FRA7.FR PA TOT COMPANY 2475 Hubbard Avenue Detroit, Michigan
SCHEDULE I
TRADE NAME: CATEGORY; COLOR; QUALITY;
Roof & Barn Paint Roof Sc Barn Paint Red First
Pigment: 55% Iron Oxide Clay Silica
Vehicle; 45^ ` . Raw Linseed Oil Heavy ..Bodied Fish Oil Gum Solution Mineral Spirits Efrier
Lbs.
245 188 188
330 42; 42 50 50
Yield in Gallons
Unit Cost
Total Cost
Weight per
.078 .01
19.11 1.88
gallon .01 1.88
finished Storage Sc handling cost product, through loss - IX
laboratory
record
12. lbs. '* - .13
42.90
.137 .06
5.75 2.52
.015
.75
.07 AtSP
Storage Sc handling cost
through loss - 3%
22.87 .23
55.42 1.66
Calculated Yield Manufacturing Loss Actual Yield
1135
94.6
2.4 92.2
Cost Analysis:
Material cost per gallon
Direct labor cost per gallon
Factory overhead per gallon
Bulk cost per gallon '
_
Complete r.ackage cost per gallon. including filling charge
Factory cost inpackage per gallon
PRICES
(a) To a comrany owned or controlled outlet Cb) To an independent wholesaler (c) By company owned or controlled outletto retail customer (d) To an independent retailer (Dealer) (e) To other (Industrial)
(Contractor)
80.18
.87 .08 1.00 1.19
None None 1.50 1-33 1.28 1.20
R-isXE0 AT .HE
\
AHU. "
OPA 16243
N 5141