Within (he General Electric Company, J.F. Young. Vice President-Technical Resources on the Corporate Staff, is "Mr. Engineer". On pages 3-5 he shares with us his under standing of how the codes of ethics can guide the conduct of the engineer. Mr. Charles Titus on pages 10 and 11 reveals a number of potential changes that may effect the future of indus trial power delivery systems. This is followed by an informa tive report on pages 12-14 (as well as the front cover) giving an update on the new POWER/VAC metalclad switchgear.
Ti. S'.
CIHTtiaiAL STAFF IHmmM S. Iwwirr - Editor Imlwnil Power System EiWMtnni Operation IHnmM K. WRendi - Manwfcta Editor Advertisim and Sale* ProrntMton Operation Jim Rtw - Art Editor Advcrthina and Sale* Promotion Operation
ctH'Nni. advisor* Hubert a. Maare Industrial Power System* Fnuineertna Operation M* f Cl* WMbtn C. (iretbam Industrial Sales Irisisttin C. Abb Rmr Apparatus Distribution Sales Division Hubert K. ttfmlri Iiwrh K. hmn Advcrtliimi and Sale* Promotion Operation
MusUM Power
System
PuOt'tnodbyOontVgieetnc Company jvNttprr vwimscuMu*;
3 INFLUENCE OF ENGINEERING CODES ON THE ROLE AND WORK OF ENGINEERS James F. Young, a Cf. vice president, discusses the iimdatittes and differences of the many coties and suggests tome changes.
6 SILICONE DIELECTRIC FLUID! A REPLACEMENT FOR ASK/VREL John C. Crouse and James P. Kinney. Jr.. discuss the results of successful tens on an environmentally safe transformer dielectric and coolant.
10 THE FUTURE OF INDUSTRIAL POWER DELIVERY SYSTEMS
ChatIts H. Titus examines the challenges increased primary voltages >v ill plate on future systems.
12 POWER/VAC METALCLAD SWITCHGEAR TESTS HIGH IN RELIABILITY Dr. Josef Vrhanek review the results of tests for fault interruption, capacitive current switching and other tests that demonstrate excellent results.
15 CO LOCATION: AN ECONOMICAL ALTERNATIVE SOURCE OF STEAM AND POWER John M. Kovacik offers co location us nn economical source of prore's steam and power that also conserves energy resources
20 STEP) A PROGRAM OF IMPROVED INDUSTRIAL TURBINE-GENERATOR MAINTENANCE Donald W. Brause details the Steam Turbine Fvaluanon Program t benefits to plant maintenance personnel and management
24 INNOVATIONS IN AKD4 LOW-VOLTAGE SWITCHGEAR
EDITORIAL COUNCIL
W. a. Abad, Distribution AuemMie* Oept
I. C. Berrett. Installation A Service En*r Oept
J. M. Betbane. Apparelui Senk't (>v
A. V. RrancMt, Industrial Control Dept
R. t. Brash, Circuit Protective Devices Dept
G. L. Cedenalet, Sncheir Dept
S. I. CapnettL Cat Turbine Div
I. C. Cranee. DittribMion Assemblies Dept
C- 0. Dykbelten, Ballast A Spec Tram Dept
F. C. Fabout. Jr.. Med Steam Turbine Mhta Dept
F. L. Ceisler. Mecb Drive Turbine Dept
U. M. HmiNir. Med Transformer Dept
B. M. Jafratb, International Sales Div
.
F. H. LarUn, Distribution Trantforntet Dept
W. I. McConeIdi. Wire A Cebfe Dept
D. H. Nlcbeb. Capacitor Prods Dept
F. I. Savaie. Apparatus Distribution Sales Div
f. H. Scan. Oen Purpose Control Dept
W. L. Teepte. Swiicltaeer Dept
H. 8. WNRaan, Power Transformer Dept
ixwi mt: officers
REGINALD II. JONES ( haiiman ol I hr Hoard ami C hivf I tccmu,i* Officer
ROREN1 H.KVRV/ Vice President ami (ireup I ,ecuti,e liul.islrmt and Power Deliver, tiroup
JAMES P. U RI.EY Vice President umHrenrr.il Sl.inuiirr C.imrnt i.r Equipment Dt.ist.ai
RAI PII B. GI.OT/RACH Vive President and General Munueer Appurut us Distribution Sales Do iwon
DONAI.I) E. PERRY" Vice President and General Manager Industrial Sales Disiston
Indusirtul Power Systems mueunne < publiihed uunrierlv by General Electric Company at Sctwnevind) V V ll.U* Copyright 1177 bs General Electric Co
tndmtriat Power Systems June 1977
nw Oipmna a! Modam Induatnat andCommartiat Efoetncal Fraction
HONS 002Y80
GUEST FEATURE
Influence of Engineering Codes
on the Role and Vksrk
of Engineers --
by James F. Yeung
JAMES F. YOUNG James F. Young is Vice-PrtsidentTechmcal Resources of General Electric Company. His office is at the Corporate Headquarters in
Fairfield, Connecticut. Mr. Young attended Lafayette College, where ha received a Bachelor 's degree in mechanical engineering with honors
in 1937. That same year he joined General Electric's Engineering Test Program. In 1944 he transferred to the Appliance and Merchandise Department and was named as Con-
juftam on Engineering Studies and Surveys for the Vice President Engineering in 1953. He was appointed General Manager of GE 's Advanced Technology Laboratories
and in February I960 was named General Manager-Electric Utility Engineering Operation. In August 1963 he was named General Man ager of the Nuclear Energy Division and was elected a Vice President in June 1965. Mr. Young became Vice President-Engineering in November
1966 and was named to hispresent position on June I, 1970. Mr. Young is a member of Thu Beta Pi and Phi Beta Kappa. He was granted an honorary doctorate by Lafayette College in 1963. Mr. Young is a member of the National Academy of Engineering, Institute of Electrical
and Electronic Engineers and National Society of Professional Engineers, and a Fellow in the American Society of Mechanical
Engineers. His public service
includes presidency of the Atomic
Industrial Forum (A/FI, trusteeships
for severe! colleges and National
Research Council activities. He is a
licensed professional engineer in New York and Connecticut.
How long has It been since you
reviewed the code of ethics of your engineering society?
Whether recently or beyond recol lection, a re-look may be in order for there are many indications that "ethics" are of growing concern to engineers and to the public.
The reasons are many. Some stem from startling disclosures of failures in meeting reasonably expected ethical standards of behavior among some businessmen, public officials and members of learned professions. Others derive from a growing recog nition of society's dependence upon technology--and recognition that this dependence must continue to grow. So, it seems timely for engineers to give renewed attention to the codes of ethics that guide their conduct in re sponding to the public need and trust that this dependency entails.
Unfortunately* there are many dif ferent versions of a code of ethics for engineers. Separate codes have been adopted by the Institute of Electrical and Electronics Engineers,''the Amer ican Society of Civil Engineers, the American Society of Mechanical En gineers, the Engineering Council for Professional Development, the Na tional Council of Engineering Exam iners, and the National Society of Professional Engineers, And varia tions have been certified or modified by the Engineering Registration
*To ittustrete... the IEEE Code of Ethics is reproduced on pegs S.
Boards of each of the states. There have been calls for an umbrella code for years, and some codes art even designed to speak for the profession, rather than the uniqueness in the dis cipline or organization of the sponsor. Nagging problems that are delaying uniformity range from mere recon ciliation of word interpretations, to pride of authorship or participation, to honest disagreement on scope or basic principles.
Despite the diversity, most codes address some common themes or pur poses:
To promote the salety, health, and welfare of the whole com munity.
To provide a basis for regulating actions of the profession, and to establish standards for its mem bers.
To strengthen recognition of the public for engineers at profes sionals.
To assure high standards of com petence.
To provide a basis for dealing with members who violate the ethics of the group.
Typical Raladewhlps
The influence of these code pur poses on the role and work of the en gineer can be indicated by a look at the typical relationships. Public rec ognition will be omitted since it is earned through understanding of the engineer's contributions which flow
/ 3Induttrkti Power Syiteiits June 1977
HONS 0 0 2 4 0 1
(ran ethical concern in hi> relation ship with other engineers, direct cli ent!, end employer* In e broad nw:
Thm anginaarto-anginaar relation ship tpane all rolee: coneultanu, em ployees, and employers. The body of engineering knowledge is created, maintained and shared, and the ethi cal standards of the profession are petceived and upheld by these ethical concerns lor fellow engineers singly and ss a group.
The anginaar-to-cliant relationship is at the very center of the moral responsibility that characterizes the learned professions: the client places his confidence and trust in the engi neer and is dependent upon the en gineer for depth of knowledge and Judgment, or for clear disclosure of uncertainties and limitations. The cli ent Is gravely dependent upon the competence and Integrity of the en gineer.
Tha enginear-to-ampioyar relation ship involvee a dual responsibility:
As an agent of hia employer, an engineer assumes the engineerto-chent role on behalf of his employer when he is providing dlrect-to-cllent engineering ser vices for the employer.
As with any employee, an engi neer is responsible for diligent, competent and productive work in support of hit employer. At a "professional" employee, the en gineer is also a functional ele ment of the enterprise, sharing In teamwork responsibilities with both engineers and nou-eaginaan and serving in the decision making structure of the organi sation.
I sense that the engineer-to-empioyer relationahlpa are the hast re solved and, therefore, of the greatest concern to engineers. And since the overwhelming majority of engineers an employees rather than consulting engineers, principals, partners, or of ficers of their firms, the area deserves more study.
The Engineer's RespoasMIty
The ultimate responsibility for products or services rests with the principals, officers and managers of the enterprise, or others to whom they have delegated special responsibility and authority, in this light, engineers in their specialist, manager, and offi cer roles have clear-cut responsibili ties in support of their teammates and the enterprise:
Where engineers have final deci sion-making responsibility and authority, most all of the codes of ethics are adequate in provid ing guiding principles.
neering practice give legal status to some code or title that may be en forced legally. The NSPE Coda and those of some states forbid the engi neer to solicit dhect-todieat basiaem on the basis of pries--a matternow in the courts. Some legally enfoscaabla codes require an engineer to report to the appropriate lepl authority any incident where hia judgment has been overruled and he look that this could endanger the client or the public. No one would ever deny any engineer's basic moral responsibility for the safety and welfare of the public. However, the specific requirement is without regard to the respective ac countability and qualifications in the engineer-employer relationship.
Where decision-making responsi
bility and authority reside else
where, the codes are not so dear.
Here engineers have another du
ality in respouaibiiity:
-
It is in these last areas that we need
more study, dtscussioa and documen tation of principles in the codes.
--competent and complete infor mation and advice to the de cision-makers through the ad ministrative channels of the enterprise;
--loyalty and concern for the en terprise to the eztent of volun teering information and taking the initiative in persuading the decision-makers where there is reason to believe that factors have been overlooked or judg ment has been faulty.
This latter responsibility is an im perative for the engineer and the em ployer alike. In this age of special isation, an individual engineer may not see bow the engineering process conies together to eliminate faults. By taking the initiative with decision makers, he can, as be must, satisfy his concerns. On the other hand, the indi vidual engineer's own work or obser vations may uncover limitations that might take time or resources to cor rect at a later date, so early disclosure is an imperative to the decision maker.
The code of ethics scene is not at all clear on these matters. For example, state laws governing registered engi
By and large, engineers have had a good sense of their ethical standards. Recent public surveys show trust in engineers at the top of those in pubic service. But the ethic of the engineer is to keep it that way. The inrreaaiag dependence of society upon technol ogy, and the added trust this entails,
make engineering ethics a matter of public concern. As a response, it seems essential that the societies, an socistions and engineering nrganiis tions should undertake:
Continued effort to develop one basic master or umbrella code of ethics that is accepted and under stood by ah.
More study sad discussion to crystallise concepts of the indi vidual employee's reaponeablity and thorn of engineers in the em ployer's responsible managesteal structure.
Sustained effort to keep the coda
up-to-date by new concepts and
modifications that reflect chang
ing values end expectations of
society.
4 / Industrial Power Systems - Juno W77
HONS 002482
IEEE Code of Ethics for Engineers
EaglOMn effect the quality of life for all people In our complex tech nological eociety. In the punuit of their profeNkm, therefore, it la vital that engineer! conduct their work In an ethical manner ao that they merit the confidence of colleague!, employer!, client! and the public. Thti IEEE Code of Ethici la a itandard of profaaaional conduct for anginaera.
Arthkl
Englneen ahall maintain high atandarda of diligence, creativity and pro ductivity, and ahall: 1. Accept reaponaibillty for their
actiona;
2. Be honeat and realiatlc in auting claim! or eatimatea from available data;
3. Undertake engineering taaka and accept reaponaibillty only if quali fied by training or experience, or after full diedoeure to their employert or clients of pertinent qualifications;
4. Maintain their professional skills at the level of the state of the art. and recognise the importance of current events in their work;
5. Advance the integrity and pres tige of the engineering profession by practicing in a dignified manner and for adequate compensation.
Artteiell
Engineers shall, in their work: 1. Treat fairly all colleagues and co
workers* regardless of race, reli gion. sex, age or national origin; 2. Report, publish and disseminate freely Information to others* sub ject to legal and proprietary restraints.
3. Encourage colleagues and co workers to act in accord with this Code and support them when they do so;
4. Seek, accept and offer honest criti cism of work, and properly credit the contributions of others;
5. Support and participate in the activities of their professional societies;
6. Assist colleagues and co-workers in their professional development.
Article UI* 1
Engineers shall, in their relations with employers and clients:
1. Act as faithful agents or trustees for their employers or clients in professional and business matters,
provided such actions conform with other parts of this Code;
2. Keep information on the business
affaira or technical processes of
an employer or client in confi
dence while employed, and later,
until such information Is properly
released, provided such actions
conform with other parts of this
Code;
_
3. Inform their employers, clients, professional societies or public
agencies or private agencies of which they aremembersor to which they may make presentations, of any circumstance diet could lead to conflict of interest;
4. Neither give nor accept, directly or indirectly, any gift, payment or service of more than nominal value to or from those having business re lationships with their employers or
clients;
5. Assist and advise their employers or clients in anticipating the possi ble consequences, direct and in direct, immediate or remote, of the projects, work or plant of which they have knowledge.
Article IV
Engineers shall, in fulfilling their re sponsibilities to the community:
1. Protect the safety, health and wel fare of the public and speak out against abuses in these areas affect ing the public interest:
2. Contribute professional advice, as appropriate, to civic, charitable or other non-profit organizations:
3. Seek to extend public knowledge and appreciation ofthe engineering profession and its achievements.
In an important action, the IEEE
Board of Directors adopted an IEEE
Code of Ethics for Engineers at its
meeting of December4,1974. The new
code resulted from the combined ef
forts of a number of volunteer Com
mittees and Boards within IEEE,
specifically the United States Activi ties Board (USAB), USAB'i Ethics
and Employment Practices Commit
tee, the Executive Committee and its
ad hoc Committee on Ethics, and the
Board ofDirectors. In addition, expert
viewswere obtained from theCommh-
tee on Social Implications of Tech
nology xnd many other IEEEorganisa
tions! units.
.......
The adoption of this Code is a sig
nificant step forward in the area of professionalism. It is responsive to
the decision of the voting members in
1972 that one of the Institute's con
stitutional objectives should be the
establishment of standards of ethical
conduct. 1 urge every member to read and reflect on the contents of this liv
ing document with great care, and
invite individual comments.
a
AMhwP.Swm, 1973 Imtiom FmHom
Ropriiuad from IEEE SPECTRUM. VoL It No. Z Fabrmry 1973. p. S3 Copyright 1973 bp tha fnatttuta of Ebetrkot and Elattromc Sngmaan, /nr.
FEINTED IN THE U S.A.
5IncftfftrfcWPDwwr Syttmmt-Jun* ff77 j
HONS 002463
Silicone Dielectric Fluid: A Replacement for Askaiel
by John C. Crouse and James P. Kinney, Jr.
lor over 40years, (he transformer industry has used a nonflammable di electric liquid, known genetically as "askarel". for indoor transformer in stallations or other locations where fire safety was important. Askarel which has been used by transformer manufacturers under several brand names consists, in part, of polychlor inated biphenyls with four or five chlorine atoms per molecule. It has been found that if allowed into the en vironment polychlorinated biphenyls will persist for a long period of time and have certain adverse effects on the environment. As a result, manu facturers have intensified their search for alternative liquids to replace the polychlorinated biphenyls.
In undertaking such a search. Gen eral Electric enumerated certain ba sic requirements that included not only the normal transformer opera tional and safety requirements, but also the expected environmental re quirements. The safety and environ mental needs require that the fluid:
Be nonflammable or nonpropa gating.
Be environmentally acceptable.
Have a low order of toxicity.
lehaC. Creese Development Engineer
Medium Transformer Department
Rome, CA
The transformer operational appli cation requires that the substitute fluid:
Have satisfactory physical prop erties.
Have adequate dielectric strength.
Be compatible with the insula tion system.
A great number of potential liquids were screened using the basic require ments noted above. Some of the more promising fluids were subjected to a series of comprehensive tests to de termine their suitability as a substi tute. or alternative, for askarel. As a result of the comprehensive testing, one fluid emerged as the leading alter native -- 50 centistoke viscosity polydimethylsiloxane. This silicone fluid is a clear, colorless liquid having low surface tension, outstandingchemical resistance, good oxidation resistance, and small changes in viscosity with temperature. The chemical structure is shown in Figure 1.
Physical Properties
To form some judgment of the abil ity of silicone to meet the safety re quirements for indoor transformer installation, a series of catastrophic failure tests were conducted. These were designed to test the tendency of
hot (1350 liquid expelled from a transformer tank during a severe elec trical failure to ignite combustible materials in the vicinity of the tank. The combustible materials used were panels of plywood, cardboard, and polystyrene foam.
The mineral oil test produced a large fire-ball and spread burning liq uid in a 30-foot radius of the test tank. The cardboard and polystyrene panels were completely burned by the flaming mineral oil. There was some burning on the plywood panel.
Although all three panels were soaked with silicone liquid during the silicone tests, none of the panels showed any signs of burning. The per formance of silicone in these tests was comparable to that of an askarel.
The photographs shown in Figures 2 and 3 were taken during the tests of mineral oil and silicone, SF*97(50), at the same elapsed time from the start of the test. One can easily see the marked difference in performance be tween mineral oil and silicone.
Silicone fluids have been used over a long period of time in non-electrical application: and from a paper pub lished by the Office of Toxic Sub stances, it is apparent that these fluids present no appreciable threat to the environment.1 As far as toxicity is concerned, this does not appear to present any problem as silicones have been used over a tong time period in
KImm;, Ir. Development Chemist Medium Transformer Department Rome, CA
6/ Industrial Pomr Syitemi '
Fig, 1. The chemicalstructure of dlmethyt-sIHcone fluid, a eheruetive for askarel. HONS 002484
77
Fig. 2. Results of the miners! oil test, where cardboard and polystyrene foam were completely burned.
FIr. 3. An Identical test using slHcone fluid, where none of the test panels showed signs of burning.
facial cosmetic applications and in applications involving direct contact with foods.2
To sum up. as far as the safety and environmental needs are concerned, silicone fluids are nonpropagating, environmentally acceptable, and have a very low order of toxicity.
Dielectric Strength
How does silicone fluid meet the requirements of a transformer dielec* trie? Table I gives a comparison of the physical properties of silicone fluid with mineral oit and a typical askarel.
A major difference between the
fluids is the viscosity versus temper* ature characteristics.' The higher vis cosity of silicone fluid at tempera tures above 25C has a major effect on its heat transfer characteristics. By proper design of the transformer cool ing equipment it is no problem to obtain the standard temperature rises over normal ambients. However, this difference in viscosity does present a serious problem when considering the retrofilling of an existing askarel transformer with silicone fluid.
The higher coefficient of thermal expansion for the silicone fluid re quires an adjustment in the design to take into account the greater rise and fall of the liquid irvnt r its
HONS 002485
peeled temperature ranges. It is par ticularly important that this charac teristic be considered so that under very cold start-up temperatures the live parts inside the tank will not be exposed. The pressure increase at the high temperature is minimized to a great extent by the greater solubility of the air. or nitrogen, in the silicone fluid.
Silicone fluid has considerably less lubricity than either transformer oil or askarel. While this may not seem of major importance, we have found that it was necessary to take this charac teristic into consideration when de signing a tap changer that must oper ate in silicone fluid. A characteristic
r /items-Jun* 1977 I 7
tabu 1 PHYSICAL PROPERTIES OP SILICONE, MINERAL OIL, ANDASKAREL
SHfeone
Mintrat OH
Askarei
Viscosity, csntlstokss st 26 C ateoc
60 cs 20 e
100 cs 2.7 cs
12.0 cs 4.2 CS
strength of silicone was much higher than that of oil or askarei. The break down strength of silicone impreg nated kraft paper was lower than that of oil or askarei impregnated paper. The positive polarity impulse creepage strength of kraft pressboard was
Plash point opon cup Firs point, ootn cuo Ul flammability rating
Oxygsn Index Sotclflc gravity at 29 C Cooffldont of oxponslon
cubic cont/cubic csnt/C Pour point Soiling mops
290 C 316 C . 4-5 21.4
0.96
146 C 160 C 10-20 16.8 066
no true hash point non* to boiling point
2-3 378
15
0.00106 cc-C 0.0007 cc-C
-55 C
-56 C
nono
260-370 C
0.0007 cc-C -40 C
200-301 C
lower than that of pressboard in oil or askarei. Since silicone fluids do ex hibit different dielectric characteris tics than oil or askarei. it is necessary to design a silicone fluid transformer taking these differences into account.
Because the negative impulse strength of silicone was found in many of the tests to be considerably higher than the positive polarity strength, it is suggested that (he purchaser of a sili cone filled transformer who wants an impulse test specify that a positive
polarity impulse test be performed. Normally, negative polarity impulse tests are performed on oil and askarei
transformers. The standard practice
that is important when considering with and submerged in silicone fluid for positive polarity impulse tests is
retrofitting existing units is that some are summarized in Table 11.* *
to apply chopped waves at the same
tap changer mechanisms used in oil
In many of the tests, the dielectric level as full waves.
and askarei transformers were found strength of silicone fluid was similar to
to bind or hang up when operated in that of oil and askarei. However, sig
tiUcone fluid.
nificant differences-were observed for - --Insulation.System Compatibility
The dielectric properties of silicone some of the tests performed. The neg
fluid and of kraft paper impregnated ative polarity rod-to-plane impulse
Compatibility testing and thermal
aging programs of (he insulation sys
tems were undertaken and showed
TABLE II DIELECTRIC PROPERTIES OF SILICONE, MINERAL OIL, ANDASKAREL
that silicone fluids can be used with practically ail materials commonly used in the construction of trans
Dielectric constant 28C 60 Hi Impulse Sreehdown
Uniform field. 0.1 in. gtp (ASTM 01016 electrodes)
Non-uniform hold Rod-to-plane, 0.6 in. gsp
Negative polarity Positive polarity
Impregnated Kraft paper Round edge tltctrodt, 2 0 in. diameter
0.010 in. thickness 0.002 In. thickness
SMoone 2.7
136.4 kV
206.6 HV 00.6 kV
38.4 kV 134.0 kV
Mineral Ol
2.2 142.0 kV
107.0 kV 90.9 kV
43.0 kV 102.0 kV
Askarei 53
153.3 kV
119.0 kV 114.0 kV
49.0 kV 163.0 kV
formers. The one example of incom patibility is silicone rubber gasket material that is often used in askarei transformers. In contact with silicone fluid, the silicone rubber gasket ma terial will disintegrate rather rapidly.
Accelerated thermal aging studies
have shown the aging characteristics of (he transformer insulation system in silicone is similar to that in mineral oil. Thus, it can be said that a properly designed silicone fluid transformer will have the same life expectancy as an oil or askarei transformer.
Impulse creeoeoe on Kraft pnttboard. (2) siectrodas. 1 0 In. diameter, edge-toedge spacing, 3.0 In.
Positive polarity
00 Hortz breakdown disk tltctrodt. 0.100 in. gap
Impregnated Kraft paper rounded edge electrode 2.0 In. diameter
0.010 In. thickness 0.002 In. thickness
00.6 kV 36.0 kV
10.5 kV 64.3 kV
152.3 kV 35.0 kV
22.1 kV 77 0 kV
130.0 kV 35.0 kV
28.7 kV 86.5 kV
Silicone Success
We have recognized that, while the silicone fluid differs from transformer oil or askarei in some aspects, it can be used successfully as a liquid dielec tric and coolant in a transformer. By proper design, the transformer will have the same electrical and thermal characteristics as an oil or askarei unit.
8 / Induttrktl Power Systemi Jun* 1977
HONS 002486
transformers are now in service. Each
has passed the normal tests that are
performed on similarly rated oil and
askarel transformers. At the time of
this writing, there have been no ser vice problems. Typical silicone filled
transformers are shown in Figures 4
and 5.
In its Program Directive 100-54. the
Occupational Safety and Health Ad
ministration permits the use of polydimethylsiloxane fluid transformers
as equivalent to askarel transformers
in its enforcement of the National
Electric Code. The 1978 revision of
that code to be printed this year will
define, in section 450-23. a high fire
point, nonpropagating liquid such as
silicone fluid as suitable for indoor
installation without vaults. Major in
surance companies have developed
tests for determining acceptability of
high fire point, nonpropagating liq
uids for insurance when used in trans
formers installed indoors without
vaults. Several dielectric grade, 50
centistoke viscosity silicones, includ
ing GE SF-97150). meet the require
ments of these tests. Transformers
filled with silicone fluid meet the stan
dard test codes, satisfy safety require
ments, and are providing satisfactory
performance in service.
o
Fig. 4. This AKD-5 load-center unit substation uses a 1500 kVA iMkoat filled transformer.
MFfRINCI*
t. Philip H,. Howard. Patrick R. Durkin, and Arnold Hanchttt. Assessments of Ucuid Siloxanes (Silicones)", published by the Office of Toxic Sub stances tt EPA-880/2-75-004
2. Pood and Drug Administration. 21 C.P.R. Section 121 2819. "Oefoaming Agents Used in the Manufacture of Paper and Paper Board for Use in Packaging Foods-"
3. John S. Hurley, Jr. and Arnold Torkeion, Silicone Oielectric Fluids for UQuid Pilled Transformers," C-74 284-8, presented at the 1974 IEEE PE8 Winter Meeting, New \prk. N Y
4. Paul P. Ast, and John C. Crouse. "PQtydknethyituoxane at a Liquid Oi electric for Transformers: Electrical Breakdown and Dielectric Properties of tho Fluid and of impregnated Catluiesic insulating Materials," A-77 173-8, presented at the 1977 IEEE FES Winter Power Meeting.
8. Robert A Nelson. "Silicone Liquid Filled Transformers."' Paper pre sented at tha American Power Con ference. Chicago. >L. April 19.1977.
Fig. 5. This 2500-ltVA silicone filled transformer Is used In a 5 kV muster
unit substation.
,,ONS 002487
Industrial Power lyitcmi Jim* 1977 j 9
The Future of Industrial Power Delivery Systems
GUEST FEATURE
by Churks H. Titus
#ust as low voltage industrial dis tribution systems have increased from 208Y/120 volts to 480Y/277 volts, so have the primary industrial power de livery system voltages increased from 2.4 kV to 4.16 to 13.8 kV. There are indications that primary power sys tem voltages will continue to increase to 34.5 kV (and possibly to 69 kV). This higher primary voltage evolu tion occurs under the following con ditions: Reliable and economical cable and cable splicing techniques must be available.
Extruded solid dielectric cables for 34.5 kV (as well as 69 kV) are now available.
Switchgear should also be availa ble to adequately protect and con trol whatever primary voltage is used in industrial power delivery systems.
Metalclad equipment using va cuum circuit breakers is now avail able from 4.16 kV through 34.5 kV. Figure 1 shows a new POWER/ VAC* circuit breaker that permits the construction of metalclad equip ment at voltages from 4.16 through 13.8 kV.
Through the use of special surge suppressors connected from the load terminal of each circuit breaker to ground, previous concern about tran-
* Rsgittmd Itadcmark of General Electric
Chart** H. TthN Consulting Engintrr Snitehgtar Business Dtpanmtnl Phikuhlpkia, PA
sient voltages has been eliminated. Since POWER/VAC equipment limits transient voltages to values less
than those encountered in previously used switchgear, this new POWER/ VAC equipment may be applied to any type of load circuit without fear of abnormal dielectric stress.
When conserving energy and re ducing electric power costs, the
transformer banks may be switched off when output power from the transformer is not required. While POWER/VAC switchgear is suited for this service, the increased switch
ing duty may have an effect on the life of transformers.
In the future, electronics will be playing an even greater role in the control of industrial plants and pro cesses. Low-level integrated circuits may be key elements in many elec tronic control systems. These cir cuits may be adversely influenced by harmonics, voltage regulation and transients which are present in the power system. Additional care may be required to be sure that transients created by contact bounce and-arc restrikes are minimized.
Industrial Power System* * June 1977
MQNS 002488
particularly when power-factorcorrecting capacitors are used in the
industrial power system. The future of static circuit break
ers is sometimes asked. Based on present technology, static circuit
breakers for power applications will be larger and more expensive than similarly rated electromechanical cir
cuit breakers. Their application will therefore be limited to cases where millions of operations or special con
trol of the load current is a primary
system requirement.
Arc furnaces and spot welders are known for their ability to produce
electrical disturbance such as lamp flicker on both industrial and utility systems. These disturbances have re stricted the use of arc furnaces on some utility systems. The new devel opments in static var control equip ment. however, ore changing this situation.
Figure 2 shows the solid state switching equipment as the heart of 1.1.8 kV 50 MVA static var control equipment. This equipment balances
out the lagging vars of the load on
each half cycle of each phase, there
by reducing (he system voltage varia
tions produced by rapidly fluctuating load current.
Minimizing voltage variations has
always been important for industrial
power systems. In the future it may
be even more important. Vacuum
circuit breakers and static var con
trol equipment will be essential ele
ments in the protection and control
of future industrial power delivery
systems.
-
Fig. 2. A 13.8 kV thyristor controller Is shown on the right. The upper of the two photos shows the thyristor panel In the drawn out position lor mnlntcnnnce. This equipment Is used to minimize voltage fluctuations produced by lumnces like the one at Tsgllaftrrl Italy.
HONS 002489
Industrial Power Systems 'June 1977 j 11
POWER/VAC Metalclad Switchgear Tests High In Reliability
hy Dr. Josef { rboneh
D
Xeseurchers at the Wilfred E. Skeats High Power Laboratory in Philadelphia have recently com pleted design tests on the first ratings of POWER/VAC * metalclad switchgeur. the most significant mediumvoltage equipment design in 40 years.
The Skeats Laboratory has the first test facility for 3200-MVA short-circuit capacity. It is also the first short-circuit laboratory with remote control circuits, the first laboratory with full-size synthetic circuits to test 20.000 MVA inter rupters, and the first with magnetic tape recording systems.
POWER/VAC metalclad switch gear itself. (Figure 1) continues this innovative tradition. POWER/VAC switchgear is a significant step toward the future because it comprehensively meets the industry standards, as well as achieving a new dimension in reliability.
This new product line utilizes the technical features of the POWER/ VAC circuit breaker while building upon the well-documented labora tory and field performance of Gen eral Electric vacuum interrupters.
Short-circuit Capacity
POWER/VAC switchgear is being carefully tested in accordance with the American National Standard In stitute's "Test Procedure for Power Circuit Breakers" (ANSI C37.091 and
" Registered Trademark of General Electric
V Dr. load Urbanek Manager-High Power
" Laboratory Sw itchgear Business Department Philadelphia. PA
i /,
Fig. 1. POWER/VAC switchgear takes a step into the lutnre by meetingIminatry standards and achieving a new dimension In reliability.
rules specified in ANSI C37.20,
"Switchgear Assemblies and Metalenck>sed Bus".
POWER/VAC switchgear is also rated according to ANSI C37.06, "Preferred Ratings of Power Circuit Breakers". Table I lists part of these ANSI ratings, for which the qualifi cation has already been completed. Testing for additional ratings will pro duce a complete line of POWER/ VAC metalclad switchgear.
Table I illustrates all the interrupt ing duties as required by ANSI C37.09 demonstrating short-circut capabili
ties for each breaker rating in each voltage class. Even though ANSI al lows maintenance between tests, nei ther equipment nor breaker needed uny maintenance during the test series (hat achieved these ratings.
The accumulated interrupted cur rent in kA iKSIl* without maime-
KSl is defined in ANSI C37.04-l%4 RI97f nd consists of "K " being ibe rated voltage range factor. "S'* being the ratio of circuit breaker asymmetrical to symmetrical interrupt ing capabilities and "I" is the rated shortcircuit current.
12 hKkntrM Power Systems June 1977
MONS 002490
TABLE 1 RATINGS COVEREO BY TE8TS, COMPLETED TO DATE
(Based on Table 2 ot ANSI C37.0S Schedule ot Preferred Ratings tor Indoor otlless Circuit Breakers) (Symmetrical Current Basts of Ratine)
Identification
Voltage
Rated Vetues Insulation Level
Current
Related Required CapeMHMee Current Values
Rated Withstand Test Voltage
Nominal Voltage
Class rms kV
Nominal I Phase
MVA
Ctass
Ratdd Max Voltage rms
kV
Rated Voltage
Rang* Factor.
K
Low Fre quency
Voltage rms kV
Impulse VoNage
Creel kV
Rated Contin
uous
Current at
80 Hs rma
Amperes
Rated Short-
ctreuit Current
(at Rated MaxkV) rmt
HA
Rated Max Voltage Divided
by K rms kV
Max 3 Second Closing
Symmet Short
and
rical time Latching
Inter Current CapoMMy
rupting Carrying 1.9*
Capacity CapaMRy Tkeaa
m (10) * TimetINMM
Rated Short-
ShortQreM
dreed
Cutrent
Current
rms rma rms
kA kA kA
4 IS 250 4.IS 250 4.1$ 350
4.te 350
4.78
4 78 4 78 4 76
1.24
1.24 1 19 1.19
19 19 19
19
80 1200 29
60 2000 29
80
1200
41
60 3000 41
3 85 38 38 58 3 86 36 36 56
40 49 49 78
40 49 49 78
72 500 7.2 500
8.25 8.25
1 25 1 25
38 36
95 1200 33 95 2000 33
65 41 41 88 66 41 41 68
136 500
13.6 500
13.8 730 138 750
IS 15 15 15
1.30 36 95 1200 16 11.5 23 23 37
1 30 36 95 2000 16 1V5 23 23 37 1 30 36 95 1200 26 11.5 38 36 50 1.30 36 95 2000 28 11.5 36 36 58
nanct was 4100 percent KSI com* pared lo the 400 percent required by the standards.
In addition, fault interruption data from thousands of sample tests of POWER/VAC interrupters have been accumulated to determine the statistical variation of this data. This might be the highest confidence level ever achieved in medium-voltage switchgear.
Capacitive Currants
Capacitive current switching capa bility is tested according to ANSI C37.073 reference.
However, twice the required num cuits. Additionally, considerable
ber of tests must be performed to single-phase data on individual
demonstrate a reliability similar to POWER/VAC interrupters has been that of fault-current interruption. accumulated to improve the statist!-
Though only the- general-purpose- -cal confidence levet.
circuit breaker ratings ias specified
The test circuits are designed to
in ANSI C37.0732) are required, cur meet the requirements of ANSI
rent was increased to 630 amperes so C37.073. However, extensive system
POWER/VAC could be qualified as studies determine critical system
defmitt-purpose breakers.
parameters not specified in the stand
With sophisticated instrumentation ards. These special circuit situations
in place, no overvoltages above 2.5 were also tested satisfactorily. per unit were recorded in the testing.
POWER/VAC switchgear has then
qualified not only for general, but also for definite-purpose equipment.
Inductive Load Currents
The capacitor switching tests were
Various transformer and motor
conducted in actual three-phase cir loads were simulated, including small
Industrial Power Systems Jun* 1977 /13
HONS 00249 L
inductive current switching loads, and tested with an extensive instru mentation, and computer analysis. Again, no unallowable overvoltages were detected.
As in the case of the capacitance switching program, the over-voltage protection of the POWER/VAC metalclad switchgear was connected during the test series. These surge suppressors provide power circuit loads with the highest quality voltage ever achieved from a transient stand point. (See References I, 2 and 3).
Insulation Laval
Extansiva dielectric test series on the various components, on the breaker and on the equipment are performed to ensure the reliability of the design. Tests were done at full ANSI ratings. During all the di electric tests, the surge suppressors were disconnected according to ANSI standards. Since these sup pressors actually limit surges to 15
to 37 percent of the ANSI ratings, this represents an extensive safety margin.
Other Tests
The qualification data reported
here is only a part of that information
compiled by (he Skeats High Power
Laboratory. (Test reports and com
plete documentation are on file with
the Switchgear Business Depart
ment.) The testing of metalclad
switchgear is an expensive and com
plicated procedure. A vast amount of
data concerning continuous current
carrying capacity, no-load switching
capacity and seismic and environ
mental behavior has also been ac
cumulated elsewhere by switchgear
development engineers.
All qualification tests reported
are part of a total program which
has as its objective the assurance of
the highest possible reliability for
the new POWER/VAC metalclad
switchgear product line.
REFERENCES
t Donald R Kurtz. Jan Panek. Charles H Titus, and George w Walsh. Wanslant Voltage Performance of Vacuum Mtalclad Switchgear ', presented at the 1970 IEEE industry Application Society Annual Meeting in Chicago, n. Conference Record No. 70CH1122-1IA. pd 872-877
2 Jan Panek and Edward J Tuohy Chopping of Transformer Magne tizing Currents. Part l: Singte-ohase Transformers F77 09001. presented at the 1977 IEEE PES Winter Meet ings in New York. NY
3 George W Walsh. A New Technology Station Class Arrester for Industrial and Commercial Power Systems '. presented to the 1977 IEEE industrial and Commercial Power Systems Technical Conference Pittsburgh. PA Conference Record No 7TCH11M-IA, PD 30-35
4 Charles E. Bedford and Gerald J Don nelly. "POWER/VAC MetalcladSwitch gear'. Industrial Power Systems Maga zine. September. 1976, dp. 0-9
14 I Indintrkil Power fyrrcmi Ju 1977
HOMS 002492
Co-location: An Economical Alternative Source of Steam and Power
______________________________________________________
by John M Kotocik
TIhe increased cost of energy has
intensified efforts by ail sectors of in dustry to use it more efficiently. Many industrials are also examining energy alternatives as gas and oil become progressively less available as indus* trial fuels.
Evaluations by most large indus trials. including those in (he petro leum and petrochemical industries, indicate that their future source of energy will be derived from coal. Whether that energy results from the direct combustion of coal or the con version of coal to synthetic fuels which can be utilized in existing equipment will depend upon the in dustrials' geographic considerations. However, investment costs for coal use will be higher than those of gas and oil-fired installations.
Some locations, such as Texas City. Texas and Lake Charles. Louisiana, have a number of large industrials lo cated adjacent to each other. In areas like these, there Is a growing interest in the economics of co-location, or joint industrial-utility ventures, as an industrial energy supply system op tion. In this alternative, the "central station,** either publicly or privately owned, would provide both steam and power to its industrial customers.
Certain industrials have been pro moting co-location based on evalua tions made years ago. Industry has been aware of the benefits of co-loca tion. and co-generation, for heat and power long before our government's recent support of this concept. The
Mm M. KovacNi Consulting Application Engineer
Thermal Power Systems Engineering
Industrial Turbine Sales 4 Engineering Operation
Schenectady. NY
principles involved in co-location are not new: they are an extension of sound engineering and economics which have been responsible for the installation of many in-plant power generation (IPG) systems in process plants requiring Targe quantities ofboth process heat and power.
Co-location evaluations illustrate that by-product power generation, the concept that has produced many eco nomic IPG systems, is economical. Furthermore, co-location makes sense as both fuel and purchased power costs increase in the years ahead.
The merits of co-location become obvious when the favorable eco nomics of integrating turbines sup plying electrical energy and/or shaft power into the energy supply system providing the plant's process heating needs are examined. Furthermore, evaluations must factor the varied needs of a combination of industries, such as pulp and paper, metals, or chemical, into the development of the central heat (steam) and power supply.
Industrial Energy Requirements
Generally speaking, most indus trial plant energy requirements arc grouped into two main categories: electrical energy and process heat. Electrical energy is defined as that required for such things as lighting, motors, controls, and for electrolytic processes such as aluminum reduc tion, and chlorine. Process heat is energy needed to perform functions at a specific temperature or range of temperatures such as drying opera tions in the paper industry, heating of process fluids in a refinery, or regen eration of catalysts. In process areas requiring heat at relatively low tem perature levels, such as the 250F to 500F range, steam at a suitable pres
sure is commonly used to supply the required energy. When high tempera ture levels such as 1000F to 3000F are required, direct combustion of fuel is usually the source of this energy. _However. since conventional indus trial power plant systems do not supply high temperature energy, our reference to process heat will be that energy which can be supplied as steam.
Modern Facilities
The energy required for several in dustries that are large energy users is presented in Table I. This data is for facilities based on today's process technology and energy costs. Also given is the energy available from pro cess or by product fuels as well as the by-product power generation avail able by expanding the steam required before it is discharged into the process steam systemfs).
This data implies that the refinery could provide most of its energy re quirements from by-product fuels, whereas the petrochemical plant and the steel mill could be exporters of by-product fuels. However, this is not the case since all three industries use most of their by-product fueb for di rect process heat, and that remaining for steam generation.
Much of the process steam demand for the refinery and petrochemical complex is generated through heat re covery associated with process units. This increased steam generation in process illustrates the gains in effec tiveness of energy use which now can be economically justified since fossil fuels are no longer inexpensive. Since these industries are essentially steam sufficient, there is no apparent advan tage of co-location unless these indus tries could generate excess power (at a more favorable fuel rate than (he utility) which could be fed into the utility system.
HONS 002493
Industrial Power fyitemi June 1977 / I 3
TABLE 1 ENEMY SYSTEM CONSIDERATIONS FOR MOOERN INDUSTRIAL PLANTS
Industry
Approx
Electric
Size
Total
Avg Proeeee Heat
Power
Net Heat Available
fnargy
(Steam) Demand
fteoulrod
From Byproduct
Required
(1000 Ib/hr / Steam Cond.)
(MW)
Fuels 6 Type
(MW)**
(M BHi/hr)*
Pulp 4 Paper
Chemical
Petroleum Refining
2000 ton/dey integrated kraft
mill
1000 ton/day chlorine
1100 ton/dey caustic
250.000 bbi/day crude Input
1800 880
1560
Petrochemical
large mixed
products complex
Steel Mill
8 million ton/yeer
1400 1960
210/475 psig. 705 F 625 / 165 psig. 425 F 370 / 69 psig, 339 P
240 / 150 psig. sat.
150/625 psig. 700 F 500 / 350 psig. 950 F 355 /150 psig. 420 F 110/ 60 psig. 325 F
65 / 600 psig. 700 F 680 / 200 psig. 465 F 160/ 70 psig. 370 F
750 / 225 psig. 550 F
94 810 M 8tu/hr
71 3
(berk 6 black liquor)
130 85 M 8tu/hr (hydrogen)
106
60 420 M Btu/hr (carbon monoxide)
37 0
110 2600 M Btu/hr (liquids 8 gaseous)
60 1
309 3060 M Btu/hr
36.7
(coke oven gas,
blast furnaca gas.
basic oxygen furnaca
gas)
'Electric power included baaed on 3412 Btu/kWh "Turbine Inlet steam conditions 1460 psig 950 F excapt for the Chemical industry which is based on 860 psig - 825 F
For the paper, chemical and steel Industries, purchased fuels are re quired to provide at least 40 percent of their process steam demands. Thus these industries would be likely candi dates for co-location.
Co-location at Existing Facilities
In existing industrial plants, the economics of co-location depend upon how effectively steam can be utilised in existing industrial equip ment. Those plants having noncon densing or automatic extraction steam turbine-generators would natu rally prefer retaining the benefits of by-product power generation. And in some plants, higher steam conditions are preferred to continue the use of mechanical drive turbines for critical process compressor drivers.
In most existing refineries and pet rochemical plants, fossil fuel firing is required for process steam generation since these plants were designed and built in the era of low energy costs. Thus, co-location at existing facilities may include these industrials.
Energy Supply System Options
Base Case
The alternative of the industrial purchasing all of its electric power and generating process steam is nor mally referred to as the Base Case (Figure 1 A). In areas where a reliable source of electric power is available, this alternative usually has the lowest industrial investment cost, but often operating costs are high relative to other alternatives available.
Generally speaking, this energy supply system will utilize several lowpressure boilers with sufficient spare capacity to permit continued plant operation at average and often peak plant steam demands when the largest boiler is out of service for inspection, maintenance and/or repair.
Industrial Power Generation
Those industrials with large process steam demands have an opportunity
--To integrate power generation with their process steam needs. These en ergy supply systems (Figure IBI gen erate steam at initial steam conditions higher than those required in process. (Typical boiler outlet steam condi tions being considered today are 895 psig-8.K)F to 1525 psig-955F). The steam generated is expanded in tur bine-generators or mechanical drive turbines before being delivered to the process steam header or headers. Power generated in this manner --that is without condensing losses --is usu ally referred to as byproduct power.
Noncondensing by-product power is generated at a fuel chargeable to power of approximately 4000 Btu/ kWh HHV. This favorable fuel chargeable to power is the primary reason why many industrials have found IPG a profitable investment.
The amount of by-product power which can be produced in a specific application is a function of the pro cess steam demand as well as the tur bine inlet steam conditions and the process steam pressure or pressures required. Low process steam pres*
16 / liKhntrM Power Syittms June 1977
MONS 002494
lures, high initial steam conditions, and a good feedwater heating cycle all contribute toward industrial energy supply systems with large quantities of byproduct power.
Some industrial plants include fos sil-fuel-fired condensing steam lurbine generating capacity in addition to byproduct power. The condensing power usually provides the flexibility required in many industrial plants to meet normal load variations without increasing the demand on the utility tie. In other applications, condensing power may be considered necessary due to local conditions such as con tinuity of service required, or avail ability of purchased power.
Besides noncondensing byproduct power, there may be some industrial plants where condensing power can be considered a byproduct. This is the case in those plants where process heat recovery produces either steam quantities greater than process needs or at steam conditions not suitable for process use. In these instances, heat recovery reduces process energy losses and converts a portion of the energy into shaft power in either con densing steam turbine-generators or mechanical drive steam turbines.
Table I presents the amount of by product power which can be gener ated for each industry based on initial steam conditions which are common ly used at the present time. Turbine initial steam conditions are 1450psig 950F except for the chemical plant which is at 850 psig - 825F.
Co-location
Another alternative would be to have a utilitiescompany, either a elec tric utility or possibly an industrial utility, devoted to the simultaneous production of both steam and electric power or co-generation for a group of industrials coupled closely to the util ity plant (Figure 1C). This approach would release the industrials from much of the investment cost for their process steam, and often, integrated power generating facilities. Sup posedly. if properly implemented, economies might be realized which would benefit the industrials served. Also, the efficiency of energy utiliza tion might exceed that expected if en ergy supply systems were developed at each industrial plant.
Fig. I. Three energy supply system alternatives: A. Bust Cose--the hwhwsrlal purchases aH electric power and generating process steam, B. By prtftlmct Power--the Industrial Integrates power generation and process
steam functions, C. Co-location-n Industrial utility produces steam and electric power simultaneously for a group of tadnstriab closely to the utility plant.
Co-location Considerations
Co-location of industrials with a central utilities plant providing pro cess steam and power imroducescon** siderations not encountered in the design of either base case or industrial power generation alternatives, or util ity power generation facilities. Some of the major considerations follow.
The Central Plant
The central plant must distribute steam at a pressure suitable for the tenant with the highest steam pres sure needs. Based on examination of pressure requirements for new as well as existing facilities of energy intensive industries, a distribution pressure of 650 to 750 psig should
be adequate for most potential ap
plications. Economics should favor by-prod
uct power generation in the central facilities. Thus, it is expected that initial steam conditions of 1450 psig-950F or higher can be justified. The amount of by-product power which can be generated in the cen tral facility will probably be less than the power required by the large industrial plants. Thus, either
condensing power generation and/ or a tie to the utility grid will be required to supply the balance of (he power required.
It is conceivable that co-location could attract many small industrial plants that normally could not jus tify in-plant power generation. The increased central plant steam base
would result in increased by-prod uct power generation. The total
N0NS 002495
IncftiffWo/Powerlyrtciiu-Amff77 M?
mount of by-product power gen erated wilt be function of the industrial steam demands and the distribution pressure selected. The merit of co-location will de pend on the disposition of the by product power generated in the central plant. Thus, alternatives where the central plant by product power generation is not credited to the co-located industrials will de tract from the economics. Economics of most large industrial
plants require an essentially uninterruplabie process steam supply system for profitable plant operalion. Thus, the steam supply system must he developed to assure a con tinuous supply of steam, even with a major equipment item such as a boiler out of service for mainte nance and/or repair. Although no detailed studies have been made, it is believed that the minimum total industrial steam de mand for co-located arrangements should be approximately 1 million lb-h. Since most large industrial plants are base load operations, (he steam demand should be relatively constant with expected variations of JO percent of the average value. Detailed steam distribution piping studies are required to define the maximum economic length of the steam distribution system. It is ex pected that two to three miles will be ecnomically justifiable in many locations. Many industrial processes use the latent heal from the process steam and have relatively hot condensate
IhUFI available for return to the central plant. At today's increasing energy coats, economics favor the return of this condensate to the central plant even if polishing is required before injection into the boiler feedwater system.
The Industrial Plant
Those industrials having by-prod uct fuels in excess of that required for their direct process heating needs will have to evaluate how to dispose of the excess. Some may find that the by-product fuels are saleable. Others may find it eco nomic to install steam generating equipment, thus reducing the pro cess steam demands on the central
steam and power facility. In still other instances, the by-product fuel
TABLS II SNSAOY MOUMSMSNTS COLOCATION CXAMPLB
Nat Process Heat Required (M>Blg/h)
19 psig
GllSptig # 08 ptig
__
Net Energy from 8y-oroduct Fool* (M Btu/h)
Not Heat from Co-located Plant (M Btu/h)
2730 980 1 MO
2600
2996
Fuat Required (M Btu/h HHV) By-product Power Generated (MW)
BASE
5640 0
6906 296 7
69TS 2975
BASiS: t, 7ft# ofata prasantad ere /ft# total raquiramants tor a group of mduatria/a adiacant to a cenfref facility.
2. 7ft# nat haat from the co-locatad plant includaa tha anargy raquirad tor by-product power ganaration atsociatad mth ataam receive# from tha
centra/ plant. 3. Fual raquiramants are based on 87 percent boitar afflciancy. Ftguraa
includa Influence to net heat from by-product fuels converted to equ/ve/ent
anargy from pwchaaad fue/s. 4. IPG and Co-fo cases use 1450 psig - 950F initial steam conditions. Tha
contra! facility axhauata ataam at 860 paig into tha steam diatribution system. Steam it received ar rfte induatriat sites at 900patg ana is anpanoaa to process praaaura levels in noncondensing steam turbine-generators, 5. Haatloasln tha steam diatribution ayatam ia 0.3 parcant (~4 9tu/lbJ.
may be supplied to the central plant for use in their boilers. Grass roots facilities will probably have steam supply pressures higher than that required for the initially planned tenant industrials. This would permit expansion of the number of industrials with a high probability that the steam pressure would be suitable for use by the new industrials.
In most instances, it is expected that the central plant and the steam distribution systems will be de signed to provide steam ai a rela tively high pressure, such as MX) psig. Since most industrial pro cesses require steam at pressures less than 200 psig, the opportunity to install steam turbine-generators and/or mechanical drive steam tur bines permitting some by-product power generation in the industrial plum exists. And economics should favor this approuch.
Co-located arrangements for ex isting industrials with in-plant power generation systems will favor continued use of the steam turbine units providing by-product power.
Economics of Co-location
The economic merit of co-location relative to the other alternatives avail
able to a group of close-coupled in dustrials is illustrated in Tables 11 and
II I. and Figure 2. This example is based on grass roots facilities being within one mile of the central utility plant. The average net heal required
in process, the contribution of by product fuels to the net heat required, the energy required from the central facility, as well as the by-product power generation, are given in Table II.
The annual costs given in Table 111 illustrate that co-location can be at tractive compared to the traditional in-plant power generation alternative even if the central facility costs are based on a fixed charge rate (FCR) identical to that for the industrial plants. The favorable influence of a lower FCR (18 percent versus 25 per cent) is also illustrated. The sensitivity of the results to both fuel costs and purchased power credits other than the values used to develop Table (If is illustrated in Figure 2.
The annual cost comparisons given in Table III and Figure 2 are based on no spare turbine-generator capacity. Thus, any turbine outage in either the in-plant power generation or co-loca tion alternatives would require an in crease in purchased power or curtail ment in plant operations. If back-up
was provided through purchased de-
18/ IndusirM Power Syttemt June 1977
MGNS 002496
mand at a cost of 55/kW/mo., the influence of 50 MW additfona! de mand to cover the largest steam tur bine-generator out of service would increase the cost of in-piant power generation and co-location alterna tives approximately 7c/million Btu required in process. This does not significantly alter the economic com parisons presented.
Other Considerations
Results illustrate that a co located arrangement of industrial plants with a central power and steam supply fa cility can be an economically attrac tive alternative, providing a suffi ciently large process steam demand is developed and other considerations which often govern the location of industrial plants can be satisfactorily resolved. Some of these considera tions include:
Cost of raw materials and delivery of products to markets.
Availability of water for process use.
Environmental considerations of a group of industrials at a single loca tion.
Right-of-way for steam and conden sate piping systems, roadways, as well as fuel transport and power distribution.
Other factors which will influence the decision include the possibility of process obsolescence.
Although the co-location example was based on the combustion of coat, other alternatives might prove eco nomic for certain site situations. For example, in highly industrialized areas presently using gas and/or oil as their energy source, economics may favor development of a large central facility which would gasify or liquify coal and distribute this synthetic fuel to the industrial sites for use in their existing equipment. Or. fluid bed technology developments may result In lower cost solutions compared to direct combustion of coal with SOa scrubbing of boiler stack gases.
Regardless of the type of co-located energy supply system which might be developed, the application of prime movers in these systems should con tribute to economic solutions which conserve our energy resources.
TABLE III ANNUAL COST SUMMARY - CO-LOCATION KXAMPLC
CASE
BASE IPO
CO-LO
Estimated Total installed Cost - S millions
Annual Costa -- s millions Fuel 681/M Btu Labor Makeup Water Limestone & Ash Disposal Maintenance 62.5 percent Pmw Q.lrlon Credit SS mlll./kWh Fixed Charges 625 percent
Total
Total 625 percent FOR Industrial 610 percent FCR Central Plant
Coet/M Btu Net Heat to Process 628 percent FCR
Cost/M Btu Nat Heat to Process 626 percent FCR Industrial 610 percent FCR Central Plant____
130 225 53 Industrial 162 Central Plant
47 4 500 1.1 18 1.2 1 8 22 32 33 56 NA (62.3)
32.8 66.3 88.0 64.2
2 18 1.66 (8/M) (8/M)
58 1 2.7 20
53.6 626
51 6
154 (/M)
1 27 (*/M)
BASIS:
1. Costs given are booed on 1978 ottimotot. No fntoroot during construction or Mdl.on tn Included. Spare boHot ctpoeUy permit, oporMon ot pom* steam demands with largest bolter out of service (peek lo 10 portent grwotor Uttn ovorogm volumtl SO, icrubbing ty.lmm con It bppmddMo* 110,000 pot U Btu bollor duly. Slnco by-product luolodbollon are MUM
In oil cases only the Increments/ increase In the coat of these units tor power generation it included.
2. 8400 hours per yoor operotion ot average process hoot demands. 3. Cost, 12,000 Btu/lb, 3 percent aultur, 10 percent ooh. 4. Total not hoot to process Is 4050 million Blu/h.
BASIS: 1. Induttriml pirn# fixed
charge rate (FCR) 25 percent. UtIPty plontFCR 70 percent
2. Tbtaf net heat to proa-- ter doth induotrtet sttea it 4890 million Btv/h.
5. Figure foffowfng IP9 and Co-to ktendheotien /a the crodlt oooigned to the by-product power generated In mm per kwh.
4. Sou Tebfee 0 ond PI for other supporting data.
Fig. 2. The net heel to process cost for various alternatives Is sensitive lo Ml fuel costs and purchased power credits.
HONS 002497
Indtntrkil Power jytfcitu June 1977 / 19
STEP: A Program of Improved Industrial Turbine-generator Maintenance
by Donald W. Brims*
Today's high value on production
time and energy cost places con* stantly greater emphasis on reliabil ity and availability of major power plant equipment. Because of this, the General Electric Company, in coop eration with industrial users, has de veloped a Steam Turbine Evaluation Program (STEP) which can improve turbine-generator reliability and availability.'
Today's demanding economic con ditions increase the need for longer intervals between major inspections and for selective sectionalized planned outages of relatively short duration. In addition, the need to maintain the improved efficiency de signed into the equipment at or near new unit levels has become a pri mary maintenance consideration. This change in mode of operation and equipment employed, has made necessary better plans for turbinegenerator maintenance. Also, prop erly operated and monitored units should not require shut-down and opening as frequently as in the past.
STEP Scope
STEP was first applied in 1972 and Is now in use on 46 Industrial steam turbine-generator units in 27 paper mills, representing over 1.000.000 kW in generating capacity. STEP is de signed for industrial units because the turbine-generator set, with its
DeaaM W. IrauM Msa#*r-- Modium Sinm/Mtchanica! Drivt Turbin* Srrvic* Support
Installation 4 Sarvie* En$in**rin$ Division
Sckantctody. NY
controlled extractions and/or straight non-condensing and condensing tur bines. represents a thermodynamic and electrical model in which the steam pressures, temperatures and flows, and kW measurements are commonly available, permitting ana lysis of unit performance.
Turbine-generator outages are pre dominantly caused by the effects of steam path deposits, water induction, lubrication and hydraulic system malfunctions, and control system deterioration. STEP makes regular checks and surveillance of com ponents and auxiliary systems where it concentrates on detecting de teriorating trends and conditions, and identifying probable causes to deter mine corrective and preventive actions.
Some of the operating characteris tics that reflect equipment condi tion can be obtained quantitatively by on-line measurements with tools or Instruments currently available. Other characteristics must be ob tained by qualitative operational observations of weir patterns, sys tem instability, leakages, etc. The data and observations are analyzed and interpreted, with the interpreta tion generally a comparison to ac ceptance values and standards, or the application of experienced judgment.
The STEP System
STEP consists of six segments.
Equipmentanalysis--Initially. STEP involves a careful study of a unit and plant conditions to determine whether a unit is suitable for STEP or needs action to upgrade the unit and plant auxiliaries, and operating conditions. Maintenance of station instruments in good working order or the provision of additional stationtype instrumentation is important since a major portion of STEP cen
ters on systematic data taking and comparison to base or previously acquired data.
Establishing the bast data--Once
a unit is placed on STEP, base data establishes a reference point from which all future comparisons of unit performance and auxiliary system monitoring will be evaluated. Base
data should be established as soon as normal stabilized conditions de
velop following startup or after each major internal inspection. Internal
inspections are usually performed consistent with normal customer
maintenance policy, although other segments of STEP might indicate
that an internal inspection is in order. Any known or marginal problems or conditions reported during prior
STEP activities should be resolved at the time of internal inspection.
The data base is generally re-estab lished after each major inspection. STEP can also be applied before an internal inspection by taking data,
examining the results, upgrading
where necessary, and retaking re
lated data.
'
Periodic operating suneillances-- This segment is the heart of STEP. It generally consists of three surveil lance inspections per year. These surveillance inspections identify and evaluate deteriorating trends, or significant, persistent step changes in operating parameters for the tur
bine-generator and its auxiliaries.
Comparison and trend analysis--
After each surveillance, operating data comparisons are made to both the previous surveillance and to the
base reference data. The results are then trended. These trend com parisons are the basis for the engi neering appraisal of all results, trends and their interrelationships.
Shut-down or start-up suneillances --This segment allows accumulation
and observation under other than normal operating conditions. In ad-
20 / kKktsUial Power Systcms Junt W77
HONS 002498
ditlon, protective device* which can not be tested during normal opera*
tion can be exercised. Perform* Ing checks a* the unit is being shut
down allows the use of corrective meeiures during a planned outage. Start-up checks, while covering the same areas as shut-down data and observation, allow observation of
any areas worked on during the outage.
Sectionalized maintenance plan-- Regular operating checks and sur veillance, and the troubleshooting experience gained should point to more intelligent planning and sched uling of maintenance. Priority at tention can be directed to compo nents or systems in which a "need to inspect" appears to be real. Initially, a sectionalized maintenance plan concentrates on establishing major
internal maintenance and inspection intervals for the turbine and removal of the generator rotor which are consistent with existing user commit ments and/or policies. With time, such a plan based upon time intervals can be tailored to suit unit experi ence and time available where this is practical. Subsystem inspection intervals are also established.
Analytical Procedures
Fig. I. The process measurements required lor an analytical performance
The process measurements re quired for an analytical performance evaluation are shown in Figure l. a double automatic extraction turbine. These processes involve tempera tures, pressures, and flows in each steam lead to and from the turbine, plus the factory-provided first stage pressure indication. All of these measurements are normally available in modern industrial plants.
Most calibrated station instru ments in good working condition are suitable for detecting significant changes and trends. It should be noted that the repeatability is much more relevant than absolute accuracy.
The analytical procedures used are structured to provide for the evaluation of the condition of the unit and of the probability of con tinuing reliable operation.
Section Efficiency
Fig. 2. Aaalyali ol wetkm .fflclncy nmltt.
Turbine efficiency is calculated by the enthalpy drop method using
pressure and temperature data from measurements in process piping.
Efficiency losses occur because of steam path roughness and area changes caused by deposits, steam path damage from ingestion of loose or foreign material and worn steam path packings.
A change in section efficiency is significant when there is a 10 per* cent change from base reference data, or a 5 percent change from last surveillance data.
Figure 2 illustrates analysis of ac tual section efficiency results. The --data is not only calculated as shown on the characteristic (left hand) curve; it is also normalised, cor rected to a common percent load point, to achieve a proper evaluation of the clearly deteriorating trend, as shown on the right.
HONS 002499
hiduftrktl Power Syittms Jun 7977 i ^1
Slog* Flew/Pmrart Relationship
Another normal trend is decreas ing efficiency caused by deposits as shown in Figure 3. The stage pres* sure and flow relationships are cal culated using first stage shell pres sure and flow data from the process. Losses can be from the same causes as for section efficiency deterioration.
Kilowatt Cback
This compares metered kilowatts to calculated kilowatts. The kilo* watt output of non-condensing tur bines can be calculated by means of an energy balance. This compari son checks the repeatability of al most all of the measurements in the process against a single stable watt hour meter.
Figure 4 demonstrates that unit A instruments are more reliable than those of unit B. The unit A kilowatt check is more consistent, its trend approximately a straight line. The check for unit B, on the other hand, shows no trend at all. While this information tells nothing about the unit's condition directly, the kilo* __. watt check is a powerful correlative
tool. Since the same temperature, pres
sure. and flow measurements are used to calculate section efficiency and stage flow/presaure, good checks as in unit A indicate that analysis of other results and trends are trust worthy. Indeed, they are reinforced. Scattered checks as in unit B. bring other results into question and might signal a need for instrument checks.
(In Surveillance Intervals)
Fig. 3. Decreasing efficiency caused by deposits.
effect as measured by the capability results.
Correlation of Rasuhs
A good correlation (Figure 51 might show gradually decreasing sec tion efficiency, with a a slowly de creasing stage flow/pressure func
tion. reduced capability, and a kW
check with insignificant variations. Steam path deposits are the corre lative factor. Steady kW checks tell the analyst that instrument re peatability is good and reinforces the analysis, which is also rational, since it agrees with experience.
Figure 6 is a duplicate of the pre vious analysis with the obvious ex*
rlampeUMllnny <v**x--tes1
A comparison of maximum power output under duplicate operating conditions Is a quick way to estab lish whether performance changes of any type have occured, since al most all physical degradations of the steam path affect either its flow passing capability or the efficiency or energy conversion. This compari son quantifies the aggregate effect of all of the changing factors affecting tha machine's output. When all instruments yield good data, it is possible to correlate the sum of in dividual effects with the aggregate
Flg. 4. Unit A InstraoMOts are more reliable tkaa those of mk I
22/ fnctotrio/ Pomr Systms hm 1977
HONS 002500
ceptions of the sharp excursions In stage flow/pressure and the kW
check. The previous analysis may appear
to be weakened because the new results do not seem to correlate well. However, a common denominator for both of the affected functions (and of no other) is flow. Therefore, flow measurements are primary candidates for instrument rechecks. Finding a bad flow measurement es tablishes that the analysis and corre lation are sound and convincing.
Thus, it is possible to monitor the
condition of instrumentation as well as that of the apparatus.
Borascoplc Inspections
Borescopic inspection can be con sidered within the context of analyti cal procedures. While the examina tion requires e shutdown, it can be brief, without opening casings, and largely justified by prior analyti cal review of performance results. The examination, in turn, has the potential for validating and reinforc ing the analysis. Thus, the bore scopic inspection and analytical ap praisal complement each other.
To properly accommodate the use of the borescope, the turbine must be equipped with adaptor fittings. Most GE Medium Steam Ttirbine De partment industrial units have been so equipped since 1973. Earlier units can be adapted in the field during a planned major inspection outage.
The borescope access openings Iso allow remote deposit gathering for chemical analysis. Thus informa tion is available not only on effi ciency degradation, but alio corro sion and stress corrosion problems associated with carryover of caustics, sulfides, and chlorides.
The final step in the analysis is the interpretation of all (he results. This is based on a knowledge of ma chine and process characteristics and practical experience in applying that knowledge to the specific field of steam turbine diagnostics.
Time (In Surveillance Intervale)
Fig. 5. A good correlation of results showing gradually decreasteg section efficiency, a slowly decreasing stage flow/pnnure lunette*, reduced capability, and a kW check with Insignificant variations.
the STEP process assists plant main tenance personnel and management in making planned performance evaluations, improving existing maintenance programs and extend ing major inspection intervals. This will aid in anticipating operating
problems, minimizing maintenance
costs, and anticipating parts needs
(hat may develop.
a
REFERENCES
1. Systematic Monitoring and Perfor mance Evaluation Can Ineroaaa Tbrbtno Generator Availability." by RE. Sparry, J A Carcich and CJ. Isak (GER306)
Conclusion
STEF performance evaluations can be a valuable addition to a steam turbina-ganerator maintenance pro gram. The information provided in
HONS 002501
Fig. 6. A duplicate o( tbe previous analysis wttb tbo obvious exceptfoua m the sharp excursions In stage flow/pressure end the kW check.
hniustriatPowvr Systems-Mmc 1977 23
l-*STf366-S0
' *mss suItl 5o iimanw iuo
ST tOUlS MO
BULK MTI POBTAQf MAID
CMtNtCTAOY. N. V. PERMIT NO. 100
GENERAL ^ ELECTRIC
QENEMAL ELECTRIC COMPANY ONE RIVER ROAD SCHENECTADY, N. Y. 12345
IN AKD-6 LOW-VOLTAGE SWITCHGEAR
^^lew GE AKD-6 Switchgear
incorporates field-pToven features along with new design advances that provide an equipment offering to meet all your needs for reliability, safety, maintainability, convenience and economy. And. to strengthen that reliability. GE AKD-6 Switch gear is not only responsive to ANSI, IEEE, and NEMA standards but ia now available U/L listed and U/L labeled. Additionally, a service entrance U/L label is available when required.
Other features which make AKD-6 the Switchgear easy to specify are:
A new. standard ECS solidstate trip device with built-in time delay.
Delay adjustment of narrow time-current trip bands.
An optional SST solid-state ------ trip deviee offering trip indi
cation for overload, short-circuit or ground-fault conditions. Standard closed door drawout breaker operation. Optional cable compartment isolating barriers. AKD-6 Switchgear maintains the same rugged, reliable construction now combined with new standard and optional features to provide the highest degree of service continuity.
SCO 344 9
MONS 002502