. Best results will be acquired by keeping fuel line as high as found practical. Fire should receive attention at regular intervals. When boiler is operating under average heating requirements, grates should be shaken once each day unless weather is mild in which case grates may be shaken only as required to sustain fire. At regular attention interval, observe the following: 1. Open pipe (choke) damper in smokehood fully. 2. Close draft and check draft doors. 3. Release catch which holds grates in level position. 4. Shake grates until fire shows in ashpit. 5. Engage grate locking catch and add fuel. After fuel is added to fire, open slide damper in fire door. For hard coal or coke use of this damper is not so essential as when burning soft coal. The ad ditional air admitted thru this damper is required in order to burn the volatile gases which form when fresh fuel is added. Length of time which damper should be open depends upon fuel and rate at which fire is burning. Regulation of this damper must therefore be found by practice to obtain best results. Use of pipe (choke) damper in smokehood depends upon chimney and type of fuel used. This damper is provided to reduce draft thereby placing an additional check on fire if needed. ( 8 14189 (Operation and care NEW IDEAL ARCO BOILER < 9 9 9 P When using soft coal do not close this damper entirely until fuel is partly burned and practically smokeless. Where poor chimney conditions prevail, it may be necessary to have choke damper open wide at all times. Best results in setting this damper will be found by practice. The Automatic Regulator* with counter weights adjusted as directed under "Instructions for Attachment and Operation of Automatic Draft Control" (pa ge 6) will control fire without further attention. GENERAL RULES FOR BOILERS 1. Give fire regular attention, especially in severe weather when boiler is oper ating under full load. 2. Observe firing instructions. 3. Do not smother fire with fresh fuel and close dampers tight. 4. Do not overshake or poke fire in mild weather. 5. Do not leave fire door open in order to check fire. Correct adjustment of Automatic Regulator and Choke Damper in smokehood will regulate fire to supply amount of heat desired. 6. Remove ashes daily. If ashes are allowed to accumulate in ashpit, warped or burned out grates may result. If accumulation of ashes is allowed to remain in ashpit, same will absorb moisture and cause corrosion of metal parts with which ashes may come in contact. 7. Keep boiler surfaces and flues clean. Soot and dust are insulators and prevent boiler surfaces from absorbing and delivering full amount of heat to radiators. 8. If fire does not burn evenly over the entire grate and seems sluggish in starting up after grates have been well shaken, a thorough cleaning is required. This is done by allowing fire to burn down until a thin layer of fuel is left on grate; shake well and remove slate and clinkers left on grate with poker and scraper. 9. If fire has been neglected for some time and grate becomes covered with slate and clinkers massed together, quickest way to get active fire is to break up mass and dump grate. Then build an entirely new fire. Occasionally this clinker mass will hold together and may be removed thru fire door in one or more pieces. If this can be accomplished, building of new fire may be avoided. 10. If hard clinker or piece of coal lodges between the grate bars, do not force shaking mechanism too hard. Dislodge the obstruction with the poker and avoid breakage of parts. 11. The liability of material lodging between grates is greatly reduced if grates are not shaken to the dump position or limit of their movement. Ordinary shaking of fire can be accomplished by part movement of the shaker handle. 12. At beginning of heating season open drain cock and perrrvt sufficient water to run from system to remove sludge accumulation at bottom of boiler. Refill boiler as directed under "Operation and Care" before starting fire. WHEN BOILER IS NOT IN USE (Summer Months) 1. Remove smokepipe, clean thoroughly and replace in the fall, making all joints tight with boiler putty or asbestos cement. 2. Clean all flues; remove soot and ashes from boiler and at base of chimney. 3. Oil all door hinge bearings, damper bearings and regulation parts. 4. Leave doors partially open all summer to avoid sweating and rusting of interior surfaces. 5. On water boilers--keep system filled with water as directed under "Operation and Care." On steam boilers--fill boiler with water until water runs out of safety valve. Note: Safety valve lever should be held up when boiler is nearly full to avoid over filling. WHEN BOILER IS NOT IN USE (Winter Months) If boiler is not to be used during winter, draw off all the water in the entire system. If water is permitted to freeze in boiler or radiators, breakage may result. If further instructions are needed, consult your heating contractor or the American Radiator Company. 14190 OPERATION AND CARE NEW IDEAL ARCO BOILE BLOWING OFF STEAM BOILERS Oil, grease or grit in a new system causes a Steam Boiler to foam, prevents proper generation of steam, and produces an unsteady water line. Therefore, it is necessary to BLOW OFF THE BOILER, UNDER PRESSURE, to clear the system of oil or any foreign matter in Radiators, Mains and Boiler. This should be done WITHIN A SHORT TIME AFTER THE BOILER IS INSTALLED and in operation. If one blowing off does not result in a CLEAN WATER GAUGE GLASS, proper generation of steam and a steady water line, the boiler should be blown off a second, and if necessary, a third and fourth time. The following method for cleaning Steam Boilers under pressure will be found helpful. f ^ WHEN WATER SUPPLY PRESSURE IS AVAILABLE Remove safety valve from boiler. Connect a pipe at least 1V2 * 'n diameter to safety valve tapping, extending the pipe to the outside of the building or some suitable drain. Close off all the Radiator Valves connected with the system, or if the main flow and return pipes are equipped with Gate Valves, these valves may be closed in place of closing the radiator valves. Fill the boiler with water to the top of the gauge glass. With a hot fire in boiler, blow hot water and steam out through safety-valve tapping and pipe referred to above. Maintain as much steam pressure as possible in boiler up to fifteen pounds, as indicated on steam gauge. Carefully supply makeup water to the boiler. Continue the blowing for about two hours. Then close off the Water Feed Valve and drain the water through the draw-off down to the proper water line in the boiler. Remove the Blow-off Pipe and replace the Safety Valve, open up the Radiator Valves or the Gate Valves on the flow and return pipes, as the case may be, and then the heating outfit is ready for operation with the boiler thoroughly cleaned inside. WHEN WATER SUPPLY PRESSURE IS NOT AVAILABLE Remove safety valve from boiler and insert nipple and tee fitting. Replace safety valve in top of tee and use side opening of tee for blow-off line. Connect a pipe at least V/z" in diameter, provided with a gate valve, to the blowoff opening in tee and run it to the nearest drain. Close all Radiator Valves and boiler Return Valve. Fill the boiler with water to the top of the gauge glass. With the valve in the blow-off line closed, start wood fire and build up steam pressure from five to ten pounds. Open valve in blow-off line and close it when pressure has dropped to zero. Carefully supply fresh water to the boiler to maintain the proper level and con tinue to repeat the above process for two to four hours. At the end of this time draw fire quickly and with at least ten pounds pressure, drain boiler through bottom draw-off. Remove the Blow-off Pipe, Nipple and Tee Fitting, and replace the Safety Valve. Allow boiler to cool, then refill with water to proper level, and open Radiator Valves and boiler Return Valve before starting fire. At times, one blowing off will not give the desired results, so that this process must be continued until the boiler is thoroughly cleansed. 10 14191 COMBINATION ALTITUDE GAUGE AND THERMOMETER 9 9 This gauge is used with water boilers and should be connected into tapping provided on top of boiler. It serves the purpose of indicating the level of water in expansion tank and has fixed and movable hands which show the height of water in feet on the black circular scale marked "HEIGHT IN FEET." After system is filled to proper level, the red fixed hand is then set at number of feet shown by the short black movable hand. This becomes the permanent water level. Any loss by evaporation is indicated by the movable hand receding to a smaller number on the dial at which time the water supply valve should be opened until movable hand is again directly over the fixed hand. TO SET THE RED FIXED HAND, LOOSEN THE TWO SCREWS WHICH SECURE THE RIM AND REMOVE RIM AND GLASS. AFTER SETTING, RE PLACE RIM AND GLASS AND TIGHTEN SCREWS. Pressure is indicated by the short black movable hand which in this case shows on the red circular scale marked "LBS. PER SQ. IN." If this hand indi cates between twenty-five and thirty pounds and remains at that point, heating system should be carefully checked to insure that pressure is not building up beyond the safe working limit. WATER BOILERS MUST OPERATE BELOW 30 POUNDS PRESSURE, OTHER WISE DAMAGE MAY RESULT. On closed type pressure water systems, valves or parts must function properly so that water pressure in boiler never builds up over 30 POUNDS. Temperature is indicated by the long black hand which shows on the black scale at top of dial marked "WATER TEMPERATURE DEGREES." As water in system becomes heated this hand moves to the right, indicating temperature in degrees, FAHRENHEIT, to be maintained for varying conditions of weather. 11 14192 PACKING AND PARTS LIST NEW IDEAL ARCO BO IT Ft* --. t COMPLETE BOILER CONSISTS OF: 1 BODY CASTINC 1 BASE CRATE 1 FRONT DOOR CRATE 1 BOX TRIM (STEAM OR WATER) 1 JACKET CRATE 1 BUNDLE FIRE TOOLS (2 PIECES) GIVE BOILER SIZE AND SERIES NUMBER WHEN ORDERING REPAIR PARTS BASE CRATE STEAM TRIM BOX ( I Base, Complete with Grate Bars 1 Grate Connecting Arm 1 Angle Lever 1 Angle Lever Bracket 1 Connecting Arm Catch 1 Ashpit Door, Hinge and Catch Plate 1 Draft Pouch Complete, consists of: Pouch, Frame and B-Fly Draft Door (Inside and Outside Half) 1 Smokehood Frame 1 Smokehood Complete, consists of: Smokehood with Check Draft Frame, B-Fly Door (Inside and Outside Half), Balance Weight, Lever, Choke Damper and Cap 1 Shaker Handle 1 Regulator Lever 1 Regulator Rod (2-Piece, Jointed) 1 Automatic. Steam Regulator 1 Set Water Column Trimmings 1 Pop Safety Valve and Bushing 1 Steam Gauge 1 Water Seal and Nipple 2 Regulator Weights 1 2 x \fin Bushing ( For 1 '/2n Nipple f Regulator 2 V2" Nipples 2 Vin Couplings 1 For f Gauge Cocks 2 Nipples j For 2 ?gn Couplings ) Tri-Cocks 1 Instruction Tag Form BP 2055 1 Regulator Rod Clevis and Ball Collar 2 Jacket Washers for Gauge Cocks 2 Jacket Washers for Tri-Cocks Lbs. Putty i WATER TRIM BOX 1 Automatic Water Regulator FRONT DOOR CRATE 1 Combination Altitude Gauge and Ther mometer | 1 Slice Door Frame with Slice Door, Baffle Hinge and Catch Plate 1 Combination Fire and Cleanout Door Frame with Fire Door, Baffle, Slide Damper, Hinge and Catch Plate, Cleanout Door, Baffle, Series Plate, Hinge and Catch Plate 2 Regulator Lever Weights 1 2 x V/2n Bushing 1 2" Rad. Plug 2 /z" Flush Plugs 2 H" Flush Plugs 1 Bag Bolts, Coil Hole Covers and Sundry i Regulator Rod Clevis and Ball Collar Small Parts | Lbs. Putty 12 14193 Oil Burning: Boilers are shipped less Grate Bars, Connecting Arm, Catch, Angle Lever, Bracket, Regulator, Weights, Regulator Lever and Rods, Poker, and Shaker Handle. Cover Plates for Connecting Arm and Angle Lever Bracket Openings included with Base. NOTE: All parts for this boiler have been carefully inspected and packed. In case of shortage, make sure that all parts have been removed from shipping container and examine parking material thoroughly. If part cannot be found, report shortage to your dealer, giving boiler size, aeries number, date, inspector's number and packer's number. (See Parts List and Packer's Check Ticket on Page 12 and this Cover.) 9 ' i ,i|' PACKER'S CHECK TICKET BOILER SIZE__________________ SERIES No__________ __________ DATE r___ I_________ INSPECTED BY PACKED BY._____________ _____ GIVE BOILER SIZE AND SERIES NUMBER WHEN ORDERING REPAIR PARTS American Radiator Company Offices in All Principal Cities REVISED ll-U ' 14194 NEW IDEAL ARCO BOILER 18-20-22 INCH a ONE-PIECE CONSTRUCTION FOR ALL FUELS i Erecting Directions r Operating Instructions Parts List | American Radiator Company offices in all principal cities FORM B. P. aoto IM 11-33 WM. J. KELLER. INC. .. 1 *- \-rt'. jT .>,** -7 ,.'>7 *- *' * . ` ' 14195