Document 1n8Bd0pdwV2vJZN2YKErQ5E5

But Pittsburgh - 4* 234-2024 Pibrarr U, 1973 - Dm of Ubtitoi Mrttrials la Soldering OptratU Mr. B. J. BUvaty Mr. H. H. Saallwood - Mr. S. I. Murphy - *. *. L. Bergqulst - Ik. p. Curtis Mr. J. C. Sorts - Ik. J. 0. Davidson PUsss rtfsr to previous corrsspoodsaeo.oo tbs abort subject, cht aost rseaat bela* Mr. Bergquiet'e Isttsr of February 7, 1973 aad Mr. Bltvaty's letter of tbs mm data. It is apparent that a detailed report of tbs tests ssds la the 3L-38 Lab oa January 23, 1973, is required la order to present the issue for a fair evaluation. It say be that this Customer will require a slsllar test at the site wfceo the soldering operation la performed la aay svaot, but we should provide the* vlth the specific data we obtained. The simulated solder operetlon performed la the 3L-3S lab consisted of the following: 9:00 A.M. -- Operator V. G. Craig vas fitted with the aooltor placed on his chest lust below the south. A sevao ainute staple vae taken while aebeetoc cloth vas cut froa a roll using shears and several large places wars placad ovar a case representing the stator winding. A place of wood 2 a 4 used to sisulate s coil connection sad this was esped with asbestos tape io a Banner staller to that used by a winder in taping ever arena to ba protected during soldering. Tola aoaltor staple was resowed aad a new saspla was takas la the eras fros 9:15 A.M. to 12:00 Rooo. 1:30 P.M. -- Operator V. G. Craig was agala fitted with the aoaltor placed as before aad a 10 ainute staple vas taken while asbestos cloth aad tape was out aad placed aa before. In addition, asbestos pspor was torn aad placed around the test area (tha tabasco# pspor was not available for the morning toot). The soultor staple wet rsacvsd aad a now taaola was taken la tba araa froa 1:45 7X ts 4:50 IJ. i TO: EAST PITTSBURGH WORKS, 2-G Industrial Hygiene ' Mr. H. W. Spelcher cc: East Pittsburgh, 4G-10, Accident Prevention cc: East Pittsburgh, 6G, Paver Gen. Service cc: San Francisco, Power Generation Service cc: San Francisco, P.G.S. Safety Coordinator cc: East Pittsburgh, 10L, Ins. Dev. Eng. cc: East Pittsburgh, 4NN, Ins. Design Eng. cc: East Pittsburgh, 5NN, Turbine Gen. Eng. East Plttsburgi>5n : 236-2024 February 13, 1 - ' Use of Aebestoi3JC>j Materials in S<^_> Operations i-p-i 00 - Mr. J. Hlavety - Mr. H. H. Sm*i$wot - Mr. S. B. Muiiphy Please refer to previous correspondence.on the above subject, the aost recent being Mr. Bergqultt's letter of * February 7, 1973 and Mr. Hlavaey's letter of the same dace. tIt Is apparent that a detailed report of the tests aade in the 31.-38 Lab on January 23, 1973, is required in order to present the issue for a fair evaluation. It say be that this Customer will require a similar test at the site when the soldering operation is performed in any event, but we should provide them with the specific data ve obtained. The siauiaced Lab consisted of t 9:00 A.M. monitor cloth vas cut fromra roll using shears and several fegj large pieces vere placed over a case representing h*z. the stator winding. A piece of wood 2x4 vas used to simulate a coil connection and this vas taped vith asbestos tape in a manner similar tr l--J that used by a winder in taping over areas to be f--P protected during soldering. This monitor sample vas removed and a new sample vas taken in the area P--1 from 9:15 A.M. to 12:00 Moon. 1:30 P.M. -- Operator V. G. Craig was again fitted vith the monitor placed as before and a 10 minute sample vas taken while asbestos cloth and tape vas cut and n placed as before. In addition, asbestos paper was L-- torn and placed around the test area (the asbestos ^ paper mas not available for the morning test). Thefey monitor sample vas removed and a new sample vas take*t^ in the area from 1:45 P.M. to 4:30 P.M. 2 An analysis of the monitor samples was taade by Mr. John av4e* for Mr. Speicher and a report of those find ings should be issued by Mr. Speicher to complete the test data. y_ It should be noted that Mr* Hfavaty's recent letter indicates a questionable level of particle content in a teet armpit apparently taken at another time by Mr. Speicher when asbestos cloth was torn by hand. The soldering operation which la used in the field by Power Generation Service and shop winders does not involve the tearing of aebeetos cloth by hand. It is always cut using either shears or knife and should be evaluated only on that baeis rather than by tearing. It is the writer's opinion that the use of asbestos cloth tape and paper in this application does not exceed the limita tions imposed by the OSHA Federal Register and the teat results obtained at this time support that position. Please arrange to provide the data obtained in the January 23, 1973 taet and, If it is felt to be necessary, arrange to perform similar tests on the Customer's property when the Power Generation Service Division starts the work on the Diablo Canyon unit for Pacific Gae and Electric. We hope this action will satisfy the question which has been raised by the issue of the OSHA Federal Register limitations on the use of asbestos materials in our operation. W. G. Craig * Service Performance Engineering Large Generator Department Large Rotating Apparatus Division Mdb