SAFETY AND HOUSEKEEPING ACTION COMMITTEE April 30, 1976 ACTION REQUEST
Over an extended period of time, you have all been involved in a concerted effort to control the installation and use of ball valves. This action request is intended to be a final followup to implementation of our applicable P-Bulletin (P--013^) to verify completion of actions required by previously committed dates (attached) and to solicit comments regarding the effectiveness of our current procedure.
In reviewing actions taken in your applicable areas, check your current status vs. the five key points of the P-Bulletin, as follows:
1. Instrument manifolds design.
2. Proper use in open-ended hazardous services.
3. Use of lockout devices where necessary.
4. Survey to insure open-ended connections are not plugged where removal of a plug could expose personnel to hazardous conditions.
5. Removal or replacement of ball valves in "low-use" services.
The SHAC committee interprets this bulletin to require ready availability within the unit of lockout devices capable of effectively locking ball valves in the desired position during maintenance. Examples of suitable lockout devices are available in several units in the plant and will be on display outside the Cafeteria about mid-May.
While questionnaires are attached to all copies of this request, I expect one answer from each area containing ball valves to be returned to me. The operating supervisor, or equivalent, will be responsible for completing the status report/questionnaire and will return it to me by May 14.
During the guest inspections scheduled in mid-June, inspectors will be specifically looking for implementation of this procedure during the course of their inspection.
gk Attachments
Harold Lac^iiMl
Chairman. Safety and Housekeeping Action Committee
SC 13470
LAM014690
CHECKING BALL VALVE HANDLES FOR COMPLIANCE WITH PLANT PROCEDURE P-Ol3*4 (12/15/75)
Area
Response
Dept 10
(MH)
Dept. 13-1*4
Dept. 15" 16
(SK)
Dept. 19-25-27
(RTH)
Dept. 2*4
(REW)
Dept. 33
(ARW)
Dept. 35
(TEK)
Dept. 4*4, 45, 46
(CMH)
Dept. 48
(LJP)Ph.
Dept. 50
(NLR)
Dept. 53
(TSH)
Distribution Dept. (JER)
Dept. 56
(JTS)
Central Shop,
Valve Shop,
Garage, and
Sandblast Fac.
(JMG)
Utilities Area
(JBC)
Labs 6 Environmental
Control
(ERH)
Labs
0. W. Cooper
E. R. Beaver
H. Epstein (Res. 2)
J. L. Slate
B. L. Jacob
W. G. Bauer
Plant Air
(REW)
Primary Waste
Water Treatment
(JBJ)
Construction
(GLC)
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Yes Yes
Yes
Yes Yes Yes Yes Yes Yes Yes
Yes Yes
Working
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Yes Yes
Yes
_
Yes Yes Yes Yes Yes Yes
Yes -
Estimated Completion Date
1/30/76 3/31/76 6/76 3/15/76 1/19/76 2/1/76 6/1/76 3/1/76 6/76 6/7/76 1/30/76 6/1/76 1/15/76
Completed 12/31/75 1974 (reinspected 1/13/76)
1/22/76
No valves used in Lab 1205, 1206 2/15/76 1/20/76 1/12/76 MR0 issued to change out 12/29/75 Completed 1/20/76 1/19/76
1/19/76 No valves used in his area of '-;.Jponsibi 1 ity to-date
gk 1/27/76
SC 13471
LAM014691
BALL VALVE QUESTIONNAIRE 1. a. Have you completed replacement (where necessary) of ball valves to
fit current requirements? b. If not, what percentage of valves are now in compliance? ___________ c. Are you on target for completing installation as reported 1/27/76
(See attachment) 2 2. Approximately how many valves did you replace within the last year?
a. Instrument manifolds . b. Process service . 3. a. Do you have lockout devices available in your unit? b. If so, briefly describe basic design. ____________________________________
c. If not, what are your plans for making these available?
4. Are bull plugs removed from open-ended lines where their use constitutes a hazard?
5. What do you consider the most serious hazard you have corrected by changing ball valves to conform with our current standard?
6. By changing valve handle design, what difficulties have you encountered in determining ball valve positions, and how have you overcome them?
SC 13472
LAM014692
Ball Valve Questionnaire
-2-
7. Any other comments regarding this program?
April 30, 1976
HL
V30/76
SC 13473
LAM014693
r
'SAFETY AND HOUSEKEEPING
ACTION COMMITTEE
S HRC t
J. V. Cavender J. A. Glass
-- 2R-21 -- 0-22
C. C. Hebert H. M. Lacy
-- 2Z -- OA-3
G. L. Stacy J. M. Tissue
-- 0-11 -- 0-4
ACTION REQUEST
R. F. Arnold SMD A. J. Bolton ID K. H. Morel 1 11
E. F. Gorcyca
13D
C. Jackson
0A-16
G. A. Orum
SS-15
,J. P. Irwin
SMD
J. F. Carl isle
0A-5
V. P. Osburn
2Z
S. E. Knipling
16D * F. E. Grissom
0A-4
W. L. Riddick
1Z
D. D. Kos
.
I0D
P. S. Gupton
0A-16
L. Schwab
SS-29
G. L. Stacy .
0-11 ' B. J. Harrell
ID
E. M. Travis
1Z
J. P. Hickman
0A-16
P. K. Saunders
1Z
E. G. Fiesinger , `35LD
0$: . M. `"Hancock
~'f :'vR A. Hernandez
! ' Johnson
Nelson *
**ij
Schlechte
1-M;R L Stuart . i % ;vh. Triplett
' ^ i50D
50D; ' j44D ' 35LD
_ OA-2 35LD
W. E. Repschleger :0A-5
' R. C. Turner
ID
N. F. Wood "-si'-- ; /.*
0A-3 i /
Sf w.'O^Pauer Wf.t 2R-42
!(-Mi P-18 : ' E. R. Beaver
i-;; 2R-3
.r
SS-26 ' j^R.-H. Benson ,-L
iR-io
0-21 M J." V. Cavender ; v 2R-21
T. G. Lyons ; J
CL-2 H1- H. L. Epstein ` ^ 2R-39
G. R. King
AB
W. R. Johnson
0A-7
R. G. McDonnell
0-21
' R. L.' Maute "
1R-16
K. F. Webb, .; ""'`3510
J. E. Robinson
0-18 r ' J. L. Masten ,
2R-2
L. Y. Saunders
CL-2 . R. A. Newsom \s
2R-29
$0.' w. Conrad
,W,J 19D
'Cooper\i;,^^j\ 1R-12
J.^Tissue^ >y, , \5-
>0 'a*.'- VV"
T.'S.1 Ha 11 e n :th<'*&$'530
R.L.Brownlng
0-4
\,,
K. K. Okamoto M L* Owen>
0-22 i'iV-M. D. Burns -
0A-11 ^ 0A-I1
v 0A-7
.^R. T. Hammann : :vv,.--: ll 90 . *
J. E; Clark
S
.$
''-'V- H. M. 'Lacy '^;;^#^0A-3,
- v-
vAD. J. ''Met herd ^;5/56D,.,
r 4';
..'uyi,;
^L. J. Povse/1!,-r;\56D
J
J. L. Rasmussen
0-6A
E. N. Steele
tv'A. R. Wilson ` ; 33D .i'.'
Charles Goode
. 0A-18 - J. C. Parks : ; A. Pinkerton L. Price v L. Roberts v
1$ '(.f1*,
PER . W. R. Rolingson
j^ OA-18 } T. J. Shuff
0A-7 1R-16 0A-1I LR-3 2R-3 2R-24
, 0. R. Wise .. _ `
; P-6 '' - J. M. Eason
1 fd
; W. A. Wall V 0A-19
T. C. Singleton G. 0. Smith
1R-- 15 1R-6
/;J. E. Bersuder
42D ; H.L. Schroeder
0A-19
G. L. Tromblee
0A-10
.. R. J. Burkett 420 C. E. Yoas V
0A-19
J. C. Trube
0A-10
^ R. W. Ceyanes
42D
v'V-
E. C. Maktn
1R-11
G. W. Hanks
' 42D
E. R. Albritton WG
G. L. Woffo.rd
P-19
J. L. Kilfoy
PEL E. P. Baily
2Z R. T. Eby
0A-10
R. V. Mullikin
42D
W. F. Bridenbaugh SS-18
R. J. Johle
2R-6
N. F. Broussard . SS--17
J. C. Cook
0-13
/
Bill Birdwel1 CED A. W. Kuehl
2-Z
R. C. Martini
CED
J. M. Gatewood
CD .
SC 13474
E. D. Moore R. Medina
CED T. A. Harper
2PD
CED C. C. Hebert
2Z
J. H. Jackson
420
L. W. Jones
42D
R. D. Rivero
2PD
. T. _P. Spruiel 1^
2Z
LAM014694