Document 1QxRb1D4ZeL77oJw4y68V00eo

Industrial PLAINTIFF'S EXHIBIT 'm w>-' i 0-7 *4 ST 0075678 nposure eduction m 4 '-Hi* n ;'<?r '!,W: INFORMATION EXCHANGE FOREWORD J /3-SD'l 132.77 The attached booklet is a collection of Successful Exposure Reduction Applications (SERA) information collected by a portion of the Industrial Hygiene Network in the U.S. and Canada. The intent of this project is to. provide a ready reference of Dow technology in reducing employee exposures. This is the fourth edition. If you did not get a copy of the other issues, contact any committee member listed below. Since it is the intent of the committee to continue this project on an on-going basis, please contact one of the committee members if you know of an exposure reduction that would be a good candidate to appear in the SERA publication. SERA COMMITTEE MEMBERS: Stan Dombrowski. Sidney Geode bill l.edf ord Gary Heir 01iver McDonald Dick Olson Rick Olson John Summerlin Helen Tobol Chairman U.S. Area Oyster Creek Division Louisiana Division Eastern/Central Div. Dowell Inc. Sarnia Division Michigan Division Texas Division Western Division (517) 636-2989 (713) 238-9697 (504) 389-1809 (216) 826-6291 (918) 592-0771 (519) 339-3233 (517) 636-5641 (713) 238-1281 (415) 432-5303 GO CD c_n cr> _j KJD 3/81 PORTABLE COLD CLEANER I.A. PROBLEM Vapors of 1 ,1,1-Trichloroethane generated in cold cleaning operations should be kept at levels less than the Threshold Limit Value of 350 ppn. Control of the vapors also reduces waste of solvent and metal corrosion when the vapors contact hot metal surfaces. SOLUTION A snail cold cleaning unit called "Cycleen" and distributed by Hotsy Pacific, 13327 Pierce Road, Saratoga, CA 95070 (408) 867-2099 (approximate cost $220) is now commercially available. The unit sits on top of a 55 gallon drum of solvent and pumps solvent through a hand held brush until the solvent is too soiled for cleaning. SUCCESS Breathing zone measurements for 1,1,1 trlchloroethane indicate concentrations less than 75 ppn even while using poor cleaning practices. CONTACTS A. W. Schaffer - Manager Dowell Industrial Hygiene Department (918) 592-0769. DIAGRAM RESTRICTED: For use within The Dow Chemical Company Only I. A CONTROL OF EXPOSURES DURING ETHYLENE OXIDE SAMPLING PROBLEM High peak exposures during sampling of ethylene oxide occurred when the line was purged prior to sampling. Peak concentrations up to 163 ppm EO were monitored for a brief period. SOLUTION A recirculating sample line with a septum-bottle, syringe sampling system was installed. The flow-through sample line eliminates the need for purging and the septum bottle contains the EO sample vapors. SUCCESS Ethylene Oxide Maximum Peak Concentration (PPM) Before After 163 8 CONTACTS Bill Gary, Propylene Oxide Purification, 713/238-7701 (Designer of Septurn-Sampling System) Donna Hicks, Environmental Health Services, 713/238-1281 George H. Flores, Environmental Health Services, 713/238-2942 DIAGRAM --> ' cr O'* CO 12/3/81 - - - - RESTRICTED: For use within The Dow Chemical Company Only - - - - II.D ASBESTOS SUBSTITUTE FOR TURBINE INSULATION Problem: The removal of asbestos insulation pads during maintenance on the gas turbine at the Chlor-Alkali Plant was a potential source of airborne asbestos fibers. Solution: Maintenance procedure on the gas turbine proved timely for installing an asbestos substitute, CERABLANKET, a waterproof ceramic-fiber cover blanket made by Johns-Manville Company. Success: Installation of the CERABLANKET insulation pads has resulted in eliminating a potential asbestos exposure. Contact: Johns-Manville Company Product Information (303)--979--1000 LAD Industrial Hygiene: Terry Campbell (504) -- 389--8549 LAD Chlor-Alkali II: Bill Sharkey (50*0-389-6122 12/18/81 {~ ^ o-i jr\ co r-o - - RESTRICTED: For use within The Dow Chemical Company Only - - II.E AUTOMATIC DE-BAGGER ELIMINATES DUST Problem: The adding of talc (non-asbestos form) to the system of the Chlorinated Polyethylene unit created potential overexposures. Solution: An automatic de-bagger from Taunton Engineering was installed to add the non-asbestos form talc. Success: Previous to the installation of the automatic de-bagger,employee breathing zone samples to talc ranged as high as 10 mg/m3 total dust for an eight-hour TWA. The installation of the automatic de-bagger has eliminated contact with the talc when added to the system. Source of De-bagger: Tauton Engineering, 700 W. Water St., Taunton, Mass. 01780 Contact: LAD Industrial Hygiene: Terry Campbell, (504)--389--85^9 LAD Chlorinated Polyethylene: Jane Watkins (504)-389-8776 12/18/81 cn O'* -D co - - RESTRICTED: For use within The Dow Chemical Company Only - - REMOTE CONTROL C-CLAMP III.A PROBLEM Marine Dock operators, disconnecting vinyl chloride ships, are required to manually remove load line flange bolts, thus increasing potential vinyl chloride exposure in the immediate work area. (Workers wear supplied air respirators.) SOLUTION A remote control 20-ton capacity hydraulic C-clanp system was employed to temporarily hold the flanges together. The operators then removed the bolts and moved upwind from the flange site to activate the clamp release and break the connection (different length hydraulic hoses may be assembled). SUCCESS Monitoring data indicates potential personnel exposure levels have been reduced approximately 50%. CONTACT LAD Industrial Hygiene: Dannie Kennedy (504) 389-6218. 12/18/81 GO t CD ^IDI <n oo co 3 /_0u J. Si IV. B. NOISE REDUCTION AT CAUSTIC PLANT PROBLEM: V2 is a process vessel which is used in the manufacture of bead caustic. The beads are produced at the top of the tank and free fall through a cool air stream. Approximately six feet above the outlet nozzle, a grating (1" squares) screens out any material that might plug up the airveying system. The beads are airveyed in a batch to a storage silo. During the airveying cycle, the product builds up in the V2 cone, the airveying system shuts down, the outlet nozzle opens, and the blow tank fills. Original equipment included a pair of electrically operated vibrators used to start the bead caustic flowing from V2 and V4 on a timed basis; they operated anywhere from 0-60 seconds every time the outlet valve on V2 opened. As these were very noisy [107 dB(A)), another system of air jets was installed on the same timer, to be used instead of the vibrators. The jets worked well, but another process problem intervened. Without intermittent vibration, the grating would become plugged. If the grating was allowed to become more than 25% covered, even prolonged operation of the vibrators would not prevent it from becoming completely plugged over, in which case shutdown and wash out was required. In short, there were now two problems: a) a process problem of the grating in V2 plugging, and b) an industrial hygiene problem of high noise levels. SOLUTION: New pneumatic vibrators from Mason Industries Ltd. were installed on the V2 cone at the grating level to deliver vibration energy closer to the area of concern in the process. The air jets are still employed in the bottom of v2 to rid the vessel of any material buildup at the outlet. The old vibrators are still in place for emergency use. SUCCESS: Material buildup at the V2 outlet and on the grating above the outlet is cleared more efficiently than before and noise levels generated with both the airveyor and the new vibrators on are 20+ dB(A) less than the levels measured with just the old vibrators on the vessel. --------2 RESTRICTED: For use within The Dow Chemical Company only ~ - 2 NOISE REDUCTION AT CAUSTIC PLANT - CONT'D CONTACTS; Caustic: George Frank, Sarnia (519) 339-3154/339-3048 Industrial Hygiene: Alex Pollock, Sarnia (519) 339-4501 Faye Butler, Sarnia (519) 339-4214 o CO .__I cn co CD CO vibt'cvViOrN 4tc\j\' n\i O'rets ara^S RESTRICTED: For use within The Dow Chemical Company only _ _ ST0075687 IV. c. SULFURIC ACID DRYING TRAIN AREA NOISE REDUCTION PROBLEM Area noise levels around the chlorine recycle system in the drying train area ranged from 97 to 111 dB (A). These levels caused the nearby main walkway past the control room building to have readings of 86 dB(A). Since plant personnel were often in the area of the chlorine recycle system, measures to reduce the noise levels were undertaken. SOLUTION A sound reducing enclosure and pipe insulation were installed on the chlorine recycle system in the drying train area. The control valve enclosure measured approximately 74" X 74" X 92" high, and was assembled from 4" thick NoisecapTM sound reducing panels, containing one personnel access door and sealed openings for 4 pipes. The pipe insulation was 4" thick with a 20G satin coat exterior face and a 22G perforated galvanized steel inside face. There is a 4" air space between the pipes and the insulation, which required support from vibration isolation mounts. SUCCESS The project resulted in area noise levels reading 85 to 87 dB(A), an overall reduction range of 11 to 24 dB(A). Walkway noise levels were reduced to 81 dB(A), a 5 dB(A) drop. CONTACT Chlorine II: Jim Brunton, Sarnia, (519) 339-3306 Industrial Hygiene: Dave Bourque, Sarnia, (519) 339-3439 Faye Butler, Sarnia, (519) 339-4215 - - RESTRICTED: For use within The Dow Chemical Company only - -