R- M- Kountz - General Offices
December 8, 1969 PCB Incineration
TO : H. A. Vodden - RUABON
R. A. Baxter - RUABON D. S. Cameron - BRUSSELS T. W. Dalton - WGK D. B. Hosmer - GO J. C. Landwehr - ANNISTON H. L. Williams - ANNISTON R. E. Howard - GO
As a follow-up to W. A. Kuhn's letter of December 2, 1969, I can fill you in briefly on our activity in engineering for incinerating Aroclors.
Early last Spring, we began a survey to see what had been done and what could be done. From this we found: -
.
a) Process Research and Design at W.G. Krummrich had experimented with a Quartz tube and they had shown that organics could be destroyed at temperatures about 800 C. Of course, the resultant products were Hcl, C02 H2O and Cl2- Larger amounts of excess air caused oxidation of Hcl and resulted in a higher content of free chlorine.
b) We then made a survey of potential vendors of incinerators, firms for contract incineration and potential land-fill operations.
As you would expect, there are many vendors of incinerator equipment. Some of the more promising ones were:
Union Carbide Thermal Research & Engineering, and Prenco
The most promising firm for contract incineration was Rollins-Purle, Inc.? however, their first plant was scheduled to start in late December. Rollins-Purle have since announced that they are planning to build 20 industrial waste collection and treatment plants in the states. Rollins-Purle said they plan to use the experience and technique of Purle Brothers Holdings,Ltd., of London who reportedly treat 65% of industrial wastes in the United Kingdom which may be of particular interest to you.
We also found a land-fill operator, but this is of little
interest at this time.
'
c) We then sent some Aroclor samples to Thermal Research and Engineering for tests. They injected the material into a very small laboratory unit and reported that Aroclor 1242 will burn. However, additional fuel was needed to get and sustain ignition until an elevated temperature was reached.
MQNS 100157
Mr. H. A. Vodden December 8, 1969 Page 2
Stack gas samples could not be obtained from the small laboratory unit. They required $500 per day to enter their larger testing unit where stack gas analyses could be made.
d) We then surveyed the business group and local plant
and found that no -one was interested in pursuing
the problem further. Nothing was being collected
at that time for incineration. Other than keeping
abreast of developments, active work stopped on
incineration.
Interest has been generated again in incineration and we have started tracing our own original steps.
We will be checking Rollins-Purle's status and schedule for bringing their plants on stream. We understand that Westinghouse has a small incinerator under construction at Sharon, Pa. Marketing has been requested to project the products, locations and quanti ties of materials for incineration. Unless we find that adequate test work has been done, we visualize the need of a test program to establish the temperature-retention relationship for the various products. We feel that fairly large systems will need Hcl scrub bing facilities which will substantially increase capital and operating costs. Small systems can possibly stack Hcl; however
this may be dependent on state laws.
As we develop additional information, I will be glad to send you our developments if you wish.