Document 1g6kL3ZMyrXOnvqNj2N2DLVbq

ElANESE CHEMICAL COMPANY, INC. CHGMC6L PLANT Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723 Dear Mr. Stewart: The Celanese Chemical Company, Inc., at Bishop plans to demolition and physically remove three (3) existing boilers from service. This demolition work will start May 1, 1981. The boilers and supportingequipment are insulated with friable abestos insulation, so, insulation will be removed as the first step and landfilled in the designated abestos landfill located on the plant site. All precautions' outlined in 40 CFR 61.20-61.25 will be observed. This letter will serve as notification of this work, as required by 40 CFR 61.22 (d) (2). The attached data sheet lists all the pertinent data. Please contact me if you have any questions or comments. Very truly yours, Plant Manager bcc: J.F. Harper T.L. Markham J. Smith W.H. Meyer J. Garza J.C. Doedyns J'.' .Beasley H.W. Head, Jr. File: 202.1 004253 CELANESE CHEMICAL COMPANY. INC. BOX428.BISHOP.TEX. 78343 - TELEPHONE: 512-584-3S11 t, NOTIFICATION INFORMATION - DEMOLITION I. OWNER: II. ADDRESS: III. DESCRIPTION: IV. ADDRESS OF SITE: V. STARTING AND COMPLETION DATE: ..VI- NATURE OF DEMOLITION: VII. PROCEDURES: VIII. LANDFILL SITE: Celanese Chemical Company, Inc. P. 0. Box 47320 1250 W. Mockingbird Lane Dallas, Texas 75247 Remove friable asbestos insulation from three (3) boilers and related equipment. Chemcel Plant Celanese Chemical Company, Inc. P. O. Box 428 Bishop, Texas 78343 Start: May 1, 1981 End: July 31, 1981 See III above. Jj|. Wet insulation thoroughly, strip off insulation, pack in plastic bags and landfill in registered (on-site) landfill*. ^~ Texas Department of Waste Resources Registration #30084 EPA I.D. #TXD 008113441 004254 xSSa3 ELAN ESE CHEMICAL COMPANY, INC. CH6MCEL PLANT Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723 Dear Mr. Stewart: The Celanese Chemical Company, Inc., at Bishop plans to reclaim about 450 linear feet of steel pipe ranging in size from 2-inch to 12-inch diameter. This reclamation work will start May 4, 1981. The pipe is insulated with friable asbestos insulation, so insulation will ie removed as the. first step, and landfilled in the designated asmlstos landfill located on the plant site. All precautions outlined in - 40 CFR 61.20-61.25 will be observed. This letter will serve as a notification of this work, as required by 40 CFR 61.22 (d) (2). The attached data sheet lists all the pertinent data. Please contact me if you have any questions or comments. Very truly yours, attachment bcc: J.F. Harper T.L. Markham J. Smith Juan Gonzalez, ABI J. Garza File: 202.1 H.W. Head, Jr. Central Files (2) 004255 CELANESE CHEMICAL COMPANY, INC. - BOX428.8ISHOP.TEX. 78343 TELEPHONE: 512-584-3511 NOTIFICATION INFORMATION - RECLAMATION I. OWNER: II. ADDRESS: Celanese Chemical Company, Inc. P. 0. Box 47320 12S0 W. Mockingbird Lane Dallas, Texas 75247 III. DESCRIPTION: Remove friable asbestos insulation from 450 linear feet of steel pipe ranging in size from 2-inch to 12-inch diameter. IV. ADDRESS OF SITE: Chemcel Plant Celanese Chemical Company, Inc. P. 0. Box 428 Bishop, Texas 78343 V. STARTING AND COMPLETION DATE: Start: May 4, 1981 End: May 22, 1981 te p: . ?-- VI. NATURE OF RECLAMATION: VII. PROCEDURES: See III above. Wet insulation thoroughly, strip off insulation, pack in plastic' bags and iandfill in registered (on-site) landfill VIII. LANDFILL SITE: Texas Department of Water Resources Registration #30084 EPA I.D. #TXD 008113441 004256