Document 1y5ZLqrrXQM0ZxKr0jkOb2nDj

r tAlNTIFF'S EXHIBIT - tfial Hygiene Survey Emco Asbestos/Cement Pipe Plant ,Iar 17'20' 1983 *ndations recommended that: i* inspection of the exhaust ventilation ductwork be made for clogs and leakage on the Coupling Saw and Rework Saw. v Redesigning of the local exhaust ventilation ductwork on the Coupling Saw Xi/ and Rework Saw be accomplished. (See appendix III) \/ i>r-jfrj 5^ .`i'i Mi* |^fhe Small Coupling Tester "`CWSplingsSw Operator aannd/Rawork Saw Operator sj year resippiratwory protection. ,.o // f The Pressss Operator and /Line ll Hydrotester/oolf Plant A and the Machine"^Tender ,sind Presis Oppeerraattoorr**of P&lant B be resampled 1for asbestos to determine if exposure results are true and consistent. y The wearing of hearing protectors be made mandatory for all employees in P' the Manufacturing and Finishing Departments in both Plants "A" and "B" V including all visitors. J^ Employees be infor?ned of the results of the measurements in this report. ] A quarterly report be made to Corporate Health and Safety as to thenitatus of these recommendations. $ CTD016600 jinTeed , Oate March 13.__1984__ 7),-J Location ana mail code Mr. Peter Nnrrin______ u p. li^/i Location and mail code 1st Quality Progress Report Hillsboro A/C fJ. L. Anderson cc: J. P. McGi.nley D. R. Hall #257 Hillsboro The following report is submitted in accordance with your recommen dation No. 7 in your report of the survey, October 17 - 20, 1983. 1. The exhaust ventilation ductwork has been inspected and no clogs nor leakage was discovered. The fan speed has been checked and it is running at the design rpm. 2. The local exhaust ventilation and ductwork has been redesigned and installed in accordance with your recommendation in appendix III of your report. Although this design did not result in the fiber count falling within acceptable limits it has helped. ? m; 3. A windbreak-was installed between the small rework saw and the ^ ^ door preventing wind entrainment of dust from the saw flowing into the Cp l coupling tester area. After this installation, the coupling testers ' Qb ((11 were resampled and the counts are below the .37 limit", ' The results of Kfitna. f^`V7 these counts have been duly documented and recorded, In view of the , 1 favorable counts, respirator protection is not required ktft' - o ic 4. The Press Operator in A plant has been resampled The count i. still above the .37 allowable, therefore respirator protection is _ . required for this employee as well as the mandrel ha Her woriking on 1 S< f3 the other side of the machine. Work is continuing on phis problem and ^C our progess will be reported in the next report. ' * ^ U(G- The B plant machine tender and press operator have been resampled and acceptable counts were obtained. ^ 55 Cj> - o. sqt *(</ViJ.ti T.'m - 5,1 f fee We have not attempted an engineering control for the problem of the Line 1 Hydrotester. This will be accomplished this quarter. IS Jo.* f H - 0-W0 5 f(cc. 5. Hearing protectors are .now mandatory in all areas of the plant other than the maintenance shop. This is a most difficult matter to enforce because the employees dislike the requirement intensely. If we can come up with an engineering control for noise, it will help considerably with our employee morale. 6. All employees have been notified of the results of the measure ments. The proper documentation has been completed and entered into their files in accordance with procedure. The results are also permanently displa^<^gpA.lA&employees1 bulletin board. RtCtO'60 CTD016601 We are currently preparing a instantaneous recovery of all ways: (a) by name (b) by occupation (c) by fiber count (d) by date computer file which will counts classified in the allow ua following This work is expected to be completed this quarter. General Comments Although we have not completed all of our goals in the area of industrial hygiene, we have made some significant starts. 1. We have purchased 2 additional portable vacuum cleaners which have been placed in the finishing departments. General area housek is greatly improved. 2. We have received approval to install a developmental random which may greatly reduce use of the rework saw. This equipmen be similar to the F/M cutter. A comparison of counts is as folio Equipment Small rework saw F/M cutter Count 0.56 - .33 0.25 - .18 This concept has a good probability of success, although it is still in the developmental stage. upan m CTD016602