'ETHYL ETHER HYDRATION PLAINT NO. 1 15.000 POUNDS PER DAY
PART II SERVICE LINES AIT) MlSCELIANEOUS SPECIFICATIONS
ENGINEERING DEPARTMENT Carbide & carbon chemicals corp
so. charleston, w. va. OCTOBER 12. 1954
PLAINTIFF'S EXHIBIT
3-G.Q12-0Q
UCASB02053884
WV-17816
ETHYL ETHER HYDRATION PLANT NO. 1 15,000 POUNDS PSR DAY PART II
SERVICE LINES AND MISCELLANEOUS SPECIFICATIONS
FOREWORD: This report is divided into the following sections: (1) Sei'vice Lines (2) Paint Schedule (3) Building Accessories (4} Safety Equipment (5) Insulation (6) Miscellaneous Operating Equipment
V/ritten by R. V. Wallin October 8 -* 10, 1934
Checked by I. L. Murray
ua
UCASB02053885
I - SERVICE LIKES
L. P. 15-LB. STEAM Provide 4" header to Ether Hydration Unit in accordance
with Pipe Specification No. 2.
H. P. 150-LB. STEAM
Provide 3" header to Ether Hydration Unit in accordance with Pipe Specification No. 3.*
RIVER WATER
Provide 4" header to Ether Hydration Unit in accordance with Pipe Specification Mo. 1,
PROCESS WATER
System.
Provide 2" line to P - 111 -2" in Ether Hydration
FUEL GAS
System.
Provide 2" line to FC- - 103. -2" in Ether Hydration
UCASB02053886
AIR Provide 1" line to the Ether Hydration Unit for air-
operated control instruments.
CITY WATER Extend l-l/2" city water line to Ether Hydration Unit,
SEWER Provide 6" sewer from Ether Hydration Unit. Sewer is
to connect into sewer main at the Ethanol Generator Building,
>
UCASB02053887
4-
II - PAIIJT SCHEDULE
PRIMING COATS
Iron sind, Steel All iron and steel must be given a priming coat
of #85 Red Lead as soon as erected, with the following ex ceptions:
(a) The inside surface of tanks shall not be painted unless by special order. [To) Beams to be buried in concrete or to receive concrete fireproofing shall not be painted. (c) The bottoms of all tanks shall be given one heavy coat of black asphaltum paint before being lowered to foundations, regardless of what primer has been pre viously applied.
Two coats of -85 Red Lead are required by all iron and steel which Is to be insulated; the time between coats is to be not less than 4B hours of dry weather.
Ho. 85 Red Lead is to be used for the shop coat on all iron and steol delivered primed. Such equipment is to be retouched before a finish coat is applied.
If more than three months has elapsed since the initial priming, the entire surface shall be covered again with Ho. 85 Red Lead,
Other Metals Brass, copper, Everdur, or similar metals will
require no priming coat.
UCASB02053888
- 5-
Wood Wood is to "be primed with a coat of the finishing
paint thinned with a one-to-one mixture of linseed oil and turpentine. Per average work, one part thinner to two parts paint is satisfactory. Knots and pitchy spots should first "be shellacked.
Miscellaneous Plaoter walls and ceilings must receive one coat
of Vinyloid Brushing Concrete and Plaster Sealer, Ho. 96. Tar Paper (roofing paper) covering insulation need
not be painted. Canvas covering on magnesia insulation must re
ceive a coat of glue sizing before paint is applied. Concrete to be painted, must be primed with one
coat of Concrete Sealer, Ho. 96.
Machinery to be painted, must first have iron filler applied to blow holes, chips, etc. to produce a reasonably smooth surface before painting.
The above specifications apply to the materials named, regardless of the form in which they are used} tanks, framework, pipe lines, etc.
UCASB02053889
- 6-
<\
FINISH COATS
Oatside Equipment Structural Steel Uninsulated Buried in concrete
No. Coats
Paint Specification
1 #56 Black No Paint
I,Ia chinery
Small motors, pumps, etc. (cold surfaces)
Turbines, hot surfaces of light machinery
1
#60 Black Engine Enamel
#61 Black Hot Engine Polish
Tanks Insulated
Uninsulated
No paint on weatherproof insulation.
2 #51 Aluminum
Furnaces
Cold steel, sheet and framework, below 550F.
Stacks, hot surfaces over 550F.
2 1
#56 Black
#73 Light Grey Stack Paint (applied after stack has been heated at least once.)
UCASB02053890
7-
Inside Equipment
Structural Steel Uninsulated
Insulated
No. Coats
Paint Specifications
1 #56 Black, containing 1 qt. #99 Varnish per gallon of "black
No Paint
Concrete Foundations, etc.
1 #81 Maroon
Tanks
Steel, insulated and uninsulated
1 #72 Li gilt Grey
Machinery
Small motors, pumps. etc. (cold surfaces)
Turbines, hot surfaces of light machinery
2 #60 Black Engine Enamel
1 #61 Black Hot Enamel Polish
Building
Exterior Doors, Windows, and Trim
Interior Doors, Windows, and Trim
1 1
#75 Bottle Green #72 Light Grey
UCASB02053891
0
Building (Continued)
No. Coats Paint Specifications
Interior (Continued)
Walls, Ceiling, Insulated Building Steel
Dado Line, 2-l/2" wide 5' above floor
2
#56 Black, containing 1 <yt. 99 Varnish per gallon of Black
Walls below Dado line
1
#96 Vinyloid Brushing Sealer
1 #71 Vinyloid Brushing Wall Finish, Grey
Walls above Dado line and ceilings
1
#9$ Vinyloid Brushing Sealer
1 #94 Vinyloid Brushing '.Vail Finish, White
Uninsulated Building Steel, Handrails, etc.
1
#56 Black, containing 1 qt. #99 Varnish per gallon of Black
Concrete,Foundations, etc.
1
#81 I-laroon
Pipe lines Inside
H.P.Steam L.? .Steam River Water
Paine Specification
No. Coats
Pipe
Tittings
1 #89 Signal Red
Same
1 #00 Maroon
Same
1 #72 Light Grey
Same
U CAS B02053892
9-
Pipe Lines (Continued)
Inside (Continued)
Paint Specifications
Ho. Coats
Pipe
Fittings
City Water
1 #72 Light Grey
#80 Maroon
Process Water
1 #72 Light Grey
#56 Black, con taining 1 qt. #99 Varnish per gallon of Black
Compressed Air 1 #92 White
Same
Fire Lines
1 #72 Light Grey
#89 Bright Red
Fuel Gas
1 #72 Light Grey
#51 Aluminum
Unfinished Alcohol 1
#37 Dark Red
Same
Ether
1 #82 Orange
Same
Outside
H.P.Steam L.P.Steam Fuel Gas Do?; them
Same as inside, except:
2 #56 Black 2 #56 Black 2 #56 Black 1 #73 Light Grey
Stack Paint
Same* Same* Same* Same
Pipe lines to he striped with paint specified for fittings on inside lines handling same material.
UCASB02053893
- 10 -
III - BUILDING- ACCESSORIES
1. KEATING AliD VENTILATING The building is to be heated and ventilated with
motor-driven York Heat-Diffusing Chits sufficient in size and number to maintain a comfortable working atmosphere. These units should be provided with outside air-intakes and dampers. l/2" Armstrong No. Ill steam traps are to be used.
2. LIGHTING
Lights are to be provided so that all instruments, meters, weirs, etc. are adequately illuminated for efficient operation at night. Outdoor walkways, tank gauge-boards, etc. must be properly lighted.
5. DRINKING ECONTAIKS
level.
A drinking fountain is to be provided on operating
4. TOILETS AND Y/ASHEOWLS
One toilet and a washbowl fitted with soap and paper-towel dispensers are to be supplied.
UCASB02053894
11 5. HOSE OUTLETS
Hose outlets are to "be provided in the building as follows:
2 - 1" air outlets 2 - 1" water outlets 2 - 1" I.?. Steam Outlets
UCASB02053895
\
IT - SAFETY SQUIKGNT
1. FIKE-FIGKTING EQUIPMENT
Inside The high pressure fire line is to he extended
within the building, and hoses are to he provided near the doors. These hoses are to he 100 feet of 2-l/H inch Standard Underwriters* labeled unlined linen hose with 2-1l2" x 15" aluminum-painted iron nozzle, installed according to Drawing No. C - 33544. 2-\jz gallon Foaraite Extinguishers, model CA, are to he provided adjacent to each fire hose, and are to he hung on wall racks con structed according to Drawing No. C - 35543.
A 40 gallon Foamite engine is to he supplied and will he located outside the building convenient to a suitable ramp so that the engine may he easily rolled inside.
Two gallon, model 7-l/2 Alfite Extinguishers are to be provided accessible to all electric motors.
Outside Two hydrants with 2-way standard 2-l/2" hose
connections, 6" bottom connections, automatic drain cock to avoid freezing. One hydrant is to he spotted to the east of the building; the other, to the v/est of the building between the Dowtherm boilers and the building.
Each hydrant is to be equipped with two units consisting of 4 - 50 ft. lengths of standard 2-l/2", single-jacketed cotton, rubber-lined, mill-yard hose with standard l-l/o" smooth bore nozzles. Hoses are to be stored in hose houses contracted according to Drawing No. B - 28385.
Hose houses are to be located close to hy drants and each is to contain 5-45 lb. cans of Foamite Generator Powder.
UCASB02053896
- 13 -
2. FUST AID ECtUIPHEBT One first aid caToinet i3 to "be supplied* It is
to be located inside the building near the door at the west end.
The cabinet is to contain the following: 2 - eye cups 1 gal. - 2^ acetic acid solution 1 gal* - 5% boric acid solution 1 gal. ~ 5% sodium bicarbonate solution 1 gal. - mineral oil
U CAS B02053897
N
*
__
J
-
V - INSULATION
Poliowing is a list of equipment and pipe lines which are to "be insulated. Thicknesses and insulation specifications are given.
APPARATUS LIST
Item No.
Location
Thickness Temperature of Insulation loaterial
101 102 10S 10? 108 118 123 15 3-A 153-3 154 156 190
Outside Outside Outside Outside Outside Outside Outside Outside Outside Outside Outside Outside
Atmospheric Atmospheric Atmospheric
90C. .90C, 300C. 300C. 300C. 300C. 300C. 300C. 300C.
1" 1" 1" 1-1/2" 1" 4" 4" 4" 4" 1" 1" l7'
Roclcwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool Rockwool
J UCASB02053898
3
PIPING LIST
Line No. P-to% P-104 P-105
P-106 P-107
Thickness
Location
of Insulation
Aw
ti /&*,
t03 -o i'n 3,`e/e
Outside
l-l/2"
Material Rockwool
Outside
1-1/2"
Roclcwool
Outside
3" Rockwool
Outside
3" Rockwool
L-101 L-102
Outside Outside
4" Rockwool 3" Rockwool
IS-101 IS-104
Outside Outside
1-1/2" 1-1/2"
Rockwool Rockwool
HS-101
(inside {Outside
(1-1/2" (1-1/2"
(Roclcwool (Rockwool
Lines D-101 and D-102 should "be insulated with lowpressure steam lines.
>
UCASB02053899
9
v
> V
16 -
VI - MISCELLANEOUS 0P5BATING EQUIPISITT
(1} 1 - Log desk constructed according to Dra\ving No. B-46924.
(2) 1 - Sample rack constructed according to Drawing Fo. C-33540
(3) 1 - Pool sot containing the following items: 1 - 10" Pipe wrench. 1 16" Pipe wrench 1 - 24" Pipe wrench 1 - 8" Crescent wrench Ov _** 10" Crescent wrenches 15" Crescent wrench 2 - 1/2" Spud wrenches 2 - 5/8" Spud wrenches 2 - 3/4" Spud wrenches 1 - 8" Combination Pliers 1 - 8" Screwdriver 1 - 12" Screwdriver 1 - 24:' Dividers 1 - Die stock with following dies: l/4", l/2", 3/4", 1", l-l/2`\ 2" 1 - Tinsnip, 14" 1 - Center punch 1 - Caullcing chisel Padlock and key
UCASB02053900
(4) 1 - Tool "bo:: constructed according to Drawing No. C-53539.
(5) 3 - Wilson-Jones No. 618, 11" x 8-1/2" aluminum sheet holders for log sheets.
(6) 3 - 12-l/2,T x 9" wood hack "Globe Clip" hoards.
(?) 1 - Pencil sharpener (8) 2 - Rubbish barrels (9) 2 - Ladders, one 12-foot, one 24-foot.
(10)
Rubber Hose 2-50 ft. lengths 1/2" I. D.-U. S. Giant Steam Hose 2-50 ft. lengths 1/2" I. D. U. S. Mogul Air Hose 2 - 50 ft. lengths 1" I. D. U. S. Rainbow Water Hose 4 - pairs 1/2" U. S. Samson High Pressure Hose Couplings 2 - pairs 1" U, S. Samson High Pressure Hose Couplings
t
{11)
2 - 1 pt. capacity oil cans.
* UCASB02053901
z
j'.'l
*1 r.
f*
:-! r
^>
''j.. .. re a.'J
-1
;.c
a-
,*',
a. -vs
t
t\ ,!t i * *
_____ <_ /r , - ;__________
"ECTOR. C C~ Z.**c I e'-\r--^=7 jd -: -cv
JAS^er 5~1rf -T---i-C-^-x A*CCV ______
V*>1
&*-}C6k.N. ."N-ic6* TC_A_f_________M__c*m_:__;'__g_'_ks'_>&_ r__
c .sr o'
v- 7?.. ., l.J-JVj'- -- Z-
^"Vr?!-
ZC?.AJ>,
i- TV\ c'R 7~-'>
- ___- itr> <? .-*\ V?.i
+ =* lh & r- h
o.swbt
a>-sg- j>s&A<a?^
1JL1 CCRB- A>-.Mg>t-r! " 1 -70 ' , Mf
* *i ' 4<<l
TV&j-li:
'> Htirr u'Mi
^'m* \j \*n r
il-J W'A
T'nt *=A-^L.'5C.='z
Ross H- E'--*rT! Es- f<> r4v v->AM-->ro-oD* * 'A i AW__
~~ 7MOC
7%>^./t4.
^ 37fc ~/7C?>
A . *r ! ?*
v
-! :*
UCASB02053902