Document 1yNkzgGEkrNyrz5pEe8X7oa6a
0TH1R LOCAT fc."v
wl"i nn ! wnnutminL
ANNISTON
J. T. Bell/J. L. Brown J. L. Corder/G. W MUltr G. L. Jesses J. C. Landwehr/V. R. Haupt/
A. G. McCarty
JOB NO.
PROGRESS REPORT
TECHNICAL SERVICES DEPARTMENT
ANNISTON. ALABAMA PLANT
ORT MO.
DATE July 21, 1970
TITLE: OBJECTIVE
THE ANNISTON PLANT
To report all data which la available to date on Arodor loseee In the Anniston Plant. Aleo, to report all data on Aroclor raalduea In the Snpw Creek * Choccolocco Creek Watershed. To summarize progress to data on Aroclor clean-up efforts at Anniston.
PERSONNEL: REPORTED BYi
FUTURE WORK:
E. G. Wright, (J. T. Bell)
E. C. Wright Aroclor losses from the Anniston Plsnt for the period April 15 through
3lo0s,se1s97o0,f a>v2e5r0a,glabds*.1/d6aylbafo./rdaayc. omTphairsabilse specroiondsideurainbgle 1i9m6p9r.ov(eNmoeten:t
0 lbs./day Is used for the 1969 figure because improved analytical ode and actual measurement of material from the catch tank and coalescer
shown that the losaes were approximately 10 times as high as was rted In 1969.) This reduction has been primarily achieved by an edu-
fonal program and resulting changed operating habits plus HC1 organics val projects. Other projects are being installed and evaluated which further reduce these losses toward the Business Group goal of 10 ppb.
SampCleonatninduaensaalymseplinamg bainedntaaniarlyfsoinrgAfroorcloArroccolonrtelnots.aaa on a routine basis. SempCleonatninduaenatolysseamtpelnek avnednatsnaIlnysethegrAabroscalomrpldeespofrrotmmeSnnt owto apnidnpCohionctcolocco CetrmeeokasphfeorrlcAlrooscslopr ocinontst.ent. Collect additional aquatic samples from Choccolocco Creek Watershed. Issue periodical reports on Anniston Plant loasaa and progress toward 10 ppb goal.
HONS 059145 b,s
E. C. Wrigfft
T8D Progreea Report Ho. Job Ho. 002-1026
Peg* 2
DISCUSSION
I. Aroclor Deportment Sewer*
MCI SiSSSi
Since the lnetelletlon of e ceteh tank In the HC1 gat line and a coalaacar In the acid atream, the Aroclor content In the waate acid atraam ha* baan greatly reduced. (1.*., Approximately 200 pound* of organic material la being removed by theta two project*.) During the aampllng period, thla ever averaged 13.0 ppb of Aroclor. (8ee Data Sheet I.) Baaed on thla dataj the declalon waa mad* not to rout* thla atream to the aump praaantly being lntailed. Thla raaultad In a aubatantlal aavlnga on lnatalllng th* eumpJ However, at tlmea, the apent carbon from the HC1 carbon towara waa dumped Into thla aewer. Alternate method* are being evaluated to collect th* apant carbon for dlapoaal.
B. Chlorinetor and Still Room Sewer*
At tlmea theae aewer* had a two phaae flow. The quantity of th* Aroclor phaaa could not be determined. However, theae two aewera are being routed through the Aroclor aump. When th* aump la completed and put Into operation, th* Aroclor phaae can then b* quantified. The aump will alao provide a mean* for recovering thla aecond phaae, which under preaent condition* aventuglly make* lta way out of the plant.
Whan the aump la lnatalled In than* aewera, a dally aampl* will b* taken and analysed to monitor th* efficiency of the aump. A aecond phaa* of project* la achedulad for further reduction of Aroclor in the** procaaa atream* (Raf.: Annlaton Prograa* Report Ho. 1, Job Ho. 003-10S1).
C. Warebqua* Sewer
Th* major loaaaa from thla aewer are dua to aplll* while drumming or flaklngi Thai* aplll* ar* than awapt to the aewer during floor clean-up. Fraaently, clean-up la accompllahed by ua* of Du-Bola ataam cleaning which conaldarably ralaea th* aolublllty of Aroclor In water. Alternate method* of claan-up and dlapoaal ar* praaantly being evaluated.
D. Total Plant Effluent
During th* period April IS through June 30, 1970, the total plant loaaea avaragad 16 lb*./day. Thla la excluding th* period April 21 through May [20,, 1970, whan the acid nautrallaatlon pit waa being cleaned. During thla period, the loaaea ran very high (Sea Data Sheet V.) due to th* feet that th* Aroclor which waa trapped In the pit waa being atlrred and entrained Into th* plant affluent.
The flacrepancy between the 1.7 lb*./day loaaaa from th* aewera and th* 16 lb*./day loaaea reported from th* plant affluent may poealbly be due to two thing*! 1) Semple* from the aewera did not Include any of th* Aroclor phaa* and 2) Due to the mixing and th* velocity at th* plant affluent (ampler, aome of the Aroclor waa being entrained and, therefore.
HONS 059146
TSD Progress Report Ho. Job No. 002-1026
Paga 3
glvlnk higher raaulta. A cloaer correlation la expected when an accurate measure of the Aroclor phaee can be accompllahed. Cloae observation of the simp should provide this Information.
I. Miscellaneous Samples (Data Sheet VXI 6 VIII)
These Samples vara collected from Snow and Choccolocco Creaks at various times. They show that Aroclora are present In the Choccolocco Creek, even above where the Monsanto effluent enters the creek. They also Indicate significant amounts of Aroclor In the mud and water of Choccolocco and Snow Creeks a condlserable distance (15-20 miles) downatream from the Anniston Plant. In fact, Aroclor concentrations can probably be found In the Coosa River system.
Data Sheet VIII lists the results of samples taken while the Aroclor department was not operating. These results Indicate that significant Arocljor la being lost even whan the plant is down or that these are deposits of Aroclor In the various sewers.
The sample from Coldwater Spring (City of Anniston's water supply) was taken for the purpose of establishing a background for this area. It might be Interesting to note that this la the only sample collected to data which does not contain Aroclora.
MOWS 059147
SAtt, jbbiI
Sample Location: HC1 Department Sewer
Average Flow:
200 GPM
Aroclor Concentration
ms______________________iWBi
4/15/70
12
4/16/70
7.8
4/17/70
8.3
4/20/70
18.5
4/21/70
6.2
4/22/70
16.4
4/23/70
10.6
4/24/70
20.4
4/27/70
15.0
4/28/70
13.1
4/29/70
18.7
5/3/70
10.5
5/4/70
11.3
Aroclor Losits
____wax).____
0.030 0.019 0.020 0.044 0.015 0.039 0.025 0.050 0.036 0.031 0.045 0.025 0.027
Average:
13.0
0.031
MONS 059148
PAT* SHEET fct
Sample Location: Warehouse Sewer
Average Flow:
63 GPM (Estimated)
Bate 6/22/70 6/23/70 6/24/70 6/27/70 4/28/70 4/29/70 5/3/70 5/4/70
Aroclor Concentration
cm)
2,800 2,860 1,250 1,520 1,300 2,130 1,320 1,480
Aroclor Loeeee (#/dey) 2.18 2.23 0.98 1.18 1.02 1.66 1.03 1.15
Average:
1,833
1.43
MOMS 059149
PAT* SHEET IB
Sample Location: Aroclor 8till Room Sewer
Average Flow:
ISO GPM (Estimated)
Bfte
.
1/22/70
1/23/70 .
1/24/70
4/27/70
4/28/70
4/29/70
5/4/70
5/6/70
5/8/70
Aroclor Concentration (PPB) 12,500* 13.8 30.0 17.0 12.2 4.8 20.0 11.0 23.4
Aroclor Losses (#/dav)
0.025 0.054 0.036 0.022 0.009 0.036 0.020 0.042
Average:
16.5
0.031
Contaminated sample - not Included In average. .
HONS 059150 I
DATA SHERI 3*
Sample Location: Aroclor Chlorinator Sauer
Average FloUt
275 CFH (Ketimated)
Data 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/3/70 5/4/70 5/6/70
Average:
Aroclor Concentration fPPBl 80.0 46.5 35.0 51.0 56.5 70.0 81.6 73.0 85.3
Aroclor Loaeee <+/dy>____ 0.264 0.153 0.115 0.168 0.186 0.233 0.262 0.241 0.281
64.3
0.212
HONS 059151
bma gam.ft
Sample Location: Total Plant Effluent
Average Flow;
900 GFM
Df te
Aroclor Concentration (PPB)
Aroclor Loaaaa (#/dav)
A/15/70 A/16/70 A/17/70 A/21/70 A/22/70 A/23/70 A/27/70 5/A/70 5/5/70 5/6/70 5/7/70 5/10/70 5/12/70 5/20/70
5/25/70 6/2/70 6/3/70 6/5/70 6/6/70 6/7/70 6/8/70 6/9/70 6/10/70 6/11/70 6/12/70 6/13/70 6/IA/70 6/15/70 6/16/70 6/17/70 6/18/70 6/19/70 6/20/70 6/21/70 6/22/70 6/23/70 6/2A/70 6/25/70 6/26/70 6/27/70 6/28/70 6/29/70 6/30/70
Average:
98 150 3,300 10,800 16,000 875 13,750 18,000 3,300 '* 9,750 9,900 3,300 1,327 2,65Qj
68 216 880 1A8 360 950 315 3,100 A00 760 l.SAO 1,875
8? 820 520 1,820 A90 3,500 3,825 800 720 1.920 1,620 1,A60 2,9A0 680 3,966 3,200 A,200
1,480
1.08 1.65 36.30 119.00 i 176.00 9.62 151.00 198.00 36.30 A 107.00 109.00 36.30 1A.60 29.20/ 0.75 2.38 9.70 1.63 3.96 10. A5 3.A6 34.10 A.AO 8.35 16.90 20.60 0.9A 9.00 5.72 20.00 5. AO 38.50 A2.00 8.80 7.92 21.10 17.80 16.10 32 .AO 7.A7 43,60 35.20 A6.20
15.74
059152
*Llmeatone Pit being cleaned out - Data not Included In average.
BATA SHEET VI
Sample Locj tioni Snow Creek Sampling Station
Aroclor Concentration
Elis(mi
4/15/70 4/16/70 4/17/70 4/18/70 4/19/70
4/20/70
4/21/70 4/22/70 4/23/70 4/24/70 4/25/70 4/26/70 4/27/70
4/28/70 4/29/70
5/1/70 5/2/70 5/7/70
5/8/70 5/9/70 5/10/70 5/11/70 5/12/70 5/13/70
5/14/70 5/18/70 5/19/70 5/20/70 5/21/70
5/22/70 5/23/70 5/24/70 5/29/70 5/30/70
5/31/70 6/1/70
6/2/70 6/3/70 6/4/70 6/5/70
6/6/70 6/7/70 6/8/70 6/9/70
1,800.0 233.0 124.0 499.0
5,435.0
1,950.0 1,220.0 2,550.0 3,200.0 3,750.0 3,800.0 2,166.0 1,860.0
860.0 2,800.0
2,800.0 1,450.0 1,320.0 1,760.0 1,840.0 9,600.0 1,740.0
3.8
1,566.0 1,325.0 1,920.0 2,400.0 1,320. 3,000.0 1,500.0
800.0 1,540.0
12.5 5.0 14.8
250 16.4 36.0 14.0 1,320.0
140.0 240.0 104.0 430.0
HONS 059153
MX* MEET il - continued
I
Aroclor Concentration
&S--------------------------- iSSSi-----------
6/12/70 6/13/70
6/14/70 6/15/70 6/16/70
6/17/70 6/19/70 6/20/70 6/21/70
630.0
760.0 254.0 1,470.0
41.5 110.0 216.0 272.0 480.0
Average:
768.0
*LlMgton* pit being cleaned out - Data not Included In avaraga.
HONS 059151*
DATA SHEET MX
S*apl*
Dt
10-8-69
10-8-69
10-8-69
10-8-69 10-8-69
11-23-69 11-23-69 11-23-69
11-23-69 10 11-23-69
11 11-23-69
89fflPl9 IfMlUOh
Snow Crook ot Clonaddlo
Choeeoloeeo Crook ot Bolling Springe (upetroaa Iron Monoonto'o effluent)
Choeeoloeeo Crook at City Treatment Plont (1 block below confluence of Snow and Choeeoloeeo Crooka)
Choeeoloeeo Crook at Jackoon Shoal* (20 alloo downatroaaO
Choeeoloeeo Croak at lureka Brldga (*25 alloo downotrooa, aouth of Choeeoloeeo Into Coooa klvor)
Snow Crook - 1 block below plant
Snow Crook at Clonaddlo
Choeeoloeeo Crook at Highway 9 (*15 alloo upotrooa froa the confluence of Snow and Choeeoloeeo Crook*)
Choeeoloeeo Creek at Belling 8prlnga (upotrooa froa Monoonto'o offluont)
Choeeoloeeo Crook at City Troataont Plant (1 block below confluence of Snow and Choeeoloeeo Crooka)
Choeeoloeeo Crook ot Jaekaon Shoal* (a*20 allot downotrooa)
Aroelor Concentration Mud Motor
2.36 a 107
23.3
78 8.1
738,000
< 2.0
7,300 3,240
5.8 < 2.0
2.19 10* 1.84 a 106 1,336
20,300 1,435 11
26 10 * 58 470 10
HONS 059155
)>* SHEET VIII
fiasi
10-3-69 10-3-6) 10-3-6)
10-3-69 \*
10-3-69 10-3-69 l0-3-69y
3aml* Location Llneatone Fit Influent
Aroclor Concentration
_________ am ......
4,ISO
Llmaatona Fit Effluent
103
Flant Effluent
74
Harehoua* Sowar
216
Aroclor Chlorlnator Sawar
317
HC1 Dapartaant Sawar
264
Flant 8tora Sawar
2
4-20-70
Coldwatar Spring (City Water Supply)
NDA
Hot* i Hun inpln vara collected after tha Aroclor dapartaant had blan ahutdown on* vaak du* to a fir* In tha actor control cantor.
COMPANY CONFIDENTIAL'
HONS 059156