Document 15GnDLXyvokdDG8r5p6VjnK3E

PROJECT ORGANIZATION AND PROCEDURE ( CEA 1430 Aroclors Expansion - New Tank Farm, Drumming & Flaking Anniston Plant PROJECT MANAGER - H. D. Gabelman DISTRIBUTION W. G. Adams C. R. Becker/j.A.Modica R. Q. Brown/P.E.Haase L, R. Burchfield R. E. Emling/O.F.Bremer F. W. Enoch W. C. Geil/R.W.Wind/T.A.Jackson J. E. Kehm J. L. Mathews/R.R.cook/j.R.Ful.lgraf J. R. Raymond H. W. Persons R. L. Sandstedt/R.B.West/j.F.Halla W. F. Taffee-Anniston L. H. Todd/H,,C.Browne/R.R.Hedieston H. E. Waldrep-Anniston (see note below) R. S. Yates NOTE; All transmittals to Mr. H. E. Waldrep are to be sent to to Mr. L. R. Burchfield until the project manager is notified that Mr. Waldrep is in Anniston. 0235*11 TOWOLDMON0044005 TABLE OF CONTENTS 1. INTRODUCTION 2. DESCRIPTION OF FACILITIES 2.1 General Description 3. PROJECT ORGANIZATION 4. SECURITY 5. REVIEW AND APPROVAL 6. DISTRIBUTION 7. PROCUREMENT 8. CONSTRUCTION 9. ACCOUNTING 10. PROJECT COMPLETION POP, CEA-1430 10/5/67 Page No. 1 1 1 2 2 2 3 3 4 4 4 APPENDICES Project Organization Chart - Appendix 1 Review and Approval Responsibilities - Appendix 2 Distribution of Design info for Comments - Appendix 3 Distribution of Project Info - Appendix 4 Distribution of Vendor Prints & Drawings for Approval Distribution of Vendor Final Prints, Drawings, Data - Appendix 5 - Appendix 6 Project Distribution List - Appendix 7 0235419 TOWOLDMON0044006 POP, CEA 1430 10/5/67 Page 1 INTRODUCTION This document describes the organization and procedure for the de sign, procurement, construction and start-up of manufacturing facilities at Monsanto's Anniston, Alabama Plant. Communication channels for approval and distribution of documents are established. Any suggested corrections to this procedure shall be brought to the attention of the Project Manager and all revisions will be issued by him. DESCRIPTION OF FACILITIES 2.1 General Description This project consists of expanding the Aroclor facilities of the Organic Chemicals Division at its Anniston, Alabama Plant by installing a storage tank farm for the various liquid Aroclors plus blending and/or mixing facilities; drumming and flaking facilities; and railroad and truck loading facilities Estimated project costs are: Capital $1,400,000 Expense 150,000 Total $1,550,000 Estimated completion dates: Start Field Work Deliver Storage Tanks Tank Farm Area Drumming & Flaking Area December 11, 1967 February 19, 1968 July 29, 1968 October 1, 1968 This project, to simplify control, will be considered as Area 01 in its entirety. PROJECT ORGANIZATION 3.1 Process design and engineering design of all facilities is be ing done by CED. 3.2 Procurement will be by CED, except for certain items. See Section 7 - PROCUREMENT. 3.3 Construction contractors for the plant site will be determined at a later date. 3.4 Cost accounting will follow CED procedures. See Section 9 - ACCOUNTING. 0235420 TOWOLDMON0044007 POP, CEA 1430 10/5/67 Page 2 3.5 Among the participating organizations, communications involv ing decision, approval or other action shall be through the key individuals named below: Between CED and Organic Chemicals Division: H. D. Gabelman and W. F. Taffee Between Monsanto and Construction Contractor: H. E. Waldrep and to be determined later 3.6 Appendix 1 is an organization chart showing key Monsanto per sonnel for this project. SECURITY 4.1 Monsanto employees shall maintain the security of proprietary information in compliance with the Monsanto Security Manual. Members of CED, when visiting the plant site, shall comply with security requirements of the plant. 4.2 Arrangements for admission of contractor's employees con nected with execution of this project will be made by Anni ston Plant Management and the Field Construction Superin tendent. 4.3 Permission to visit the plant site can be obtained from the following: H. E. Waldrep, Field Superintendent - All Visitors W. F. Taffee, Manufacturing Liaison- All Visitors REVIEW AND APPROVAL 5.1 To prevent delays of project execution, comments arising from review of drawings or other documents must be transmitted to the Project Manager within five working days from receipt of material for plant personnel and three working days for CED personnel. 5.2 On documents requiring review or approval from the Organic Division, initials of W. F. Taffee will indicate that con currence of appropriate operating and maintenance personnel has been obtained. 5.3 Review and approval responsibilities for this project are in dicated in Appendix 2. 5.4 The originating design engineer will transmit copies of de sign information for design review in accordance with Appendix 3. 0235421 TOWOLDMON0044008 POP, CEA 1430 10/5/67 Page 3 l 6. DISTRIBUTION 6.1 The originator of specification data sheets, process data sheets or drawings will be responsible for the final distri bution. 6.2 Project Manager will issue approved documents to Project Manual holders only. 6.3 Distribution, including number of copies of information gen erated for this project, is shown in Appendix 4. 6.4 Vendor prints for initial approval are distributed according to Appendix 5. 6.5 Vendor prints and data for final distribution are issued according to Appendix 6. 7. PROCUREMENT 7.1 The appropriate design engineer will initiate bid solicita tions and purchase requisitions. Bids are generally solic ited before design review is complete, however, design re view should proceed simultaneously with the bid solicitation. I 7.2 All purchase orders for numbered equipment items will require the signature of the Project Manager. 7.3 Instrument and electrical items will be purchased by the in strument and electrical engineers after approval of design basis by the Project Manager. Exception will be for major items which will require the signature of the Project Manager. 7.4 Procurement of the following will be handled by CED at St. Louis: 7.41 7.42 7.43 7.44 7.45 All numbered items. All instrumentation including panel boards. All major electrical items including feeder cables (check with H. E. Waldrep), lighting fixtures, thermo couple wire, motor control center and transformers. All pipe, valves and fittings except carbon steel pipe and valves 1" and smaller. All structural steel. 7.5 Bill of materials for piping and electrical items will be furnished by the AC&M and EI&U design sections to the pur chasing section. I 0235422 TOWOLDMON0044009 POP, CEA 1430 10/5/67 Page 4 7.6 Procurement of the following will be handled by the selected contractors subject to approval of the Construction Superintendent, H. E. Waldrep, and the CED Purchasing Manager. 7.61 Concrete. 7.62 Backfull. 7.63 Carbon steel piping and valves 1" and smaller. 7.64 7.65 7.66 7.67 7.68 Electrical conduit and fittings and wire except feeder cable. Sheet metal ductwork. Thermal insulation materials. All building items. Waste disposal piping materials. 8. CONSTRUCTION 8.1 Supervision of contract construction personnel will be exer cised by H. E. Waldrep, Field Construction Superintendent. Contact with the Construction Contractors or their employees must be through H. E. Waldrep or his representative. 8.2 Shutdowns for tie-ins to existing process equipment, steam mains and at the substations shall be scheduled by agreement with Mr. Waldrep and Mr. Taffee. Any delays in this area should be brought to the attention of the Project Manager. 9. ACCOUNTING 9.1 All field invoices, approved by the Construction Superin tendent, shall be forwarded to the Project Accountant for payment by Monsanto. 9.2 Accounting procedures shall be those specified by C. R. Becker, Project Accounting Supervisor at St. Louis. 10. PROJECT COMPLETION 10.1 Mechanical Completion H. E. Waldrep will notify H. D. Gabelman when an area is ready for process simulation. After such checking and re view as he finds desirable, Mr. Gabelman will notify Mr. Taffee. Messrs. Gabelman (CED) and Taffee (Organic Division) will then work out an agreement on the state of readiness of the area noting work yet to be done. This will be confirmed in writing. 10.2 Process Simulation The Organic Division will plan and perform process simula tion ("water batching"). H. D. Gabelman will review these plans and participate in the process simulation and arrange for participation of other CED personnel as required. 0235423 TOWOLDMONOQ44010 POP, CEA 1430 10/5/67 Page 5 10.3 Initial Operation The Organic Division is responsible for the initial operation of the facility. This is the early chemical operation of the facility in which each unit of the plant is operated, de bugged, if necessary, and put on stream. H. D. Gabelman will represent CED during this phase and will work out an agree ment with the Organic Division representative on correction of deficiencies made evident by initial operation. 10.4 Project Demonstration The Organic Division will carry out the project demonstration which is a planned operational run of predetermined duration. The objective is to produce material at the quality, yield and rate as specified in the Process Manual and Project Manual and in complete accordance with safety standards. H. D. Gabelman and the Organic Division representative will work out an agreement on termination of CED participation. This will occur when progress toward meeting the project objectives has reached the point where further joint effort is not warranted. The Division Representative will make the formal report. 10.5 Project Closing H. D. Gabelman will notify C. R. Becker, CED Accounting, when project demonstration has been completed and work out details of fiscal closing with Mr. Becker. In this project, tank farm facilities will be installed and placed in operation ahead of manufacturing facilities. A partial closure will be made when these facilities are completed. 0235424 TOWOLDMONOQ44011 APPEND, 1 PROJECT ORGANIZATION CHART POP. CEA 1430 1073/67 Page 6 ORGANIC DIVISION <- J. Cresce H. C. Carder PD&PM R. E. Howard R. P. Stevens ORGANIC DIVISION W. F. Taffee Project Manage H. D. -Gabelmsuf DIVISION REPRESENTATIVES PROJECT MANAGEMENT Field Construction Supt. H. E. Waldrep .t Design Coordinator*-- [J. R. Fullgraf |J. R. ^Raymond-4- Instrument Engr. P. E. Haase Electrical Engr. J. F. Halla project Purchasing Purchasing Specialists Proiect 'Expediter t J. E. Kehm Project Accountant *- J. A. Modica - .J ProiectTControl 4______ O. F. Bremer CEP Construction 0. ,R. Bailey W. J. Burkett CEP Design A. B. Terry R. R. Cook C. L. Parish CEP Procurement F. W. Enoch 0. A. Klingler H. W. Persons CEP Accounting R. W. Kaltenrieder C. R. Becker CEP Control R. E. Emling PROJECT EXECUTION ADMINISTRATIVE CONTROL TOWOLDMONOQ44012 POP, CEA 1430 10/9/67 Page 7 ( APPENDIX 2 REVIEW AND APPROVAL RESPOSIBILITIBS P ro je c t M anager H .D .G a b e lm a n ACM D e s ig n C o o rd in a to r J .R .F u llg ra f ACM D e s ig n E n g in e e r E IU D e s ig n C o o rd in a to r J.R .R a ym o n d In s tru m e n t E n g in e e r P. E . Haase E le c tric a l E n g in e e r J . F . H a lla D iv is io n R e p re s e n ta tiv e W .F .T a ffe e A - Approve R - Review 0 - Originate GENERAL Design Basis Arrangement Drawings Scope Changes I jCESS Engr. Flow Diagram Perf. Data Sheets Instr. Per Data Sheets MECHANICAL & STRUCTURAL Equip. Specs. Equip. Drawings Foundation Drawings Structural Drawings Undergr. Util. Drawings Piping Drawings ELECTRICAL Electrical Drawings Electrical Specs , INSTRUMENTATION Instrument Drawings Instrument Specs . PROJECT EXECUTION ( Instrument Purchases Electrical Purchases ACM Purchases Cost Status Reports Project Schedule Procur. Status Reports Construction Specs Construction,Contracts A,0 A,0 A, 0 A,0 A,0 A. A A A A A A A A A A R R A R A,0 R A A A R R - A,0 R A, 0 R A,0 R A,0 R A,0 R A, 0 R R R R 0 R R R R R R R RR R R R,0 R R R RR RR R R R RR A, 0 A.O R R A,0 A, 0 R R A,0 A, 0 R RR R R R 0235426 TOWOLDMONOQ44013 POP, CEA 1430 10/5/67 Page 8 ( APPENDIX 3 DISTRIBUTION OF DESIGN INFORMATION FOR COMMENTS . ' 0235427 I . Number in parenthesis is the number of copies distributed TOWOLDMONOQ44014 0233428 (Agut cjDi-rrC'.p.'jrQfJ IT-J_-T Ivpop.hat^'' >j frucu,*. Ex Au^'V ,/ALa. Cl> Up Mlp tVi f^cjer T*4^ZAf*' T^r***** gs>. u J*f> fcfsfi, 7 M* Mr ^ X 15 & * w I l% W-kr ^ , V 2I l i .2 *4 .:5-v i:`Uif ist } fc-.'Sr * Il:. r vW-: 112 &\k ^ "i . <2 1. '* 1 A.' J^' * * I. < "* < *> *i,3 * v fc 4 ti, l w "i c ?* % , . * = 4 aM iI Jd 1s af- -* <1 !? . *' *- ! ' * M Sii*j. t.-x,'> fill _ . y<ior H?o^c( tMRectit TBch .b*. M<5*. Mrs- Rcrtrsf*^rATwL J-^CSCt . I 'f ' # W.TAfpre 2. : I I ' ( | ( I I . I . ? J.. 5 . .? 3 v j3. T.3,3 .3; J.3.1 s: lIi3t VcS: II: 8:? * 3P * ' v< ^ E 5 * _3' ftfc- i 5*2 .21 l\ I ^PtfcPM fIM. pwj&rr hsr R. STEVES '1/1 1 1. 1 > i 1> | z1 1 j 1 I . 1 ii 1 '<iL_i.._ i ,- i - i 1 - i J_ i i HWcks Ew:*. p, Y*te.s 1 A C.4M* EutfR5tffVk R.Coor 1 Cpoe- fc.FvUtfSRF II l 1 1 1i t 1, iii i 5, '"ITT i I :* i +.1 * .it 11 ! L.J....! . . /._t.-4--. 11 11 / i' E.I.i U. DESiS*-* J.*AyMCI-'0 II 1 i 1 iii i .'i i iii/* :' Electric Emsjwc** J. MUA 11 ti i 1 i * i i i i i i i ii i iN'STR.t'Mtfc'T' E ?TRt>CTT^AC A A C JM DRAfT'MC ?.HAA5e .......f ..u B.He*u<7V (1 TJACK3AJ 2. 2 it ii _.i i ii ii ii i i i 11 ; 1 :i ji n iii iii i ii i i i ji i i i. . 1 !i 11 i 1 i |. 1 i 1 / ;, 1 !' 1i ,: l i i hi i ; -- 'iTTT i i ji ; /i r' . i 1 : . ; . : 1 ' 1 1 1 1 :1 ' : !i i : i; t, i i i ; : | 1 5 t, t : ; ! i j ! .r \ 1 : i U.'.. .;___________ TOWOLDMONOQ44015 POP, CEA 1430 10/5/S? Page 10 APPENDIX 5 DISTRIBUTION OF VENDOR PRINTS AND DRAWINGS FOR APPROVAL 0235429 TOWOLDMONOQ44016 APPENDIX 6 POP, CEA 1430 10/3/67 Page 11 DISTRIBUTION OF VENDOR FINAL PRINTS, DRAWINGS AND DATA 0235430 TOWOLDMONOQ44017 APPENDIX 7 PROJECT DISTRIBUTION LIST 10/5/67 Page 12 ^ P TO' ADDRESS; Monsanto Co. (Project 1430) Anniston, Alabama Attn: H. E. Waldrep DATE 9-22-67 TITLE INCREASE REV. NO 1 LIQUID CEA NO. 1430 AROCLORS CAPACITY Project Expediter: .7. f. Kehm ESTIMATE - fits * 1.55 Project Manager * H. D. Gabelman Kidd Engineer: H. E* Waldrep - Anniston PURCHASE ORDER MASTER RUN OFF & DISTRIBUTION BY PURCHASE SERVICE Project Expediter -- Traffic -- Inspection -- Business Systems (tneludo Vendor Dato Roquiromont*) Other* (Homo and Locotion): *(3) W. F. Taffee - Anniston ST ART UP DATE * 10-1-68 IXl Send COPIES (20 for P.0 , 10 for C.0.) run off from Master to Field Engineer Send MASTER to Field Engineer * V' "DOR FINAL DRAWING/DATA DISTRIBUTION: (N.TM ,----- Lqti.,,:): (by: M ; Ready-- ) Final Port* Dwg. Lislt Sporoa Liata Manuali Curves Raporta Cartif Icataa Requisitioner - CED H. D. Gabelman (+ reprod.) -H. E. Waldrep - Anniston W. F. Taffee - Anniston If: ACM - T. A. Jackson - EIU - C. W. Dunford - - CED CED CED 1 -1 l1 2 -- 3 33 1 -- l1 l1 22 33 -- T, 1 - 2 - 8 44 87 3 INSPECTION REPORT DISTRIBUTION: (N,,m. L.cion): Requisitioner - CED 0. A. Klingler - CED H. W. Persons - CED J. R. Jeter - CED J. E. Kehm - CED * H. D. Gabelman - CED * H. E. Waldrep - Anniston CE-74 (8/67) 0235431 FIELD EXPEDITING REPORT DISTRIBUTION: (Noma and Location): H. W. Persons - CED J. E. Kehm - CED * H. D. Gabelman - CED * O. F. Bremer - CED * H. E. Waldrep - Anniston TOWOLDMONOQ44018