Document 1Q5EyzOm82BZor4gvbadV2Kmd

UNION CARBIDE CORPORATION ___________________________________________ Specialty Chemicals Division Sistersvil1e, WV MEMORANDUM TO: W. C. Nycz COPY TO: C. A. Gorrell J. K. Kyle N. C. Nil sen W. V. Summers DATE: January 11, 1988 SUBJECT: Three Year Plant Insulation Upgrade Program Insulation included in this program should qualify under one or more of the following criteria: 1. Insulation and/or equipment is obsolete or abandoned. 2. Insulation is of environmental concern. 3. Insulation is in serious need of repair or replacement. 4. Insulation is asbestos that is in an area of high mechanical disturbance. Job scheduling will have to give consideration to weather, equipment availability and job grouping for contractual purposes. Tentative schedules for first, second and third years are attached. Some jobs from first year will most assuredly have to be slipped into second year etc. This contractor will possibly be used on demolition projects. All asbestos insulation in the area of work will be labeled if it is not removed. This is to be done in such a manner that all remaining asbestos in the plant will be labeled by the end of this program. KB P/ rah Attachments K. B. Purinton UCC 007136 FIRST YEAR Job Description Est. Cost of Stripping *T-4, strip insulation 17,000 oBasement of Bldg. #1 36,000 Warehouse Steam Lines 20,000 *T-228, 559, 463 & 311 30,000 Lines W. of Poly I Drum 12,000 OLines from Bldg. 21 to K-17 9,000 *#1 Boiler w/2Tks & Pipe 45,500 Abandon Thermo Line {225') 6,000 OLines from T-279 to 496 10,000 Lines from Poly II N. 27,000 Lines in Tk Farm N. 8" Mill 14,000 Lines in Capper Prod. Area 50,000 Asbestos in Bldg. #43 39,000 !T-20ti, 215 & 226 Strip fM/ 20,000 *Is hard dollar bid Can be hard dollar on a per full bases !Can be hard dollar bid Est. Time Est. Reinsul. 2 Wks. None 4 Wks. 37,300 4 Wks. 26,900 1 Wk/TK 54,000 2 Wks. 1 Wk. 4 Wks. 1 Wk. None 2 Wks. 3 Wks. 2 Wks. ? 2 Wks. 3 Wks. None Date Available A/T A/T 3/15/88 Spring 4/15/88 Fall To Be Scheduled To Be Scheduled ) UCC 007137 SECOND YEAR Job Description Est. Cost of Stripping Est. Time Jobs not completed 1st year Misc. Tanks in Poly II Tank Farms CNT Tanks Tank Farm 5 Monomers #2 Graver Tank #3 Boiler Asbestos Lines Under and In Poly II Kettle House All Filter Area Tanks Poly I All Lines in Poly I Kettle House including K-56 Area ) Asbestos in Pipetrail from Poly I Area to Cyclic Area Est. Reinsul. Date Available ) UCC 007138 Job Description Jobs not completed 1st and 2nd year THIRD YEAR Est. Cost of Stripping Est. Time Est. Reinsul. Date Available ) ) UCC 007139