SWRCO (UNIT) INTERNAL CORRESPONDENCE RECEIVED MAY 3 1 1995 to Randy Calloway from peter Staneland P-sJU date May 31,1995 T' W* SANDS suBJtCT piant Asbestos Summary The attached list is an executive summary of the Asbestos Containing Material (ACM) on the Southwestern Refining Site. The original estimate was completed in 1986 and only a minimal amount of ACM has been removed since that date. During the original estimate the amount was roughly estimated and the lines, vessels, etc. were not permanently marked as having ACM on them. The total estimated amount of ACM is 266,683 ft* which is primarily located in the older units. The majority of the ACM is In the form of pipe insulation and vessel insulation with some other material in the form of cooling tower panels and structural steel fireproofing. The cork mastic Insulation on the roofs of the hot oil storage tanks is not included In the above estimate of ACM In the plant. xc. B. Teel L. Miranda | SWRf/Asbestos 4495 Asbestos Summary UNIT NAME HF Alkylation Cat I (incl. Poly) Cat 1 Engine/Control Room Crude 1 Crude 1 Control Room Crude II Motor Fuel Platformer Sulfolane Cooling Towers North Piperack West Piperack (Citgo area) Truck Loading Rack Terminal 1 Terminal III Main Gate Change House Warehouse and Shops ACM^PIPING/VE-SSELS/FIREPRPOFING fSQ. m 14,876 37,421 6,047 63,499 4,659 65,735 14,086 24,056 22,792 14,314 1,163 391 1,659 929 500 im. lata! 265.683 SWRf/Asbestos 4496