Mr. H. L. Reveal Building 202-1 South Charleston Plant
Mr. J. R. Hall Mr. G. F. Hurley
Mr. B. Y. LeiC*
Mr. H. L. Robinson Mr. J. K. Smith Mr. W. C. Young
P. O. SOX 8361. SOUTH CHARLESTON, WEST VIRGINIA 25303
Dre October 3, 1979
ori^rra.in, DPr Technical Center IH/EP
Sub|CCt
Asbestos - Stripping Old Insulation
PROJECT Suryey for asbestos exposure of Construction insulators and
laborers stripping insulation from a 4" by 1200' polyol filling line.
DATE OF SURVEY September 25 and 27, 1979
SUMMARY Good work practices and proper demolition procedures kept the
exposure to asbestos fibers to a minimum. The work is continuing along the back channel of the South Charleston Plant and will ter minate at the Tank Car Loading Rack on the mainland near the Automated Warehouse.
DISCUSSION Construction insulators are in the process of removing 1200
feet of insulation from a four-inch polyol filling line which is located on the south side of the Island Polyol Complex. This line when refurbished will enable the Shipping Department to load rail cars from the Polyol Unit.
The old insulation was wet down with water as much as possible and every precaution to reduce asbestos exposure to employees was
UCC 017344
Mr. H. L. Reveal
2
10/3/79
followed. These precautions include approved disposable dust respirators, coveralls, gloves, and bagging and labeling of stripped insulation for landfill.
The Technical Center Industrial Hygiene/Environmental Protection Department sampled the laborers who were bagging the stripped insu lation in the morning of September 25 and the insulators dismantling old unibestos-type insulation on the 27th. The results of the sam- ; pling are presented below. Also included in the sampling was a truck driver hired by an outside contractor to haul the stripped insulation to the landfill area.
Additional monitoring will be necessary to maintain compliance with the asbestos standard. The Technical Center Industrial Hygiene/ Environmental Protection Department will continue to monitor this stripping job.
DATA
Date
Personnel
Time
9/25/79 i V
9/27/79
1 1 I V
D. Kirk J. Chase D.M. Bourn T.J. Kennedy H.C. Bird*
0938-1029 0947-1058 0830-0911 0830-0911 0834-0910
Henson Trucking Company employee.
Air Sample Liters
102
142
82
82
72
Exposure Fibers/cc > 5 pm
0.38
0.13
0.80
1.10
0.80
REFERENCES
Volume 38C-29X4-Rla Asbestos Dust Determination by Membrane Filter Technique Using Phase Contract Microscopy
REPORT PREPARED BY
G. W. Bott Technical Center Industrial Hygiene Department
Mr. H. L. Reveal APPROVED BY
6. F. Hurley
GWB/sc
-3-