Document 1E91ND0a0N56dY2o0MeBBkJ5
Interoffice ilemramtaiL.
TO (Naina ana Location)
L. W. Hartman
FROM (Nimi and Location)
E. R. Lock
DATE
7/26/83
REFERENCE NO.
ERL-10-83
Dr. D. 0. Anderson conducted the Asbestos Training on 7/22/83. Those in attendance were: C. L. Horn, F. Hernandez, D. J. Johnson, G. Munoz, J. G. Shafer, and E. R. Lock from Celanese. Those from ABI were Joe Green, Robert Mendez, and W. e. Clark.
D. 0. Anderson will supply the needed special clothing & equipment and protective equipment. He will also furnish the asbestos construction tape for barricades.
He -cautioned against the use of tobacco in any form while working with asbestos.
Up to five feet of any kind of asbestos insulation can be removed by anyone. Over that amount will be removed and disposed of by the above by complying with RFS-580-83. Maintenance or ABI will bag the asbestos (after it is analyzed) and place it in a marked hazardous waste drum west of B-149 or B-160. The as bestos procedure will be:
Have the material analyzed. If asbestos:
Wear coveralls (special from D. 0. Anderson),
Shoe covering (special from D. 0. Anderson).
Goggles, mask, gloves
Control the dust while removing the asbestos.
Bag the asbestos and dust.
Place the bags in drums and label the drums. Anderson will furnish the labels and tags.)
(D. 0.
Remove protective clothing and place in a bag. If dis posable, place the bag in the drum with the insulation, if not, the supervisor will have them laundered. Shower before returning to other assignments.
ERL/jb
007231