Document 1gR9OkengXrgxGjqDqmdR2LDo

FRAZER L Il.T COMPANY 2475 Hubbard Avenue Betroit, Michigan SCHEDULE I TRADE NAME; CATEGORY: COLOR: SPALITY: Tuftex Perch & Deck Forch 4 Deck Paints GrayFirst Pigment : i:9 Leaded Zinc Cryptone Asbestine Litharge Vehicle: 51% Linseed Oil Varnish Concer^trated Drier Mineral Sririts Lbs. 2CC 300 100 4 190 325 1097 Yield in Gallons Unit Cost Total Cost Weight .07 14.00 per gallon .0585 .01 17.55 1.00 finished .085 .34 product. Storage 4 hand line cost Laboratory through loss - 1!? record 12.2 lbs. 13 * - - - .18 24.70 58.50 .32 9.20 015 1 Storage 4 handling cost through loss - 3% 32.89 .33 8Zi6 2.04 Calculated Yield Manufacturing Lcrs - 2\% Actual Yield 1226 ICO .5 2.5 98. Cost Analysis: Material cost per gallon Direct labor cost per gallon Factory overhead per gallon Bulk cost per gallon Complete rackage cost per gallop, including filling charge Factory coat in package per gallon PRICES (a) To a company owned or controlled outlet (b) To er. independent wholesaler (c) By company owned or controlled outlet to retail customer (d) To an independent retailer (Dealer) (e) To ether (Industrial) (Contractor) 123.72 3.26 ,27 ,05 1,58 ,19 1,77 ifone None 3.50 2.71 2.98 2.85