Document 1yOr1k5qD47xGNY1aK0v4oxZ

ti*o *#<). *'l ' RilEMQRAHfeUM Mjr. J. C. Same FROM Win. A. Ingham, Jr. c SUBJECT EXXON WASHINGTON , New Port News Shipbuilding & Dry Dock Co. New Port News, Virginia DATE ' ' " ........................... | FILE HO, ' ' '' Vossel docked at Pier #8 at 2 p.m. - 8/22/74 Draft aft 24' - fwd 15' DSCG & AES surveys commenced in order to complete by end of current yard period the major portion of the 4-year special survey and to take advantage of the year of grace period to complete same in 1975. Left Pier #8 - 8/24/74 @ 0830 - entered #10 dry dock <3 930 - draft aft 20' 10" fwd 12' 2" - adjusted draft to 20' aft and 13/ fwd. On blocks 1430 hrs - vessel dry 1600 Position on blocks #1. Dxydock #10 - 9/3/74 - 1500 hrs. started flooding dock -- 1545 afloat - 1645 stopped flooding - 5 ft of water in aft pumproom. Located problem of valve open - pumped out pumproom. 1811 -- resumed flooding 1852. Opened gates - 1900 single up, 1910 - moved vessel out of drydock, 1920 clear of drydock, 2040 all fast - stbd side of berth #4. Repairs were carried out in accordance with attached yard specifications with comments as follows; Items 1-5 - ok as written 6 - cancelled but survey credit by ABS 7 - ok - total of (13) 8 - ok - cancel aft anchor chain - not required by ABS. Renewed fwd P & S cross pieces and 2 patent links - survey credited by ABS. 9 - ok - survey credit by ABS and USCG 10 - deferred - year of grace 11-12 - ok - survey credit by ABS 13 - deferred - year of grace 14-15 - ok. - survey credit by ABS 16 - delete "test to 15#" - survey credit by ABS - ok 17 - deferred - year of grace 18 - delete "1st stage"- survey credit by ABS for 384 stage 19 - not used 20 - relief valve tested set and approved by USCG in shop 22 - ok - add renew defective studs and upper shaped portion of shell in way of door V x 6" x 18" - survey credit USCG 2.1 - ok - survey credit by USCG . 23 - not used 24 - Alter to read #1, #2 & #3 turbine rotors to shop for fly ash and balancing. Renew owner furnished carbon packing #2 - Survey credit by ABS 25 - delete #2 pump. Add - install owner furnished rotating element - return defective element to Warren Mfg. Co. for overhaul. Survey credit by ABS - as indicated. Note - #2 pump overhaul deferred - year of grace. 26 - overhaul electric flrepump and stbd main condensate pump - Survey credited by ABS. Note - 1st stage heater draim pumps, (1) one aux. condensate pump and (1) one aux. circulating pump deferred - year of grace. EXX-MOR-008612 Mr. J. C. Same -2- 27 - alter to read remove existing defective rotating element - to be put ashore @ Harrisburg for overhaul. Install owner furnished space element Survey credited by ABS 28 - cancel - Survey credited, by! ABS 29-32 - defer - year of grace 33 - not used . 34 - ok 35 - not used 36 - cancel - Survey credited by ABS 37-38 - ok 39 - cancel - Survey credited by ABS 40 - ok ' 41 - delete " after boilers are steamed to 400 PSI 42 - ok 43 - as written - see and add attached report 44 - ok 45 - cancel - not required at this time 46 - ok 47 -- ok , 48 - delete paragraph "A" - See attached report - ale 49-53 - ok 54 - delete "3000" - substitute "11000" * 55-70 - ok 71 - defer - to next layup 72 - ok - Survey credited by ABS 73 - ok 74 - ok 75 - alter as indicated in 75 "A" 76 - ok 77 - not used ! 78-79 - ok Stock drain page #13 - assign Item #375 to this - ok 81 - ok 82 - ok - Survey credited by ABS 83 - Delete " after P & S boat walkways" - ok 84-85 - ok - Survey credited by USCG 86-87 - ok 88 - cancel - spare cylinders not presently available. 89-90 - ok 91 - cancel aft anchor windlass - ok 92 - cancel 93 - ok 94 - cancel 95 - ok 96 - defer to turn arounds or next lay up 97-100 - ok 101-102 - cancel 103 - alter to read as per 103 "A" 104 - ok - delete "A" section 105 - ok - delete "prime coat" alter to read "3" instead of "1" 106 - cancel 107 - ok . 108 - cancel 109 - ok EXX-MOR-008613 Mr. J. C Same -3- 110 - cancel X11-113 - ok . 114 - cancel . 1.15-118 - ok 119 - cancel - same as 107 120 - ok - Required by USCG 121 - ok 122 - ok - alter to read "2" instead of "1" 123 - ok 124 - ok - Survey credited by ABS 125-126 - ok 127 - add reweld crack along seat seal certified welder. for examination. Survey credited by ABS 128 - ok 129 - ok ' 130 - ok 131 - cancel - same as 129 132 - not used 133-134 - ok 135 - ok 136 - ok - add make new spectacle flange and install 137 - ok 138-139 - ok 140 - cancel. Done previously. 141 - cancel. Done previously. 142 - ok 143 - cancel 144 - ok. Alter "4" to read "5" 145 - ok 146 - cancel same as 132 147-148 - ok 149 - cancel 150 - ok . 151 - cancel - pipe found ok 152 - ok - add "punch tubes" 153 - defer to next lay up 154 - add logging - add 154A & 154B 155 - see attached report - ok 156 - ok. Add 156A 157-158 - cancel 159 - ok 160 - cancel 161 - ok 162 - ok. Add 162B & 162C 163 - ok. See services report 164 - ok. Add 164A 165-167 - ok 168 - substitute 168A - ok r 169 - add 169A, 169B, 169C and 169D - ok 170 - ok. Survey credited by ABS 171 - cancel 172 - ok 173 - ok. See 173A 174-177 - ok . Add open astern throttle . . ' EXX-MOR-008614 c Mr. J. C. Same "4" 178 - cancel 179 -- cancel. 180 - cancel. System tested ok System tested ok . 181 - ok 182 - cancel 183 - to shop and add 183A 184 - ok. Survey credited by ABS 185 - ok 186 - cancel 187 - ok 188 - ok add supplement 188A 189 ~ superceded by supplement 189A 190-191 -ok 192 - cancel 193 - cancel " 194-202 - ok 203 - cancel 204 - ok 205 - superceded by 205B 206 - superceded by 206A ' 207-211 - ok 212 - cancel. 213-217 - ok 218 - cancel. Done previously Same as #289 219-220 - cancel 221-222 - ok 223 - add supplement 223A -- ok 224 - ok 225 - superceded by #225A , 226-227 - ok 228 - add #7 winch stuffing box stud ' 229-230 - ok 231 - ok 232 - add supplement 232A 233 - superceded by supplement 233B 234 - ok - delete primer and coat - ok 235-239 - ok , -' 240 - superceded by supplement 240A - ok . 241-245 - ok 246 - delete "and tide" - add 246B 247 - ok - see attached report 248 - ok - add certified welder 249 - ok 250 - ok - add certified welder - ok 251-251A superceded by 251B - ok 252 - ok 253 - cancel 254 - ok 255 - delete "open in place" substitute "send to shop" - ok 256-257 - ok 258 - superceded by supplement 258A & 258E - ok 259 - ok 260 - delete last line - add - cooler heads,to. shop to rebuild and machine division plates -ok ' 261 - not used ' EXX-MOR-008615 Mr. J. C Same -5 262 - superceded by supplement 262A - ok 263 - ok 264 - alter "17.5" to read 7.5 265 - ok 266 - cancel - repeated item 267 - ok 268 -ok 269 - superceded by supplement 269A - ok . 270 - cancel - same as 120 271 - ok 272 - ok - add blast and coat as directed 273 - cancel work on #8 - do //9 only - ok 275-275 - ok 276 - cancel 277 - ok t " 278 - cancel 279-280 - ok 281-283 - cancel 284 - ok 285 - cancel 286-290 - ok 291 - ok - add "officers also" - add supplement 291B 292 - ok - add supplement 292A 293 - substitute supplement 293A 294 - ok - add "paint boats" - add supplement 294A, 294B & 294C - see attached report 295 - ok - See attached copy of certificates 296 - cancel same as 46 - ok 297 - cancel same as 47 - ok 298 - ok 299 - ok. - in line #1 cancel "cargo center tanks" 300-301 - ok 302 - ok - substitute "Exxon 5662 in lieu of red lead" 303-304 - ok 305 - ok - Survey credited by ABS ' 306-313 - ok 314 - ok - add supplement 314A 315-326 - ok , 327 - ok - add tested, passed and sealed by USCG 328 - ok - alter measurement to read "double plate 8" x 13' - 20// plate" 329 - ok -- add "overhaul in shop" 330 - ok 331 - ok - see attached report. Add 331A 332 - ok 333 - ok - add supplements 333A & 333B 334 - ok 335 - add "portside" ok 336-337 - ok 338 - add "furnish valves" - ok 339-340 - ok 341 - cancel same as 207 342 - ok 343 - ok - see attached report 344 - ok 345 - cancel - same as item 73 EXX-MOR-008616 (I Mr. J. C. Same -6- 346 - ok 347 - ok - see attacked report ' 348 - ok - see attached reports - add supplement 348A 349 - ok - approved by ABS 350-357 - ok 358 - ok - requested by USCG 359-362 - ok 363 - cancel same as item 336 364 - ok - substitute "repair" for "replace" 365 - add 365A - ok 366 - add 366A - olt 368 - ok 369 - add 369A - ok 370 - ok - see attached reports 371-374 - ok 375 - assign this item # to "Stack Drain" at bottom of page #13 376 - ok 377 - ok - per attached report 378-386 - ok EXX-MOR-008617