-Procedure Bulletin P-0916
TO ;A11 Holders of Procedure Bulletin Manuals
PLAINTIFF'S EXHmfr
Attached is a copy of a new Procedure Bulletin "Interface Electrical Maintenance With Engineering and Construction - P-0916.
If additional copies are needed, please let me know.
Attachment
Marjorie Grady
SC 005084
85.0223
LAM006295
PROCEDURE BULLETIN --TEXAS CITY PLANT
INTERFACE ELECTRICAL MAINTENANCE TOTH________________________________________________ ENGINEERING AND UUNSTRUL'i'iUN----------------------------------------------------------------------
I. PURPOSE This procedure is to insure that installation of elec trical equiment will be adequately supported by Monsanto Maintenance.
II. SCOPE This procedure covers all I&E projects installed at Texas City.
III. RESPCNSIBILITY The person(s) responsible for implementing this Procedure is stated under "Procedure" Below.
IV. PROCEDURE 1. New units or major unit revisions (normally designed by CEP). The SUPERVISOR of MAINTENANCE ENGINEERING will deter mine the project scope fran the CED PROJECT MANAGER and from this information will resolve with the AREA ELECTRICAL FOREMAN the following items: a. Checkout and detailed startup procedure. b. Manpower requirements for (a) above. c. Training and vendor literature needs in view of new equiment not previously used in the plant. d. Spare parts literature and additional store stock needed. e. Drawing distribution. f. Acquisition of new tools or other equipment needed for startup.
2. Minor Unit Revisions (Normally designed by Plant I&E Department) The I&E PROJECT ENGINEFER will review each project's scope with the AREA FOREMAN and resolve the following concerns:
a. The degree of participation in checkout and startup by the unit electricians. The magnitude of the project will determine this extent. For example, this could be fairly detailed on the one hand to no more than a walk through on the other.
b. That the design incorporates constructive ccnments from the AREA FOREMAN. This may result in reduced cost and/or simplicity of design and operation. This must be done prior to detailed design work.
005085
c. That the materials needed for the project construction be reviewed to determine:
1. Source -- can any items be obtained from surplus
LAM006296
ORIGINAL ISSUE-* 4/85
REVISED:
PAGE _4- OF,
PROCEDURE BULLETIN -- TEXAS CITY PLANT
INTERFACE ELECTRICAL MAINTENANCE WITH ENGINEERING AND CTNSmrTTnN
P-Q916
field stock or if outside purchase, determine who is responsible for writing orders.
2. Makes and models of items. This is to reduce the number of different makes and standardize as possible.
d. Accurate electrical drawings and instrument loop diagrams. Drawings must be sent to ELECTRICAL FOREMAN at the same time as for construction. The I&E ENGINEER is responsible for incorporation of field changes on drawings (after re ceipt of as-built markups from the field) and reissuing the corrected copies to the area foreman. The FOREMAN is responsible for placing the drawings in a file con venient for the CRAFTSMEN'S use.
e. Adequate vendor information. The I&E ENGINEER will request instruction books, parts list, etc., as part of equipment
,, order and be responsible for its receipt and issue to the ELECTRICAL MAINTENANCE FOREMAN. The ELECTRICAL MAIN TENANCE FOREMAN will be responsible for placing the vendor information in a file convenient for the CRAFTSMEN'S use.
f. Adequate replacement parts. The AREA ELECTRICAL FOREMAN will be responsible to determine what new-store stock parts are needed and write request to set-up. After approval, the FOREMAN is responsible for reviewing with CRAFTSMEN the new MICS parts listing so future retrieval will be less difficult.
Sc 5086
ORIGINAL ISSUE**
4/Hi
REVISED:
LAM006297 ,, 2 ------ 3-- PAGE___OF___
PROCEDURE BULLET IN--TEXAS CITY PLANT
_________ INTERFACT RT.FTTRICAL MATNTENANCE WITH__________________________________ _ J^UlNiMdRTANb' 'OTSTOCMOn
3. Hie AREA ELECTRICAL FOREMEN shall be responsible for keeping the Leadman informed of the status of all new and major and minor revisions within the unit(s) on a periodic basis.
Revised By Ben Kullerd
Approved by
G. L. Tranblee
ORIGINAL ISSUE: 4/85
REVISED:
LAWK)06298 PAGE 2_ OF 3