Document 1g0Bzxwv1Z6LKbXKXvg3G1npj

'ETHYL ETHER HYDRATION PLAINT NO. 1 15.000 POUNDS PER DAY PART II SERVICE LINES AIT) MlSCELIANEOUS SPECIFICATIONS ENGINEERING DEPARTMENT Carbide & carbon chemicals corp so. charleston, w. va. OCTOBER 12. 1954 PLAINTIFF'S EXHIBIT 3-G.Q12-0Q UCASB02053884 WV-17816 ETHYL ETHER HYDRATION PLANT NO. 1 15,000 POUNDS PSR DAY PART II SERVICE LINES AND MISCELLANEOUS SPECIFICATIONS FOREWORD: This report is divided into the following sections: (1) Sei'vice Lines (2) Paint Schedule (3) Building Accessories (4} Safety Equipment (5) Insulation (6) Miscellaneous Operating Equipment V/ritten by R. V. Wallin October 8 -* 10, 1934 Checked by I. L. Murray ua UCASB02053885 I - SERVICE LIKES L. P. 15-LB. STEAM Provide 4" header to Ether Hydration Unit in accordance with Pipe Specification No. 2. H. P. 150-LB. STEAM Provide 3" header to Ether Hydration Unit in accordance with Pipe Specification No. 3.* RIVER WATER Provide 4" header to Ether Hydration Unit in accordance with Pipe Specification Mo. 1, PROCESS WATER System. Provide 2" line to P - 111 -2" in Ether Hydration FUEL GAS System. Provide 2" line to FC- - 103. -2" in Ether Hydration UCASB02053886 AIR Provide 1" line to the Ether Hydration Unit for air- operated control instruments. CITY WATER Extend l-l/2" city water line to Ether Hydration Unit, SEWER Provide 6" sewer from Ether Hydration Unit. Sewer is to connect into sewer main at the Ethanol Generator Building, > UCASB02053887 4- II - PAIIJT SCHEDULE PRIMING COATS Iron sind, Steel All iron and steel must be given a priming coat of #85 Red Lead as soon as erected, with the following ex ceptions: (a) The inside surface of tanks shall not be painted unless by special order. [To) Beams to be buried in concrete or to receive concrete fireproofing shall not be painted. (c) The bottoms of all tanks shall be given one heavy coat of black asphaltum paint before being lowered to foundations, regardless of what primer has been pre viously applied. Two coats of -85 Red Lead are required by all iron and steel which Is to be insulated; the time between coats is to be not less than 4B hours of dry weather. Ho. 85 Red Lead is to be used for the shop coat on all iron and steol delivered primed. Such equipment is to be retouched before a finish coat is applied. If more than three months has elapsed since the initial priming, the entire surface shall be covered again with Ho. 85 Red Lead, Other Metals Brass, copper, Everdur, or similar metals will require no priming coat. UCASB02053888 - 5- Wood Wood is to "be primed with a coat of the finishing paint thinned with a one-to-one mixture of linseed oil and turpentine. Per average work, one part thinner to two parts paint is satisfactory. Knots and pitchy spots should first "be shellacked. Miscellaneous Plaoter walls and ceilings must receive one coat of Vinyloid Brushing Concrete and Plaster Sealer, Ho. 96. Tar Paper (roofing paper) covering insulation need not be painted. Canvas covering on magnesia insulation must re ceive a coat of glue sizing before paint is applied. Concrete to be painted, must be primed with one coat of Concrete Sealer, Ho. 96. Machinery to be painted, must first have iron filler applied to blow holes, chips, etc. to produce a reasonably smooth surface before painting. The above specifications apply to the materials named, regardless of the form in which they are used} tanks, framework, pipe lines, etc. UCASB02053889 - 6- <\ FINISH COATS Oatside Equipment Structural Steel Uninsulated Buried in concrete No. Coats Paint Specification 1 #56 Black No Paint I,Ia chinery Small motors, pumps, etc. (cold surfaces) Turbines, hot surfaces of light machinery 1 #60 Black Engine Enamel #61 Black Hot Engine Polish Tanks Insulated Uninsulated No paint on weatherproof insulation. 2 #51 Aluminum Furnaces Cold steel, sheet and framework, below 550F. Stacks, hot surfaces over 550F. 2 1 #56 Black #73 Light Grey Stack Paint (applied after stack has been heated at least once.) UCASB02053890 7- Inside Equipment Structural Steel Uninsulated Insulated No. Coats Paint Specifications 1 #56 Black, containing 1 qt. #99 Varnish per gallon of "black No Paint Concrete Foundations, etc. 1 #81 Maroon Tanks Steel, insulated and uninsulated 1 #72 Li gilt Grey Machinery Small motors, pumps. etc. (cold surfaces) Turbines, hot surfaces of light machinery 2 #60 Black Engine Enamel 1 #61 Black Hot Enamel Polish Building Exterior Doors, Windows, and Trim Interior Doors, Windows, and Trim 1 1 #75 Bottle Green #72 Light Grey UCASB02053891 0 Building (Continued) No. Coats Paint Specifications Interior (Continued) Walls, Ceiling, Insulated Building Steel Dado Line, 2-l/2" wide 5' above floor 2 #56 Black, containing 1 <yt. 99 Varnish per gallon of Black Walls below Dado line 1 #96 Vinyloid Brushing Sealer 1 #71 Vinyloid Brushing Wall Finish, Grey Walls above Dado line and ceilings 1 #9$ Vinyloid Brushing Sealer 1 #94 Vinyloid Brushing '.Vail Finish, White Uninsulated Building Steel, Handrails, etc. 1 #56 Black, containing 1 qt. #99 Varnish per gallon of Black Concrete,Foundations, etc. 1 #81 I-laroon Pipe lines Inside H.P.Steam L.? .Steam River Water Paine Specification No. Coats Pipe Tittings 1 #89 Signal Red Same 1 #00 Maroon Same 1 #72 Light Grey Same U CAS B02053892 9- Pipe Lines (Continued) Inside (Continued) Paint Specifications Ho. Coats Pipe Fittings City Water 1 #72 Light Grey #80 Maroon Process Water 1 #72 Light Grey #56 Black, con taining 1 qt. #99 Varnish per gallon of Black Compressed Air 1 #92 White Same Fire Lines 1 #72 Light Grey #89 Bright Red Fuel Gas 1 #72 Light Grey #51 Aluminum Unfinished Alcohol 1 #37 Dark Red Same Ether 1 #82 Orange Same Outside H.P.Steam L.P.Steam Fuel Gas Do?; them Same as inside, except: 2 #56 Black 2 #56 Black 2 #56 Black 1 #73 Light Grey Stack Paint Same* Same* Same* Same Pipe lines to he striped with paint specified for fittings on inside lines handling same material. UCASB02053893 - 10 - III - BUILDING- ACCESSORIES 1. KEATING AliD VENTILATING The building is to be heated and ventilated with motor-driven York Heat-Diffusing Chits sufficient in size and number to maintain a comfortable working atmosphere. These units should be provided with outside air-intakes and dampers. l/2" Armstrong No. Ill steam traps are to be used. 2. LIGHTING Lights are to be provided so that all instruments, meters, weirs, etc. are adequately illuminated for efficient operation at night. Outdoor walkways, tank gauge-boards, etc. must be properly lighted. 5. DRINKING ECONTAIKS level. A drinking fountain is to be provided on operating 4. TOILETS AND Y/ASHEOWLS One toilet and a washbowl fitted with soap and paper-towel dispensers are to be supplied. UCASB02053894 11 5. HOSE OUTLETS Hose outlets are to "be provided in the building as follows: 2 - 1" air outlets 2 - 1" water outlets 2 - 1" I.?. Steam Outlets UCASB02053895 \ IT - SAFETY SQUIKGNT 1. FIKE-FIGKTING EQUIPMENT Inside The high pressure fire line is to he extended within the building, and hoses are to he provided near the doors. These hoses are to he 100 feet of 2-l/H inch Standard Underwriters* labeled unlined linen hose with 2-1l2" x 15" aluminum-painted iron nozzle, installed according to Drawing No. C - 33544. 2-\jz gallon Foaraite Extinguishers, model CA, are to he provided adjacent to each fire hose, and are to he hung on wall racks con structed according to Drawing No. C - 35543. A 40 gallon Foamite engine is to he supplied and will he located outside the building convenient to a suitable ramp so that the engine may he easily rolled inside. Two gallon, model 7-l/2 Alfite Extinguishers are to be provided accessible to all electric motors. Outside Two hydrants with 2-way standard 2-l/2" hose connections, 6" bottom connections, automatic drain cock to avoid freezing. One hydrant is to he spotted to the east of the building; the other, to the v/est of the building between the Dowtherm boilers and the building. Each hydrant is to be equipped with two units consisting of 4 - 50 ft. lengths of standard 2-l/2", single-jacketed cotton, rubber-lined, mill-yard hose with standard l-l/o" smooth bore nozzles. Hoses are to be stored in hose houses contracted according to Drawing No. B - 28385. Hose houses are to be located close to hy drants and each is to contain 5-45 lb. cans of Foamite Generator Powder. UCASB02053896 - 13 - 2. FUST AID ECtUIPHEBT One first aid caToinet i3 to "be supplied* It is to be located inside the building near the door at the west end. The cabinet is to contain the following: 2 - eye cups 1 gal. - 2^ acetic acid solution 1 gal* - 5% boric acid solution 1 gal. ~ 5% sodium bicarbonate solution 1 gal. - mineral oil U CAS B02053897 N * __ J - V - INSULATION Poliowing is a list of equipment and pipe lines which are to "be insulated. Thicknesses and insulation specifications are given. APPARATUS LIST Item No. Location Thickness Temperature of Insulation loaterial 101 102 10S 10? 108 118 123 15 3-A 153-3 154 156 190 Outside Outside Outside Outside Outside Outside Outside Outside Outside Outside Outside Outside Atmospheric Atmospheric Atmospheric 90C. .90C, 300C. 300C. 300C. 300C. 300C. 300C. 300C. 1" 1" 1" 1-1/2" 1" 4" 4" 4" 4" 1" 1" l7' Roclcwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool J UCASB02053898 3 PIPING LIST Line No. P-to% P-104 P-105 P-106 P-107 Thickness Location of Insulation Aw ti /&*, t03 -o i'n 3,`e/e Outside l-l/2" Material Rockwool Outside 1-1/2" Roclcwool Outside 3" Rockwool Outside 3" Rockwool L-101 L-102 Outside Outside 4" Rockwool 3" Rockwool IS-101 IS-104 Outside Outside 1-1/2" 1-1/2" Rockwool Rockwool HS-101 (inside {Outside (1-1/2" (1-1/2" (Roclcwool (Rockwool Lines D-101 and D-102 should "be insulated with lowpressure steam lines. > UCASB02053899 9 v > V 16 - VI - MISCELLANEOUS 0P5BATING EQUIPISITT (1} 1 - Log desk constructed according to Dra\ving No. B-46924. (2) 1 - Sample rack constructed according to Drawing Fo. C-33540 (3) 1 - Pool sot containing the following items: 1 - 10" Pipe wrench. 1 16" Pipe wrench 1 - 24" Pipe wrench 1 - 8" Crescent wrench Ov _** 10" Crescent wrenches 15" Crescent wrench 2 - 1/2" Spud wrenches 2 - 5/8" Spud wrenches 2 - 3/4" Spud wrenches 1 - 8" Combination Pliers 1 - 8" Screwdriver 1 - 12" Screwdriver 1 - 24:' Dividers 1 - Die stock with following dies: l/4", l/2", 3/4", 1", l-l/2`\ 2" 1 - Tinsnip, 14" 1 - Center punch 1 - Caullcing chisel Padlock and key UCASB02053900 (4) 1 - Tool "bo:: constructed according to Drawing No. C-53539. (5) 3 - Wilson-Jones No. 618, 11" x 8-1/2" aluminum sheet holders for log sheets. (6) 3 - 12-l/2,T x 9" wood hack "Globe Clip" hoards. (?) 1 - Pencil sharpener (8) 2 - Rubbish barrels (9) 2 - Ladders, one 12-foot, one 24-foot. (10) Rubber Hose 2-50 ft. lengths 1/2" I. D.-U. S. Giant Steam Hose 2-50 ft. lengths 1/2" I. D. U. S. Mogul Air Hose 2 - 50 ft. lengths 1" I. D. U. S. Rainbow Water Hose 4 - pairs 1/2" U. S. Samson High Pressure Hose Couplings 2 - pairs 1" U, S. Samson High Pressure Hose Couplings t {11) 2 - 1 pt. capacity oil cans. * UCASB02053901 z j'.'l *1 r. f* :-! r ^> ''j.. .. re a.'J -1 ;.c a- ,*', a. -vs t t\ ,!t i * * _____ <_ /r , - ;__________ "ECTOR. C C~ Z.**c I e'-\r--^=7 jd -: -cv JAS^er 5~1rf -T---i-C-^-x A*CCV ______ V*>1 &*-}C6k.N. ."N-ic6* TC_A_f_________M__c*m_:__;'__g_'_ks'_>&_ r__ c .sr o' v- 7?.. ., l.J-JVj'- -- Z- ^"Vr?!- ZC?.AJ>, i- TV\ c'R 7~-'> - ___- itr> <? .-*\ V?.i + =* lh & r- h o.swbt a>-sg- j>s&A<a?^ 1JL1 CCRB- A>-.Mg>t-r! " 1 -70 ' , Mf * *i ' 4<<l TV&j-li: '> Htirr u'Mi ^'m* \j \*n r il-J W'A T'nt *=A-^L.'5C.='z Ross H- E'--*rT! Es- f<> r4v v->AM-->ro-oD* * 'A i AW__ ~~ 7MOC 7%>^./t4. ^ 37fc ~/7C?> A . *r ! ?* v -! :* UCASB02053902