A meeting
effort to
was held in correct the
reported on September
Mr. Menz's office to report asbestos problem in our inspection 6 1973. The following action
1 Investigate the thickness of our lining with the possibility of cutting down on the amount of lining to be ground
During the months of September and October we were
grinder cuts in an effort to cut down on the amount
the lining however the sample reading was 11.8
ran
it through the new vacuum and brush machine the reading at this
time was 9.3
2 Set up a grinder similar to the one in our Cleveland Plant
In the first week of October the
the ones in Tennessee
reading of 22.8
and
lining
grinders were arranged run was inspected with
similar to an asbestos
3 Install new fans motors and increase duct sizes on the grinders
According to upon receipt
Dave
they
Stone shall
the fans and motors have been
be installed immediately
ordered
and
Further action to be taken under No. 2 above - Dave Stone is going to install jets on the grinders similar to the Tennessee operation Upon completing this project the lining will be sampled
issuedwas further decided at the meeting that protective to the inspection department handling Ford