Document 1Yym9B6vdnva0My40z2YZ11q

UNION CARBIDE CORPORATION SOLVENTS ANO COATINGS MATERIALS DIVISION INDUSTRIAL HYGIENE RECErVEO MR 1V bat) H PA, Ocdt po. sox 471. texas crrv, texas 77592^71 Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, TX 78723 March 14, 1986 Re: Renovation Notification Dear Mr. Stewart: This is to notify you, as required by 40 CFr 61^146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut 06817, as owner, plans to engage in renovation activities as described below: Insulation will be removed from conduit located at Bldg. 57 the plant at 3301.5th Avenue South, Texas City, TX 77590. Approximately 2Qu lineal feet of insulation is involved and the equipment is approximately 20 years old. in Removal of the insulation is scheduled to start on April 1, 1986, with completion by April 11, 1986. Procedures to be employed in the handling and disposal of the asbestos material will conform to the requirements in 40 CFR 61.147 and 61.152. All asbestos materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, TX. Yours very truly, JBL:IR:RencvKEM Cc : Dr. E. R. Ibert - C Bcc : s. K. Phillips - 5 S. J. Footer w. W. Henderson R. F. Kelley - 500 M. D. Lindsey K. E. Martin R. C. Wise -500 R. E. Woodcock /A. P. Yalcinkaya La Marque J. B Leverton UCTC 18812 suwafrt i UNION CARBIDE CORPORATION TEXAS CITY PLANT Plant Procedure I-B-b Attachment 4) NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR -------------------- F AC I lTTY ~TT5n TATn lNG~'A^b E$ T OS mATERIAT 1 . Description of the facility: /pfa// T (2&A/Dd/7~ Aoa/TTXaZ/ /A/47'/Zc,'sr7&~A/r ~7rZ,;'/<f ( Z r 3 " o> ____ Age (approx, years) ACO______ Size ~ Prior Use /Aeprc770a/~ /y/2E PerZC77&H .2 Estimate of approximate amount of friable asbestos materials present: (Area in sq. ft. or linear ft.) __ z-r Estimation technique used: -pAhd&~~0/-rX- 3. Location cf facility: &S 7 rfXfrZXCXS ? Tfzesj c/Jsr-^ Scheduled starting day: _______ 3///^Xp 4. Scheduled completion day: 5. Nature of planned demolition or renovation: '> 77ESZ=> /a/6cZ^4-77qJ^7-g /Jcc&cQ /e7rto \/AC Of* CoaJ^u/ Method to be used: 6. Name of person that prepared the form: Location and telephone number: .7. Date: NOTE: This form must be completed and delivered to the EP Department (Bldg. ?1 ) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation. ) UCTC 18813 4 Ij UNION CARBIDE CORPORATION SOLVENTS ANO COATINGS MATERIALS DIVISION INDUSTRIAL HYGIENE R EC Rf v Bn ^ MAR 1 y ^ P a. npDT P.O BOX d71, TEXAS CITY. TEXAS 77592-0-371 March 14, 1986 Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, TX 78723 Re: Renovation Notifi cation Dear Mr. Stewart: This is to notify you, as required by 40 CFr 61.146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut 06817, as owner, plans to engage in renovation activities as described below: Insulation will be removed from conduit located at Bldg. 57 the plant at 3Avenue South, Texas City, TX 77590. Approximately^CtTO lineal feet of insulation is involved and the equipment is^-approximately 20 years old. in Removal of the insulation is scheduled to start on April 1, 1986, with completion by April 11, 1986. Procedures to be employed in the handling and disposal of the asbestos material will conform to the requirements in 40 CFR 61.147 and 61.152. All asbestos materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, TX. Yours very truly, JBL:IR:RenovKEM Cc: Dr. E. R. Ibert - GCACD, La Marque Bcc: S. K. Phillips - 500 S. J. Footer W. W. Henderson R. F. Kelley - 500 M. D. Lindsey K. E. Martin R. C. Wise -500 R. E. Woodcock /A. P. Yalci ' aya J. B. Leverton UCTC 18814