Document 1Yym9B6vdnva0My40z2YZ11q
UNION CARBIDE CORPORATION
SOLVENTS ANO COATINGS MATERIALS DIVISION
INDUSTRIAL HYGIENE
RECErVEO
MR 1V bat)
H PA, Ocdt
po. sox 471. texas crrv, texas 77592^71
Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, TX 78723
March 14, 1986
Re: Renovation Notification
Dear Mr. Stewart:
This is to notify you, as required by 40 CFr 61^146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut 06817, as owner, plans to engage in renovation activities as described below:
Insulation will be removed from conduit located at Bldg. 57 the plant at 3301.5th Avenue South, Texas City, TX 77590. Approximately 2Qu lineal feet of insulation is involved and the equipment is approximately 20 years old.
in
Removal of the insulation is scheduled to start on April 1, 1986, with completion by April 11, 1986. Procedures to be employed in the handling and disposal of the asbestos material will conform to the requirements in 40 CFR 61.147 and 61.152.
All asbestos materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, TX.
Yours very truly,
JBL:IR:RencvKEM
Cc : Dr. E. R. Ibert - C
Bcc : s. K. Phillips - 5 S. J. Footer w. W. Henderson R. F. Kelley - 500 M. D. Lindsey K. E. Martin R. C. Wise -500 R. E. Woodcock
/A. P. Yalcinkaya
La Marque
J. B Leverton
UCTC 18812
suwafrt i
UNION CARBIDE CORPORATION TEXAS CITY PLANT
Plant Procedure I-B-b Attachment 4)
NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR -------------------- F AC I lTTY ~TT5n TATn lNG~'A^b E$ T OS mATERIAT
1 . Description of the facility: /pfa// T (2&A/Dd/7~ Aoa/TTXaZ/
/A/47'/Zc,'sr7&~A/r ~7rZ,;'/<f ( Z r 3 " o> ____
Age (approx, years)
ACO______ Size ~ Prior Use /Aeprc770a/~
/y/2E PerZC77&H
.2 Estimate of approximate amount of friable asbestos materials present:
(Area in sq. ft. or linear ft.) __
z-r
Estimation technique used:
-pAhd&~~0/-rX-
3. Location cf facility: &S 7 rfXfrZXCXS ? Tfzesj c/Jsr-^
Scheduled starting day: _______ 3///^Xp 4.
Scheduled completion day:
5. Nature of planned demolition or renovation:
'> 77ESZ=>
/a/6cZ^4-77qJ^7-g /Jcc&cQ /e7rto \/AC Of* CoaJ^u/
Method to be used:
6. Name of person that prepared the form:
Location and telephone number:
.7.
Date:
NOTE: This form must be completed and delivered to the EP Department (Bldg. ?1 ) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation.
)
UCTC 18813
4
Ij
UNION CARBIDE CORPORATION
SOLVENTS ANO COATINGS MATERIALS DIVISION
INDUSTRIAL HYGIENE
R EC Rf v Bn ^
MAR 1 y
^ P a. npDT
P.O BOX d71, TEXAS CITY. TEXAS 77592-0-371
March 14, 1986
Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, TX 78723
Re:
Renovation Notifi cation
Dear Mr. Stewart:
This is to notify you, as required by 40 CFr 61.146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut
06817, as owner, plans to engage in renovation activities as described below:
Insulation will be removed from conduit located at Bldg. 57 the plant at 3Avenue South, Texas City, TX 77590. Approximately^CtTO lineal feet of insulation is involved and the equipment is^-approximately 20 years old.
in
Removal of the insulation is scheduled to start on April 1, 1986, with completion by April 11, 1986. Procedures to be employed in the handling and disposal of the asbestos material will conform to the requirements in 40 CFR 61.147 and 61.152.
All asbestos materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, TX.
Yours very truly,
JBL:IR:RenovKEM
Cc:
Dr. E. R. Ibert - GCACD, La Marque
Bcc: S. K. Phillips - 500 S. J. Footer W. W. Henderson R. F. Kelley - 500 M. D. Lindsey K. E. Martin R. C. Wise -500 R. E. Woodcock
/A. P. Yalci ' aya
J. B. Leverton
UCTC 18814