5j0,*c' Commits on "Operations Procedure for Asbestos Panova1"
m
Beil Laboratories
May 10, 1984
"a- C. P. Lichtenwalner Hi 77621 LF-110 X5399
H. R. Fitch:
With regard to your April 3, 1984, Manorandun for Record on "Operations Procedure for Asbestos Removal" we have noted sev eral areas that were not addressed that we feel are essential to assure employee health and caapliance with regulatory require ments.
1. Protective clothing should be vrem to prevent ccntanrination of personal clothing and dispersion of asbestos-containing debris throughout the build ing and to the homes of the mployees.
2. All respirators used must have NIOSH/MSHA approval for asbestos-containing dusts.
3. Arr^vmstes containing asbestos must be sealed in impermeable containers, appropriately labelled, and disposed of in an approved landfill. Waste manifests and landfill receipts must be retained to verity omplianoe with EPA regulations.
4. Procedures should specify removal of respirators as final step of work operations.
5. Meticulous dean-ip of any work area is required to prevent dispersion of asbestos. We leoiuumd covering work area with di^oaable plastic drop cloths (to be removed as asbestos aontsminated waste) and subsequent vacuuming of area with a HEPA filter equipped vacuun cleaner restricted in use for asbesto6 operations.
6. An asbestos program manager should be appointed to oversee all asbestos jobs including pre-survey and post-survey checkout of all work.
7. Occupants and all other personnel not wearing respirators and protective clothing must be restricted from areas while work is proceeding.
000803
H. R. Fitch - 2
B. If work is being performed in an area used as pare of the supply or recura air. Che fans should be shut dnm, the area sealed, or the work perfonted out-of-hours during rairunial occupancy of the bu2-lding.
9. Representatl.ve work operations should be monitored to assess exposure levels.
10. All individuals perfoBg work requiring disturbance of asbestos-containing materials must be trained in: a. proper rOal procedures. b. proper use of respirators, and c. hazards of asbestos.
11. Any work involving rl of more than 260 lineal feet of pipe or more than 160 ft2 of surface area requires notification of EPA (and probably ocher regulacory agen cies .)
You rmy want to consider the attached "Procedures for Work Bring Handling or Disruption of AsbestosBBq Materials' which bas been developed as a guideline for work operations with slight or mml disruption of asbestos-omtaming material.
If you need any further information please let us know.
Sincerely.
P. A. Huggins
MH-"7-6219L-:ve
Copy to:
W. W. Crawford
D. Rainer
w. J. Schreibeis
G . M. Wi
g-
C. P. Lichcerrwalner
H. R. Pitch - 2
8. If work is being performed in an area used as part of the supply or return air, the fans should be shut down, the area sealed, or the work performed out-of-hours during minimal occupancy of the building.
9. Representative work operations should be monitored to assess exposure levels.
10. All individuals performing work requiring disturbance of asbeatcs-Gcntaining materials must be trained in: a. proper removal procedures, b. proper use of respirators, and c. hazards of asbestos.
11. Any work involving removal of more than 260 lineal feet of pipe or more than 160 ft2 of surface area requires notification of EPA (and probably other regulatory agen cies. )
You may want to consider the attached "Procedures for Work Requiring Handling or Disr^tion of Asbestoe-Containing Materials" which has been developed as a guideline for work operations with slight or minimal disruption of asbestos-containing material.