T}| MJoAf ftrtot of food o/ely
*t*iel o*e now covered Ijr Ferfe#ol foywfotiong. The**
not oWfdy in twi Softly Prict^ivt Wok will uhtmotely Wcomo port of owe peimoAeot softly rvlog*
TK*t gkovld now fce given special tmpKotil in our normal work proclicoi*
October l6 1972
GUIDELINES TON HAKRI.INC ArreHTOS MATERIALS t`
NO. l
'The Inhalation of asbestos dust say be Injurious to the health of our employees The following guidelines should be followed to minimize this exposure when asbestos naterlals liavc to be handled. Some examples of exposure are: '
, Installation of asbestos insulation.* 9
.\
. Hand sewing or cutting asbestos insulation.'**
**
*" **
* Removal (rip-off) of asbestos Insulation.**
*
. Cleanup operations involving asbestos'materials.
`
. Saving or cutting cement asbestos materials (Transitc, Marinitc, etc.). * .
The procedures to be followed -when handling materials that contain asbestos are:
1. Install signs to show asbestos dust may be present. (Jobs of significant size end duration only.) These signs can be obtained from No. 1 tool rosa. -
2. Schedule work to minimize number of people in area. All personnel whose y `presence is not required alia11 be restricted from the icaodiate area unless
" ' they arc pretested with approved *i-usc respirstrrs.
3. All personnel working In the area shall wear approved single-use respirators
(Symbol No. 77700-093).
.. .
* These respirators shall be discarded at.the end of the day or at the end of the Job, whichever is the shorter period. .
4 * Bnplo- y*ee should*.ad far as practicable stand upwind from source of asbestos * dust to minimize 'accumulation of-dust on clothing. .
9. Remove fibers and dust from clothing using a vacuum cleaner before removing respirators. Change coveralls as necessary.
6. Perform work in such a manner as to minimize exposure.
`
*
(a) Installation work
_.
18-0000793
1) Preeut and score asbestos, whenever possible, using bond saw with
*
*
*
* r a o *1 * <
507
o3* *
s
-2-
o
dust collector. When possible tills should be done at * location *
renote from other work.
.
2) rick up broken Insulation and scraps immediately and place In plastic bag*. Dampen asbestos to minimize Generation of dust'.
. (b) Removal of asbestos
1) Clip wiring on bonds bolding jacket.
2) Remove Jacket.
.*
3) Remove insulation in picees as large as practical. Cut or breek
carefully to minimize dusting. '':en practical dmapen insulation
to reduce dusting.
*
U) Place all material in plastic bogs (Stores Symbol Ko. 18103*003) for disposal. Where practical place drop cloths under work area to retain broken materials (i.e., on tower platforms, etc,, where
` material otherwise could be spread over several, levels). _ .
' . 5) Area should be cleaned up prior to lunch brrak and at end-of -shift. Dampen asbestos to minimize generation of dust.
(e) When insulation materials arc removed to do mechanical work and or:
replaced at end of job, ure asbestos-frrs materials for the replace*
ment.
*
(d) Do net spray asbestos materials.-
Do not use materials contiininc asbestos if
'ottos-free --
are available. The Baytown Refinery engineering specifications and purchase*
specifications have been chanced to specify acturlals that are "asbestos-free.
Zf a nonstandard material is required for a special job, asbestos-free ,
material should be specified on the requisition. All insulation supplied as
kits such as Rxomet* should be assumed to be asbestos unless the kit is
labeled asbestos-free.
'
All existing high-temperature Insulation should be assumed to b.e asbestos or to contain asbestos as a binder. -